1.What are
the emergencies that are expected to happen in boiler operation?
Failure
due to aging
Failure
due to uneven expansion
Failure
due to ash and flue gas erosion
Failure
due to material defects
Failure
due to internal and external tube corrosion
Motorised
Improper
or effected circulation due to opening/passing of low point drains Motorised
Motorised
3.List down
the sequential action taken after boiler tube leakage to restore the boiler.
Track
Following activities are
done to restore the boiler: Track Trolleys Track
Trolleys After
tube leakage, Shutdown the boiler as soon as possible Trolleys
Allow to cool
the boiler continuously by circulating feed water
If
necessary start fast cooling by keeping ‘ON’ ID and FD fans
After
cooling the boiler, identify the leakage tube/coil
Drain
the water up to the leakage point
Designers and
Find
out the root cause of leakage Track Gauges,
Designers and
Manufacturers of
If
leakage is minor like pin hole, crack then weld the tube (follow welding Alumicarts,
Manufacturers
procedure) Railway Engineering
Portable &
of Railway
If
leakage is major like fish mouth damage, then replace the damaged part Tools and Equipment Handheld
Engineering
Allow
to cool the joint for two hours Lighting, Remote
Tools and
Fill
up the boiler and carryout hydraulic test at 1.25% of maximum operating Monitoring, Hand
Track Trolleys
5.How do you
handle a boiler, if steam drum safety valve lifts before lifting of super
heater
line safety valve?
level normal by allowing more feed water flow into drum. And reduce the
firing rate and drum
pressure for re-seating drum safety valves quickly. Manufacturers of
Railway Engineering
7.What action
you will take if boiler blow down valve fails?
Following immediate
actions shall be taken during boiler blow down valve failure:
Allow
more feed water flow and maintain drum level normal.
Reduce
the boiler load and check the quantity of water flowing through the blow
down
line.
If
the water loss is less and acceptable run the boiler till upcoming planned
CLOSE ADS CLOSE ADS
shutdown, If it is more than acceptable, shutdown the boiler and get done the
repair
work of valve.
Motorised
Unbalanced
draft i.e. high positive pressure
Track
Secondary
combustion Track Trolleys Track
Trolleys Bypassing
the boiler protections and interlocks Trolleys
Overheat
Scale
and corrosion of pressure parts
9.What
are the causes of higher flue gas outlet temperature of boiler? And how do you
troubleshoot? Designers and
Track Gauges,
Designers and
Improper
Heat Transfer in Economizer, APH: Clean
Economiser coils and APH Manufacturers of
Alumicarts,
Manufacturers
tubes regularly, maintain flue gas temperature as per
manufacturer guide.
Railway Engineering
Portable &
of Railway
Accumulation
of Soot on Super Heater Coils, Economizer: Operate soot blowers
regularly.
Tools and Equipment Handheld
Engineering
Lighting, Remote
Burning
of Higher Moisture Content Fuel: Limit
the moisture content of fuel.
Tools and
Monitoring, Hand
Higher
Economizer Feed Water Inlet Temperature: Reduce steam flow to HP/LP
Equipment heaters. Tools
Excess
Heating Surface of Boiler: Modify
the boiler pressure parts design in
consultation with manufacturers and
designers.
LP heaters.
Manufacturers of
Formation
of Soot on Heat Transfer Surfaces: Operate
soot blowers regularly at
rated pressure and temperature. Railway Engineering
14.What
are the trouble shoots during boiler start up?
Motorised
Boiler
Flue Gas Ducts Explosion: Before
light up purge the boiler properly. Motorised
Motorised
Trouble
to Achieve Furnace Temperature: Maintain
balanced draught (slightly
Track
positive). Track Trolleys Track
Fluctuation
in Drum Level: Maintain
drum level by taking feed water control valve in
Trolleys manual. Do not allow the drum
level to go high (>90%) or less (<20%). Trolleys
Tripping
of ID Fan or FD fans Due to Draught Fluctuation: Maintain furnace draft in
manual mode
until boiler load reaches more than 30% of MCR.
High/Low
Steam Temperature: Maintain
attempteration in manual and keep open
attemperator isolation valves.
Flue gas condensation
in APH: By pass the APH for FD air flow to Designers and
Track Gauges,
Designers and
avoid flue gas condensation. Manufacturers of
Alumicarts,
Manufacturers
Railway Engineering
Portable &
of Railway
15.How
do you troubleshoot the formation of clinker? Tools and Equipment Handheld
Engineering
Lighting, Remote
Using
low moisture coal
Equipment Tools
Maintaining
proper air fuel mixture
Achieving
proper combustion
Using
coal with no foreign materials
Avoiding
frequent startups and stops
Use
coal with high ash fusion temperature
17.How
do you reduce the auxiliary power consumption of Boiler?
Maintain
proper air fuel mixture so that speed of ID, FD fans and fuel feeding
system
can be optimized.
Avoid
using high moisture coal as it requires more air for combustion.
Use
VFDs to fuel feeding system.
If
boiler is running on load less than <30% shutoff the stand by fans.
Tune
the feed water control valve for maximum opening to reduce the speed of
Boiler
feed pump.
Motorised
Viva Questions & answers for preparation of BOE exam & interview
Track Trolleys
18.What
are the possible reasons for higher main steam temperature?
Failure
of Attemperator control valve
More
boiler load
More
heat transfer in super heater zone due to more velocity of flue gas
More
firing rate
Low
Economiser inlet feed water temperature Designers and
High
moisture fuel Manufacturers of
More
excess air Railway Engineering
Low
drum level Tools and Equipment
Leakage
of super heater coil
shut
down in a normal manner. Water leaks in the economizer can cause considerable
erosion Motorised
Motorised
Track
damage Track Trolleys Track
Track Gauges,
Designers and
Manufacturers of
Faulty setting
of safety valve. Alumicarts,
Manufacturers
Railway Engineering
Portable &
of Railway
The following actions have
to be taken to bring boiler into normal operation: Tools and Equipment Handheld
Reduce
fuel-firing rate.
Engineering
Lighting, Remote
Tools and
Open
the start up vent valve. Monitoring, Hand
EquipmentObserve
the steam flow of the super heater. If there is no flow, trip the boiler. Tools
Maintain the
steam drum level.
Motorised
Track Trolleys
Designers and
Manufacturers of
Railway Engineering
at
July 12, 2020
Labels:
Boiler
1 comment:
Balaji M 19 August 2020 at 12:15
Nice
Reply
Hi all,
This article is written based on practical experience..If liked, share with others, or any suggestions
leave in comment box.
Motorised
Motorised
Track
Rs949 Rs449 Track
DesignersSubscribe
and
to:
Post Comments (Atom)
Rs499 Rs499 Alumicarts,
Manufacturers
Portable &
of Railway
Handheld
How do you carryout performance Guarantee (PG) test of power plant equipments??
Engineering
Lighting, Remote
What do you mean by performance Guarantee (PG) test? It is a test carried out to measure the
Tools and
Monitoring, Hand
Rs299 Rs499
About Me
Powerplant and calculations
►
2022
(10)
►
2021
(45)
▼
2020
(58)
December
(2)
November
(2)
October
(4)
September
(3)
Frequently visited posts
August
(5)
Calculation of heat rate & efficiency of the power plant
Heat rate is the amount of energy used by an electrical generator/power plant to generate one kilo Watt- July
(11)
hour (kWh) of electricity Hea...
June
(8)
Boiler feed pumps (BFP) questions & answers for interview May
(23)
Boiler feed pumps (BFP) questions & answers for interview: 1-What is the function of Boiler
feed pumps (BFP) in power plant? ...
Labels
STEAM CONDENSER,VACUUM AND CALCULATIONS AVR
A steam condenser is device or an appliance in which steam condenses and heat released Boiler
by steam is absorbed by water. Heat is basi...
Efficiency & performance
Electrical & Instrumentation
Objective & Viva Questions & Answers for preparation of Boiler operation Engineer (BOE) exam & Boiler energy conservation & thumb rules in power
Interview plant
1-Why Boiler is considered as explosive equipment / system? Boiler involves the generation of steam at ESP
higher pressure & temperature u...
fuel handling
Basic things you must know about nut bolts & spanners
Mechanical Engineering
A Bolt is a mechanical device which has head on one end of a body and a thread on the
other end designed for fastening of two parts. Bo... pmg
power generation
power plant
Boiler calculations for Boiler operation Engineer Exam (BOE)
CLOSE ADS CLOSE ADS
Grab a Titan Watch Today
Ad TITAN - Fashion Hues
Motorised
Motorised
Track
Track
Trolleys Trolleys
Track Gauges,
Designers and
Alumicarts,
Manufacturers
Portable &
of Railway
Handheld
Engineering
Lighting, Remote
Tools and
Cooling India Since 1939
Monitoring, Hand
HVAC System
Ad octovent.com
Motorised
Motorised
Track
Track
Trolleys Trolleys
Track Gauges,
Designers and
Alumicarts,
Manufacturers
Portable &
of Railway
Handheld
Engineering
Lighting, Remote
Equipment Tools