Professional Documents
Culture Documents
Item No. ITEM DESCRIPTION QTY UNIT UNIT COST TOTAL COST
I. GENERAL REQUIREMENTS
1.0 Mobilization & Demobilization 1.00 lot 3,000.00 3,000.00
2.0 Cleaning, Hauling and Disposal 1.00 lot 1,500.00 1,500.00
3.0 Temporary Facilities (Barracks, Water and Power) by owner
SUBTOTAL I. GENERAL REQUIREMENTS 4,500.00
_____________________________ ___________________
RIO GRACE G. ILAGAN OWNER
OPERATIONS MANAGER
DATE: __________________________________