Professional Documents
Culture Documents
Mitsubishi Heavy Duty Ac Offer PDF
Mitsubishi Heavy Duty Ac Offer PDF
Coolin
3 Heavy Duty SRK10CRS-S6 0.8 3 Star 35,490 7,090 28,40
g Only
0
Coolin
4 Heavy Duty SRK13CRS-S6 1.1 3 Star 41,990 8,390 33,60
g Only
0
High Coolin
6 Heavy Duty SRK18CS-S6 1.5 1 Star 43,990 8,790 35,20
Airflow g Only
0
High Coolin
7 Heavy Duty SRK24CS-S6/A 2.0 2 Star 61,990 12,390 49,60
Airflow g Only
0
High Coolin
14 Heavy Duty DXK 50CS-S6 1.50 1 Star 43,990 8,790 35,20
Airflow g Only
0
Coolin
17 Hyper Inverter SRK 10 YL-S 0.8 5 Star 39,490 7,890 31,60
g Only
0
Coolin
18 Hyper Inverter SRK 13 YL-S 1.0 5 Star 46,490 9,290 37,20
g Only
0
High Coolin
19 Hyper Inverter SRK 18 YL-S 1.5 4 Star 59,990 11,990 48,00
Airflow g Only
0
Turbojet Coolin SRK 24 YRV-
20 Hyper Inverter 2.2 5 Star 82,490 16,490 66,00
Flow g Only S6
0
High Coolin SRK 13 YVS-
21 Hyper Inverter 1.0 5 Star 49,490 9,890 39,60
Airflow g Only W6
0
High Coolin SRK 18 YVS-
22 Hyper Inverter 1.5 5 Star 61,990 12,390 49,60
Airflow g Only W6
0
ANNEXURE - 2
EXCLUSIONS
The contract value mentioned above includes only the items of work specifically mentioned.
All other ancillary work including following will have to be arranged by customer free of cost.
1 All masonry work such as breaking and making good of holes for the passage of ducts, pipes and
cables etc.Jari filling work will be done by customer or at extra cost.
All the Windows should be with curtains & doors with automatic door closer system to avoid
leakages and cooling losses
2 Any other significant leakages should be closed to ensure that there is no cooling losses
3 Any wooden or boxing work for hiding away equipment or duct work, for installation of
grille/diffuFor non A/c area partition up to ceiling should be provided above falce ceiling.
4 Safe and lockable storage space at site for safe custody of material and tools.
5 Provision of Drain Point near Indoor Unit.
6 Incoming Power supply along with earthing IN each OUTDOOR UNIT IN CASE OF CASSETTE UNIT
Incoming Power supply along with earthing IN each INDOOR UNIT IN CASE OF HI-WALL -0.8 / 1.1
Incoming Power supply along with earthing IN each OUTDOOR UNIT IN CASE OF HI-WALL - 1.5 / 2 7
Stairecase will be provided by you for working to the true celieing.
8 Any insulation work other than specifically mentioned in our offer.
9 Electricity provision for erection and commissioning.
10 Glasses to be covered with sun polyester film/venetian blinds.
11 UNDERDECK / OVERDECK IF ANY TO BE PROVIDED BY THE CUSTOMER USING 50MM THICK
THERMOCOL ON THE CEILING OF THE FLOOR EXPOSED TO DIRECT SUNLIGHT
Thanking you
Yours faithfully,
For IAPL Group
We hope that the above is in line with your requirement and you would honour us with your
valued order . Thanking you and assuring you of our best attention at all times
Yours faithfully,