Professional Documents
Culture Documents
Pu blic Con su lt a t ion Su m m a r y a n d Con side r a t ion Re por t
May 8 , 2 0 1 7
O er ie of the proposed proje t
As pa t of its fo us o o ti uous i p o e e t a d e i o e tal leade ship, Neptu e Te i als is pla i g to
upg ade the dust supp essio s ste fo its steel aki g oal sto kpile. Neptu e has applied to the Va ou e F ase
Po t Autho it the po t autho it fo a pe it to e o e its e isti g sp a poles a d i stall e o es.
Sp a poles a e a i po ta t pa t of Neptu e’s e i o e tal a age e t s ste . Thei pu pose is to sp a a fi e ist
of ate o to the steel aki g oal pile hi h oats it a d eates a fi e ust. This i tu p e e ts oal dust f o
lo i g to eigh ou i g sites a ou d the te i al.
The u e t sp a pole s ste is o ki g effe ti el , ut is old a d o lo ge up to u e t e i o e tal est p a ti es.
Dust supp essio e pe ts ha e ad ised that upg adi g the s ste ould allo fo ette o e age of the steel aki g
oal pile, e e du i g d a d i d o ditio s.
Neptu e’s u e t s ste i ludes poles, of hi h a e the old ood st le a d t o that a e the e steel st le. The
p oposed p oje t ould i lude the e o al of oode sp a poles a d the i stallatio of poles as follo s, fo a
et additio of th ee poles:
e poles the sa e height as the e isti g poles;
e , la ge sp a poles to p ote t the site f o offsho e a d o sho e i ds f o Bu a d I let;
e a d sp a s ou ted o the poles, hi h fu tio like os illati g la sp i kle s to sp a the
steel aki g oal; a d
Repla e e t of the ‐ ea old ate li e feedi g the poles.
Details of otifi atio ethods
I o de to otif the o u it a d othe stakeholde s a out the p oje t a d seek feed a k, Neptu e u de took the
follo i g o u i atio s a ti ities.
A ti it Audie e Ti i g
Co u it otifi atio Te i al a ea eside ts a d We site – li e o Fe . th/
‐ Mail d op, e site, t itte a d Pa k & Tilfo d a ea
e ail oti e e: p oposed sp a usi esses. see ap i Co u it Notifi atio –
pole epla e e t a d Appe di B deli e ed /o Fe . th ia
usi ess da feed a k pe iod Copies e e also ailed to Ca ada Post.
et ee Fe ua a d No th Va MLAs, MPs,
Ma h , . i ludi g Ma o s & Cou ils, Lette s to stakeholde s ailed
o ta t i fo fo feed a k a d Cha e of Co e e, a d /o Fe . th.
o e ts S ua ish a d Tsleil
Waututh Fi st Natio s. T eets posted Fe , a d
‐ Notifi atio also featu ed Ma /
i fo atio o Neptu e’s
e i o e tal s ste s o e all
Media Relatio s Fe . /
Neptu e did a i te ie ith the
No th Sho e Ne s hi h esulted i a
a ti le i the pape o Fe . / See
Appe di G
P ese tatio to No th Sho e No th Sho e Wate f o t Ma h /
Wate f o t Liaiso Co ittee Liaiso Co ittee
Details of the o sultatio aterials produ ed
Mate ials p odu ed fo the a o e a ti ities i luded:
Co u it a d stakeholde aile Appe di A
Po e Poi t p ese tatio Appe di C
T eets Appe di E
We site o te t Appe di F
Le el of pu li parti ipatio
The e e e th ee e ails e ei ed f o eigh ou s esidi g i the L ou South a d Ri e side West eigh ou hoods.
Su ar of feed a k re ei ed
All th ee e ails e ei ed f o the o u it e p essed suppo t fo this p oje t as a ea s of edu i g dust a d
e ha i g o e all ai ualit i the a ea.
Additio al o e ts a d uestio s e e e ei ed f o o ittee e e s a d guests at the No th Sho e Wate f o t
Liaiso Co ittee eeti g Ma h , , a d a e as follo s:
Questio A s er
Do the to e s e ui e lighti g? The e isti g to e s al ead ha e lighti g, a d the e
to e s ill ha e lights at the sa e height. The ill e
a gled do a ds to i i ize distu a e o
su ou di g eigh ou s.
A e the e at h asi s fo the u ‐off f o the sp a ? Yes, the e a e su ps at lo atio s. The u ‐off is pu ped
to settli g po ds a d it is the t eated off‐site.
Wh is the ate ot e led a k o to the pile? Re led ate does go a k to e used o the o e o ,
ut it does ot get used o the sp a poles e ause of
o e s a out pa ti ulate loggi g up the sp a s.
Whe e is the e ess ate pu ped? The ate is pu ped i to the Bu a d I let, ut is fi st
t eated a d ust eet st i t e i o e tal sta da ds set
the BC Mi ist of E i o e t. The ate is egula l
tested fo o plia e.
Wh a the te i al ot use salt ate ? The e a e o e s a out ho the salt ould i te a t ith
oal, as ell as the possi ilit of the salt da agi g the
e uip e t.
Ho u h ate is used i a ea at Neptu e Te i al? I , Neptu e’s ate use as , u i ete s,
o . u i ete s pe et i to e of p odu t ha dled.
This is a sig ifi a t edu tio f o . illio u i
ete s, o . u i ete s pe et i to e used i
, tha ks to sig ifi a t ate o se atio effo ts
u de take at the te i al.
Ho u h ate is e led? Wate is u e tl o l e led o the oal side du i g d
o ths, a d that e uates to app o i atel % of use. We
o ti ue to e plo e additio al oppo tu ities to e le
ate at the te i al.
What a e the ou da ies fo the o u it otifi atio of Neptu e otified adja e t eside ts east to Ri e side
the p oje t? D i e, o th to Keith Road, a d West to Lo sdale.
Is the e a thi g that a e do e to offset ate use Neptu e is pla i g to o k o a p oje t to edu e ate
du i g d seaso s? use. I the ea ti e, itigatio easu es i lude
shutti g do the a ash a d ope ati g the sp a e s
a uall .
Whe ill o st u tio sta t? Co st u tio is pla ed to sta t i the su e of .
APPENDICES
Appe di A ‐ Co u it a d Stakeholder Mailer – Page
Appe di A ‐ Co u it a d Stakeholder Mailer ‐ Page
Appe di B ‐ Distri utio Area for Co u it Mail‐Out
Appe di C ‐ Po erPoi t Prese tatio to NSWLC a d NSWLC Mi utes of Mar h / 7 Meeti g
Appe di D ‐ Mi utes of NSLWC Meeti g
1. Welcom es and Com m it t ee m em bers int roduced t hem selves. Special guest s
int roduct ions included:
Babs Perowne, Nort h Vancouver Com m unit y Associat ion
Net work
John Miller, Nort h Vancouver Com m unit y Associat ion Net work
Lisa Dooling, Nept une Term inal
Dana Nielsen, Nept une Term inal
2. Review of not es a) Organize present at ions on LNG ( planned for May 4) and
and act ions Green Marine ( planned for June 29)
b) Noise working group Term s of Reference ( deferred t o next
m eet ing)
3. Present at ion from Lisa Dooling and Dana Nielsen from Nept une Term inal present ed on
Nept une t heir dust suppression upgrade proj ect :
Rem oval of original st eel wat er line and replacem ent wit h new
HDPE pipe
Rem oval of t en exist ing wooden spray poles
I nst allat ion of five new st eel spray t owers ( 43.9 m t all)
I nst allat ion of eight new st eel spray poles ( 24.5 m t all)
Thirt een new oscillat ing yard sprinklers ( one on each pole or
t ower)
I nst allat ion of t hree new boost er pum p and valve houses t o
pressurize t he wat er line
Discussion
Q: Do t he t owers require light ing?
A: The exist ing t owers already have light ing, and t he new t owers will
have light s at t he sam e height . They will be angled downwards t o
Act ion : Nept une Term inal will get back t o t he com m it t ee wit h
inform at ion about how m uch wat er is used a year, and how m uch of
t hat wat er is recycled.
4. Nept une Nept une will be providing t ours of t he t erm inal all day long on April
Com m unit y Tour 22 nd , t hrough pre- booked bus t ours. I t s com m unit y part ners, such as
Day Green Marine, t he port aut horit y, and local com m unit y organizat ions,
will have boot hs set up in an adj acent field where people are
arriving. The Nort h Shore Wat erfront Liaison Com m it t ee is invit ed t o
have a presence as a com m unit y part ner.
5. Present at ion from The Nort h Vancouver Com m unit y Associat ion Net work ( NVCAN) was
Nort h Vancouver form ed less t han a year ago, and is an um brella organizat ion of 17
Com m unit y com m unit y associat ions in t he Dist rict of Nort h Vancouver. I t is also
Associat ion open t o m em bership from com m unit y associat ions in t he Cit y of
Net work Nort h Vancouver. The group is com posed of direct ors, m em bers wit h
vot ing right s, and non- vot ing chart er m em bers. The group m eet s
m ont hly t o share issues and experiences. Recent priorit ies include
concerns about t raffic, especially along t he Marine Drive corridor,
and developm ent . NVCAN is working wit h t he planning depart m ent
t o lim it t he am ount of developm ent .
NVCAN can dist ribut e any inform at ion t hat t he NSWLC and it s
m em bers would like t o share t o t he com m unit y.
6. Recruit m ent of Heat her Drugge has com e t o t he end of her t wo- year t erm and has
new Cit y of Nort h decided not t o renew her posit ion. I n addit ion, I an McMurdo has
Vancouver served on t he com m it t ee for five years and will be st epping down.
represent at ives
Act ion : A recruit m ent process for new represent at ives will
com m ence.
8. Proj ect Vancouver Dry Dock proposes t o const ruct a t hree- st orey, m et al-
applicat ion for clad addit ion t o t he rear of t he exist ing heavy m achine shop on sit e.
ext ension on
Seaspan dry The ground floor of t he addit ion will provide a new st ore room and
docks st eel shop for welding personnel, second floor will be reserved as a
st aff lunchroom while t he t hird floor will be used as offices for st aff.
The current office st aff and lunch room s are current ly being
accom m odat ed in t em porary work t railers in t he exist ing em ployee
parking lot on sit e and will be rem oved once t he addit ion is
com plet ed and occupancy is obt ained ( approxim at ely May 2018) .
This is a Cat egory B applicat ion and is current ly in pre- applicat ion
review by t he port aut horit y.
9. Nort h Shore There have been t wo individuals who have m ade several com plaint s
com m unit y t o t he port aut horit y recent ly. One com plaint is t o do wit h whist ling
com plaint s noise from CN, which will be conveyed t o t he new com m unit y
relat ions cont act once she begins. The ot her com plaint was about
garbage in front of t he Seaspan dry dock building; t his has been
forwarded t o Jeff Taylor.
10. Com m it t ee n/ a
correspondence
Act ion Le a d
Nept une Term inal t o get back t o t he com m it t ee wit h inform at ion Lisa Dooling
about how m uch wat er is used a year, and how m uch of t hat
wat er is recycled.
Get feedback from t he com m it t ee on how t hey would like t o Frances Tang- Graham
part icipat e in Nept une’s com m unit y day
Recruit for new CNV com m unit y represent at ives Frances Tang- Graham
Find out about locat ion of inform at ion bollards ( West Frances Tang- Graham
Vancouver?) and how NSWLC m em bers can have input int o t he
t ype of inform at ion being conveyed
At t e nda n ce
Gu e st s
Babs Perowne, NVCAN
John Miller, NVCAN
Lisa Dooling, Nept une Term inal
Dana Nielsen, Nept une Term inal
Cit y of N or t h Va n couve r :
Heat her Drugge, Com m unit y Represent at ive Regret s
I an McMurdo, Com m unit y Represent at ive I n at t endance
Larry Orr, Manager, Lands and Business Services, Com m unit y Regret s
Developm ent , Cit y of Nort h Vancouver
I n du st r y:
Jeanet t e O’Brien, West ern St evedoring - Represent ing Wharf Regret s
Operat ors Associat ion
Dave Lucas, West ern St evedoring - Represent ing Wharf Operat ors I n at t endance
Associat ion
Ron Sander, Nept une Bulk Term inals Canada – represent ing Nort h Regret s
Shore Wat erfront I ndust rial Associat ion
CN Represent at ive n/ a
Jeff Taylor, Direct or, Com m unicat ions and Public Relat ions, Seaspan Regret s
Appe di E ‐ T eets
Appe di F ‐ We site Co te t
Appe di G ‐ North Shore Ne s Arti le
A spray pole lays down a water curtain at Neptune Terminals’ metallurgical coal pile. The company is looking to install new, larger spray
poles for dust suppression. photo supplied
Neptune Term inals is looking to install $ 6 m illion worth of infrastructure aimed at keeping more of its coal dust on site.
The plan is for a series of new spray poles that create a “water curtain” around the m etallurgical coal storage area.
“We’re always looking to do things better. Som e of the poles need to be replaced so we’re replacing them with … better
poles for better coverage to prevent dust from leaving the site,” said Lisa Dooling, Neptune spokeswom an. “We know
people don’t want coal dust in their yards or in their hom es.”
A Metro Vancouver air quality study conducted in 20 14 and 20 15 did detect som e coal particulate in the Moodyville
neighbourhood uphill. Since that time, Neptune has spent about $ 30 0 m illion updating its term inal and adding export
capacity.
Despite adding m ore spray poles, there will be less water used overall through better autom ation, Dooling said.
The project m ust still be approved by the Vancouver Fraser Port Authority. Mem bers of the public are invited to com ment
on the project by em ail to ldooling@neptuneterminals.com . The review period ends March 17.