Professional Documents
Culture Documents
Objective
Born 1991
To obtain a responsible and growth oriented position in the organization of professional team. Aiming
to understand and implement the modern era of quality within the limits of sustainable business
environment.
Personal Profile
1) Reliable and dependable in meeting the objectives
2) Hard working, organizing and monitoring abilities, working in Community.
3) Motivated and determined to move forward in life, Ability to face
challenges.
4) Good communication and interpersonal skills, an efficiently manage the
time.
5) Great team-worker - adaptable and flexible
6) Studied, Lean Manufacturing, Metal forming & cutting analysis, Computer
integrated manufacturing, Supply chain Management, Total Quality
Maintenance as elective courses.
Functional Areas
1. TPM (Total productive maintenance)
2. Lean manufacturing
3. TQM (Total Quality Management)
4. LeanSix Sigma
5. Supply chain Management
Experience
6 Week Pakistan Engineering Company limited Lahore –
Internship
Complete the internship in PECO, (Pakistan Engineering Company
Limited)
Traning Circle: -
Observation the parts that are making in the company Like Electric
Towers.
Observe the Gassified plant that are produce steam by the burning of
coal.
Observe the Galvanizing plant and its working.
Observe the working of Pumps and compressors.
Observe the working of CNC machine.
Knowing the working of different type of machine like Lathe,
Shearing.
Making the daily observation report & submit to the related
department.
4 Week Internship Syed Metal Works (Pvt) Lahore –
Traning Circle
Complete the internships in Syed Metal Works (Services for
Pharmaceutical) Pvt Lahore.
This firm is making the Injection Seals like
1. Injection silver seals,
2. Injection Flip off seals
3. Making the caps for syrup bottles
Find out defect according to the industrial engineering and apply the method
that will help them to improve their productivity.
Education
Feb 2011-March, BSc Industrial Engineering
2015
University of Management and Technology (UMT), Lahore
(BS-Industrial Engineering)
2010 Unique group of College whdat Road Lahore
(Fsc )
Himayat e islam School Multan Road Lahore
2007 (Matriculation)
Term Projects
1. Making of metal piece in Metal Forming & Cutting Analysis
Metal Forming & Performing these operations
Cutting Analysis Turning, Facing, Knurling on the workpiece.
Knurling is a manufacturing process, typically conducted on a lathe,
whereby a diamond-shaped (criss-cross) pattern is cut or rolled into
metal.
Facing is a turning operation often carried out on a lathe.
Turning is a machining process in which a cutting tool, typically a non-
rotary tool bit, describes a helical tool path by moving more or less
linearly while the workpiece rotates.
Engineering 2. Calculate and compare the cost of solar panels use for all electrical
Economics appliances at home as an alternate to electricity used by WAPDA for a
year. In how many years the investment will be recovered, if we convert
the electrical source of a house to solar panels?
Human Factor 3. Find the faults in the office table in UMT and improve the table’s design
Engineering according to the standard ergonomic measurements.