REKAPITULASI TOTAL KEBUTUHAN MATERIAL BAJA

NO. URAIAN SATUAN TOTAL 1 BERAT/BTG TOTAL 2


A B C=A/B (
1 WF - 150 x 75 x 5 x 7 kg 3,514.25 168.00 21.00
- 200 x 100 x 5,5 x 8 kg 13,673.66 256.00 54.00
- 250 x 125 x 6 x 9 kg 972.29 355.00 3.00
- 300 x 150 x 6,5 x 9 kg 5,738.26 440.00 14.00
- 400 x 200 x 8 x 13 kg 13,611.11 792.00 18.00
- 450 x 200 x 9 x 14 kg 6,020.72 912.00 7.00
- 500 x 200 x 10 x 16 kg 1,802.64 1,075.00 2.00
- 588 x 300 x 10 x 16 kg 2,138.89 1,812.00 2.00

2 CNP - 125 x 50 x 20 x 3.2 kg 1,611.41 37.00 44.00


- 150 x 50 x 20 x 3.2 kg 4,716.57 40.56 117.00
- 100 x 50 x 20 x 3.2 kg 751.94 33.00 23.00

3 SIKU - 60 x 60 x 6 kg 104.16 32.52 4.00


70 x 70 x 6 kg 224.93 38.28 6.00
80 x 80 x 8 kg 55.18 57.96 1.00

4 HOLLOW - 100 x 200 x 4 kg 2,400.22 113.04 22.00

5 PIPA - 3 inch kg 1,217.31 67.75 18.00


- 6 inch kg 664.98 169.55 4.00
- 10 inch kg 1,992.07 361.80 6.00

6 PLATE - 28 kg 700.62 653.24 2.00


- 26 kg 87.44 606.57 1.00
- 22 kg 110.81 513.30 1.00
- 18 kg 916.68 420.00 3.00
- 16 kg 33.64 373.00 1.00
- 14 kg 2,286.81 326.62 8.00
- 12 kg 1,942.30 280.00 7.00
- 10 kg 1,823.31 233.00 8.00
- 8 kg 1,489.84 187.00 8.00
- 6 kg 2,558.54 140.00 19.00
- 5 kg 371.37 117.00 4.00

7 BAUT - HTB 16 bh 3,770.00 3,770.00


- HTB 18 bh 84.00 84.00
- HTB 19 bh 436.00 436.00
- HTB 20 bh 261.00 261.00
- HTB 22 bh 32.00 32.00
- HTB 24 bh 136.00 136.00
- HTB 24 bh 136.00 136.00

8 BESI TULANGAN - Besi 10 m 543.32 7.40 74.00


- Besi 16 m 900.16 18.94 48.00

9 ANGKUR - M-16 bh 198.00 198.00


- M-19 bh 316.00 316.00
- M-22 bh 32.00 32.00
- M-24 bh - -
REKAP PERHITUNGAN

NO.
Uraian Satuan Volume

1 Balok Canopy 1
a. WF 400 x 200 x 8 x 13 kg 2,918.52
b. WF 300 x 150 x 6,5 x 9 kg 4,328.43
c. WF 150 x 75 x 5 x 7 kg 290.50
d. CT 250 x 200 x 10 x 16 kg 1,612.50
e. Siku 60 x 60 x 6 kg 104.16
f. Siku 70 x 70 x 6 kg 224.93
g. Siku 80 x 80 x 8 kg 55.18
h. CNP 125 x 50 x 20 x 3.2 kg 411.93
i. Hollow 100 x 200 x 4 kg 2,400.22
j. Besi Besi 10 m 126.55
k. Besi Besi 16 m 149.20
l. Plat 5 kg 66.43
m. Plat 8 kg 347.18
n. Plat 10 kg 219.22
o. Plat 14 kg 74.18
p. Plat 16 kg 33.64
q. Plat 18 kg 46.13
r. Plat 22 kg 21.28
s. Baut HTB 16 bh 268.00
t. Baut HTB 20 bh 52.00
u. Baut HTB 24 bh 136.00

2 Kolom Canopy 1
a. WF 588 x 300 x 10 x 16 kg 2,138.89
b. WF 500 x 200 x 10 x 16 kg 1,802.64
b. Plat 8 kg 63.06
c. Plat 10 kg 162.15
d. Plat 12 kg 158.28
e. Baut 14 kg 305.71
f. Baut 18 kg 152.63
g, Plat 22 kg 89.54
h. Plat 26 kg 87.44
i. Angkur M-22 bh 32.00
j. Angkur M-25 bh 16.00
k. Baut HTB 16 bh 576.00
l. Baut HTB 18 bh 84.00
m. Baut HTB 22 bh 32.00
n. Baut HTB 25 bh 16.00

3 Balok Canopy 5
a. WF 400 x 200 x 8 x 13 kg 1,643.40
b. WF 200 x 100 x 5,5 x 8 kg 1,252.65
b. WF 150 x 75 x 5 x 7 kg 450.72
c. CNP 125 x 50 x 20 x 3.2 kg 542.98
d. Besi Besi 10 m 57.16
REKAP PERHITUNGAN

NO.
Uraian Satuan Volume

e. Besi Besi 16 m 40.80


f. Plat 5 kg 39.86
g. Plat 6 kg 13.11
h. Plat 8 kg 96.02
i. Plat 12 kg 66.33
j. Plat 14 kg 159.64
k. Baut HTB 16 bh 184.00

4 Kolom Canopy 5
a. WF 400 x 200 x 8 x 13 kg 1,238.69
b. Plat 8 kg 82.08
c. Plat 18 kg 477.78
d. Angkur M-19 bh 64.00
e. Baut HTB 16 bh 168.00
f. Baut HTB 19 bh 64.00

5 Balok Canopy 6
a. WF 200 x 100 x 5,5 x 8 kg 3,829.97
b. WF 150 x 75 x 5 x 7 kg 1,250.20
c. Pipa 3 inch kg 672.72
d. CNP 150 x 50 x 20 x 3.2 kg 1,968.99
e. Besi Besi 10 m 79.37
f. Besi Besi 16 m 227.78
g. Plat 5 kg 41.85
h. Plat 6 kg 1,143.71
i. Plat 8 kg 61.36
i. Plat 10 kg 67.73
j. Plat 12 kg 373.74
k. Baut HTB 16 bh 204.00
l. Baut HTB 20 bh 63.00

6 Kolom Canopy 6
a. Plat 6 kg 441.49
b. Plat 10 kg 92.42
d. Plat 12 kg 235.84
e. Plat 14 kg 138.48
f. Angkur M-16 bh 126.00
g. Baut HTB 16 bh 378.00
h. Baut HTB 20 bh 63.00

7 Balok Canopy 7
a. WF 200 x 100 x 5,5 x 8 kg 1,562.41
b. WF 150 x 75 x 5 x 7 kg 394.80
c. Pipa 3 inch kg 224.24
d. CNP 150 x 50 x 20 x 3.2 kg 918.33
e. Besi Besi 10 m 31.64
REKAP PERHITUNGAN

NO.
Uraian Satuan Volume

f. Besi Besi 16 m 81.97


g. Plat 5 kg 21.26
h. Plat 6 kg 35.45
i. Plat 8 kg 110.93
j. Baut HTB 16 bh 210.00

8 Kolom Canopy 7
a. WF 450 x 200 x 9 x 14 kg 2,479.12
b. Plat 6 kg 18.96
c. Plat 10 kg 104.00
d. Plat 12 kg 374.11
e. Plat 14 kg 325.54
f. Plat 28 kg 288.49
g. Angkur M-19 bh 84.00
h. Baut HTB 16 bh 210.00
i. Baut HTB 19 bh 84.00
j. Baut HTB 20 bh 21.00

9 Balok Canopy 8
a. WF 200 x 100 x 5,5 x 8 kg 1,513.90
b. CNP 100 x 50 x 20 x 3.2 kg 200.48
c. Besi Besi 10 m 26.14
d. Besi Besi 16 m 23.29
e. Plat 5 kg 26.57
f. Plat 6 kg 24.57
g. Plat 8 kg 11.93
h. Baut HTB 16 bh 88.00

10 Kolom Canopy 8
a. WF 400 x 200 x 8 x 13 kg 2,003.43
d. Plat 6 kg 12.49
e. Plat 8 kg 66.60
f. Plat 12 kg 87.05
g. Plat 14 kg 239.47
h. Plat 18 kg 74.62
i. Angkur M-19 bh 36.00
j. Baut HTB 16 bh 112.00
k. Baut HTB 19 bh 36.00

11 Balok Canopy 9
a. WF 200 x 100 x 5,5 x 8 kg 2,198.66
b. WF 150 x 75 x 5 x 7 kg 563.50
c. Pipa 3 inch kg 320.34
d. CNP 150 x 50 x 20 x 3.2 kg 1,291.16
e. Besi Besi 10 m 31.64
f. Besi Besi 16 m 114.18
REKAP PERHITUNGAN

NO.
Uraian Satuan Volume

g. Plat 5 kg 31.89
h. Plat 6 kg 77.91
i. Plat 8 kg 64.41
j. Baut HTB 16 bh 184.00

12 Kolom Canopy 9
a. WF 450 x 200 x 9 x 14 kg 3,541.60
b. Plat 6 kg 27.09
c. Plat 10 kg 148.57
d. Plat 12 kg 534.45
e. Plat 14 kg 465.05
f. Plat 28 kg 412.13
g. Angkur M-29 bh 120.00
h. Baut HTB 16 bh 300.00
i. Baut HTB 19 bh 120.00
j. Baut HTB 20 bh 30.00

13 Balok Canopy 10
a. WF 400 x 200 x 8 x 13 kg 2,493.74
b. WF 300 x 150 x 6,5 x 9 kg 1,409.83
c. WF 250 x 125 x 6 x 9 kg 325.42
d. WF 200 x 100 x 5,5 x 8 kg 117.33
e. WF 150 x 75 x 5 x 7 kg 65.80
f. CNP 125 x 50 x 20 x 3.2 kg 384.80
g. Besi Besi 10 m 25.71
h. Besi Besi 16 m 148.35
i. Plat 5 kg 26.57
j. Plat 8 kg 276.64
k. Plat 10 kg 103.46
l. Plat 14 kg 315.42
m. Plat 18 kg 90.45
n. Baut HTB 16 bh 158.00
o. Baut HTB 20 bh 32.00

14 Kolom Canopy 10
a. WF 400 x 200 x 8 x 13 kg 588.59
b. Plat 8 kg 11.18
b. Plat 10 kg 55.19
c. Plat 14 kg 52.23
d. Plat 18 kg 29.85
e. Angkur M-19 bh 12.00
f. Baut HTB 16 bh 64.00
g. Baut HTB 19 bh 12.00

15 Balok Canopy 11
a. WF 400 x 200 x 8 x 13 kg 1,174.80
REKAP PERHITUNGAN

NO.
Uraian Satuan Volume

b. WF 250 x 125 x 6 x 9 kg 646.87


c. WF 200 x 100 x 5,5 x 8 kg 1,671.42
d. WF 150 x 75 x 5 x 7 kg 140.00
e. CNP 100 x 50 x 20 x 3.2 kg 551.46
f. Besi Besi 10 m 77.86
g. Besi Besi 16 m 44.48
h. Plat 5 kg 63.78
i. Plat 6 kg 12.29
j. Plat 8 kg 206.84
k. Baut HTB 16 bh 246.00

16 Kolom Canopy 11
a. WF 400 x 200 x 8 x 13 kg 1,549.94
b. Pipa 10 inch kg 1,992.07
c. Plat 6 kg 732.03
d. Plat 10 kg 729.62
e. Plat 12 kg 112.49
f. Plat 14 kg 211.10
g. Plat 18 kg 45.22
h. Angkur M-19 bh 120.00
i. Baut HTB 16 bh 132.00
j. Baut HTB 19 bh 120.00

17 Balok Canopy 12
a. WF 200 x 100 x 5,5 x 8 kg 1,527.32
b. WF 150 x 75 x 5 x 7 kg 47.59
c. CNP 125 x 50 x 20 x 3.2 kg 271.70
d. Besi Besi 10 m 50.34
e. Besi Besi 16 m 29.14
f. Plat 5 kg 34.55
g. Plat 6 kg 16.38
h. Plat 8 kg 83.13
i. Baut HTB 16 bh 160.00

18 Kolom Canopy 12
a. Pipa 6 inch kg 664.98
b. Plat 10 kg 140.93
c. Angkur M-16 bh 48.00
d. Baut HTB 16 bh 48.00

19 Balok Canopy 13
a. WF 150 x 75 x 5 x 7 kg 311.15
b. CNP 150 x 50 x 20 x 3.2 kg 538.10
c. Besi Besi 10 m 36.92
d. Besi Besi 16 m 40.98
e. Plat 5 kg 18.60
REKAP PERHITUNGAN

NO.
Uraian Satuan Volume

f. Plat 6 kg 3.05
g. Plat 8 kg 8.49
h. Angkur M-16 bh 24.00
i. Baut HTB 16 bh 80.00
TYPE DIMENSI BERAT /BTG BERAT/1M

HB 400 x 400 x 13 x 21 2,064.00 172.00


HB 350 x 350 x 12 x 19 1,644.00 137.00
HB 300 x 300 x 10 x 15 1,128.00 94.00
HB 250 x 250 x 9 x 14 869.00 72.42
HB 200 x 200 x 8 x 12 599.00 49.92
HB 150 x 150 x 7 x 10 378.00 31.50

CT 250 x 200 x 10 x 16 537.50 44.79

WF 600 x 200 x 11 x 17 1,272.00 106.00 106.00


WF 588 x 300 x 10 x 16 1,812.00 151.00 151.00
WF 500 x 200 x 10 x 16 1,075.00 89.58 89.60
WF 450 x 200 x 9 x 14 912.00 76.00 76.00
WF 400 x 200 x 8 x 13 792.00 66.00 66.00
WF 350 x 175 x 7 x 11 595.00 49.58 49.60
WF 300 x 150 x 6,5 x 9 440.00 36.67 36.70
WF 250 x 125 x 6 x 9 355.00 29.58 29.60
WF 200 x 100 x 5,5 x 8 256.00 21.33 21.30
WF 150 x 75 x 5 x 7 168.00 14.00 14.00

CNP 150 x 65 x 20 x 2 28.92 4.82


CNP 150 x 65 x 20 x 2.3 33.00 5.50
CNP 150 x 65 x 20 x 3.2 45.10 7.52
CNP 150 x 50 x 20 x 2 26.10 4.35
CNP 150 x 50 x 20 x 2.3 29.76 4.96
CNP 150 x 50 x 20 x 3.2 40.56 6.76
CNP 125 x 50 x 20 x 2 23.70 3.95
CNP 125 x 50 x 20 x 2.3 27.10 4.52
CNP 125 x 50 x 20 x 3.2 37.00 6.17
CNP 100 x 50 x 20 x 2 21.40 3.57
CNP 100 x 50 x 20 x 2.3 24.40 4.07
CNP 100 x 50 x 20 x 3.2 33.00 5.50

SIKU 100 x 100 x 10 90.60 15.10


SIKU 90 x 90 x 9 73.20 12.20
SIKU 80 x 80 x 8 57.96 9.66
SIKU 75 x 75 x 7 47.64 7.94
SIKU 70 x 70 x 7 44.28 7.38
SIKU 70 x 70 x 6 38.28 6.38
SIKU 60 x 60 x 6 32.52 5.42
SIKU 50 x 50 x 5 22.60 3.77
SIKU 50 x 50 x 4 18.50 3.08
SIKU 40 x 40 x 4 14.30 2.38
SIKU 40 x 40 x 3 11.00 1.83
SIKU 30 x 30 x 3 8.16 1.36

UNP 200 x 80 x 7,5 x 11 148.00 24.67


HOLLOW 50 x 100 x 3 42.39 7.07 42.39
HOLLOW 100 x 200 x 4 113.04 18.84 113.04
PLAT 4.5 110.00 37.01 Cheker plat
PIPA 3 inch 67.75 11.29
PIPA 6 inch 169.55 28.26
PIPA 10 inch 361.80 60.30

PLAT 28 653.24 219.80 219.80


PLAT 26 606.57 204.10 204.10
PLAT 25 583.00 196.17 196.25
PLAT 24 560.00 188.43 188.40
PLAT 22 513.30 172.72 172.70
PLAT 21 490.00 164.88 164.85
PLAT 20 467.00 157.14 157.00
PLAT 19 443.30 149.16 149.15
PLAT 18 420.00 141.32 141.30
PLAT 16 373.00 125.51 125.60
PLAT 16 373.00 125.51 125.60
PLAT 15 350.00 117.77 117.75
PLAT 14 326.62 109.90 109.90
PLAT 12 280.00 94.22 94.20
PLAT 10 233.00 78.40 78.50
PLAT 8 187.00 62.92 62.80
PLAT 6 140.00 47.11 47.10
PLAT 5 117.00 39.37 39.25
LEMBAR PERHITUNGGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 1

Berat Total Jumlah Jumlah Jumlah


NO Uraian n Panjang Lebar Jumlah Luas Berat Baut Baut Baut Keterangan
BAJA CT SIKU CNP Hollow BESI 10 BESI 16 Plat 5 Plat 8 Plat 10 Plat 14 Plat 16 Plat 18 Plat 22 HTB 16 HTB 20 HTB 24
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)
(m) (m) (bh) (m2) (kg) (kg) (kg) (kg) (kg) (kg) (m) (m) (kg) (kg) (kg) (kg) (kg) (kg) (kg) (bh) (bh) (bh)

Truss TR-1
1 Batang A Diagonal - Siku 60 x 60 x 6 8 1.74 - 5.42 - - 75.42 - - - - - - - - - - - 24.00
Plate plat 10 8 0.10 0.10 2.00 0.01 78.40 - - - - - - - - - 12.54 - - - -
Batang A Vertikal - Siku 60 x 60 x 6 4 0.93 - 5.42 - - 20.12 - - - - - - - - - - - 12.00
Plate plat 10 4 0.10 0.10 2.00 0.01 78.40 - - - - - - - - - 6.27 - - - -

2 Batang B As AD-AG - CT 250 x 200 x 10 x 16 2 18.00 - 44.79 - 1,612.50 - - - - - - - - - - - -


Plat Joint plat 16 2 0.67 0.20 1.00 0.13 125.51 - - - - - - - - - - - 33.64 - - 16.00
Plat Joint plat 10 2 0.54 0.19 2.00 0.10 78.40 - - - - - - - - - 32.18 - - - - 12.00
End Plate plat 22 2 0.28 0.11 2.00 0.03 172.72 - - - - - - - - - - - - - 21.28 24.00
Stiffener plat 10 2 0.32 0.17 1.00 0.05 78.40 - - - - - - - - - 8.53 - - - -
Stiffener Segitiga plat 10 2 0.07 0.14 8.00 0.01 78.40 - - - - - - - - - 11.43 - - - -
Sambungan - - - - - - - - - - - - - -
Additional Plate Join plat 10 2 0.19 0.24 1.00 0.05 78.40 - - - - - - - - - 7.15 - - - -
Plat Joint plat 10 2 0.21 0.40 2.00 0.08 78.40 - - - - - - - - - 26.34 - - - -
Siku Siku 80 x 80 x 8 2 1.00 4.00 - 9.66 - - 19.32 - - - - - - - - - - - 16.00
Fly brace - - - - - - - - - - - - - -
Plat Joint plat 10 2 1.00 0.15 2.00 0.15 78.40 - - - - - - - - - 47.04 - - - - 8.00
-
3 Batang C Diagonal - Siku 70 x 70 x 6 16 1.74 - 6.38 - - 177.57 - - - - - - - - - - - 48.00
Plate plat 10 16 0.10 0.10 2.00 0.01 78.40 - - - - - - - - - 25.09 - - - -
Batang C Vertikal - Siku 70 x 70 x 6 8 0.93 - 6.38 - - 47.37 - - - - - - - - - - - 24.00
Plate plat 10 8 0.10 0.10 2.00 0.01 78.40 - - - - - - - - - 12.54 - - - -
-
4 Batang D Vertikal - Siku 80 x 80 x 8 4 0.93 - 9.66 - - 35.86 - - - - - - - - - - - 12.00
Plate plat 10 4 0.10 0.10 2.00 0.01 78.40 - - - - - - - - - 6.27 - - - -

BAJA
1 SB3 As AC-AH - A1'-A2' WF 300 x 150 x 6,5 x 9 2 22.60 - 36.67 1,657.33 - - - - - - - - - - - - -

2 SB3 As A1 - AC-AH WF 300 x 150 x 6,5 x 9 1 22.60 - 36.67 828.67 - - - - - - - - - - - - -


SB3 VT WF 300 x 150 x 6,5 x 9 12 0.15 - 36.67 66.00 - - - - - - - - - - - - -
SB3 VT WF 300 x 150 x 6,5 x 9 12 0.23 - 36.67 99.00 - - - - - - - - - - - - -
Stiffener plat 8 4 0.14 0.14 3.00 0.02 62.92 - - - - - - - - 15.28 - - - - -

3 SB3 As AH - A1'-A2' WF 300 x 150 x 6,5 x 9 1 15.00 - 36.67 550.00 - - - - - - - - - - - - -

4 SB3 As AC - A1-A2 WF 300 x 150 x 6,5 x 9 1 9.85 - 36.67 361.17 - - - - - - - - - - - - -

5 SG3 As A2 - AC-AH WF 300 x 150 x 6,5 x 9 2 2.29 - 36.67 168.23 - - - - - - - - - - - - -


Joint dengan WF - - - - - - - - - - - - - -
Plat Joint Sayap plat 14 2 0.45 0.15 1.00 0.07 109.90 - - - - - - - - - - 14.84 - - -
Plat Joint Badan plat 8 2 1.00 0.06 2.00 0.06 62.92 - - - - - - - - 15.42 - - - - - 8.00
Stiffener plat 8 2 0.29 0.07 1.00 0.02 62.92 - - - - - - - - 2.55 - - - - -
-
6 SG3 As A1'-A1 - AD-AG WF 300 x 150 x 6,5 x 9 6 2.05 - 36.67 451.00 - - - - - - - - - - - - -
Joint dengan WF - - - - - - - - - - - - - -
Plat Joint Sayap plat 14 6 0.45 0.15 1.00 0.07 109.90 - - - - - - - - - - 44.51 - - -
Plat Joint Badan plat 8 6 1.00 0.06 2.00 0.06 62.92 - - - - - - - - 46.25 - - - - - 24.00
Stiffener plat 8 6 0.29 0.07 1.00 0.02 62.92 - - - - - - - - 7.64 - - - - -

7 SG3 As A2-A2' - AD-AG WF 300 x 150 x 6,5 x 9 2 2.01 - 36.67 147.03 - - - - - - - - - - - - -


Joint dengan WF - - - - - - - - - - - - - -

1. BALOK C1 11 / 38
LEMBAR PERHITUNGGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 1
Plat Joint Sayap plat 14 2 0.45 0.15 1.00 0.07 109.90 - - - - - - - - - - 14.84 - - -
Plat Joint Badan plat 8 2 1.00 0.06 2.00 0.06 62.92 - - - - - - - - 15.42 - - - - - 8.00
Stiffener plat 8 2 0.29 0.07 1.00 0.02 62.92 - - - - - - - - 2.55 - - - - -

8 SG4 As AE - A1' - A2' WF 400 x 200 x 8 x 13 2 9.46 1.00 - 66.00 1,248.06 - - - - - - - - - - - - -


SG4 VT WF 400 x 200 x 8 x 13 2 0.20 - 66.00 26.40 - - - - - - - - - - - - -
SG4 VT WF 400 x 200 x 8 x 13 2 0.30 - 66.00 39.60 - - - - - - - - - - - - -
Stiffener plat 8 2 0.38 0.09 4.00 0.04 62.92 - - - - - - - - 18.07 - - - - -
Joint dengan TR - - - - - - - - - - - - - -
Plate plat 18 2 1.02 0.16 1.00 0.16 141.32 - - - - - - - - - - - - 46.13 -
Stiffener plat 8 2 0.32 0.09 8.00 0.03 62.92 - - - - - - - - 30.12 - - - - -
Fly Brace Siku 60 x 60 x 6 2 0.80 4.00 - 5.42 - - 8.62 - - - - - - - - - - - 16.00
Plate plat 10 2 1.00 0.04 4.00 0.04 78.40 - - - - - - - - - 23.83 - - - - 8.00

9 SG4 As A1-A2 - AE-AF WF 400 x 200 x 8 x 13 2 9.46 1.00 - 66.00 1,248.06 - - - - - - - - - - - - -


SG4 VT WF 400 x 200 x 8 x 13 2 0.20 - 66.00 26.40 - - - - - - - - - - - - -
SG4 VT WF 400 x 200 x 8 x 13 2 0.30 66.00 39.60 - - - - - - - - - - - - -

10 SB4 As A2-A2' - AE-AF WF 400 x 200 x 8 x 13 2 2.20 1.00 - 66.00 290.40 - - - - - - - - - - - - -

11 SB1A As A2-A2' - AD-AG WF 150 x 75 x 5 x 7 3 2.08 1.00 - 14.00 87.15 - - - - - - - - - - - - -


Joint dengan TR - - - - - - - - - - - - - -
Plat Joint WF plat 8 3 1.00 0.04 1.00 0.04 62.92 - - - - - - - - 6.80 - - - - - 6.00
Plat Joint TR atas plat 8 3 1.00 0.06 1.00 0.06 62.92 - - - - - - - - 10.95 - - - - - 6.00
Plat Joint TR atas plat 8 3 1.00 0.08 1.00 0.08 62.92 - - - - - - - - 15.46 - - - - - 6.00
Joint dengan WF
Plate Joint plat 8 3 1.00 0.04 2.00 0.04 62.92 - - - - - - - - 15.10 - - - - - 6.00
Stiffener plat 8 3 0.29 0.07 1.00 0.02 62.92 - - - - - - - - 3.82 - - - - -
-
12 SB1A As A2-A2' - AD-AG WF 150 x 75 x 5 x 7 7 2.08 1.00 - 14.00 203.35 - - - - - - - - - - - - -
Joint dengan WF
Plate Joint plat 8 7 1.00 0.04 4.00 0.04 62.92 - - - - - - - - 70.47 - - - - - 28.00
Stiffener plat 8 7 0.29 0.14 4.00 0.04 62.92 - - - - - - - - 71.30 - - - - -
-
Hollow -
1 B1 As AD-AG - A1-A2 H 100 x 200 x 4 7 18.20 1.00 - 18.84 - - - - 2,400.22 - - - - - - - - -
-
Gording/Purlin
1 CNP - CNP 125 x 50 x 20 x 3.2 2 22.60 2.00 - 6.17 - - - 278.73 - - - - - - - - - -
Plate plat 5 2 0.13 0.13 18.00 0.02 39.37 - - - - - - - 22.14 - - - - - - 72.00
Rip Plate plat 5 2 0.06 0.13 18.00 0.01 39.37 - - - - - - - 11.07 - - - - - -
2 CNP CNP 125 x 50 x 20 x 3.2 9 2.40 2.00 6.17 - - - 133.20 - - - - - - - - - -
Plate plat 5 9 0.13 0.13 4.00 0.02 39.37 - - - - - - - 22.14 - - - - - - 72.00
Rip Plate plat 5 9 0.06 0.13 4.00 0.01 39.37 - - - - - - - 11.07 - - - - - -

Ikatan Angin
1 Besi 16 BESI 10 2 10.51 2.00 0.62 - - - - - - 42.03 - - - - - - -
2 Besi 16 BESI 10 2 5.82 2.00 0.62 - - - - - - 23.28 - - - - - - -
3 Besi 16 BESI 10 2 6.99 6.00 0.62 - - - - - - 83.89 - - - - - - -

Trekstang
1 Besi 10 BESI 10 8 11.13 1.00 0.62 - - - - - 89.03 - - - - - - - -
2 Besi 10 BESI 10 16 2.34 1.00 0.62 - - - - - 37.52 - - - - - - - -

TOTAL 7,537.45 1,612.50 384.28 411.93 2,400.22 126.55 149.20 66.43 347.18 219.22 74.18 33.64 46.13 21.28 268.00 52.00 136.00

1. BALOK C1 12 / 38
LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Kolom Canopy 1

Berat Total Jumlah Baut


NO Uraian n Tinggi Lebar Jumlah Luas Berat Keterangan
WF 500 WF 588 Plat 8 Plat 10 Plat 12 Plat 14 Plat 18 Plat 22 Plat 26 Angkur M-22 Angkur M-25 HTB 16 HTB 18 HTB 22 HTB 25
(1) (2) (3) (4) (5) (6) (7) (8) (9) = (3) x (4) x (8) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (kg) (kg) (kg) (kg) (kg) (bh) (bh) (bh) (bh) (bh)

1 SC5 WF 500 x 200 x 10 x 16 Baja 4 5.97 89.58 2,138.89 - - - - - - - - 32.00 32.00


plat 22 Plendes 4 0.54 0.24 1.00 0.13 172.72 - - - - - - - 89.54 -
plat 10 Stifner 4 1.00 0.02 6.00 0.02 78.40 - - - 41.47 - - - - -
plat 14 Joint Plate 4 1.00 0.04 16.00 0.04 109.90 - - - - - 305.71 - - -
Fixed Joint WF300 plat 12 End Plate 4 0.53 0.20 3.00 0.11 94.22 - - - - 118.71 - - - - 144.00
plat 8 Stifner 4 0.05 0.10 24.00 0.00 62.92 - - 28.24 - - - - - -
WF400 plat 18 End Plate 4 0.75 0.24 1.00 0.18 141.32 - - - - - - 101.75 - - 56.00
plat 8 Stifner 4 0.06 0.12 10.00 0.01 62.92 - - 16.93 - - - - - -
-
2 SC5A WF 588 x 300 x 10 x 16 Baja 2 5.97 151.00 - 1,802.64 - - - - - - - 16.00 16.00
plat 26 Plendes 2 0.63 0.34 1.00 0.21 204.10 - - - - - - - - 87.44
plat 5 Stifner 2 1.00 0.04 3.00 0.04 39.37 - - - - - - - - -
plat 10 Joint Plate 2 1.00 0.06 12.00 0.06 78.40 - - - 120.68 - - - - - 288.00
plat 16 Joint Plate 2 1.00 0.06 4.00 0.06 125.51 - - - - - - - - - 96.00
Fixed Joint WF300 plat 12 End Plate 2 0.53 0.20 2.00 0.11 94.22 - - - - 39.57 - - - - 48.00
plat 8 Stifner 2 0.05 0.10 16.00 0.00 62.92 - - 9.41 - - - - - -
WF400 plat 18 End Plate 1 0.75 0.24 1.00 0.18 141.32 - - - - - - 25.44 - - 14.00
plat 8 Stifner 1 0.06 0.12 10.00 0.01 62.92 - - 4.23 - - - - - -
CT250 plat 18 End Plate 1 0.75 0.24 1.00 0.18 141.32 - - - - - - 25.44 - - 14.00
plat 8 Stifner 1 0.06 0.12 10.00 0.01 62.92 - - 4.23 - - - - - -

TOTAL KOLOM 2,138.89 1,802.64 63.06 162.15 158.28 305.71 152.63 89.54 87.44 32.00 16.00 576.00 84.00 32.00 16.00

2. KOLOM C1 13 / 38
LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 5

Berat Total Jumlah


NO Uraian n Panjang Lebar Jumlah Luas Berat Baut Keterangan
BAJA CNP BESI 10 BESI 16 Plat 5 Plat 6 Plat 8 Plat 12 HTB 16
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (m) (m) (kg) (kg) (kg) (kg) (bh)

BAJA
Horizontal
1 CSG2 As B2 - 6B-9B WF 200 x 100 x 5,5 x 8 2 1.36 - 21.33 58.03 - - - - - - -
CSG2 VT WF 200 x 100 x 5,5 x 8 2 0.20 - 21.33 8.53 - - - - - - -
Stiffener plat 6 2 0.19 0.05 2.00 0.01 47.11 - - - - - 1.64 - -

2 SB2 As B2 - 6B-9B WF 200 x 100 x 5,5 x 8 1 2.55 - 21.33 54.40 - - - - - - -


CSG2 VT WF 200 x 100 x 5,5 x 8 2 0.20 - 21.33 8.53 - - - - - - -
Stiffener plat 6 2 0.19 0.05 2.00 0.01 47.11 - - - - - 1.64 - -

3 CSB2 As B2-B2.8 - 6B-9B WF 200 x 100 x 5,5 x 8 8 1.41 - 21.33 240.64 - - - - - - -

4 SB2 As B2-B2.8 - 6B-9B WF 200 x 100 x 5,5 x 8 4 2.56 - 21.33 218.45 - - - - - - -


SB2 VT WF 200 x 100 x 5,5 x 8 8 0.48 - 21.33 81.92 - - - - - - -
Plat Joint Sayap Atas plat 12 4 0.88 0.10 2.00 0.09 94.22 - - - - - - - 66.33
Plat Joint Badan plat 8 4 1.00 0.07 0.07 62.92 - - - - - - - -
Plat Joint Sayap Bawah plat 12 4 0.88 0.10 0.09 94.22 - - - - - - - -

5 CSG2 As B2.8-B3 - 6B-9B WF 200 x 100 x 5,5 x 8 4 1.51 - 21.33 128.51 - - - - - - -


CSG2 VT WF 200 x 100 x 5,5 x 8 4 0.20 - 21.33 17.07 - - - - - - -
Stiffener plat 6 4 0.19 0.05 2.00 0.01 47.11 - - - - - 3.28 - -

6 SG2 As B2.8-B3 - 6B-9B WF 200 x 100 x 5,5 x 8 2 2.84 - 21.33 121.26 - - - - - - -


CSG2 VT WF 200 x 100 x 5,5 x 8 2 0.20 - 21.33 8.53 - - - - - - -
Stiffener plat 6 2 0.19 0.05 2.00 0.01 47.11 - - - - - 1.64 - -

7 CSB2 As B4 - 6B-9B WF 200 x 100 x 5,5 x 8 2 1.46 - 21.33 62.29 - - - - - - -


Plat Joint plat 8 2 1.00 0.02 1.00 0.02 62.92 - - - - - - 2.97 - 4.00

8 SB2 As B4 - 6B-9B WF 200 x 100 x 5,5 x 8 1 2.84 - 21.33 60.63 - - - - - - -


Plat Joint plat 8 1 1.00 0.02 2.00 0.02 62.92 - - - - - - 2.97 - 4.00

Vertikal
9 SB1A As B2-B2.8 - 6B-9B WF 150 x 75 x 5 x 7 10 2.38 - 14.00 332.50 - - - - - - -
Plat Joint Badan plat 8 10 1.00 0.02 4.00 0.02 62.92 - - - - - - 57.89 - 40.00

3. BALOK C5 14 / 38
LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 5
10 SB1A As B2.8-B3 - 7B-9B WF 150 x 75 x 5 x 7 2 3.28 - 14.00 91.70 - - - - - - -
Plat Joint Badan plat 8 2 1.00 0.02 4.00 0.02 62.92 - - - - - - 11.58 - 8.00

12 SB1A As B3-B4 - 7B-9B WF 150 x 75 x 5 x 7 2 0.95 - 14.00 26.52 - - - - - - -


Plat Joint Badan plat 8 2 1.00 0.02 4.00 0.02 62.92 - - - - - - 11.58 - 8.00

13 SG4 As B2-B2.8 - 7B-8B WF 400 x 200 x 8 x 13 2 12.05 - 66.00 1,590.60 - - - - - - -


SG4 VT WF 400 x 200 x 8 x 13 2 0.40 - 66.00 52.80 - - - - - - -
Stiffener plat 8 2 0.38 0.09 2.00 0.04 62.92 - - - - - - 9.04 -

14 SG2 As B2.8-B8 - 7B-8B WF 200 x 100 x 5,5 x 8 2 0.91 - 21.33 38.78 - - - - - - -


SG2 VT WF 200 x 100 x 5,5 x 8 2 0.20 2.00 - 21.33 8.53 - - - - - - -
Stiffener plat 6 2 0.19 0.05 4.00 0.01 47.11 - - - - - 3.28 - -

15 SG2 As B2.8-B8 - 7B-8B WF 200 x 100 x 5,5 x 8 2 3.00 - 21.33 128.00 - - - - - - -


SG2 VT WF 200 x 100 x 5,5 x 8 2 0.20 1.00 - 21.33 8.53 - - - - - - -
Stiffener plat 6 2 0.19 0.05 2.00 0.01 47.11 - - - - - 1.64 - -

Ikatan Angin - - - - - - - -
1 Besi 16 BESI 16 5 6.61 1.00 1.58 - - - 33.04 - - - -
2 Besi 16 BESI 16 1 7.76 1.00 1.58 - - - 7.76 - - - -

Gording
1 CNP - CNP 125 x 50 x 20 x 3.2 15 5.87 6.17 - 542.98 - - - - - -
Plate plat 5 15 0.13 0.10 4.00 0.01 39.37 - - - - 29.53 - - - 120.00
Rip Plate plat 5 15 0.06 0.07 4.00 0.00 39.37 - - - - 10.33 - - -

Trekstang
1 Besi 10 BESI 10 3 19.05 1.00 0.62 - - 57.16 - - - - -

TOTAL 3,346.77 542.98 57.16 40.80 39.86 13.11 96.02 66.33 184.00

3. BALOK C5 15 / 38
LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Kolom Canopy 5

Berat Total Jumlah Baut


NO Uraian n Tinggi Lebar Jumlah Luas Berat Keterangan
WF 400 Plat 8 Plat 14 Plat 18 Angkur M-19 HTB 16 HTB 19
(1) (2) (3) (4) (5) (6) (7) (8) (9) = (3) x (4) x (8) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (kg) (kg) (bh) (bh) (bh)

1 K2
SG4 plat 18 End Plate 2 0.84 0.24 1.00 0.20 141.32 - - - 56.98 40.00 40.00
plat 8 Stifner 2 0.06 0.12 16.00 0.01 62.92 - 13.55 - -
SG2 plat 18 End Plate 2 0.44 0.20 2.00 0.09 141.32 - - - 49.75 48.00 -
plat 8 Stifner 2 0.05 0.10 8.00 0.00 62.92 - 4.76 - -
- - -
2 SC4 As B.28 WF 400 x 200 x 8 x 13 Baja 2 4.69 66.00 619.34 - - - 12.00 12.00
Joint Kolom Pedestal plat 18 Plendes 2 0.44 0.24 1.00 0.11 141.32 - - - 29.85
plat 8 Stifner 2 1.00 0.02 6.00 0.02 62.92 - 16.65 - -
plat 14 Joint Plate 2 1.00 0.03 12.00 0.03 109.90 - - 79.82 -
SG4 plat 18 End Plate 2 0.84 0.24 1.00 0.20 141.32 - - - 56.98 40.00
plat 8 Stifner 2 0.06 0.12 16.00 0.01 62.92 - 13.55 - -
SG2 plat 18 End Plate 2 0.75 0.24 1.00 0.18 141.32 - - - 50.88 16.00
plat 8 Stifner 2 0.06 0.12 4.00 0.01 62.92 - 3.39 - -

3 SC4 As B.3 WF 400 x 200 x 8 x 13 Baja 2 4.69 66.00 619.34 - - - 12.00 12.00
Joint Kolom Pedestal plat 18 Plendes 2 0.44 0.24 1.00 0.11 141.32 - - - 29.85
plat 14 Joint Plate 2 1.00 0.03 12.00 0.03 109.90 - - 79.82 -
plat 8 Stifner 2 1.00 0.02 6.00 0.02 62.92 - 16.65 - -
SG2 plat 18 End Plate 2 0.75 0.24 4.00 0.18 141.32 - - - 203.50 64.00
plat 8 Stifner 2 0.06 0.12 16.00 0.01 62.92 - 13.55 - -

TOTAL KOLOM 1,238.69 82.08 159.64 477.78 64.00 168.00 64.00

4. KOLOM C5 16 / 38
LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 6

Berat Total Jumlah Baut


NO Uraian n Panjang Lebar Jumlah Luas Berat Keterangan
BAJA Pipa CNP BESI 10 BESI 16 Plat 5 Plat 6 Plat 8 Plat 10 Plat 12 HTB 16 HTB 20
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (kg) (m) (m) (kg) (kg) (kg) (kg) (kg) (bh) (bh)

BAJA
Horizontal
1 SG2 As B2 - 8B-9B WF 200 x 100 x 5,5 x 8 2 0.62 - 21.33 26.24 - - - - - - - - -

2 SG2 As B2 - 9B-29B WF 200 x 100 x 5,5 x 8 20 4.50 - 21.33 1,920.00 - - - - - - - - -


SG2 VT WF 200 x 100 x 5,5 x 8 40 0.20 - 21.33 170.67 - - - - - - - - -
Stiffener plat 6 20 0.19 0.05 80.00 0.01 47.11 - - - - - - 655.29 - - -

3 SB2 As B2 - 9B-29B WF 200 x 100 x 5,5 x 8 1 4.70 - 21.33 100.27 - - - - - - - - -


Plat Joint plat 8 1 1.00 0.02 4.00 0.02 62.92 - - - - - - - 5.96 - - 2.00

4 SB1A As B2-B2.8 - 9B-29B WF 150 x 75 x 5 x 7 19 4.70 - 14.00 1,250.20 - - - - - - - - -


Plat Joint plat 8 19 1.00 0.02 2.00 0.02 62.92 - - - - - - - 55.40 - - 76.00

Vertikal
5 SG2 As B2 - 9B-29B WF 200 x 100 x 5,5 x 8 21 3.40 - 21.33 1,523.20 - - - - - - - - -
SG2 VT WF 200 x 100 x 5,5 x 8 21 0.20 - 21.33 89.60 - - - - - - - - -
Stiffener plat 6 21 0.19 0.05 2.00 0.01 47.11 - - - - - - 17.20 - - -

Pipa
1 Pipa pipa 3 inch 21 2.84 - 11.29 - 672.72 - - - - - - - -
2 Sambungan SG2
Joint plate plat 10 21 1.00 0.04 1.00 0.04 78.40 - - - - - - - - 67.73 -
Plat penutup plat 6 21 1.00 0.44 1.00 0.44 47.11 - - - - - - 436.82 - - -
Joint plate plat 12 21 0.26 0.31 1.00 0.08 94.22 - - - - - - - - - 159.47 63.00
Stiffener plat 12 21 0.10 0.19 6.00 0.02 94.22 - - - - - - - - - 214.27
Stiffener SG2 plat 6 21 0.18 0.05 4.00 0.01 47.11 - - - - - - 34.40 - - -

Gording
1 CNP CNP 150 x 50 x 20 x 3.2 3 97.09 - 6.76 - - 1,968.99 - - - - - - -
Plate plat 5 3 0.13 0.10 21.00 0.01 39.37 - - - - - 31.00 - - - - 126.00
Rip Plate plat 5 3 0.06 0.07 21.00 0.00 39.37 - - - - - 10.85 - - - -

Ikatan Angin
1 Besi 16 BESI 16 20 11.39 1.00 - 1.58 - - - - 227.78 - - - - -

Trekstang
1 Besi 10 BESI 10 20 3.97 1.00 - 0.62 - - - 79.37 - - - - - -

TOTAL 5,080.17 672.72 1,968.99 79.37 227.78 41.85 1,143.71 61.36 67.73 373.74 204.00 63.00

5. BALOK C6 17 / 38
LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Kolom Canopy 6

Berat Total Jumlah Baut


NO Uraian n Tinggi Lebar Jumlah Luas Berat Keterangan
Plat 6 Plat 10 Plat 12 Plat 14 Angkur M-16 HTB 16 HTB 20
(1) (2) (3) (4) (5) (6) (7) (8) (9) = (3) x (4) x (8) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (kg) (kg) (bh) (bh)

1 K2
SG2 plat 12 End Plate 21 0.44 0.20 1.00 0.09 94.22 - - 174.11 - 252.00
plat 6 Stifner 21 0.05 0.10 1.00 0.00 47.11 4.67 - - -

2 PIPA
Sambungan ke kolom beton plat 10 joint plate 21 1.00 0.04 1.00 0.04 78.40 - 63.33 - -
plat 6 plat penutup 21 1.00 0.44 1.00 0.44 47.11 436.82 - - -
plat 12 joint plate 21 0.26 0.12 1.00 0.03 94.22 - - 61.73 - 63.00
plat 14 end plate 21 0.20 0.30 1.00 0.06 109.90 - - - 138.48 126.00 126.00
plat 10 stiffener 21 0.05 0.09 4.00 0.00 78.40 - 29.10 - -

TOTAL KOLOM 441.49 92.42 235.84 138.48 126.00 378.00 63.00

6. KOLOM C6 18 / 38
LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 7

Berat Total Jumlah Baut


NO Uraian n Panjang Lebar Jumlah Luas Berat Keterangan
BAJA PIPA CNP BESI 10 BESI 16 Plat 5 Plat 6 Plat 8 Plat 10 Plat 12 HTB 16 HTB 20
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (kg) (m) (m) (kg) (kg) (kg) (kg) (kg) (bh) (bh)

BAJA
Horizontal
1 SG2 As B2.8-B3 - 8B-9B WF 200 x 100 x 5,5 x 8 2 0.62 - 21.33 26.24 - - - - - - - - -

2 SB2 As B2 - 9B-29B WF 200 x 100 x 5,5 x 8 1 4.70 - 21.33 100.27 - - - - - - - - -


Plat Joint plat 8 1 1.00 0.02 4.00 0.02 62.92 - - - - - - - 5.96 - - 2.00

3 SB1A As B2.8 - 7B-9B WF 150 x 75 x 5 x 7 6 4.70 - 14.00 394.80 - - - - - - - - -


Plat Joint plat 8 6 1.00 0.02 4.00 0.02 62.92 - - - - - - - 34.99 - - 48.00
- -
4 SG2 As B2.8 - 9B-29B WF 200 x 100 x 5,5 x 8 7 4.70 - 21.33 701.87 - - - - - - - - -
SG2 VT WF 200 x 100 x 5,5 x 8 7 0.20 - 21.33 29.87 - - - - - - - - -
Stiffener plat 6 7 0.19 0.05 4.00 0.01 47.11 - - - - - - 11.47 - - -

Vertikal
5 SG2 As B3 - 9B-29B WF 200 x 100 x 5,5 x 8 7 3.93 - 21.33 586.28 - - - - - - - - -
SG2 VT WF 200 x 100 x 5,5 x 8 7 0.20 - 21.33 29.87 - - - - - - - - -
Stiffener plat 6 7 0.19 0.05 4.00 0.01 47.11 - - - - - - 11.47 - - -
Plat Joint plat 8 6 1.00 0.02 4.00 0.02 62.92 - - - - - - - 34.99 - - 48.00

6 SG2 As B3 - 9B-29B WF 200 x 100 x 5,5 x 8 1 3.93 - 21.33 83.75 - - - - - - - - -


SG2 VT WF 200 x 100 x 5,5 x 8 1 0.20 - 21.33 4.27 - - - - - - - - -
Stiffener plat 6 1 0.19 0.05 2.00 0.01 47.11 - - - - - - 0.82 - - -
Plat Joint plat 8 6 1.00 0.02 4.00 0.02 62.92 - - - - - - - 34.99 - - 48.00

Pipa
1 Pipa pipa 3 inch 7 2.84 - 11.29 - 224.24 - - - - - - - -
2 Sambungan SG2
Joint Plate plat 12 7 0.34 0.26 1.00 0.09 94.22 - - - - - - - - - 58.30 21.00
Joint Plate plat 10 7 1.00 0.04 1.00 0.04 78.40 - - - - - - - - 22.58 -
Plat Penutup plat 6 7 1.00 0.00 1.00 0.00 47.11 - - - - - - 0.23 - - -
Stifner plat 12 7 0.19 0.10 6.00 0.02 94.22 - - - - - - - - - 71.42
Stifner SG2 plat 6 7 0.19 0.05 4.00 0.01 47.11 - - - - - - 11.47 - - -

Gording
1 CNP CNP 150 x 50 x 20 x 3.2 4 33.96 - 6.76 - - 918.33 - - - - - - -
Plate plat 5 4 0.13 0.10 8.00 0.01 39.37 - - - - - 15.75 - - - - 64.00
Rip Plate plat 5 4 0.06 0.07 8.00 0.00 39.37 - - - - - 5.51 - - - -

Ikatan Angin
1 Besi 16 BESI 16 7 11.71 1.00 1.58 - - - - 81.97 - - - - -

7. BALOK C7 19 / 38
LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 7
Trekstang
1 Besi 10 BESI 10 7 4.52 1.00 0.62 - - - 31.64 - - - - - -

TOTAL 1,957.21 224.24 918.33 31.64 81.97 21.26 35.45 110.93 22.58 129.72 210.00 21.00

7. BALOK C7 20 / 38
LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Kolom Canopy 7

Berat Total Jumlah Baut


NO Uraian n Tinggi Lebar Jumlah Luas Berat Keterangan
WF 450 Pipa 3" Plat 6 Plat 10 Plat 12 Plat 14 Plat 28 Angkur M-19 HTB 16 HTB 19 HTB 20
(1) (2) (3) (4) (5) (6) (7) (8) (9) = (3) x (4) x (8) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (kg) (kg) (kg) (kg) (bh) (bh) (bh)

1 SC4A WF 450 x 200 x 9 x 14 Baja 7 4.66 76.00 2,479.12 - - - - - -


plat 28 Plendes 7 0.75 0.25 1.00 0.19 219.80 - - - - - - 288.49 84.00 84.00
plat 12 Stifner 7 1.00 0.04 8.00 0.04 94.22 - - - - 195.87 - -
plat 14 Plat Joint 7 1.00 0.03 12.00 0.03 109.90 - - - - - 279.38 -
plat 12 End Plate 7 0.33 0.20 3.00 0.07 94.22 - - - - 130.58 - - 168.00
plat 6 Stifner 7 0.10 0.05 12.00 0.00 47.11 - - 18.73 - - - -

2 PIPA
Sambungan SC4A plat 14 End Plate 7 0.30 0.20 1.00 0.06 109.90 - - - - - 46.16 - 42.00
plat 12 Joint Plate 7 1.00 0.07 1.00 0.07 94.22 - - - - 47.66 - - 21.00
plat 6 Plat Penutup 7 1.00 0.00 1.00 0.00 47.11 - - 0.23 - - - -
plat 10 Stifner 7 0.12 0.06 4.00 0.01 78.40 - - - 15.81 - - -
plat 10 Stifner SC4A 7 0.43 0.09 4.00 0.04 78.40 - - - 88.19 - - -

TOTAL KOLOM 2,479.12 - 18.96 104.00 374.11 325.54 288.49 84.00 210.00 84.00 21.00

8. KOLOM C7 21 / 38
LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 8

Jumlah
Berat Total
NO Uraian n Panjang Lebar Jumlah Luas Berat Baut Keterangan
BAJA CNP BESI 10 BESI 16 Plat 5 Plat 6 Plat 8 HTB 16
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (m) (m) (kg) (kg) (kg) (bh)

BAJA
Horizontal FFL +4.6
1 SB2 As B2.8-B3 - 16B-18B.4 WF 200 x 100 x 5,5 x 8 2 11.36 - 21.33 484.86 - - - - - -
Plat Joint plat 8 2 1.00 0.02 4.00 0.02 62.92 - - - - - - 11.93 8.00

2 SG2 As B2.8-B3 - 16B-18B.4 WF 200 x 100 x 5,5 x 8 2 10.77 - 21.33 459.31 - - - - - -


SG2 VT WF 200 x 100 x 5,5 x 8 8 0.20 - 21.33 34.13 - - - - - -
Stiffener plat 6 2 0.19 0.05 8.00 0.01 47.11 - - - - - 6.55 -

Horizontal FFL +5.6


3 SG2 As B2.8-B3 - 16B-18B.4 WF 200 x 100 x 5,5 x 8 2 4.39 - 21.33 187.31 - - - - - -
SG2 VT WF 200 x 100 x 5,5 x 8 4 0.20 - 21.33 17.07 - - - - - -
Stiffener plat 6 2 0.19 0.05 8.00 0.01 47.11 - - - - - 6.55 -

Vertikal FFL +4.6


4 SG2 As B2.8-B3 - 16B-18B.4 WF 200 x 100 x 5,5 x 8 3 3.65 - 21.33 233.28 - - - - - -
SG2 VT WF 200 x 100 x 5,5 x 8 12 0.20 - 21.33 51.20 - - - - - -
Stiffener plat 6 3 0.19 0.05 8.00 0.01 47.11 - - - - - 9.83 -

Vertikal FFL +4.6


5 SG2 As B2.8-B3 - 16B-18B.4 WF 200 x 100 x 5,5 x 8 1 1.79 - 21.33 38.21 - - - - - -
SG2 VT WF 200 x 100 x 5,5 x 8 2 0.20 - 21.33 8.53 - - - - - -
Stiffener plat 6 2 0.19 0.05 2.00 0.01 47.11 - - - - - 1.64 -

Gording
1 CNP CNP 100 x 50 x 20 x 3.2 10 3.65 - 5.50 - 200.48 - - - - -
Plate plat 5 10 0.13 0.10 4.00 0.01 39.37 - - - - 19.68 - - 80.00
Rip Plate plat 5 10 0.06 0.07 4.00 0.00 39.37 - - - - 6.89 - -

Ikatan Angin
1 Besi 16 BESI 16 1 13.61 1.00 1.58 - - - 13.61 - - -
2 Besi 16 BESI 16 1 9.68 1.00 1.58 - - - 9.68 - - -

Trekstang
1 Besi 10 BESI 10 2 13.07 1.00 0.62 - - 26.14 - - - -

9. BALOK C8 22 / 38
LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 8

TOTAL 1,513.90 200.48 26.14 23.29 26.57 24.57 11.93 88.00

9. BALOK C8 23 / 38
LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Kolom Canopy 8

Berat Total Jumlah Baut


NO Uraian n Tinggi Lebar Jumlah Luas Berat Keterangan
WF 400 Plat 6 Plat 8 Plat 12 Plat 14 Plat 18 Angkur M-19 HTB 16 HTB 19
(1) (2) (3) (4) (5) (6) (7) (8) (9) = (3) x (4) x (8) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (kg) (kg) (kg) (kg) (bh) (bh) (bh)

1 SC4 WF 400 x 200 x 8 x 13 Baja 2 4.22 66.00 557.50 - - - - -


plat 18 Plendes 2 0.44 0.20 1.00 0.09 141.32 - - - - - 24.87 12.00 12.00
plat 8 Stifner 2 1.00 0.02 8.00 0.02 62.92 - - 22.20 - - -
plat 14 Joint Plate 2 1.00 0.03 12.00 0.03 109.90 - - - - 79.82 -
plat 12 End Plate 2 0.33 0.20 2.00 0.07 94.22 - - - 24.87 - - 32.00
plat 6 Stifner 2 0.10 0.05 8.00 0.00 47.11 - 3.57 - - - -

2 SC4 WF 400 x 200 x 8 x 13 Baja 2 5.48 66.00 722.96 - - - - -


plat 18 Plendes 2 0.44 0.20 1.00 0.09 141.32 - - - - - 24.87 12.00 12.00
plat 8 Stifner 2 1.00 0.02 8.00 0.02 62.92 - - 22.20 - - -
plat 14 Joint Plate 2 1.00 0.03 12.00 0.03 109.90 - - - - 79.82 -
plat 12 End Plate 2 0.33 0.20 3.00 0.07 94.22 - - - 37.31 - - 48.00
plat 6 Stifner 2 0.10 0.05 12.00 0.00 47.11 - 5.35 - - - -

3 SC4 WF 400 x 200 x 8 x 13 Baja 2 5.48 66.00 722.96 - - - - -


plat 18 Plendes 2 0.44 0.20 1.00 0.09 141.32 - - - - - 24.87 12.00 12.00
plat 8 Stifner 2 1.00 0.02 8.00 0.02 62.92 - - 22.20 - - -
plat 14 Joint Plate 2 1.00 0.03 12.00 0.03 109.90 - - - - 79.82 -
plat 12 End Plate 2 0.33 0.20 2.00 0.07 94.22 - - - 24.87 - - 32.00
plat 6 Stifner 2 0.10 0.05 8.00 0.00 47.11 - 3.57 - - - -

TOTAL KOLOM 2,003.43 12.49 66.60 87.05 239.47 74.62 36.00 112.00 36.00

10. KOLOM C8 24 / 38
LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 9

Berat Total Jumlah Baut


NO Uraian n Panjang Lebar Jumlah Luas Berat Keterangan
BAJA PIPA CNP BESI 10 BESI 16 Plat 5 Plat 6 Plat 8 Plat 10 Plat 12 HTB 16 HTB 20
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (kg) (m) (m) (kg) (kg) (kg) (kg) (kg) (bh) (bh)

BAJA
Horizontal
1 CSB1A As B2.8 - 18B.4-19B WF 150 x 75 x 5 x 7 1 2.65 - 14.00 37.10 - - - - - - - - -
Plat Joint plat 8 1 1.00 0.02 4.00 0.02 62.92 - - - - - - - 5.83 - - 8.00

2 SB1A As B2.8 - 19B-28B WF 150 x 75 x 5 x 7 8 4.70 - 14.00 526.40 - - - - - - - - -


Plat Joint plat 8 8 1.00 0.02 4.00 0.02 62.92 - - - - - - - 46.65 - - 64.00

3 SB2 As B2.8 - 27B-28B WF 200 x 100 x 5,5 x 8 1 4.70 - 21.33 100.27 - - - - - - - - -


Plat Joint plat 8 1 1.00 0.02 4.00 0.02 62.92 - - - - - - - 5.96 - - 8.00

4 CSB2 As B2.8 - 28B-29B WF 200 x 100 x 5,5 x 8 1 1.45 - 21.33 30.93 - - - - - - - - -


Plat Joint plat 8 1 1.00 0.02 4.00 0.02 62.92 - - - - - - - 5.96 - - 8.00

5 CSG2 As B3 - 18B.4-19B WF 200 x 100 x 5,5 x 8 1 1.45 - 21.33 30.93 - - - - - - - - -


SCG2 VT WF 200 x 100 x 5,5 x 8 1 0.20 - 21.33 4.27 - - - - - - - - -
Stiffener plat 6 1 0.19 0.05 2.00 0.01 47.11 - - - - - - 0.82 - - -

6 SG2 As B3 - 19B-28B WF 200 x 100 x 5,5 x 8 9 4.70 - 21.33 902.40 - - - - - - - - -


SCG2 VT WF 200 x 100 x 5,5 x 8 9 0.20 - 21.33 38.40 - - - - - - - - -
Stiffener plat 6 9 0.19 0.05 4.00 0.01 47.11 - - - - - - 14.74 - - -

7 CSG2 As B3 - 28B-29B WF 200 x 100 x 5,5 x 8 1 1.45 - 21.33 30.93 - - - - - - - - -


SCG2 VT WF 200 x 100 x 5,5 x 8 1 0.20 - 21.33 4.27 - - - - - - - - -
Stiffener plat 6 1 0.19 0.05 2.00 0.01 47.11 - - - - - - 0.82 - - -

Vertikal
8 SG2 As B3 - 18B-28B WF 200 x 100 x 5,5 x 8 11 3.93 - 21.33 921.30 - - - - - - - - -
SG2 VT WF 200 x 100 x 5,5 x 8 11 0.20 - 21.33 46.93 - - - - - - - - -
Stiffener plat 6 11 0.19 0.05 2.00 0.01 47.11 - - - - - - 9.01 - - -
Plat Joint plat 8 11 1.00 0.02 2.00 0.02 62.92 - - - - - - 32.07 - - -

9 SG2 As B3 - 28B-29B WF 200 x 100 x 5,5 x 8 1 3.93 - 21.33 83.75 - - - - - - - - -


SG2 VT WF 200 x 100 x 5,5 x 8 1 0.20 - 21.33 4.27 - - - - - - - - -
Stiffener plat 6 1 0.19 0.05 2.00 0.01 47.11 - - - - - - 0.82 - - -
Plat Joint plat 8 1 1.00 0.02 2.00 0.02 62.92 - - - - - - 2.92 - - -

Pipa
1 Pipa pipa 3 inch 10 2.84 - 11.29 - 320.34 - - - - - - - -
2 Sambungan SG2
Joint Plate plat 12 10 0.34 0.26 1.00 0.09 94.22 - - - - - - - - - 83.29 30.00
Joint Plate plat 10 10 1.00 0.04 1.00 0.04 78.40 - - - - - - - - 32.25 -
Plat Penutup plat 6 10 1.00 0.00 1.00 0.00 47.11 - - - - - - 0.33 - - -

11. BALOK C9 25 / 38
LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 9
Stifner plat 12 10 0.19 0.10 6.00 0.02 94.22 - - - - - - - - - 102.03
Stifner SG2 plat 6 10 0.19 0.05 4.00 0.01 47.11 - - - - - - 16.38 - - -

Gording
1 CNP CNP 150 x 50 x 20 x 3.2 4 47.75 - 6.76 - - 1,291.16 - - - - - - -
Plate plat 5 4 0.13 0.10 12.00 0.01 39.37 - - - - - 23.62 - - - - 96.00
Rip Plate plat 5 4 0.06 0.07 12.00 0.00 39.37 - - - - - 8.27 - - - -

Ikatan Angin
1 Besi 16 BESI 16 1 8.79 1.00 1.58 - - - - 8.79 - - - - -
2 Besi 16 BESI 16 9 11.71 1.00 1.58 - - - - 105.39 - - - - -

Trekstang
1 Besi 10 BESI 10 7 4.52 1.00 0.62 - - - 31.64 - - - - - -

TOTAL 2,762.16 320.34 1,291.16 31.64 114.18 31.89 77.91 64.41 32.25 185.32 184.00 30.00

11. BALOK C9 26 / 38
LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Kolom Canopy 9

Berat Total Jumlah Baut


NO Uraian n Tinggi Lebar Jumlah Luas Berat Keterangan
WF 450 Pipa 3" Plat 6 Plat 10 Plat 12 Plat 14 Plat 28 Angkur M-29 HTB 16 HTB 19 HTB 20
(1) (2) (3) (4) (5) (6) (7) (8) (9) = (3) x (4) x (8) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (kg) (kg) (kg) (kg) (bh) (bh) (bh)

1 SC4A WF 450 x 200 x 9 x 14 Baja 10 4.66 76.00 3,541.60 - - - - - -


plat 28 Plendes 10 0.75 0.25 1.00 0.19 219.80 - - - - - - 412.13 120.00 120.00
plat 12 Stifner 10 1.00 0.04 8.00 0.04 94.22 - - - - 279.82 - -
plat 14 Joint Plate 10 1.00 0.03 12.00 0.03 109.90 - - - - - 399.11 -
plat 12 End Plate 10 0.33 0.20 3.00 0.07 94.22 - - - - 186.55 - - 240.00
plat 6 Stifner 10 0.10 0.05 12.00 0.00 47.11 - - 26.76 - - - -

2 PIPA
Sambungan SC4A plat 14 End Plate 10 0.30 0.20 1.00 0.06 109.90 - - - - - 65.94 - 60.00
plat 12 Joint Plate 10 1.00 0.07 1.00 0.07 94.22 - - - - 68.08 - - 30.00
plat 6 Plat Penutup 10 1.00 0.00 1.00 0.00 47.11 - - 0.33 - - - -
plat 10 Stifner 10 0.12 0.06 4.00 0.01 78.40 - - - 22.58 - - -
plat 10 Stifner SC4A 10 0.43 0.09 4.00 0.04 78.40 - - - 125.99 - - -

TOTAL KOLOM 3,541.60 - 27.09 148.57 534.45 465.05 412.13 120.00 300.00 120.00 30.00

12. KOLOM C9 27 / 38
LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 10

Berat Total Jumlah Baut


NO Uraian n Panjang Lebar Jumlah Luas Berat Keterangan
BAJA CNP BESI 10 BESI 16 Plat 5 Plat 8 Plat 10 Plat 14 Plat 18 HTB 16 HTB 20
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (kg) (kg) (kg) (kg) (kg) (kg) (kg) (bh) (bh)

BAJA
Horizontal
1 CSB3 - WF 300 x 150 x 6,5 x 9 2 1.45 - 36.67 106.33 - - - - - - - -
Plat Joint SG3 plat 8 2 1.00 0.05 2.00 0.05 62.92 - - - - - 13.14 - - - 8.00
Stiffener SG3 plat 8 2 0.29 0.07 2.00 0.02 62.92 - - - - - 5.09 - - -
Plat Joint Sayap SG3 plat 14 2 0.75 0.11 2.00 0.08 109.90 - - - - - - - 36.27 -
Plat Joint SGB1A plat 8 2 1.00 0.05 2.00 0.05 62.92 - - - - - 12.91 - - - 8.00
Stiffener SB1A plat 8 2 0.29 0.07 2.00 0.02 62.92 - - - - - 5.09 - - -
-
2 SB3 - WF 300 x 150 x 6,5 x 9 1 8.85 - 36.67 324.50 - - - - - - - -
Plat Joint SB2A plat 8 2 1.00 0.04 4.00 0.04 62.92 - - - - - 21.53 - - - 6.00
Stiffener SB2A plat 8 2 0.29 0.07 4.00 0.02 62.92 - - - - - 10.19 - - -
Plat Joint Sayap SB2A plat 14 2 0.65 0.85 2.00 0.55 109.90 - - - - - - - 242.88 -

3 CSG4 WF 400 x 200 x 8 x 13 2 1.60 - 66.00 210.67 - - - - - - - -


Joint Plat plat 10 2 1.00 0.04 2.00 0.04 78.40 - - - - - - 11.67 - - 8.00
Stiffener plat 8 2 0.38 0.09 2.00 0.04 62.92 - - - - - 9.04 - - -

4 SG4 WF 400 x 200 x 8 x 13 1 8.99 - 66.00 593.47 - - - - - - - -


Joint Plat plat 10 2 1.00 0.04 2.00 0.04 78.40 - - - - - - 11.67 - - 8.00
Stiffener plat 8 2 0.38 0.09 2.00 0.04 62.92 - - - - - 9.04 - - -

5 CSB4 WF 400 x 200 x 8 x 13 2 1.50 - 66.00 198.00 - - - - - - - -


Joint Plate SG4 plat 10 2 1.00 0.08 2.00 0.08 78.40 - - - - - - 23.68 - - 8.00
Joint Plate Sayap plat 18 2 1.00 0.16 2.00 0.16 141.32 - - - - - - - - 90.45
Stiffener plat 8 2 0.38 0.09 2.00 0.04 62.92 - - - - - 9.04 - - -

6 SG4 WF 400 x 200 x 8 x 13 1 8.80 - 66.00 580.80 - - - - - - - -


Joint Plate SG4 plat 10 2 1.00 0.08 2.00 0.08 78.40 - - - - - - 23.68 - - 8.00
Stiffener plat 8 2 0.38 0.09 2.00 0.04 62.92 - - - - - 9.04 - - -

7 CSB3 - WF 300 x 150 x 6,5 x 9 2 1.50 - 36.67 110.00 - - - - - - - -


CSB3 VT - WF 300 x 150 x 6,5 x 9 2 0.15 - 36.67 11.00 - - - - - - - -
Plat Joint SG4 plat 8 2 1.00 0.06 2.00 0.06 62.92 - - - - - 15.45 - - - 8.00
Stiffener plat 8 2 0.29 0.07 2.00 0.02 62.92 - - - - - 5.09 - - -
Plat Joint Sayap SG3 plat 14 2 0.75 0.11 2.00 0.08 109.90 - - - - - - - 36.27 -
Plat Joint SGB1A plat 8 2 1.00 0.05 2.00 0.05 62.92 - - - - - 12.91 - - - 8.00
Stiffener SB1A plat 8 2 0.29 0.07 2.00 0.02 62.92 - - - - - 5.09 - - -

8 CSB3 - WF 300 x 150 x 6,5 x 9 2 8.80 - 36.67 645.33 - - - - - - - -


CSB3 VT - WF 300 x 150 x 6,5 x 9 2 0.15 - 36.67 11.00 - - - - - - - -
Plat Joint SG4 plat 8 2 1.00 0.06 2.00 0.06 62.92 - - - - - 15.45 - - - 8.00

13. BALOK C10 28 / 38


LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 10
Stiffener plat 8 2 0.29 0.07 2.00 0.02 62.92 - - - - - 5.09 - - -

Vertikal
8 SB1A WF 150 x 75 x 5 x 7 2 1.00 - 14.00 28.00 - - - - - - - -
Plat Joint plat 8 2 1.00 0.06 4.00 0.06 62.92 - - - - - 30.27 - - - 4.00

9 SB1A WF 150 x 75 x 5 x 7 2 1.35 - 14.00 37.80 - - - - - - - -


Plat Joint plat 8 2 1.00 0.06 4.00 0.06 62.92 - - - - - 30.27 - - - 4.00
- -
10 SB2 WF 200 x 100 x 5,5 x 8 1 5.50 - 21.33 117.33 - - - - - - - -
Plat Joint plat 8 2 1.00 0.06 2.00 0.06 62.92 - - - - - 15.13 - - - 4.00

11 SG4 WF 400 x 200 x 8 x 13 2 6.90 - 66.00 910.80 - - - - - - - -


Plat Joint Kolom Beton plat 10 2 0.33 0.11 2.00 0.04 78.40 - - - - - - 11.38 - - 8.00
Stiffener plat 8 2 0.19 0.05 4.00 0.01 62.92 - - - - - 4.38 - - -
Plat Joint Kolom Baja plat 10 2 0.31 0.11 4.00 0.03 78.40 - - - - - - 21.39 - -

12 SB2A WF 250 x 125 x 6 x 9 2 5.50 - 29.58 325.42 - - - - - - - -


Plat Joint SG4 plat 8 2 0.33 0.11 4.00 0.04 62.92 - - - - - 18.27 - - - 8.00

13 SB3 WF 300 x 150 x 6,5 x 9 1 5.50 - 36.67 201.67 - - - - - - - -


Plat Joint plat 8 2 1.00 0.06 2.00 0.06 62.92 - - - - - 15.13 - - - 4.00

Gording
1 CNP CNP 125 x 50 x 20 x 3.2 4 12.20 - 6.17 - 300.93 - - - - - - -
Plate plat 5 4 0.13 0.10 6.00 0.01 39.37 - - - - 11.81 - - - - 48.00
Rip Plate plat 5 4 0.06 0.07 6.00 0.00 39.37 - - - - 4.13 - - - -

2 CNP CNP 125 x 50 x 20 x 3.2 8 1.70 - 6.17 - 83.87 - - - - - - -


Plate plat 5 8 0.13 0.10 2.00 0.01 39.37 - - - - 7.87 - - - - 32.00
Rip Plate plat 5 8 0.06 0.07 2.00 0.00 39.37 - - - - 2.76 - - - -

Ikatan Angin
1 Besi 16 BESI 16 2 7.79 1.00 1.58 - - - 15.58 - - - - -
2 Besi 16 BESI 16 3 12.58 1.00 1.58 - - - 37.73 - - - - -
3 Besi 16 BESI 16 2 22.51 1.00 1.58 - - - 45.01 - - - - -
4 Besi 16 BESI 16 2 6.96 1.00 1.58 - - - 13.92 - - - - -
5 Besi 16 BESI 16 3 12.03 1.00 1.58 - - - 36.10 - - - - -

Trekstang
1 Besi 10 BESI 10 5 1.53 1.00 0.62 - - 7.63 - - - - - -
2 Besi 10 BESI 10 2 6.22 1.00 0.62 - - 12.43 - - - - - -
3 Besi 10 BESI 10 5 1.13 1.00 0.62 - - 5.65 - - - - - -

TOTAL 4,412.13 384.80 25.71 148.35 26.57 276.64 103.46 315.42 90.45 158.00 32.00

13. BALOK C10 29 / 38


LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Kolom Canopy 10

Berat Total Jumlah Baut


NO Uraian n Tinggi Lebar Jumlah Luas Berat Keterangan
WF 400 Plat 8 Plat 10 Plat 14 Plat 18 Angkur M-19 HTB 16 HTB 19
(1) (2) (3) (4) (5) (6) (7) (8) (9) = (3) x (4) x (8) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (kg) (kg) (kg) (bh) (bh) (bh)

1 SC4 WF 400 x 200 x 8 x 13 Baja 2 4.46 66.00 588.59 - - - -


plat 18 Plendes 2 0.44 0.24 1.00 0.11 141.32 - - - - 29.85 12.00 12.00
plat 8 Stifner 2 1.00 0.02 4.00 0.02 62.92 - 11.18 - - -
plat 14 Joint Plate 2 1.00 0.03 8.00 0.03 109.90 - - - 52.23 -
SG4 plat 10 End Plate 2 0.44 0.20 3.00 0.09 78.40 - - 41.40 - - 48.00
SG3 plat 10 End Plate 2 0.44 0.20 1.00 0.09 78.40 - - 13.80 - - 16.00

TOTAL KOLOM 588.59 11.18 55.19 52.23 29.85 12.00 64.00 12.00

14. KOLOM C10 30 / 38


LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 11

Berat Total Jumlah


NO Uraian n Panjang Lebar Jumlah Luas Berat Baut Keterangan
BAJA CNP BESI 10 BESI 16 Plat 5 Plat 6 Plat 8 HTB 16
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (m) (m) (kg) (kg) (kg) (bh)

BAJA
EL. +2.900
Horizontal
1 SG2 WF 200 x 100 x 5,5 x 8 1 4.94 - 21.33 105.28 - - - - - -

2 SG2 WF 200 x 100 x 5,5 x 8 1 4.94 - 21.33 105.28 - - - - - -


SG2 VT WF 200 x 100 x 5,5 x 8 4 0.20 - 21.33 17.07 - - - - - -
Stiffener plat 6 2 0.19 0.05 4.00 0.01 47.11 - - - - - 3.28 -

Vertikal
3 SB2 WF 200 x 100 x 5,5 x 8 1 4.75 - 21.33 101.33 - - - - - -
Joint Plate plat 8 1 1.00 0.02 2.00 0.02 62.92 - - - - - - 2.98 2.00

4 SB2 WF 200 x 100 x 5,5 x 8 1 4.75 - 21.33 101.33 - - - - - -


Joint Plate plat 8 1 1.00 0.02 4.00 0.02 62.92 - - - - - - 5.96 4.00

5 SG2 WF 200 x 100 x 5,5 x 8 2 4.75 - 21.33 202.67 - - - - - -


Joint Plate plat 8 2 1.00 0.02 2.00 0.02 62.92 - - - - - - 5.96 4.00

Gording
1 CNP CNP 125 x 50 x 20 x 3.2 5 4.94 - 6.17 - 152.16 - - - - -
Plate plat 5 5 0.13 0.10 4.00 0.01 39.37 - - - - 9.84 - - 40.00
Rip Plate plat 5 5 0.06 0.07 4.00 0.00 39.37 - - - - 3.44 - -

Ikatan Angin
1 Besi 16 BESI 16 1 10.42 1.00 1.58 - - - 10.42 - - -

Trekstang
1 Besi 10 BESI 10 5 5.37 1.00 0.62 - - 26.84 - - - -

BAJA
EL. +4.400
Horizontal
1 SG2 WF 200 x 100 x 5,5 x 8 2 2.90 - 21.33 123.90 - - - - - -
Joint Plate plat 8 2 1.00 0.02 4.00 0.02 62.92 - - - - - - 11.93

15. BALOK C11 31 / 38


LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 11
2 SG2 WF 200 x 100 x 5,5 x 8 2 3.14 - 21.33 134.14 - - - - - -
SG2 WF 200 x 100 x 5,5 x 8 4 0.20
Stiffener plat 6 2 0.19 0.05 4.00 0.01 47.11 - - - - - 3.28 -
Joint Plate plat 8 2 1.00 0.02 4.00 0.02 62.92 - - - - - - 11.93

3 SG2 WF 200 x 100 x 5,5 x 8 2 3.15 - 21.33 134.40 - - - - - -


Joint Plate plat 8 2 1.00 0.02 4.00 0.02 62.92 - - - - - - 11.93 12.00

Vertikal
1 SB2 WF 200 x 100 x 5,5 x 8 2 3.95 - 21.33 168.53 - - - - - -
Joint Plate plat 8 2 1.00 0.02 4.00 0.02 62.92 - - - - - - 11.93 8.00

2 SB2 WF 200 x 100 x 5,5 x 8 2 5.80 - 21.33 247.47 - - - - - -


Joint Plate plat 8 2 1.00 0.02 4.00 0.02 62.92 - - - - - - 11.93 8.00

3 SB1A WF 150 x 75 x 5 x 7 2 2.50 - 14.00 70.00 - - - - - -


Joint Plate plat 8 2 1.00 0.02 4.00 0.02 62.92 - - - - - - 11.93 8.00

4 SB1A WF 150 x 75 x 5 x 7 2 2.50 - 14.00 70.00 - - - - - -


Joint Plate plat 8 2 1.00 0.02 4.00 0.02 62.92 - - - - - - 11.93 8.00

5 SG2 WF 200 x 100 x 5,5 x 8 2 3.80 - 21.33 162.22 - - - - - -


SG2 VT WF 200 x 100 x 5,5 x 8 1 0.20 - 21.33 4.27 - - - - - -
Stiffener SC4 plat 6 1 0.19 0.05 2.00 0.01 47.11 - - - - - 0.82 -

6 SG2A WF 250 x 125 x 6 x 9 2 5.66 - 29.58 335.06 - - - - - -


SG2A VT WF 250 x 125 x 6 x 9 1 0.25 - 29.58 7.40 - - - - - -
Stiffener SC4 plat 6 1 0.19 0.05 2.00 0.01 47.11 - - - - - 0.82 -

7 SG2A WF 250 x 125 x 6 x 9 2 2.36 - 29.58 139.87 - - - - - -


SG2A VT WF 250 x 125 x 6 x 9 1 0.25 - 29.58 7.40 - - - - - -
Stiffener SC4 plat 6 1 0.19 0.05 2.00 0.01 47.11 - - - - - 0.82 -

8 SG2A WF 250 x 125 x 6 x 9 2 2.53 - 29.58 149.75 - - - - - -


SG2A VT WF 250 x 125 x 6 x 9 1 0.25 - 29.58 7.40 - - - - - -
Stiffener SC4 plat 6 1 0.19 0.05 2.00 0.01 47.11 - - - - - 0.82 -

Gording
1 CNP CNP 100 x 50 x 20 x 3.2 14 3.40 - 5.50 - 261.80 - - - - -
Plate plat 5 14 0.13 0.10 4.00 0.01 39.37 - - - - 27.56 - - 112.00
Rip Plate plat 5 14 0.06 0.07 4.00 0.00 39.37 - - - - 9.65 - -

2 CNP CNP 100 x 50 x 20 x 3.2 5 5.00 - 5.50 - 137.50 - - - - -

15. BALOK C11 32 / 38


LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 11
Plate plat 5 5 0.13 0.10 4.00 0.01 39.37 - - - - 9.84 - - 40.00
Rip Plate plat 5 5 0.06 0.07 4.00 0.00 39.37 - - - - 3.44 - -

Ikatan Angin
1 Besi 16 BESI 16 1 6.60 1.00 1.58 - - - 6.60 - - -
2 Besi 16 BESI 16 1 6.50 1.00 1.58 - - - 6.50 - - -
3 Besi 16 BESI 16 1 12.13 1.00 1.58 - - - 12.13 - - -
4 Besi 16 BESI 16 1 8.82 1.00 1.58 - - - 8.82 - - -

Trekstang
1 Besi 10 BESI 10 3 17.01 1.00 0.62 - - 51.02 - - - -

BAJA
EL. +5.600
Horizontal
1 CSG2 WF 200 x 100 x 5,5 x 8 1 0.57 - 21.33 12.18 - - - - - -
CSG2 VT WF 200 x 100 x 5,5 x 8 1 0.20 - 21.33 4.27 - - - - - -
Stiffener SC4 plat 6 1 0.19 0.05 2.00 0.01 47.11 - - - - - 0.82 -

2 CSG2 WF 200 x 100 x 5,5 x 8 1 1.81 - 21.33 38.55 - - - - - -


CSG2 VT WF 200 x 100 x 5,5 x 8 2 0.20 - 21.33 8.53 - - - - - -
Stiffener SC4 plat 6 1 0.19 0.05 4.00 0.01 47.11 - - - - - 1.64 -

Vertikal
3 SG4 WF 400 x 200 x 8 x 13 2 8.10 - 66.00 1,069.20 - - - - - -
SG4 VT WF 400 x 200 x 8 x 13 4 0.40 - 66.00 105.60 - - - - - -
Stiffener plat 8 2 0.38 0.09 24.00 0.04 62.92 - - - - - - 108.44

TOTAL 3,633.09 551.46 77.86 44.48 63.78 12.29 206.84 246.00

15. BALOK C11 33 / 38


LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Kolom Canopy 11

Berat Total Jumlah Baut


NO Uraian n Tinggi Lebar Jumlah Luas Berat Keterangan
BAJA Pipa 10" Plat 6 Plat 10 Plat 12 Plat 14 Plat 18 Angkur M-19 HTB 16 HTB 19
(1) (2) (3) (4) (5) (6) (7) (8) (9) = (3) x (4) x (8) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (kg) (kg) (kg) (kg) (bh) (bh) (bh)

1 SC10 pipa 10 inch Baja 2 3.00 60.30 - 361.80 - - - - -


plat 14 Plendes 2 0.49 0.49 1.00 0.24 109.90 - - - - - 52.77 - 24.00 24.00
plat 10 Stifner 2 1.00 0.02 12.00 0.02 78.40 - - - 40.26 - - -
SG2 plat 10 Plat Pengaku 2 0.25 0.25 4.00 0.06 78.40 - - - 38.89 - - -
plat 6 Stifner 2 0.49 0.97 4.00 0.47 47.11 - - 178.03 - - - -

2 SC10 pipa 10 inch Baja 6 4.51 60.30 - 1,630.27 - - - - -


plat 14 Plendes 6 0.49 0.49 1.00 0.24 109.90 - - - - - 158.32 - 72.00 72.00
plat 10 Stifner 6 1.00 0.02 12.00 0.02 78.40 - - - 120.79 - - -
SG2 plat 10 Plat Pengaku 6 0.25 0.25 12.00 0.06 78.40 - - - 349.98 - - -
plat 6 Stifner 6 0.49 0.97 4.00 0.47 47.11 - - 534.08 - - - -

2 SC4 pipa 400 x 200 x 8 x 13 Baja 4 5.87 66.00 1,549.94 - - - - - -


plat 18 Plendes 4 0.40 0.20 1.00 0.08 141.32 - - - - - - 45.22 24.00 24.00
plat 10 Stifner 4 1.00 0.02 4.00 0.02 78.40 - - - 27.85 - - -
plat 10 Joint Plate 4 1.00 0.03 16.00 0.03 78.40 - - - 151.85 - - -
SG2 EL +4.400 plat 12 End Plate 5 0.33 0.20 1.00 0.07 94.22 - - - - 31.09 - - 40.00
plat 6 Stifner 5 1.00 0.00 4.00 0.00 47.11 - - 4.45 - - - -
SG2A EL +4.400 plat 12 End Plate 3 0.44 0.20 1.00 0.09 94.22 - - - - 24.87 - - 36.00
plat 6 Stifner 3 1.00 0.00 8.00 0.00 47.11 - - 5.34 - - - -
SG4 EL +5.600 plat 12 End Plate 4 0.75 0.20 1.00 0.15 94.22 - - - - 56.53 - - 56.00
plat 6 Stifner 4 1.00 0.01 8.00 0.01 47.11 - - 10.14 - - - -

TOTAL KOLOM 1,549.94 1,992.07 732.03 729.62 112.49 211.10 45.22 120.00 132.00 120.00

16. KOLOM C11 34 / 38


LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 12

Jumlah
Berat Total
NO Uraian n Panjang Lebar Jumlah Luas Berat Baut Keterangan
BAJA CNP BESI 10 BESI 16 Plat 5 Plat 6 Plat 8 HTB 16
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (m) (m) (kg) (kg) (kg) (bh)

BAJA
Horizontal
1 SB2 WF 200 x 100 x 5,5 x 8 2 6.35 - 21.33 270.93 - - - - - -
Plat Joint plat 8 2 1.00 0.02 4.00 0.02 62.92 - - - - - - 11.93 8.00

2 SB2 WF 200 x 100 x 5,5 x 8 2 7.85 - 21.33 334.93 - - - - - -


Plat Joint plat 8 2 1.00 0.02 4.00 0.02 62.92 - - - - - - 11.93 8.00

3 SB2 WF 200 x 100 x 5,5 x 8 2 0.35 - 21.33 14.93 - - - - - -


Plat Joint plat 8 2 1.00 0.02 4.00 0.02 62.92 - - - - - - 11.93 8.00

4 SG2 WF 200 x 100 x 5,5 x 8 2 6.28 - 21.33 267.82 - - - - - -


SG2 VT WF 200 x 100 x 5,5 x 8 4 0.20 - 21.33 17.07 - - - - - -
Stiffener plat 6 2 0.19 0.05 4.00 0.01 47.11 - - - - - 3.28 -

5 SG2 WF 200 x 100 x 5,5 x 8 2 7.78 - 21.33 331.82 - - - - - -


SG2 VT WF 200 x 100 x 5,5 x 8 4 0.20 - 21.33 17.07 - - - - - -
Stiffener plat 6 2 0.19 0.05 4.00 0.01 47.11 - - - - - 3.28 -

6 CSG2 WF 200 x 100 x 5,5 x 8 2 0.31 - 21.33 13.35 - - - - - -


Plat Joint plat 8 2 1.00 0.02 4.00 0.02 62.92 - - - - - - 11.93 8.00

Vertikal
7 CSG2 WF 200 x 100 x 5,5 x 8 3 0.81 - 21.33 52.03 - - - - - -
CSG2 VT WF 200 x 100 x 5,5 x 8 3 0.20 - 21.33 12.80 - - - - - -
Stiffener plat 6 3 0.19 0.05 2.00 0.01 47.11 - - - - - 2.46 -
Joint Plate SG2 plat 8 3 1.00 0.02 2.00 0.02 62.92 - - - - - - 8.95 6.00

8 SG2 WF 200 x 100 x 5,5 x 8 3 2.03 - 21.33 129.73 - - - - - -


SG2 VT WF 200 x 100 x 5,5 x 8 3 0.20 - 21.33 12.80 - - - - - -
Stiffener plat 6 3 0.19 0.05 4.00 0.01 47.11 - - - - - 4.91 -

9 CSG2 WF 200 x 100 x 5,5 x 8 3 0.61 - 21.33 39.23 - - - - - -


CSG2 VT WF 200 x 100 x 5,5 x 8 3 0.20 - 21.33 12.80 - - - - - -
Stiffener plat 6 3 0.19 0.05 2.00 0.01 47.11 - - - - - 2.46 -

17. BALOK C12 35 / 38


LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 12
Joint Plate SG2 plat 8 3 1.00 0.02 2.00 0.02 62.92 - - - - - - 8.95 6.00

10 SB1A WF 150 x 75 x 5 x 7 1 0.75 - 14.00 10.49 - - - - - -


Plat Joint plat 8 2 1.00 0.02 2.00 0.02 62.92 - - - - - - 5.84 4.00

11 SB1A WF 150 x 75 x 5 x 7 1 2.10 - 14.00 29.40 - - - - - -


Plat Joint plat 8 2 1.00 0.02 2.00 0.02 62.92 - - - - - - 5.84 4.00

12 SB1A WF 150 x 75 x 5 x 7 1 0.55 - 14.00 7.70 - - - - - -


Plat Joint plat 8 2 1.00 0.02 2.00 0.02 62.92 - - - - - - 5.84 4.00

Gording
1 CNP CNP 100 x 50 x 20 x 3.2 13 3.80 - 5.50 - 271.70 - - - - -
Plate plat 5 13 0.13 0.10 4.00 0.01 39.37 - - - - 25.59 - - 104.00
Rip Plate plat 5 13 0.06 0.07 4.00 0.00 39.37 - - - - 8.96 - -

Ikatan Angin
1 Besi 16 BESI 16 1 13.12 1.00 1.58 - - - 13.12 - - -
2 Besi 16 BESI 16 1 16.02 1.00 1.58 - - - 16.02 - - -

Trekstang
1 Besi 10 BESI 10 3 16.78 1.00 0.62 - - 50.34 - - - -

TOTAL 1,574.90 271.70 50.34 29.14 34.55 16.38 83.13 160.00

17. BALOK C12 36 / 38


LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Kolom Canopy 12

Berat Total Jumlah Baut


NO Uraian n Tinggi Lebar Jumlah Luas Berat Keterangan
Pipa 6" Plat 10 Angkur M-16 HTB 16
(1) (2) (3) (4) (5) (6) (7) (8) (9) = (3) x (4) x (8) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (bh) (bh)

1 SC6 pipa 6 inch Baja 6 3.92 28.26 664.98 -


plat 10 Plendes 6 0.36 0.36 1.00 0.13 78.40 - 60.96 48.00 48.00
plat 10 Stifner 6 1.00 0.02 8.00 0.02 78.40 - 79.97

TOTAL KOLOM 664.98 140.93 48.00 48.00

18. KOLOM C12 37 / 38


LEMBAR PERHITUNGAN VOLUME

Pekerjaan : Struktur Baja


Jenis Pekerjaan : Balok Canopy 13

Berat Total Jumlah Baut


NO Uraian n Panjang Lebar Jumlah Luas Berat Keterangan
BAJA CNP BESI 10 BESI 16 Plat 5 Plat 6 Plat 8 Angkur M-16 HTB 16
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (10) (11)
(m) (m) (bh) (m2) (kg) (kg) (kg) (m) (m) (kg) (kg) (kg) (bh) (bh)

BAJA
Vertikal
1 SB1A WF 150 x 75 x 5 x 7 7 3.18 - 14.00 311.15 - - - - - -
End plate plat 8 6 0.15 0.15 1.00 0.02 62.92 - - - - - - 8.49 24.00 24.00
Joint Plate plat 6 6 0.12 0.09 1.00 0.01 47.11 - - - - - 3.05 -

Gording
1 CNP CNP 150 x 50 x 20 x 3.2 4 19.90 - 6.76 - 538.10 - - - - -
Plate plat 5 4 0.13 0.10 7.00 0.01 39.37 - - - - 13.78 - - 56.00
Rip Plate plat 5 4 0.06 0.07 7.00 0.00 39.37 - - - - 4.82 - -

Ikatan Angin
1 Besi 16 BESI 16 4 10.24 1.00 1.58 - - - 40.98 - - -

Trekstang
1 Besi 10 BESI 10 12 3.08 1.00 0.62 - - 36.92 - - - -

TOTAL 311.15 538.10 36.92 40.98 18.60 3.05 8.49 24.00 80.00

19. BALOK C13 38 / 38