1 It reduces the timeline by providing the good starting point

a Business Rules
b Community
c Accelerator
d Data dictionary

2 Where can accelerators, software and products add-ons can be accessed:

a Guidewire Community
b Guidewire Marketplace
c Guidewire website
d Client site

3 Which are the tools provided by GW to understand the product features ? (Any 3)

a Documentation/ Reference Resources


b Business Rules Document
c Extension Packs
d Security Dictionary

4 Which is not a characteristic of good requirement?

a Testable
b Feature
c Traceable
d Necessary

5 What is the best option to solve the conflicting requirement?

a Identify the conflict during Unit testing or Functional testing


b Request clarification from the client and explain how the requirements are conflict
c The requirements are already approved, assume none of the requirements are conflict
d Report the conflict to the client after development

6 How should you handle requirements that include a solution ? (Any 2)

a Document the requirements as discussed in the meeting because the solution is already provided
b Check for gaps between the requirement and the solution
c Consider the impact of the solution
d Do not challenge the solution or design

7 In which guidewire website you will find training material where it will show how can we prepare a quote?

a markeplace.guidewire.com
b guidewire.com
c education.guidewire.com
d Client site

8 Select the Guiding principles suggested by Guidewire

a We should not challenge current process


b ...
c We will automate everything as much as we can
d We are bound by the way we have always done things in the past

9 Which factor make requirements believed to be true, but not confirmed

a Use cases
b Assumptions
c Business Rules
d Acceptance criteria

10 Guiding principle is sessential (Any 2)

a Move the project from Red to Green


b In managing scope
c Discover new features
d To reduce total cost of ownership
M

s are conflict

tion is already provided

we prepare a quote? H
L

M
1 Select the responsibilities of a Business Analyst in Guidewire Project (Any 2)

a Unit testing
b Act as a liasion with all stakeholders
c Works closely with the Developers and Testers
d Demo to Developers and Testers

2 Mapping the use stories to business case is the deliverable of:

a Inception
b Before each sprint
c Pre-Inception
d During Sprint 0

3 Goal of inception is to: (Any 2)

a Prepare for and Plan for Development Execution


b Confirm Scope and Estimates
c Enable user stories with technology
d Plan the project iterations

4 Identify the Sprint 0 deliverable

Conceptual Sprint Plan


High-Level Integration diagrams
Gap Analysis
Definition of Done

5 End to End Testing, Performance Testing, UAT testing is done

At the end of each sprint


As part of Stabilization
Before giving a demo to the Business Sponsors
As part of code merge

6 What is the average duration of sprint during Development

1 Week
2 Weeks
3 to 4 Weeks
<6 weeks

7 A single story card feature can be built through several user stories across several iterations ? Is it True or False ?

1
0
8 What is the naming convention of a story card ?

a xCenter - Theme - SubTheme


b xCenter with Version - Theme - SubTheme - ID Number
c xCenter with Version - Theme - SubTheme - ID Number - Sprint #
d xCenter with Version - ID Number - Spring #

9 Difference between UI Mock up, UI Final in a use story card

a UI Mock up - screenshot of a proposed user story. UI - Final - Final screenshot to be placed by a BA after
b UI Mock up - screenshot of a proposed user story, placeholder to document UI requirements. UI - Final -
c UI Mock up - screenshot of a proposed user story. UI - Final - Final screenshot to be placed by a BA after
d UI Mock up - screenshot of a proposed user story, not a placeholder to document UI requirements. UI

10 If there are changes to the user story document on an approved version, what is the best practice while updating th

a Do not change the requirement ID


b Change the requirement ID to indicate that the requirement is updated
c Update the Document control to indicate what has been changed
d Create a new version of the user story card

11 What becomes the input to conduct the elaboration workshop ? ( Any 3)

a Review inception notes


b Review current state process and future state process
c Review the functionality in application guide
d Conduct a proof of concept with the developer to access the feasibility

12 What are the best practices to follow while conducting elaboration workshop ? (Any 3)

a Do not replicate the legacy system


b Revisit the decisions already taken during inception because client is asking for it
c Accept the changes requested by the client
d Focus on happy path first, then discuss the edge case scenarios
e Use OOTB work flows and screen

13 Role of a developer in an acceptance criteria

a Developer use them to configure and code requirements


b Developer ensures whether all the acceptance criteria is satisfied through testing
c Developer provides sign off based on the acceptance criteria
d Developer ensures acceptance criteria is signed off before start of development sprint

14 Which group will work on communicating the functions of the new product to the end users ?

a Product Owners
b Business SMEs
c Change Management
d BA's, Developers, QA

15 What are the three components of user story ? (Any 3)

a Role
b Actor
c Reason
d Action

16 What is the purpose of 'Available' column in the UI Fields Tab ?

a Indicates whether the field is visible to the user


b Indicates if the use can click on the field
c Indicates whether the field is editable to the user
d None of the above

17 If there are different values for Marital status - Divorced, Widowed, Single, Married and if 'Single' has to be listed fir

a Conditions
b Priority
c Code
d Type code name

18 When does a field needs to be marked as 'New' in UI Fields Tab ?

a Each field is marked as a New because it’s a new implementation


b If a OOTB field is modified, it is set as New to indicate the field is new
c Fields which are newly added to OOTB, is set a New
d None of the above

19 Name three benefits of Guidewire Agile Approach/Methodology

a Focus on Value
b Delivery
c Knowledge Transfer
d Increased scope delivery

20 Which one is the integral project tool

a User story
b PCF
c Data Dictionary
d Accelerator

21 User story card play an important role in which phase ? (Select 2)


a Pre inception
b Inception
c Deployment
d Success and Maintenance

22 What are the best practices during planning a delivery sprint (Select 2)

a Proritize the sprint backlog to facilitate planning


b Standardize the task list before loading the Product Backlog
c Only estimate hours for user stories in the current sprint
d Move stories to sprint as per conceptual sprint plan

23 Best practices to document user story cards (Select 2)

a Implement a peer review process


b Document the same requirement in more than one place
c Include a requirement number for traceability
d Change a requiremnet number after the requirement is published

24 Name three customization can be done on a user story (Select 3)

a Add column to capture additional information such as Dates, Text


b Create a separate user story card to capture integration requirements
c Add a tab to document possible impacts for change management team
d Add a tab to provide data mapping requirements

25 Select two best practices after the workshop

a Use standard workflow and screen to document the user story


b Follow up action items
c Park off topic, complex, or contentious items
d Escalate risks to scrum master

26 Acceptance criteria is (Select 2)

a Definition of Done
b Restatements of requirements
c Descriptions of Solutions
d conditions of satisfaction

27 When are acceptance criteria written in the requirements gathering process ?

a At the same time as the business requirement and before the functional requirements are written
b At the end of the delivery sprint
c Duirng the inception phase
d Beginning of the sprint
L

L
ations ? Is it True or False ?
L

hot to be placed by a BA after the requirements are complete


nt UI requirements. UI - Final - Final screenshot to be placed by a BA after the requirements are complete
hot to be placed by a BA after the development is completed and accepted
ocument UI requirements. UI - Final - Final screenshot to be placed by a BA after the development is completed and accepted

best practice while updating the requirement ? (Any 2) H

ment sprint

H
L

nd if 'Single' has to be listed first in the dropdown, how can it be indicated in the Typelist tab ? H

M
M

requirements are written


eted and accepted
1 Success of a cros functional team depends on : (Any 2)

a Active Business involvement


b BA's and SME's
c Empowered decision making
d Less communication

2 Which activity is not performed by a product owner

a Colloborates with the teams to develop and deliver the work


b Write requirements
c Shares vision with the development team
d Business authority to make decisions

3 What is the deliverable of inception ?

a Conceptual Sprint Plan


b Prepare low level design
c Business resources trained
d Methodology aligned

4 Business cases are defined in

a Pre inception
b Inception
c Development
d Stabilization

5 Arrange layers of planning in the order

a Program-->Project -->Release-->Iteration-->Dailyscrum
b Program-->Release -->Project-->Iteration-->Dailyscrum
c Release-->Program -->Project-->Iteration-->Dailyscrum
d Project-->Program -->Release-->Iteration-->Dailyscrum

6 Who facilitates the progress of the project ?

a Project Manager
b Product Owner
c PMO
d Scrum Master

7 What are the roles of Technical Business Analyst ? (Any 2)


a Provides impacts analysis of downstream systems
b Assist with functional requirements and workflow documentation
c Document transformation and cleansing rules
d Teams with end users to understand business requirements

8 What factors indicate that a user story is good ? (Any 3)

a Independent
b Verifiable
c Non-Negotiable
d Valuable

9 A Project manager is preparing a plan for a GW CC implementation. What best practice he/she has to follow as part

a Plan before the start of the project


b Plan and re-evaluate, make changes based on new knowledge
c Do not re-evaluate as it increases cost
d Plan after the project is kicked off

10 Which of the following are true ? (Any 3)

a Features are also known as Sub Themes


b Each Feature has one user story
c A user story can have multiple tasks
d Themes helps to identify the common process within the product

11 What is done during sizing and planning - Inception phase ? (Any 3)

a Finalize estimates
b Finalize scope
c Develop conceptual sprint plan
d Determine Development and Migration Strategy

12 Which criteria are used to prioritize the back log ? (Any 2)

a Priority
b Cost
c Size
d User action

13 What is the first step while planning for a delivery sprint ?

a Define sprint backlog


b Determine team capacity
c Define task for each user story
d Add new user story
14 Product owners and scrum masters are preparing a plan for the delivery sprint. What would be your recommendati

a Standardize the task list before loading the product backlog


b Move stories to sprints based on conceptual sprint plan
c Validate estimates during sprint planning
d Add all tasks to in-scope at any time during the sprint

15 Project manager feels team has completed most of the work but it is not reflecting in the reports accurately. What

a Use burndown charts to drive timely updates from the team


b Estimate hours for all the tasks during the sprint
c Stories can be accepted even after the sprint is over
d Team members should update tasks daily to produce the best burndown

16 Program manager is interested in monitoring the overall progress of the project. Which one from the below helps h

a Executive Role up
b Release Burn up
c Compare actual velocity vs planned velocity
d Release tracking

17 A Business analyst can revise or rewrite requirement until the sprint starts.

a 1
b 0

18 What options are available to avoid inter-story dependencies ?

a Try to breakdown the story so it can be stand alone


b No options are available
c Inter-story dependencies can be documented in the user story for references
d Dependencies are avoidable

19 Accessing the product alignment for each user story is done as part of

a Pre inception
b Inception
c During Sprint 0
d Before each sprint

20 What are the key development deliverables (Any 2)

a Burn down chart


b High level process diagram
c Updated Velocity report
d Product backlog
21 Monitor business and system process for health is done as part of

a Deployment
b Delivery
c Stabilization
d Support and Success

22 Maximum Coordination is required between

a Business sponsors, Project leadership team


b Productowner, SME, BA's
c BA&SME, QA, Technical
d SME, BA, Devloper

23 Which phases in guidewire project life cyle are divided into sprints ? (Any 3)

a Inception
b Development
c Post deployment
d Stabilization

24 During deployment phase, what happens during the pilot step ? (Any 2)

a Gather feedback
b End to End Testing
c Allow all the users to use the system
d Implement changes as needed

25 Process maps are done as part of

a Pre inception
b Inception
c Development
d Stabilization

26 Select any two best practices for inception

a Estimate stories using points


b Define a sprint back log at the end of inception
c Create new story cards for gap stories
d Document low level design for integrations

27 Who typically attends inception ? (Any 2)

a Product owner and SMEs


b Program Manager
c Business sponsors
d BA's, dev and testers

28 How do we estimate stories ?

a Points
b Hours
c Days
d Week
H

M
M

ce he/she has to follow as part of project planning ? M

H
would be your recommendation to them ? (Any 3) M

the reports accurately. What would be your recommendation to him/her ? (Any 2) M

ch one from the below helps him to achieve it ? H

M
L

M
L
1 Entity and Typelist are defined by

a Data dictionary
b Gosu Rules
c PCF
d Entity Relationship

2 UI Components are built on top of

a Data dictionary
b Gosu Rules
c PCF
d LV or DV

3 How to verify a location on a PCF ?

a ALT+SHIFTT+ T
b ALT+SHIFT+L
c ALT+SHIFT+W
d ALT+SHIFT+I

4 It stores reference related object in the data model

a Type Key
b Foreign Key
c Array Key
d None of the above

5 A claim can have multiple claimants. How it is set at the entity level ?

a Type Key
b Foreign Key
c Array Key
d None of the above

6 What is true about typelist ? (Any 3)

a Acceptable values
b Can be used as a drop down
c Fixed set
d It can used only by one field

7 What is true about common UI architecture ? (Any 2)

a All insurance suite product share 5 common UI Areas - Screen Area,sidebar,tab bar,info bar, workspace
b All insurance suite product share 5 common UI Areas - Screen Area,sidebar,tab bar,info bar, workarea
c Familiar look and feel
d Increase training time

8 Why it is important for the non-developers to understand the basics of UI architecture and components ? (Any 2)

a To communicate effectively with developers


b They can request changes to the UI that are consistent with base product
c To configure PCF
d To provide demo to the Business SME's

9 What is true about business rules? (Any 3)

a Can be disabled if not needed


b Condition must be met to take action
c cannot be disabled once it sets in admin screen
d Can also be set by business users

10 What are the factors to be considered for field validation ?

a During Create only


b During Update only
c During Create or Update
d None of the above

11 Gosu Rules consist of (Any 2)

a Business object or Root object


b A condition that doesn't evaluate true or false
c Primary object
d A condition that evaluates true or false

12 Non-developers defined business logic requirements for (Any 3)

a UI functionality
b Rules conditions and actions
c To define data mapping requirements
d Application processing flow

13 Why a non developer should have basic knowledge on integration ? (Any 2)

a Data Mapping between systems


b To develop pseudo code for integration data elements
c Define what triggers the integration
d To defined business rules

14 What are the mechanism used in integration framework ? (Any 2)


a Webservices
b Validation Rules
c Predefined Plugin
d Functions

15 What is true about Gosu rules ?

a Available for limited business purposes and business objects


b Meant for simpler logic
c Capable of handling complex logic
d Managed in Business Rules UI

16 Choose any two correct statements

a Field - atomic data stored about the entity


b Type key - set of reference to a value in a type list
c Array key - single reference to another entity
d Foreign key - single reference to another entity
L

ar,tab bar,info bar, workspace


r,tab bar,info bar, workarea
e and components ? (Any 2) L

L
L

L
1. Which characteristic is not a part of Good requirement : Ans - feature
2. Which factor make requirements believed to be true, but not confirmed : Ans - Assumption
3.Question on Guiding Principle
4. Component used to build screen is : Ans - PCF
5. What are the mechanisms used in Integration framework : Ans - Webservices, Predefined plugin
6. What is true for Typelist : Ans - Typelist are values given in drop-down list, Fixed set of values
7. What is true for Gosu Rules : Ans- Created and maintained by Developers, can hold complex logic
8.Question on Goal of Inception phase
9.Question on Deliverables of Inception phase
10. Success of Cross Function Teams depends on : Ans - Empowered decision making, Active Business Involvemen
11. Which activity is not performed by ProductOwner : Ans - Does not write requirements
12.  Which statement is true on Acceptance Criteria in USerSTory Lifecycle: Ans- Developers use them to configure
13. Arrange layers of planning in the order : Ans - Program-->Project -->Release-->Iteration-->Dailyscrum
14.Best Practice from Inception
15.Best Practice from Planning
16.Question on Accelerators (2-3 question)
17. Website for browsing and downloading accelerators, software and products add-ons : Ans- marketplace
18.UserStory cards has a role during which phases of Project Lifecycle : Options were - Pre-inception, Inception, Pre
19.Not a good practice for User Story cards
20.Question on Customizing the User story card
21.Not a good practice for Elaborating requirement.

In general , the major area to focus from Examination questions point of view are :
1. Best practices/Details about :  before Elaboration session, During Elaboration and Post Elaboration session
2.Acceptance Criteria
3.Best Practices of Planning, Inception & Pre-inception
Questions
One of the primary role of a BA
One who test the requirement
best practices for elaborative session
sequence of elaborative session
sequence of planning (from first to last)
full form of INVEST
Why non developer should have basic knowledge on application logic
Why non developer should have basic knowledge on integration
Why non developer should have basic knowledge on ui architecture

What is true about common UI architecture


Shortcut to display location info
What is agile methodology

Map foreign key, type key, array and field


______ shows definition of entity and type list
In which guidewire website you will find training material where it will show how can we prepare a quote
3 components of user story
Deliverable of Inception phase
Drop Down functionality is acheived by
Answers
Act as a liaison with all stakeholders to ensure communication b/w business and technical groups
Quality Analyst

1 - All insurance suite product share 5 common UI Areas - Screen Area,sidebar,tab bar,info bar,
workspace
2 - Common UI architecture provide familiar look and feel for all products
ALT+Shift+I

Field - atomic data stored about the entity


Type key - single reference to a value in a type list
Array key - set of reference to another entity
Foreign key - single reference to another entity
Data dictionary

role, action , reason


Conceptional Sprint plan
Typelist
Questions
what is the role of a BA in integration mechanism
ood man out of Integration Mechanism
how to verify the location of a PCF
UI components are built on top of
Entity and Typelist are defined by
Gosu Rules logics -select 2 among the list
Not part of requirement gathering?
order the guiding principles
order the requirement gathering
INVEST
where can be Accelators accessed
how do you learn to quote?
Business Cases are desgined in
Plan in the end of Incentives
Role of a Product Owner
which of them is a GW tool
User Story is used in which phase of the lifecycle
what can ne enhanced in the USer Story card
User Story related question?
People Involved in Story Elobarations
Things that are confirmed in Accpetance criteris
Role of a Business Analyst
team succes factors?
Arrange the step step by process in the Sprint
Role of a developer on Acceptance Criteria

Question Major Areas


User Story
All the best Parctices and Guiding Principles
Role of the each individual mentioned int he lessons
Pre - Inception, Inception, Sprint 0, Sprints, Stablization, Support
Acceptance Criteris
Inception Planning
Odd Man out, need to choose the odd answer
Answers
Data Mapping, UI Changes, Timing, What triggers the integration
Pre - Defined Plugins
ALT+Shift+I
PCFs
Data Dictionary
Business Object, Condition to evaluate
feature

full form
marketplace.guidewire.com
education.guidewire.com
pre-inception
Conceptual PLan

User Story

Adding Requirement field in the UI Mock UP


Role Action Reason

"Done", Describe the conditions met


Act as a liason
Frequent Communication / Empowered decision Making

Dev Uses them to confogure and code requirements


Questions
Gosu Rules
Gosu Rules consists of
bv
insurance suite integration mechanism
Definition in dropdown for typekey,arraykey,foreignkey,atomic field
stores reference related object in the data model
why nondevelopers required to understand the UI
five common UI areas
Location information
what is the best pratice to prepare elaboration session
Goal of Inception
Inception deliverables
Role of Product Owner
Role of business analyst
Good Story(invest Model)
Acceptance criteria
Layers of Planning
Sprint Planning best pratice
Reduce time line by providing good starting point
Where you can download the Accelerators
User story card role in the guidewire project phase
customizing story card example
Before Workshop - Preparation Best Pratice Drag and Drop to order the
list
During the workshop - Execution Best Pratice Drag and Drop to order the list
.Acceptance criteria Defined?
.Assumptions means?
Answers
Handling Complex Logic
Business Object or Root Object, the condition that evaluates true or false
non developers define application requirements supporting integartion
Predefined Plugin

Foreignkey example also given - claim - AssignedUser

Screen Area,sidebar,tab bar,info bar,workspace


ALT + SHIFT + I

All three option except writing requirements or test

Program,Project,Release,Iteration,Daily Scrum

Accelerators
Guidewire Market Place
Preinception,Inception other oprion not given like sprint 0 , development
phases of Guidewire project lifecycle
Key deliverable of Inception phase
in which steps user strory are referenced - other than deployment
most common team members
who are key participents in inception phase
Accelerator reduces the timeline by providing the good starting point
Feature is is not a characteristic of good requirement
In education.guidewire.com, you will find training material where it will show how can we prepare a quote
Which one is the correct statement about Acceptance Criteria - Develelopers use Acceptance criteria to Configure and code
Components of User Story - Role, Action and Reason
Customizations to be done on User Story
Correct order - Program-->Project -->Release-->Iteration-->Dailyscrum
Full Form of Invest
Short cut for Location Information in PCF
Gosu rules consists of Business Rule or Business Object/A condition that evaluates true or false
Sequence of Eloboration meeting
Sequence of User Story Estimation
teria to Configure and code