A B C D 1 2 3 4 5 6 7

0.7 mm PRE-PAINTED RIDGE ROLL


Y 0.5 mm PRE-PAINTED CORRUGATED 0.7 mm PRE-PAINTED FLASHING
G.I SHEET ROOFING AP EX L I NE

0.40
10.15 0.7 mm PRE-PAINTED GUTTER T OP OF ROOF
9.65 4.00 4.00 2.15

1.85
150 mm CHB PARAPET WALL
PLAIN CEMENT SMOOTH FINISH WITH
NON- SKID CEMENT FLOOR FINISH NON-SKID CONCRETE EPOXY PAINT
TOP OF ROOF BEAM

0.30
1
PLASTERED WALL IN

2.00
PAINT FINISHED

8.55
ramp up T OP OF BEAM

0.30
4.50

4.50

2.90
2

LI N E
FIN. FLOOR LINE

p l a n t

0.80
R OOF IN G
ROLL-UP DOOR NAT. GRADE LINE
warehouse
4.50

4.50
X
A FRONT ELEVATION

b o x
2 2
18.00

18.00
3 A C
B D

2.25
A P E X L I NE

0.40
ramp up

T OP OF ROOF
4.50

4
0.5 mm PRE-PAINTED CORRUGATED

1.85
G.I SHEET ROOFING

2.25
COMFORT
ROOM
600mm x 600mm CERAMIC TILES TOP OF ROOF BEAM

0.30
5

LI N E

2.00
plant box

DOWN

2.25
R OOF IN G
EXIT

8.55
T OP OF BEAM

0.30
offi ce 6
4.50

2.25
entrance

COMFORT 0.7 mm PRE-PAINTED GUTTER


30 mm ø g.i pipe handrail with

2.90
ROOM 30mm ø vertical support
UP

7 FIN. FLOOR LINE

0.80
R OOF IN G LI N E

A FLOOR PLAN 4.00


10.15
4.00 2.15 NAT. GRADE LINE

1 2
A RIGHT SIDE ELEVATION
3 2

D C B A 7 6 5 4 3 2 1
0.7 mm PRE-PAINTED RIDGE ROLL
150 mm CHB PARAPET WALL 0.5 mm PRE-PAINTED CORRUGATED
0.7 mm PRE-PAINTED FLASHING
A P E X L I NE G.I SHEET ROOFING A P E X L I NE

0.40
0.40

T OP OF ROOF 0.7 mm PRE-PAINTED GUTTER T OP OF ROOF

1.85
1.85

0.7 mm PRE-PAINTED GUTTER 100 mm CHB PARAPET WALL

TOP OF ROOF BEAM TOP OF ROOF BEAM

0.30
0.30

PLASTERED WALL IN

2.00
2.00

PAINT FINISHED

8.55
8.55

T OP OF BEAM T OP OF BEAM

0.30
0.30

30 mm ø g.i pipe handrail with

2.90
2.90

30mm ø vertical support

FIN. FLOOR LINE FIN. FLOOR LINE

0.80
0.80

NAT. GRADE LINE NAT. GRADE LINE

A LEFT SIDE ELEVATION A REAR ELEVATION


5 2 4 2
SUB-PROJECT ID No. PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO:

REPUBLIC OF THE PHILIPPINES FLOOR PLAN


REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF AGRICULTURE
PHILIPPINE RURAL DEVELOPMENT PROJECT
PROVINCIAL GOVERNMENT
OF EASTERN SAMAR
CONSTRUCTION OF CONSOLIDATION
CENTER OF EASTERN SAMAR SEAWEED PRODUCTION
AND TRADING ENTERPRISE
AR. ARNULFO B. DOTINCO ENGR. THOMAS A. CAMPOMANES
HEAD - PMO OFFICE
VIRGILIO P. CAPON
PPMIU HEAD
HON. BEN P. EVARDONE
GOVERNOR
FRONT ELEVATION
RIGHT-SIDE ELEVATION A
PROJECT MANAGEMENT OFFICE

LOCATION: ARTECHE EASTERN SAMAR PRC No:


ARCHITECT II REAR ELEVATION
LEFT-SIDE ELEVATION 2 5