Professional Documents
Culture Documents
receive it nor be copied or otherwise made use either in full or in part by such person or body without our prior permission in writing.
P & I DIAGRAM FOR BATCH REFINERY
A NEUTRALIZING SECTIONBLEACHING SECTIONDEWAXING SECTION DEODORIZING SECTION
A
T-311
TO
TFP-1 VACUUM PUMP
B
B
STEAM IN AIR IN
and must not be passed on to anybody not authorised by us to
AC-1
TO
VACUUM
TH.FLUID
F-1 HEADER
C
C
WATEROUT
TO
VACUUM PUMP
TH.FLUIDOUT E-710
T-307
E-504
T-315
WATER STEAM
OUT IN
STEAM IN
TO T-709 WATER IN WATER
D
D
IN
E-400A E-502 CRT-1
NORMAL WATER
TH.FLUIDIN
OUT
TH. FLUIDOUT
FROM
TH. FLUIDOUT T-709
PACKING
FINAL
NORMAL WATER
IN
STORAGE
TH. FLUIDIN TH. FLUID IN
E
E
STEAM
IN FROM CRUDE COND.
T-310 OIL ST. TANK
T-709T-309
COND.
TO
TO ACID CLIENT SCOPE T-308
ETP OIL WT-831
PLANT
PEMACofPROJECTS
F
T-1 T-2 T-3 T-4
G
P-4 CHILLED WATER PUMP T-310 EARTH PIT HOT WATER SLOP OIL
P-5 CRT FILTER PUMP(SCREW PUMP) E-502 BATCH BLEACHER
P-6 DEO FEED PUMP E-504 VACUUM CATCH ALL CAUSTIC LYE THEMIC FLUID
P-7 F-1/F-2
DEO CIRCULATION / FINAL OIL TRANSFER PUMP PRESS FILTER
P-8 FATTY CIRCULATION PUMP CRT-1 CRYSTALLIZER PIPING CODIFICATION PIPING CLASS FLUID CODE P MAC
P-9 CLEAN WATER PUMP T-308 CHILLED WATER TANK
P-10 BAROMETRIC WATER PUMP T-1,2,3&4 NOT,BOT,DWOT&DOT
A3 This