Submittal MANUAL
Project:Pelican
Date: 25-06-2020
Table of Contents
Bill of Materials
2D Drawings
3D Images
Product Data sheets
Specification
FAT Procedure
Bill of Materials
Option with 100%N and Isolated Ground
BOM (250A AMPS)
SL No
Part code Description UOM QTY
1 GS250T5CGS-M300C-STD6 Global 250A Busway Section,3P+ISO GND - 3 mtr, Red color. Nos 123
2 GS250T5CGS-M300C-STD7 Global 250A Busway Section,3P+ISO GND - 3 mtr, Blue color. Nos 123
3 GS250T5CGS-M150C-STD6 Global 250A Busway Section,3P+ISO GND - 1.5 mtr, Red color. Nos 41
4 GS250T5CGS-M150C-STD7 Global 250A Busway Section,3P+SO GND - 1.5 mtr, Blue color. Nos 41
Global 250A END Feed Unit, 3P+ISO GND, Bolt lugs, Large box, Reverse unit with CPM & IR Window Right side
5 GF250T5CGR-RRRR-M030C-STD6-PM5560-LNY Nos 21
orientation with Red color tape.
Global 250A END Feed Unit, 3P+ISO GND, Bolt lugs, Large box, Standard unit with CPM & IR Window Left side
6 GF250T5CGS-RLRL-M030C-STD6-PM5560-LNY Nos 20
orientation, with Red color tape.
Global 250A END Feed Unit,3P+ISO GND, Bolt lugs, Large box, Reverse unit with CPM & IR Window Right side
7 GF250T5CGR-RRRR-M030C-STD7-PM5560-LNY Nos 20
orientation with Blue color tape.
Global 250A END Feed Unit,3P+ISO GND, Bolt lugs, Large box, Standard unit with CPM & IR Window Left side
8 GF250T5CGS-RLRL-M030C-STD7-PM5560-LNY Nos 21
orientation, with Blue color tape.
9 GJK250T5G-1 Housing Coupler Nos 328
10 GEC250T5 End Cap Nos 82
11 MBRHT5-M12 Hanger Bolt Nos 738
12 SCST5-1 Closure strip, 3 mtr per length Each 273
13 ST5IT Installation Tool. Nos 4
14 GMCBMT5GE56-(5)316A6S-2P-4-SP-G61 Single Phase Plugin Box with 5 Double Pole 16A MCB and 5 IEC Socket .(Plug top not Included) Nos 814
15 GMCBMT5GE56-(4)316A6S-2P-4-SP-G61 Single Phase Plugin Box with 4 Double Pole 16A MCB and 4 IEC Socket .(Plug top not Included) Nos 90
16 GMCBMT5GE53-(2)316A6S-2P-4-SP-G61 Single Phase Plugin Box with 2 Double Pole 16A MCB and 2 IEC Socket .(Plug top not Included) Nos 8
17 GMCBT5GE93-532A6S-4-4P-ABB-G61 Three Phase Plugin Box with 1 Four Pole 32A MCB and 1 IEC Socket (Plug top not included ) Nos 16
NOTE : plug‐in‐unit quantity is considered is as per tender BOQ, however based on the number of cabinets we see a 20 plugs‐
in‐units short in the tender BOQ.
Layout Drawings
2D Drawings & 3D Images
Product DATA SHEET
T5 Global Systems
250T5 SYSTEMS
250T5 Systems
Support Hardware
Straight Section
Joint Kit
Tee
End Cap
Plug-In Units
For further information on applicable T5
plug-in unit options, please consult the
factory.
4.9 | StarlinePower.com
250T5 Systems
STRAIGHT SECTIONS
Product Description
Track Busway straight section consists
of an extruded aluminum shell with
“spring-pressure” type copper channel
busbars contained in a full length insulator
mounted on the interior walls. The
aluminum extrusion acts as a protective
earth. Each housing has a continuous
access slot over its entire length for the
insertion of turn-n-lock plug-in units.
Housing configurations include 4-pole
varieties, optional isolated or dedicated
earth, optional oversize (200%) neutral. GLOBAL & METRIC SYSTEM
The housing sections join together using
Bus connectors which fit into the channels 111mm
of the adjoining section. An Installation
tool is used to force the blades into the
busbar channels for a maintenance-free, (L2)
“spring-pressure” electrical connection. (L3)
128mm
Material
(L1)
Extruded Aluminum
(N)
Ratings
100% Protective Earth
250 Amps
250T5C4/250T5CG: 415 Volt
250T5CN/250T5CF: 415 Volt L1 or Phase A brown
black
Length L2 or Phase B
3m, 6m; or custom lengths between .6 - gray
6m L3 or Phase C blue
green/
Global System Weight Neutral Ground yellow
3m 4 pole: 18.6 kg
3m 4 pole w/ ground: 20.9 kg Housing Coupler
3m 4 pole w/ 200% N: 21.3 kg
3m 4 pole w/ ground & 200% N: 23.1 kg
Bus Connector
Installation Tool
4.10 | StarlinePower.com
250T5 Systems
- STD 6-7
10. 11.
Paint Color Tape Marking
1. System (standard of measure) 9. Busway Access (how plugs access the busway)
G Global C Continuous
2. Product Type (section component) 10. Paint Color (allows painting of the busway housing)
S Straight section STD UEC Mill Finish RED Paint UEC Red
Examples:
GS250T5C4S-M300C-STD0 = Global, Straight section, 250 amps, T5, Copper conductor, 3 phase plus neutral, Standard polarization- 3m,
Continuous access- UEC silver, no tape marking
4.11 | StarlinePower.com
250T5 Systems
Product Description
End power feed units connect to the end 269mm
Standard box
of the Busway. A standard size, factory
assembled unit consists of a steel junction
box, with removable sides, connected to a
305mm section of Busway. The assembly
includes connection lugs and a ground lug
305mm
for wires up to 150mm2 for standard size
boxes and large size boxes. 305mm
254mm
762mm
394mm
Boxes 305mm
Lugs Standard Large Fused
Standard S L F
4.16 | StarlinePower.com
250T5 Systems
Product Description
End power feed units connect to the
end of the Busway. A large size, factory
assembled unit consists of a steel junction
box, with removable sides, connected to a Large box with
(305mm) section of busway. The assembly circular IR window
includes connection lugs, a ground lug, and M41D CPM with
and shrink tubing for wires up to 150mm2 305mm 4.3 inch display and
Wi-Fi on a 30° angled
for standard size boxes and large size
display
boxes. 508mm”
Left
4.17 | StarlinePower.com
250T5 Systems
1. System (standard of measure) 10. Accessories Package (optional accessories for feed units)
G Global S Standard R IR window - rectangular
C IR window - circular A Angled meter lid
2. Product Type (section component) T IR (rect.) + angled lid L IR (circ.) + angled lid
F End Feed F End feed hanger & gland plates B (C+F)
E (T+F) J (R+F)
3. Product Frame (maximum amperage) K (A+F) M (L+F)
250 250 amps O Seismic D (O+C)
Q (O+R)
4. Compatibility (frame compatibility)
**O, Q & D seismic options can only be selected with Global (G) systems
T5 T5 systems K5 T5 systems (with limiting strip)
11. Accessories Location (viewed from the terminal, the side with accessory)
5. Material (busbar material)
N None (N/A) R Right
C Copper L Left F Front (consult the factory)
6. Neutral/Ground Busbar (size of neutral busbar and/or ground) 12. Straight Length (length of section)
G 3 Phase plus Neutral plus M030 .3 meters
4 3 Phase plus Neutral
Internal Ground Conductor
F 3 Phase plus 200% Neutral 13. Busway Access
N 3 Phase plus 200% Neutral
plus Internal Ground Conductor
C Continuous
Examples:
GF250T5C4R-LRLL-M030C-BLK0 = Global, end Feed, 250 amps, T5, Copper conductor, 3 phase plus neutral, Reversed polarization- Std lugs,
Large box, Right meter location, Circular IR window + angled meter lid, left accessory location- 30 cm, Continuous access-painted Black, no tape
marking
4.19 | StarlinePower.com
250T5 Systems
G F 250 T5 C 4 S - S N S N
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.
System Product Type Product Compatibility Material Neutral/ Polarization Lug/Box Lid Accessories Accessories
Frame Ground Options Orientation Package Location
busbar
*16. Meter Release (M40/M60 Series Meters) *18. System Configuration and CT Type (line-line or line-neutral
and wye or delta systems)
M41 WiFi, ≤415V Y, ≤240V Δ
1 LLD - Standard, milivolt K LLD - SC, 5A
M43 No WiFi, ≤415V Y, ≤240V Δ
2 LLY - Standard, milivolt L LLY - SC, 5A
M45 WiFi, 600V Y, 347V Δ
3 LNY - Standard, milivolt M LNY - SC, 5A
M47 No WiFi, 600V Y, 347V Δ
0 No CT's present (Temp 1 Circuit 1 Only, Solid Core
M61 Single Eth./WiFi, single phase, 120VDC - 300VDC OR split phase Monitors only) (M60s only)
120VDC (+/-60VDC) to 380V(+/-190VDC)
2 Circuit 2 Only, Solid Core 3 Both Circuits, Solid Core
M63 Single Eth./No WiFi, single phase, 120VDC - 300VDC OR split phase (M60s only) (M60s only)
120VDC (+/-60VDC) to 380V(+/-190VDC)
M67 Dual Eth., single phase, 120VDC - 300VDC OR split phase 120VDC
(+/-60VDC) to 380V(+/-190VDC) Third Party Meter: Schneider PM5560
H (T+N) J (T+A)
Q (T+D+N) K (T+D+A)
L (T+N+A) R (T+D+N+A)
Examples:
GF250T5C4R-LRLL-M030C-BLK0-M47S1 = Global, end Feed, 250 amps, T5, Copper conductor, 3 phase plus neutral, Reversed polarization- Std
lugs, Large box, Right meter location, Circular IR window + angled meter lid, left accessory location- 30 cm, Continuous access-painted Black, no tape
marking- M47 meter, Standard options, LLD- standard, milivolt
4.20 | StarlinePower.com
T5 Series
Part Number
Seismic Threaded Rod (250 & 400 amp systems only):
For mounting to 3/8 - 16 threaded rod.
Can be inserted anywhere along the top MBRH-M10
full-access slot of busway, and includes a Available in plain zinc
seismic brace. Hanger support is required
every 3m maximum. or black (-BLK)
Weight
.14 kg
Part Number
Standard(250, 400, 630 & 800 only) (250, 400, 630 & 800 amp systems
For mounting to strut or other flat surfaces. only):
Twist-in design allows inserting anywhere MBHT5-M12
along the top full-access slot on the
busway. Hanger support is required every Available in plain zinc
3m maximum. or black (-BLK)
Weight
.09 kg
Part Number
Standard One-Piece(1000 & 1250
only) (1000 & 1250 amp system only):
For mounting to strut or other flat surfaces. MBSHT5-1
Twist-in design allows inserting anywhere
along the top full-access slot on the Available in plain zinc
busway. Hanger support is required every or black (-BLK)
3m maximum.
Weight
.09 kg
4.82 | StarlinePower.com
T5 Series
bus
Part Numbers connectors
housing
(for 250 amp global & metric systems):
couplers
MJK250T5-1
MJK250T5G-1
MJK250T5N-1
MJK250T5F-1
Joint Kit
For the connection of adjacent busway
sections. One kit is required at each joint. (for 400 amp global & metric systems)
Each kit is comprised of a housing coupler GJK400T5-1 MJK400T5-1
250-800 amp
pair and bus connector set. GJK400T5G-1 MJK400T5G-1 systems
GJK400T5N-1 MJK400T5N-1
Bus Connector: copper blades secured
GJK400T5F-1 MJK400T5F-1
to an insulating mounting plate. This
makes the electrical connection between (for 630 amp global & metric systems)
GJK630T5-2 MJK630T5-2
sections.
GJK630T5G-2 MJK630T5G-2
Housing Couplers: consists of two *G = copper, M = hybrid
12-screw couplers-one for the top and (for 800 amp systems)
one for the bottom. These make the MJK800T5-2
mechanical connection between busway 1000 amp system
MJK800T5G-2
sections.
Part Number
Installation Tool ST5IT
An installation tool is used to install the
bus connector between two adjacent No available colors
sections of busway.
Weight
Busway sections are butted together
and the top housing coupler is installed. 1.4 kg
The bus connector is inserted, centered
and seated in the slot of the busway. The
installation tool is inserted into the jointed
intersection and rotated 90 degrees to
form a secure electrical connection. The
housing coupler is then positioned over
the bottom joint and tightened.
4.85 | StarlinePower.com
T5 Series
End Cap
For covering the end of T5 busway
systems.
108mm
Part Numbers
(for 250 amp global & metric systems):
220mm
GEC250T5
MEC250T5
127mm
127mm (for 400 amp global & metric systems): MEC250T5,
GEC400T5 GEC250T5 &
GEC400T5
MEC1K2T5 MEC400T5
Part Numbers
Optional Closure Strip
(for 250, 400, 630 & 800 amp systems):
The Closure Strip snaps into the bottom access
slot of T5 housing to close off access to power SCST5-1
around the installed plug-in units. It is normally
shipped in 2.9m sections. Aluminum closure strip:
SCST5-1-AL
The Closure Strip is offered in both non-
conductive plastic material and aluminum for
250, 400, 630 & 800 amp systems. It is only
available in plastic for the 1000 & 1250 amp (for 1000 & 1250 amp systems):
systems.
SCST5-2
The aluminum Closure Strip affixes with an -Plastic Closure Strip available in black &
adhesive backing to the access slot of T5 white
housing.
-Aluminum Closure Strip available in all
standard colors
4.86 | StarlinePower.com
CUSTOMER APPROVAL RENDERING
10.62 [269.9]
ORDER: NOTES:
GROUND TYPE: ISOLATED
PART NO: GMCBMT5GE56-(5)316A6S-2P-4-SP-G61 G61=ABB S200M series breaker with spacer and Neptune
DEVICE(S): (5) 316A6S Standard receptacle.
ELECTRICAL RATINGS
SYSTEM VOLTS: 415Y/240 LOAD VOLTS: 240
Approved Approved with comments
AMPERAGE: 16 SHORT CIRCUIT: 15 kAIC
F4007214-APPR-RevA (gkeck - 5/5/2020) Customer Signature Date
CUSTOMER CONCEPT RENDERING
15.000 381.00
10.625 269.87
NOTES:
UNIT IS WIRED HOUSING GROUND
ORDER:
10.000 254.00
10.625 269.87
NOTES:
UNIT IS WIRED ISOLATED GROUND
CIRCUIT BREKAER SPACER
EACH BREAKER WIRED LINE TO NEUTRAL
ORDER:
ELECTRICAL RATINGS
SYSTEM VOLTS: 240 LOAD VOLTS: 240 Approved Approved with comments
ORDER: NOTES:
GROUND TYPE: ISOLATED
PART NO: GMCBT5GE93-532A6S-4-4P-ABB-G61 G61=4P S204M-D32 ABB BKR, NEPTUNE RECEPTACLE
BUILT IN SINGAPORE
DEVICE(S): 532A6S
ELECTRICAL RATINGS
SYSTEM VOLTS: 415Y/240 LOAD VOLTS: 240/415
Approved Approved with comments
AMPERAGE: 32 SHORT CIRCUIT: 15 kAIC
F4007151-APPR-RevA (gkeck - 4/15/2020) Customer Signature Date
Specification
TRACK BUSWAY SYSTEM
1 Summary
1.1 This specification covers the electrical characteristics and general requirements for a track busway
system, hereafter referred to as Track Busway. The system shall be designed primarily for
overhead power distribution of electrical power. Once installed, the Track Busway will provide Plug
& Play, simple, versatile, fast and economic means of distributing power. Plugin units/Tapoff boxes
powering the cabinets can be added or removed from Track Busway without shutting down the
busway and the busway should be continuous access where the plugin unit/Tapoff can be
connected anywhere along the busway.
2.1 The Track Busway shall be designed and manufactured to the following standards:
2.1.2 International Electrotechnical Commission (IEC) Standard, IEC 61439-1, edition 2.0 – Low
Voltage Switchgear and Controlgear Assemblies, Part 1: Type Tested and Partially Type Tested
Assemblies
2.1.3 International Electrotechnical Commission (IEC) Standard, IEC 61439-6, edition 1.0 – Low
Voltage Switchgear and Controlgear Assemblies, Part 6: Particular Requirements for Busbar
Trunking Systems (Busways).
2.1.9 National Fire Protection Agency (NFPA) – 70, National Electric Code (NEC)
2.1.10 National Electrical Manufacturers Association (NEMA) - AB1, Molded Case Circuit Breakers and
Molded Case Switches (if applicable)
2.1.11 National Electrical Manufacturers Association (NEMA) – KS-1, Enclosed and Miscellaneous
Distribution Equipment Switches (600 VAC) (if applicable)
3 System Description
3.1.6 Conductors: 3 phase conductors, 1 neutral conductor solid copper, tin plated and Ground
Conductor
3.2.1 Environmental Conditions: The Track Busway shall be capable of operating continuously in the
following environmental conditions without mechanical or electrical damage, degradation or
derating of operating capability.
3.2.1.1 Operating temperature: busway shall operate with continuous load with no
derating up to 55 degrees Celsius, .95 at 60 degrees Celsius
3.2.1.2 Relative humidity: 0 to 95 percent, noncondensing
3.2.1.3 Altitude: Sea level to 4,000 feet (1220m)
4 Submittals
4.1 Submittals shall be in accordance with specified procedures. Submit shop drawing and product data
for record purposes prior to shipment. Shop drawings for Track Busway must include:
4.1.1 Detailed equipment assemblies and dimensions, weights, location and identification of each field
connection
4.2 Provide electrical characteristics and connection requirements for the system and accessories.
5 Warranty
5.1 The Track Busway manufacturer shall guarantee the entire system against defective material and
workmanship for a period of one (1) year from date of shipment.
5.2 Additional years of warranty and ability for start-up services must be an option if required per
drawings.
6 Product Components
6.1.1 Standard housing lengths should 1, 2 , 3m and available up to 6 meters and can be cut in
customizable lengths down to 0.6 Meters. The housing should be properly extruded with a slot
to receive rod mount hangers to hang from a ceiling. This housing should be open on the bottom
to accept plug-in units anywhere along its length. This opening shall pass UL’s hypothetical
finger probe test.
6.1.2 All conductors shall be made of copper and sized to handle 100% of its rating continuously up to
the maximum ambient temperature. The conductors shall be electrically isolated from the
housing. All insulators must be UL and IEC compliant.
6.1.3 Track Busway housing sections shall be joined together by a ‘press fit’ that requires no bolted
connection and no future maintenance
6.1.4 Track Busway housing shall be available with Red for Source A and Blue color Tape for Source
B for differentiation.
6.2.1 The End feed shall provide the connections from the incoming cables to the Track Busway
system. The End feed shall have internal connection to a section of busway conductors. End
Feeds shall have the option to be designed with mechanical or compression type lugs.
6.2.2 End feed unit to be provided with IR Window and Color Tape of Red and Blue for differentiation
6.3.2 Plug-in units can be added, removed or repositioned without de-energizing the busway
6.3.3 Plug-in units shall use a circuit breaker for branch circuit protection
6.3.4 Plug-in units shall not require any tools to mount to the busway
6.3.5 Plug-in units shall not have a mechanism in order to engage the electrical connection to the
busway conductors
6.3.6 Plug-in units shall have locking clips or bolt-on tabs to secure units to the busway
6.3.7 Plug-in units shall be configured by the manufacturer to balance the load based on quantity of
plug-in unit types provided
6.4 Accessories
6.4.2 Power Feed Monitoring: The power feed is to be provided with PM5560 Meter on it
7.1.1 Track Busway runs shall consist of lengths as shown on the drawings.
7.1.3 Hanging of the Busway: The Track Busway shall be hung from a structure above the busway,
using the supplied busway hangers. The hangers shall connect to the busway, and to an all
thread rod provided by the installing contractor. The spacing of the hangers along the busway is
10 feet (3 meters).
7.1.4 The busway shall be installed with the open access channel facing downward, or to the side for
special applications. Special installation shall be agreed upon by the manufacturer.
7.1.5 Connecting Sections of Track Busway: At a junction of Track Busway sections, the installer will
use a Joint Kit (includes Housing Couplers and Bus Connector) and an Installation Tool supplied
by the manufacturer. Two sections are joined together by a ‘press fit’ that requires no bolted
connection and no future maintenance.
7.1.6 End of Runs: End caps will be provided to install at the end of each run.
7.2 All Track Busway joints are non-bolted, compression fit and shall require no maintenance after
installation
FAT PROCEDURE
Starline Track Busway FAT :
Project:
Bridge DC
Pelican Project, Mumbai India
Factory Acceptance Test for Plugs, Busway Housings and End Feeds.
Order No:
Customer
Approval:
Date:
Testing
Check List &
4XDOLW\ Process
Facility Process
Applicable Inspection
Department/Product Responsibility
Universal
BWP-M
Electric
Process Process / Components / Sample Reference Document(s) / Applicable Acceptance standards /
BWP
BWS
BWF
Step # Manufacturing Operation Characteristics checked Type of Check / Name of test Size procedure(s) criteria Record Location Remarks
1 INCOMING MATERIAL INSPECTION
Measured Resistance
Safety Earth Ground between exposed
3.1 Ground Bond Test Ground Bond Test 100% QWI823.8 Ground Bond Testing Record collected by APT X X X X X
Connection Integrity Ground Point and Earth
Ground <30mΩ @ 30A
Universal
BWP-M
Electric
Process Process / Components / Sample Reference Document(s) / Applicable Acceptance standards /
BWP
BWS
BWF
Step # Manufacturing Operation Characteristics checked Type of Check / Name of test Size procedure(s) criteria Record Location Remarks
1.1.2 Straight Section Length Housing length verification Refer Straight Section FAT Annex 2
Verification Copper and Insulator location
Insulation Performance,
Hipot Test Dielectric Voltage Withstand Test (4kV)
Workmanship Defects