AECOM New Zealand Limited

8 Mahuhu Crescent +64 9 967 9200 tel


Auckland 1010 +64 9 967 9201 fax
Comment Sheet P O Box 4241
Shortland Street, Auckland 1140
New Zealand

Project Name: RANTAU DEDAP GEOTHERMAL POWER PROJECT NOTICE TO CONTRACTOR


AECOM Project Number: 6057 6682 DO NOT CHANGE THE FORMAT OF
Client: SUPREME ENERGY RANTAU DEDAP- INDONESIA COMMENTS SHEETS, OR ANY
PREVIOUS ENTRIES.
Issue for Review Date: 02/12/2019
Document No. RD-I-CI-G00-1022
Document Title: Layout of instrument Plot Plan, Wiring & Grounding for Well Pad RD-L
Document Review Status: Released with Comments

Date:17/03/19 Date: Date: Date: Date: Date:


No. Revision A Revision B Revision 1 Revision 1
Owners Comments REKIND-FUJI Response Owners Comments REKIND-FUJI Response Owners/AECOM Comments REKIND-FUJI Response
Direct buried instrument cables shall be 1. As per TR No RD-EPC04-0302 Rev. 1 requirement for Direct Buried and all cable Noted
installed in conduit already protected with Steel Wires Armoured, it's will triple protection if using Steel
Wire Armoured, protective Concrete & Conduit.

Page 1 of 2
Date:17/03/19 Date: Date: Date: Date: Date:
No. Revision A Revision B Revision 1 Revision 1
Owners Comments REKIND-FUJI Response Owners Comments REKIND-FUJI Response Owners/AECOM Comments REKIND-FUJI Response

2.. As per General specification for instrument cable Doc No RD-PRD01-ENG-CSPC- noted
1601 already approve by Supreme as bellow :

Contractor update grounding PE for


panel RIO refer to doc.RD-I-CI-G00-
1026-01/02 title" Layout of instrument
Plot Plan, Wiring & Grounding for Well
Pad RD-N" with update bus bar PE
connect to Electrical grounding Loop.

Page 2 of 2