S928 A west specimens shall counply with the minimam
Treg or Leng Sequived by he aandatd
9.24 Wall assembles shall he subjected toa howe stream tse
in aceardnnce with ASTM E119, Start Tit Nethas for Bre
Tas of Building Construction and Matra of UL, $68, Sendant
Joe Bie Tests of Basing Contraction aud Mts
N89.5 Fxterior Curtain Walls and the Perimeter Joint
NEOS.I* The provisions of $93 shall be intended to reset
the interior vertical pamage of fame and hot gases from ote
Hour to anther atthe loeaton where the floc intersects the
inde ofan exterioe ctin wall seer.
INA32 Floor assembles that are required to bea fire huerer
shall extend to, and be tg agains the exterior curt wa
WS483 Where fie
rsitance-rated. oor or fooe/ceiling
econo vacances Ccicls ivetecation sie
‘xterior curtain wal stemblies and such hoor or loor/ceing
‘seeonbie shal be sake with approved mater
8933.4 The appooned materials specified in 89.3 shall be
securely installed in accordance wih the
proved sem,
89832 The approved materials specified in 89.88 shall be
‘capable of preventing the passage of flame snd hot gases su
‘dent to ignite cotton waste where subjected to the time
temperanute fre conditions of UL 258, Slandard for Fe Tests of
Building Construction and Mates ot ASTM EL, Standard Tt
Maha fr Five Ts of Bing Canton and Masia, ler
2 minimum postive presure differential of 0.01 in, water
Column (25 Pa) for a time period at least equal to the fire
fesilance rating of the floor assembly, or when tested in
Becordance with ASTM E2307, Standard Test Method for Dtrmin-
ire Reistance of Pinson Bre Barner Sytome Ung
ItermatiateSad, MutSery Tt Apparotue and song
rating equal to she fire resisance rung othe Noor asembiy
8934 Height and fire resistance sequtements for curtain
wall spandrels shall comply with 7.1
BUOY General. Where required chewhere in this Cade
smoke partons shall be provided to limit the transfer of
Soke partons shall comply with ome of
the following
Stoke partitions. shal extend from the Hour uy he
Underside of the floor of toot deek aboe, dough any
ha through interstii structural and methawical paces
(@)* Stoke pardons shall be permitted to terminate st th
tundenile of a monolithic or sumpended ceiling srs
See ke ane ae
0: Barrie a aie earn
Sspended eesing pte where lf of the flowing cod
4) The ceiling stem forms continous membrane.
(b) A. stroke ight jot & provided between the dp of
the smoke parson and the Bowom of the suspen
sedeciing
1) The space above the ceiling i not used 36 perm,
on ititis, theres no eezarn gle Irom the tase
bus area int the ples
Doors in smoke partitions shall comply with 8.1032
though S106
(SEIS Des shall comply with the provisions of 1.21
HMTRE Doo: stl oot ncn overs
Door clearances all be in accordance with
NEP
HMB Doors shall be setfciosing oF sutomatccloning sn
Secortance wth 11.218.
N'S106 Shutters thot protect openings shall be automatic
Closing upon operation of approned smoke detecors installed
livsuch a way atta detect smoke on ether sue of the opening
ii aceoedance with the promaons af NEFA 72
8.10.7 Where a fire resistance ating is specified for smoke
ra ari ieee eet ee eee
Felton
(1) Doce openiogypetectvcs shall ise Ai ew "pena
Fang of not estan 30 mits where tested Wn aceore-
nce! wih NFPA.252 without Hone seam tes ules
Siherwise specified by Chapters 13 Gough 31 and 33
‘rough 34
2) Fire matdons shall comply with Section 87.
{3} Gluaing wed in sdcigns and tratoms afacent to 2
tions shall be tested tn accordance ih 878 and sal
10.4.1 ‘The provisions of S104 shall govern the materials
and methods. of ‘construction wed to protect through-
penetrations and membrane penetrations of smoke pation
840.42. Penetrations for cables, cable rm condi
tubes ven ies, an simniat nein to Aceoenmodate eee
Cal mechanea, plumbing, rt ccraanunscations systems that
pss Cicough a athoke partion shall he protected by x stem
Uhr matenat tha eapable of Kiting ve tracafer of save
8.10.5 Vibraion feolation Pguipmient oF Siteme Where
the wtration salon of equipment or ystems i erp)oyed
the Sbration Fesuaint(s) shal be located outside of “he par
tory wall, or flow avembiy for which the equipment or
B.105 AirTranafer Openings
8.10511 General, ‘The provisions of 10.5 shall govern the
fsterists and methods of contraction awed 10 protect
‘Gansfer openings n sok parions
1.10.52 Openings in Smoke Fartiions. Aleszansfer openings
in smoke parduane shall be provide wth approved srioke
dampers designed and tested ss ascordance with the reahie