Assignment: 24th October, 2021
Soft Copy (.doc file) by email (faisaljalal@iba.edu.pk): 5th November 2021
Hardcopy: 6th November 2021
Points: 20.0
(NOTE: Late submission ZERO Marks)
Q#1 You are strongly advised to read carefully and analyse the information in below paragraphs 20
before attempting to answer this Question.
What is the prevailing P2P process for MRO in this company (For MRO)? Please develop flow chart with
a) 3.5
proper labelling.
Note: Note: Please try to collect as much as possible documents/formats.
Select ONE ITEM from any MRO Category and perform following tasks:
0.5
Assess the annual requirements of selected item at company level (at all locations)
c)
Does the company raise the requirements (purchase requisitions) for a longer period of requirement under the
d) 0.5
(annual rate contract) system?
How many PRs (purchase requisitions) and POs (purchase orders) raised at present?
e) 0.5
Page 2 of 4
g) Where will you place your selected item in below map, please justify your selection of quadrant. 1.5
Review the number of vendors supplying total quantities of selected item. Perform Supplier concentration
h) 1.5
analysis for selected item purchasing as per below format:
Page 3 of 4
Review the cost of item in TSC concept (Please do not forget to include the cost in procurement process).
i) 2.0
Please develop Cost Bar Waterfall for selected item as per below format:
1.0
Is there any possibility to reduce the lead time for this item? You may use following format:
j)
Page 4 of 4
Is there any possibility to reduce the supply base for this item? You may use following format:
k) 1.0
Can we reduce the number of PRs (purchase requisitions) and POs (purchase orders) to reduce transaction
m) 1.0
cost and paperwork?
---The End---