Proyek Jembatan Perumahan Nelayan, Kappa, Aceh Timur

Perhitungan daya dukung dengan menggunakan data

BH-01
Metode SPT
Rencana Tiang Pancang
Diameter 0.5 m
Luas ujung, Ap 0.19625 m2
Keliling, P 1.57 m

GWL 1.4 SF = 3
Ketebalan Kedalaman Est. γt Cu Friction End Bearing ult. Bearing capacity Allowable
Jenis tanah Lapisan (m) (m) (m) NSPT kN/m3 N60 kN/m2 Alpha kN kN kN ton ton
0 2 1 16.216 1 6.667 1 20.93
Lempung
5.5 2 4 1 16.216 1 6.667 1 41.87
Berpasir
4 6 3 16.216 3 6.667 1 62.80
6 8 4 15.700 5 0 0 94.20
Pasir Halus 6 8 10 3 14.520 3 0 0 113.04
10 12 4 14.520 4 0 0 138.16
12 14 3 15.431 3 20 1 200.96 35.33 236.29 24.09 8.03
14 16 3 15.431 3 20 1 263.76 35.33 299.09 30.49 10.16
Lempung 8.5
16 18 3 15.431 3 20 1 326.56 32.38 358.94 36.59 12.20
18 20 2 15.431 2 13.333 1 368.43 32.38 400.81 40.86 13.62
20 22 4 15.873 3 20 1 431.23 52.99 484.22 49.36 16.45
Lempung lanau
7 22 24 13 16.932 10 66.67 0.537 543.65 91.26 634.91 64.72 21.57
sedikit pasir
24 26 21 18.021 16 106.67 0.5 711.12 113.83 824.95 84.09 28.03
26 28 14 17.900 10 0 0 773.92 314.00 1087.92 110.90 36.97
28 30 15 18.060 10 0 0 836.72 544.27 1380.98 140.77 46.92
Pasir Berlanau 10 30 32 10 18.060 6 0 0 874.40 608.38 1482.77 151.15 50.38
32 34 8 16.500 5 0 0 905.80 490.63 1396.42 142.35 47.45
34 36 6 15.873 4 0 0 930.92 412.13 1343.04 136.91 45.64
Lempung lanau 36 38 10 16.932 6 0 0 968.60 392.50 1361.10 138.75 46.25
BH-02
Metode SPT
Rencana Tiang Pancang
Diameter 0.5 m
Luas ujung, Ap 0.19625 m2
Keliling, P 1.57 m

GWL 1.4 SF = 3
Ketebalan Kedalaman Est. γt Cu Friction End Bearing ult. Bearing capacity Allowable
Jenis tanah Lapisan (m) (m) (m) NSPT kN/m3 N60 kN/m2 Alpha kN kN kN ton ton
0 2 2 16.216 2 13.333 1 41.87
2 4 3 16.216 3 20.000 1 104.67
4 6 4 14.520 5 33.333 0.907 199.60
6 8 4 15.700 5 33.333 0.907 294.53
8 10 2 14.520 2 13.333 1 336.39
Lempung 10 12 4 15.431 4 26.667 0.98 418.45
24
Berlanau 12 14 4 15.431 4 26.667 0.98 500.51 44.16 544.67 55.52 18.51
14 16 5 15.431 5 33.333 0.907 595.45 52.99 648.43 66.10 22.03
16 18 5 15.431 5 33.333 0.907 690.38 52.99 743.36 75.78 25.26
18 20 4 15.431 4 26.667 0.98 772.44 50.04 822.48 83.84 27.95
20 22 4 15.873 3 20.000 1 835.24 55.93 891.17 90.84 30.28
22 24 9 16.932 7 46.667 0.759 946.46 67.71 1014.16 103.38 34.46
Lempung sedikit 24 26 12 18.021 9 60 0.611 1061.57 82.43 1143.99 116.62 38.87
4
pasir 26 28 12 17.900 9 60 0.611 1176.68 98.13 1274.81 129.95 43.32
28 30 19 18.060 13 0 0 1258.32 408.20 1666.52 169.88 56.63
Pasir Berlanau 6 30 32 20 18.060 13 0 0 1339.96 816.40 2156.36 219.81 73.27
32 34 20 16.500 13 0 0 1421.60 1020.50 2442.10 248.94 82.98
34 36 12 15.873 7 46.667 0.759 1532.82 70.65 1603.47 163.45 54.48
Lempung sedikit
6 36 38 8 16.932 5 33.333 0.907 1627.75 86.35 1714.10 174.73 58.24
lanau
38 40 17 16.932 10 66.667 0.537 1740.17 86.35 1826.52 186.19 62.06
BH-02
Metode Data Lab UDS
Rencana Tiang Pancang
Diameter 0.5 m
Luas ujung, Ap 0.19625 m2
Keliling, P 1.57 m

GWL 1.4 SF = 3
Ketebalan Kedalaman Est. γt Cu Friction End Bearing ult. Bearing capacity Allowable
Jenis tanah Lapisan (m) (m) (m) NSPT kN/m3 N60 kN/m2 Alpha kN kN kN ton ton
0 2 2 16.216 2 13.916 1 43.70
2 4 3 16.216 3 13.916 1 87.39
4 6 4 14.520 5 21.952 1 156.32
6 8 4 15.700 5 21.952 1 225.25
8 10 2 14.520 2 14.602 1 271.10
Lempung 10 12 4 15.431 4 14.602 1 316.95
24
Berlanau 12 14 4 15.431 4 14.602 1 362.80 25.79 388.59 39.61 13.20
14 16 5 15.431 5 14.602 1 408.65 25.79 434.44 44.29 14.76
16 18 5 15.431 5 14.602 1 454.50 25.79 480.29 48.96 16.32
18 20 4 15.431 4 14.602 1 500.35 24.93 525.28 53.55 17.85
20 22 4 15.873 3 12.642 1 540.05 24.06 564.11 57.50 19.17
22 24 9 16.932 7 12.642 1 579.74 23.19 602.94 61.46 20.49
Lempung sedikit 24 26 12 18.021 9 12.642 1 619.44 22.33 641.77 65.42 21.81
4
pasir 26 28 12 17.900 9 12.642 1 659.14 22.33 681.47 69.47 23.16
28 30 19 18.060 13 0 740.78 408.20 1148.98 117.12 39.04
Pasir Berlanau 6 30 32 20 18.060 13 0 822.42 816.40 1638.82 167.06 55.69
32 34 20 16.500 13 0 904.06 1020.50 1924.56 196.18 65.39
34 36 12 15.873 7 29.988 0.944 992.95 52.97 1045.91 106.62 35.54
Lempung sedikit
6 36 38 8 16.932 5 29.988 0.944 1081.83 52.97 1134.80 115.68 38.56
lanau
38 40 17 16.932 10 29.988 0.944 1170.72 52.97 1223.69 124.74 41.58
Perhitungan Daya Dukung tiang Grup

N1 4
N2 2
Diameter, D 0.5 m
Spasi, d 1.3 m

Efisiensi Group Tiang untuk kasus tiang Friksi, berdasarkan

Los Angeles Group Action:

= 1 − −1 + −1 + 2 −1 −1

µ= 0.782

maka
untuk kedalaman 24m untuk kedalaman 36m
daya dukung tiang tunggal = 20.49 ton daya dukung tiang tunggal = 35.54 ton
(diambil terkecil metode Lab UDS) (diambil terkecil metode Lab UDS)

daya dukung tiang grup = (0.782)(4)(2)(20.49) = 128.19 ton daya dukung tiang grup = (0.782)(4)(2)(20.49) = 222.34 ton