You are on page 1of 5

Sample Fully Staffed Schedule

Meeting Area A Meeting Area B

K 1 2 3 4 5 6

3:10-3:30 Arrival, Snack, and 3:10-3:25 Arrival, Snack, and Attendance


Attendance

3:30-4:00 HW Help 3:25-3:55 HW Help

4:00-4:35 A B C 3:55-4:25 A B C D

4:35-5:10 C A B 4:25-4:55 D A B C

5:10-5:45 B C A 4:55-5:20 C D A B

5:20-5:50 B C D A

5:40-6:00 Cool down, collaborative 5:50-6:00 Cool down, collaborative games, and
games, and dismissal. dismissal.

* Minimum of 3 staff * Minimum of 4 staff members required


members required for for rotations
rotations * Teacher planning during HW help
* Teacher planning during * Smaller groups
HW help
* Smaller groups

* 1 office personnel needed for entire program


* Minimum of 8 total staff members needed
Sample Short Staffed Schedule 1

Meeting Area A Meeting Area B

K 1 2 3 4 5 6

3:10-3:30 Arrival, Snack, and 3:10-3:25 Arrival, Snack, and Attendance


Attendance

3:30-4:00 HW Help 3:25-4:00 HW Help

4:00-4:45 A B 4:00-4:30 1 3

4:45-5:30 B A 4:30-5:00 2 1

5:00-5:30 3 2

5:30-6:00 Cool down, collaborative 5:30-6:00 Cool down, collaborative games, and
games, and dismissal. dismissal.

* Minimum of 2 staff *Minimum of 3 staff members required


members required (A,B,C) * Planning time incorporated for
* Planning time incorporated teachers
for teachers * Larger groups
* Larger groups

* 1 office personnel needed


* 6 total staff members needed
Sample Short Staffed Schedule 2

Meeting Area A Meeting Area B

K 1 2 3 4 5 6

3:10-3:30 Arrival, Snack, and 3:10-3:25 Arrival, Snack, and Attendance


Attendance

3:30-4:00 HW Help 3:25-4:00 HW Help

4:00-4:30 Tech Board Art 4:00-4:20 Tech Board Art Math/


Station Games Activity Station Games Activity Reading

4:30-5:00 Art Tech Board 4:20-4:40 Math/ Tech Board Art


Activity Station Games Reading Station Games Activity

5:00-5:30 Board Art Tech 4:40-5:10 Art Math/ Tech Board


Games Activity Station Activity Reading Station Games

5:10-5:30 Board Art Math/ Tech


Games Activity Reading Station

5:30-6:00 Cool down, collaborative 5:30-6:00 Cool down, collaborative games, and
games, and dismissal. dismissal.

* Minimum of 1 staff * Minimum of 1 staff members required


members required for station for station rotations
rotations * Any additional staff members will
* Any additional staff assist with stations
members will assist with * Teacher planning during HW help
stations * Smaller groups
* Teacher planning during
HW help
* Smaller groups

* 1 office personnel needed for entire program


* Minimum of 3 total staff members needed
Sample Whole Group Special Activity Schedule

Meeting Area A Meeting Area B

K 1 2 3 4 5 6

3:10-3:30 Arrival, Snack, and 3:10-3:30 Arrival, Snack, and Attendance


Attendance

3:30-4:00 HW Help 3:30-4:00 HW Help

4:00-5:15 SPECIAL ACTIVITY 4:00-5:15 SPECIAL ACTIVITY

5:15-5:45 Physical Activity 4:25-4:55 Physical Activity

5:45-6:00 Cool down, collaborative 5:45-6:00 Cool down, collaborative games, and
games, and dismissal. dismissal.

* Minimum of 1 staff * Minimum of 1 staff members required


members required for for rotations
rotations * Additional teachers will assist in
* Additional teachers will monitoring students
assist in monitoring students

* Times will be adjusted as needed


* 1 office personnel needed for entire program
* Minimum of 3 total staff members needed if the special activity is produced by an
outside source
Sample Grouped Special Activity Schedule

Meeting Area A Meeting Area B

K 1 2 3 4 5 6

3:10-3:30 Arrival, Snack, and 3:10-3:30 Arrival, Snack, and Attendance


Attendance

3:30-4:30 SPECIAL ACTIVITY 3:30-4:00 HW Help

4:30-5:00 HW Help 4:00-4:30 Physical Activity

5:00-5:30 Physical Activity 4:30-5:30 SPECIAL ACTIVITY

5:30-6:00 Cool down, collaborative 5:30-6:00 Cool down, collaborative games, and
games, and dismissal. dismissal.

* Minimum of 1 staff * Minimum of 1 staff members required


members required for for rotations
rotations * Additional teachers will assist in
* Additional teachers will monitoring students
assist in monitoring students

* Times will be adjusted as needed


* 1 office personnel needed for entire program
* Minimum of 3 total staff members needed if the special activity is produced by an
outside source

You might also like