Name of the Station : Chandrapur Super Thermal Power Station(Unit- 8&9), Chandrapur (MSPGCL)
Energy
Energy Energy Maximum load Station Peak
Consumed in
Sr.No. Unit No. Capacity (MW) Generated Consumed in during month load during
Station Aux
(Mus) Unit Aux (Mus) (MW) month (MW)
(Mus)
Unit-8 Unit-9
SN CAUSE DETAILS CODE
(500 MW) (500 MW)
1 Wet Coal Problem 14183 0.000 0.000
2 Low system demand 14174 2.657 2.212
3 Poor coal quality 14183 16.277 25.922
4 Coal mills 14114 0.000 0.262
5 Overhaul 14109 0.000 0.000
6 Startup 14126 1.432 0.000
7 ID/FD/PA Fan 14111 0.000 0.000
8 BFP Problem 14151 0.000 0.793
9 Governing Problem 14131 0.000 0.000
10 Drum pr. Rest/silica 14102 0.000 0.000
11 Pr.parts/pipes/valves 14101 0.000 0.000
12 Boiler tube leakage 14101 0.020 0.000
13 RH metal/steam temp 14106 0.000 0.000
14 CHP/feeding 14181 0.000 0.022
15 Ash handling system 14189 0.000 0.000
16 Turbine brg./CV Problem 14129 0.000 0.105
17 Clinker Formation 14187 0.000 0.000
18 Air heater problem 14103 0.000 0.000
19 Electrical Problem 14172 0.000 0.000
20 TIC Problem 14173 0.050 0.000
21 ESP/chimney emission 14194 0.000 0.000
22 HP Heaters 14152 13.713 0.000
23 Grid System Problem 14174 0.000 0.000
24 Condenser vaccum 14125 0.000 26.450
25 Duct lkg 14117 0.000 0.000
26 Coal Shortage 14182 0.000 0.000
27 Boiler misc/others 14117 0.000 2.492
28 Turb misc/others 14164 0.000 0.000
29 Water shortage 14186 0.000 0.000
TOTAL 34.149 58.257
OCM-7 FF - 9218