Reduced thermal conductivity: stones are poor heat • Provides fuel saving by discarding solid elements.
conductors and act as insulators as indicated by the various • Adjustable application time and time of blowdown.
conductivity values. The resulting furring layer causes the • The boiler production efficiency is not reduced, because
reduction of steam generation. In addition, the resulting of less blowdown than required.
furring layer increases the fuel consumption and increases • It does not cause energy loss due to unncessary
the unit cost of steam generation. blowdown.
• Blowdown time is set, so that there will not be
unnecessary or low blowdown.
Temperature build-up in the metal wall: As a stone-coated
wall prevents heat transfer, the wall temperature rises. This is
called overheating and the metal may lose some of its
mechanical properties (elasticity, etc.). These cause local
shape disturbances and cause pipe explosion.
• TIME CONTROLLER
• ACTUATOR TYPE: SINGLE EFFECTIVE PNEUMATIC ACTUATOR SPRING
• SOLENOID VALVE
• LIMIT SWITCH
Note : The settings are not changed when the 220 V 50 Hz power is cut off in the timer.
DBV-10 BOILER AUTOMATIC BOTTOM BLOWDOWN SYSTEMS
A E
D
B
H
dxn
Dia. A B C D E F ØG ØH dxn
DN25 186 350 160 292 134 90 115 85 Ø14x4
DN32 205 388 180 318 152 96 140 100 Ø18x4
DN40 253 410 200 335 158 102 150 110 Ø18x4
DN50 253 425 230 343 166 102 165 125 Ø18x4
DN65 267 431 290 339 185 115 185 145 Ø18x8
AYVAZ
Model No : DT 2
*220 V 50/60 Hz 3.5 W
NC
N
L
P - + start stop
DT 2 AYVAZ
N
Bottom Blowdown Digital Panel
352*5$00,1*%27720%/2:'2:16<67(0
7RVHWWKHWLPHSHULRGDQGSUHVV3NH\WLPHDIWHUDSSO\LQJSRZHUWRWKHGHYLFH
7KHVHFRQGSHULRGRIWLPHRQWKHULJKWVLGHRIWKHGLVSOD\ZLOOIODVKIRUWKHVHFRQGSHULRG
6HWWKHQGWLPHSHULRGZLWKWKHDQGNH\VIRUDPD[LPXPRIVHFRQGVDGMXVWPHQW
3UHVV3WZLFHWRVWRUHWKHVHFRQGVSHULRG
7KHGLVSOD\ZLOOVKRZWKHKRXUDQGPLQXWHSHULRGZKLFKPHDQV7LPHSHULRG7KHKRXUIXQFWLRQUHPDLQVVWHDG\DQG
WKHPLQXWHIXQFWLRQIODVKHV
7KHWLPHIXQFWLRQRIWKHWLPHSHULRGLVVHWZLWKWKHDQGNH\VIRUDPD[LPXPRIPLQXWHVDQGSUHVVLQJWKH3NH\WR
VHWWKHPLQXWHVIXQFWLRQ
$IWHUWKLVRSHUDWLRQWKHWLPHIXQFWLRQRIWKHVWWLPHSHULRGZLOOVWDUWWRIODVK
7KHWLPHIXQFWLRQRIWKHWLPHSHULRGLVVHWZLWKWKHDQGNH\VIRUDPD[LPXPRIKRXUVDQGSUHVVLQJWKH3EXWWRQWR
VWRUHWKHFORFNIXQFWLRQ
$IWHUWKLVRSHUDWLRQWKHVFUHHQZLOOEHVWHDG\DQGWKHGHYLFHZLOOEHSURJUDPPHG
DBV-10 BOILER AUTOMATIC BOTTOM BLOWDOWN SYSTEMS
INSTALLATION
MGK-33
Timer DT-2
By-Pass Line
Drainage
Drainage
Haci Ayvaz M.E. Ayvaz China Ayvaz Kazakhstan LLP Ayvaz N Ayvaz Serbia
Dubai/U.A.E Cixi City/China Almaty/Kazakhstan Isperih/Bulgaria Belgrad/Serbia
Tel: +971 563550822 Tel: +86 0574 5897 3851 Tel: +7 (727) 327 97 57 Tel: +359 8431 27 32 Tel: +381 61 658 70 52
+971 501306871 info@ayvazchina.com info_kz@ayvaz.com office@ayvaz-n.eu yakbiyik@ayvaz.com
mideast@ayvaz.com www.ayvaz.kz