PROJECT:
Proposed B+LG+G+ 7+ R Commercial Residential Developments on Plot No. IC1-
IC1- REF: HFC-
DXB/p1966/CFC-001
CTYL-01_09AB
01_09AB at International City, Dubai -UAE
Rev.: 00
Document Title : Carbon Fiber Calculations
Date: 27th June 2021
Document Title :
Prepared by: Engr. Mohamed Ezzat Signature: Date: 01st June 2021
Design Director
CHILLER
PLANT
PART A PART B
33.800 SSL
34.000 FFL
33.800 SSL
PART D PART C
34.550 SSL
34.000 FFL 33.800 SSL
34.550 SSL
PL1 A B C D E F G H J K L M N P Q R
POURSTRIP 1000mm
SLAB LEGEND:
2
1500
3000 3000
2800
A
3
3900
3900
A A
POURSTRIP 1000mm
7800
POURSTRIP 1000mm
A SEC 1
2500
5
1400
B+LG+G+7+R COMMERCIAL
RESIDENTIAL DEVELOPMENT
A
2800
LAWNZ BY DANUBE
6
1400
2700
DN
A
2500
2400
A
7
1400
FO
R C E C ON
C H.F.C CONSTRUCTION SYSTEMS
R
HIGH FORCE CONCRETE
ET
HI
E
TeL: 06-5747778. Fax: 0
TeL: 04-2394133.
CONSTRUCTION SYSTEMS P.O.Box:
E-mail:hfcuae@hfcpt.com
AESF-1335
---------------- 00
COOLING
TOWER 33.800 SSL
34.550 SSL
34.550 SSL
CHILLER
PLANT
PART A PART B
33.800 SSL
34.000 FFL
33.800 SSL
PART D PART C
34.550 SSL
34.000 FFL 33.800 SSL
34.550 SSL
R RR QQ PP NN MM LL KK JJ HH GG FF EE DD CC BB AA
SLAB LEGEND:
POURSTRIP 1000mm
DN
2
2900
2700
3
3800
A
3900
A
POURSTRIP 1000mm
POURSTRIP 1000mm
A
10000
6000
2500
6150
SEC 2
SEC 3
5000
A
5100
SAJAN RIZWAN ASKERALI
5
3500
1830
B
INTERNATIONAL CITY LLC
B+LG+G+7+R COMMERCIAL
RESIDENTIAL DEVELOPMENT
LAWNZ BY DANUBE
POURSTRIP 1000mm
FO
R C E C ON
C H.F.C CONSTRUCTION SYSTEMS
R
HIGH FORCE CONCRETE
ET
HI
7
E
TeL: 06-5747778. Fax: 0
TeL: 04-2394133.
CONSTRUCTION SYSTEMS P.O.Box:
E-mail:hfcuae@hfcpt.com
AESF-1335
---------------- 00
COOLING
TOWER 33.800 SSL
34.550 SSL
34.550 SSL
CHILLER
PLANT
PART A PART B
7 34.000 FFL
33.800 SSL
33.800 SSL
PART D PART C
34.550 SSL
34.000 FFL 33.800 SSL
34.550 SSL
POURSTRIP 1000mm
3000
SLAB LEGEND:
SEC 4
10
POURSTRIP 1000mm
3000
A
3000
11
3800
4000
A
12
POURSTRIP 1000mm
13 SAJAN RIZWAN ASKERALI
B+LG+G+7+R COMMERCIAL
RESIDENTIAL DEVELOPMENT
LAWNZ BY DANUBE
14
POURSTRIP 1000mm POURSTRIP 1000mm
FO
R C E C ON
C H.F.C CONSTRUCTION SYSTEMS
R
HIGH FORCE CONCRETE
ET
HI
E
TeL: 06-5747778. Fax: 0
TeL: 04-2394133.
CONSTRUCTION SYSTEMS P.O.Box:
E-mail:hfcuae@hfcpt.com
R RR QQ PP NN MM LL KK JJ HH GG FF EE DD CC BB AA
AESF-1335
---------------- 00
H.F.C Prestressing Cont.
The ultimate stress in the required CFRP can be used as ffe = 0.005 x Ef according to the
ACI 440-2008 then:
Capacity in case of steel bars = Mns = As fy (d – b 1 c/2) = 0.9 As fy
Capacity in case of CFRP = Mnf = Af ffe (de – b 1 c/2) = 0.95 Af ffe
Mu = fMn = 0.9 (Mns + 0.85 Mnf)
Then the equivalent 0.9 x 0.9 As fy = 0.9 x 0.85 x 0.95 Af ffe
Material:
f'c = 32 Mpa
Fy = 460 Mpa
The anticipated design loads must exceed the existing capacity of un-strengthened member
SECTION NO. MDL MLL Mfire Mcapacity Status AS REQ ffe Af No. of plates Plate Length
1 605 500 1041 1200 OK 5500 800 3525 26 4
2 850 550 1348 1660 OK 2850 800 1826 14 4.7
3 665 1220 1647 1820 OK 10000 800 6409 46 4.7
4 605 490 1033 1200 OK 2400 800 1538 11 6.25
Concrete Dimension:
Material:
f'c = 32 Mpa
Fy = 460 Mpa
strand Dia = 12.7 mm
Aps = 240 mm2
fpe = 1100 Mpa
fpy = 1670 Mpa
fpu = 1860 Mpa
Ep = 195000 Mpa
Rebar Dia = 12 mm
No. Of Rebar = 5
As = 565 mm2
Comp ebar Dia = 12 mm
No. Of Rebar = 5
As' = 565 mm2
Es = 200000 Mpa
thickness tf = 1.4 mm
width wf = 320 mm
ult strength f*fu = 2600 Mpa
rupture strain e*fu = 0.014
Ef = 160000 Mpa
No of ply = 1
Af = 448 mm2
Straining action:
Existing loads
MDL initial = 50 KN.m
Anticipated loads
MDL = 73.7 KN.m
MLL = 61 KN.m
Ms = 134.7 KN.m
MU = 186.04 KN.m
Fire loads
MU (1.1 MDL+0.75 MLL = 126.82 KN.m
Moment capacity
Mcap = 193 KN.m
Analysis:
Concrete Dimension:
Material:
f'c = 32 Mpa
Fy = 460 Mpa
strand Dia = 12.7 mm
Aps = 175 mm2
fpe = 1100 Mpa
fpy = 1670 Mpa
fpu = 1860 Mpa
Ep = 195000 Mpa
Rebar Dia = 12 mm
No. Of Rebar = 5
As = 565 mm2
Comp ebar Dia = 10 mm
No. Of Rebar = 5
As' = 393 mm2
Es = 200000 Mpa
thickness tf = 1.4 mm
width wf = 140 mm
ult strength f*fu = 2600 Mpa
rupture strain e*fu = 0.014
Ef = 160000 Mpa
No of ply = 1
Af = 196 mm2
Straining action:
Existing loads
MDL initial = 40 KN.m
Anticipated loads
MDL = 80.9 KN.m
MLL = 51 KN.m
Ms = 131.9 KN.m
MU = 178.68 KN.m
Fire loads
MU (1.1 MDL+0.75 MLL) = 127.24 KN.m
Moment capacity
Mcap = 159 KN.m
Analysis:
Concrete Dimension:
Material:
f'c = 32 Mpa
Fy = 460 Mpa
strand Dia = 12.7 mm
Aps = 180 mm2
fpe = 1100 Mpa
fpy = 1670 Mpa
fpu = 1860 Mpa
Ep = 195000 Mpa
Rebar Dia = 12 mm
No. Of Rebar = 5
As = 565 mm2
Comp ebar Dia = 10 mm
No. Of Rebar = 5
As' = 393 mm2
Es = 200000 Mpa
thickness tf = 1.4 mm
width wf = 420 mm
ult strength f*fu = 2600 Mpa
rupture strain e*fu = 0.014
Ef = 160000 Mpa
No of ply = 1
Af = 588 mm2
Straining action:
Existing loads
MDL initial = 50 KN.m
Anticipated loads
MDL = 60.4 KN.m
MLL = 111 KN.m
Ms = 171.4 KN.m
MU = 250.08 KN.m
Fire loads
MU (1.1 MDL+0.75 MLL) = 149.69 KN.m
Moment capacity
Mcap = 168 KN.m
Analysis:
Concrete Dimension:
Material:
f'c = 32 Mpa
Fy = 460 Mpa
strand Dia = 12.7 mm
Aps = 218 mm2
fpe = 1100 Mpa
fpy = 1670 Mpa
fpu = 1860 Mpa
Ep = 195000 Mpa
Rebar Dia = 12 mm
No. Of Rebar = 5
As = 565 mm2
Comp ebar Dia = 10 mm
No. Of Rebar = 5
As' = 393 mm2
Es = 200000 Mpa
thickness tf = 1.4 mm
width wf = 151 mm
ult strength f*fu = 2600 Mpa
rupture strain e*fu = 0.014
Ef = 160000 Mpa
No of ply = 1
Af = 211.4 mm2
Straining action:
Existing loads
MDL initial = 52 KN.m
Anticipated loads
MDL = 83 KN.m
MLL = 67.5 KN.m
Ms = 150.5 KN.m
MU = 207.6 KN.m
Fire loads
MU (1.1 MDL+0.75 MLL) = 141.925 KN.m
Moment capacity
Mcap = 200 KN.m
Analysis: