OPERATION
INTRODUCTIONS
Jiangsu China
Swivel SL225 operation instruction SL225·SM
Table of Content
I. Range of Use 2
V. Lubrication 3
VII. Maintenance 4
X. Attached Tables 6
I. Range of Use
SL225 Swivel has a maximum static load of 250 tons, it can be used
for oil field 3000m to 4000m drilling machine (114mm spinner).
1. Type: SL225
2. Max Static Load Rating: 2250KN (250 tons)
3. Max Rotary Speed: 300r/min
4. Max Working Pressure: 350 ×10Pa (35Mpa)
5. Inside Diameter of Central Pipe: φ75mm
6. Inside Diameter of Punching Pipe: φ75mm
7. Angel Between the Gooseneck Pipe Entry and Vertical Line: 15°
5
8. Lower Thread of Central Pipe: 6 /8REG-LH
9. Diameter of Elevator Link: 150mm
5
10.Joint Thread of Kelly Spinner: 6 /8 REG-LH
11. Joint Thread of Gooseneck Joint and Water Band: 4LP
part, there are three oil seals and one blocking ring. Two oil seals are
located at the upper part of the blocking ring, one oil seal is located
at the lower part. All the lips of oil seals are facing up so that the
oil in shell can be sealed.
Central pipe is a part cored pipe, its upper end is connected with
the disk facing, lower end with joint, central part is mounted on the main
bearing and depends on the support and bearing cap to make it right and
locate. By adjusting cushions number between support and shell, we may
control axial motion of central pipe. Upper end of central pipe has rubber
umbrella, it is mounted to prevent mud.
Disk bearing is connected between the central pipe and the gooseneck
by upper and lower nuts, and created a pass way for mud. Disk bearing is
an important part to seal the mud under high pressure, so it has
self-sealing and fast loading and unloading system.
Swivel SL225 has been tested for tension, intensity of water pressure,
sealof water pressure, rotation before it is delivered from the
factory. There is no oil inside the shell of the swivel. So the
following must be done before use:
(1) Remove the oil scale plate, fill it with 90# sulfur-phosphor type
EP gear oil up the maximum scale on the plate, also make sure the
oil is clean.
(2) Check the central pipe, then one person press on the handle of
the chain with 400KN·m power, rotates equally.
(3) Lubricate oil cups with grease gun.
(4) Check the upper and lower nuts of the disk bearing, water band,
the joint nuts of the gooseneck pipe, the joints of the central
pipe are tightened or not.
(5)
V. Lubrication
1. Oil location in the shell of swivel must be checked once each shift,
to know whether it is at the location demanded (The oil location can't
be lower than the lowest graduation of oil scale plate). Grease must be
changed every two months. For new or repaired swivel, change grease after
usage of 200 hours, clean all dirty grease when changing grease.
2. Pin of elevator link, disk bearing, oil seals in the support, oil
Gaoyou Haoxiang Petroleum Machinery CO.LTD http://www.mechhx.com
3
Swivel SL225 operation instruction SL225·SM
seals inside the lower shell and others must be filled by (SY1412-75) #2
lithium grease once every shift. Filling grease to disk bearing must be
under the situation when there isn't pump pressure, so that grease can
be filled into every location of disk bearing.
When the punching pipe and the disk bearing are need to be changed, just loose the upper
and lower threads, and take out the whole disk facing from one side of the support, no other parts
are needed to be taken off.
VII. Maintenance
(1) Mount oil seal, caulking ring and outer ring of anti-bouncer
bearing into support.
(2) Mount lower race of main bearing, pin roller and holding bridge
into the shell of swivel.
(3) Mount central pipe with upper race of main bearing and righting
bearing into shell of swivel, slightly rotate the central pipe,
to make sure the main bearing is steady.
(4) Mount oil seal into the lower end of the shell of swivel and mount
pressure cap and screw bolt tightly.
(5) Mount support on the shell of rotary swivel, check bearing
movement capacity of central pipe, adjust quantity of cushions,
screw bolt tightly, and axial movement capacity of central pipe
is controlled in 0.05-0.15mm after screwing connection belt
tightly.
(6) Mount rubber umbrella, gooseneck, disk facing, joint and so on.
Fix the swivel on a pricing stand. The joint of gooseneck and the
joints of other pipes are packed by plastic cloth or stop up them with
wooden blocks. Joints must be protected.
X. Attached Tables
XII.Attached Figures