Roland Bründlinger
AIT Austrian Institute of Technology
6th International Conference on Integration of Renewable and Distributed
Energy Resources
Kyoto November 18, 2014
Contents
2
Contents
3
Framework for DER interconnection in Europe
Country specific grid codes and standards
As of 2014 there is still no formal EU wide directive on
DER grid interconnection
Country specific grid codes, standards, guidelines, laws
Different legal and administrative levels
Fundamental differences between the countries
Issues for manufacturers and project developers
Specific product settings for each country/market
Interpretation of the requirements and application in
practice
Complex and time consuming certification schemes
Increased costs and reduced competiveness
Critical issues for power system operation
Lack of coordination and compatibility
Risk of losing system security during critical events
due to undefined behaviour of DER (50.2 Hz issue)
11/25/2014 4
Development of requirements for advanced grid support
DER connected to MV distribution grids
2007/13: DK
P/Q, P(f), 2008: DE
LVRT… P/Q, P(f), remote
2008: FR P, LVRT, FRR…
P/Q, LVRT
>5MW
2009/13: AT
P/Q, P(f),
2010/14: ES LVRT…
P/Q, P(f),
LVRT 2011/13: IT
>2/10MW P/Q, P(f), Q(U),
remote P L/HVRT…
11/25/2014 5
Development of requirements for advanced grid support
DER connected to LV distribution grids
2012/14: DK 2011/12: DE
P/Q, P(f), … P/Q, P(f), remote P,
…
2013: AT
2013: FR P/Q, P(f),…
Var. over-f trip
2012: IT
P/Q, P(f), Q(U),
remote P, LVRT…
11/25/2014 6
Selected European Country Requirements
LV Connection
Country Europe Germany Italy Austria France Spain Europe Europe
(≤16 A) (≤16 A) (>16 A)
11/25/2014 8
Selected European Country Requirements
MV Connection
Country Germany Italy Austria France Spain Europe ENTSO-E
11/25/2014 10
European wide Standards and Technical Specifications
Upcoming FprTS 50549-1/2
For LV/MV connections >16 A
Comprehensive definition of advanced
functions for generators (including
static converters and rotating
generators)
Based on the principles of the ENTSO-
E RfG network code
Technical Specification
provide technical guidance for the
connection of generating plants which
can be operated in parallel with a
public distribution network.
technical reference in connection
agreements between DNOs and
electricity producers.
11/25/2014 11
Contents
12
Advanced grid support features of DER
Requirements in European codes
FprTS 50549-1:2014 Requirements for the connection of generators above 16 A per phase
Connection to LV grids
25.11.2014 15
Page 16
Advanced grid support features of DER
Reactive power: Operational requirements
CLC/FprTS 50549-2:2014
Requirements for the connection of generators above 16 A per phase
Connection to MV grids
Advanced grid support features of DER
Reactive power control modes
Autonomous reactive power control modes
Q / cos = constant
Q / cos = f(U)
Q / cos = f(P)
Q priority
Coordinated control (with communication)
cos = remote setpoint
Selection criteria
Characteristics of the electric grid (impedance, angle...)
Grid losses
Available control and communications infrastructure
Page 17
Advanced grid support features of DER
Reactive power control strategies: Q(U)
11/25/2014 21
Advanced grid support features of DER
Requirements in European codes
Grid State
DSO TSO
~ Control signals
Control Centre
Demand for
power limitation
Control Centre
Advanced grid support features of DER
Requirements in European codes
CLC/FprTS 50549-2:2014
Connection to MV grids
Page 25
Advanced grid support features of DER
Dynamic grid support: Low/High Voltage Ride Through
CLC/FprTS 50549-2:2014
Connection to MV grids
Page 26
Contents
27
Advanced Grid Codes provide the base for
safe and reliable grid integration of high shares of DER
► Using their advanced functionalities DER can be very powerful tools in
managing the grids for reliability and efficiency by providing
Steady state and dynamic voltage support
Frequency control capabilities
On-demand response via remote control and communication
► Coordinated requirements needed for safe and reliable grid integration of high
shares of DER
► Harmonisation of European national grid codes in-line with ENTSO-E RfG
► Led by CENELEC, standardised procedures for DER certification and
testing currently under development.
► Providing access to these capabilities will be the key to improve system
reliability and efficiency and enable further deployment of DER.
28
Thank you!