B1 20 Mar 2022 All Issue for Review / Comments Raju Antony Zhao ziwei Wang Zhao
A1 22 Feb 2022 11 Issue for Review / Comments Raju Antony Zhao ziwei Wang Zhao
Page 1 of 11
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
JOB SAFETY ANALYSIS FOR PRECOMMISSIONING OF 33KV GIS,
CRP PANEL, 11KV, 400V & ALL THE PANELS
Table of Contents
1. PURPOSE AND SCOPE .......................................................................................................................... 4
3.1 Section Ⅰ. Enter general information about the site and job task ........................................4
3.2 Section Ⅱ. Job Safety Analysis ....................................................................................................5
ATTACHMENTS.............................................................................................................................................. 5
Page 2 of 11
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
JOB SAFETY ANALYSIS FOR PRECOMMISSIONING OF 33KV GIS,
CRP PANEL, 11KV, 400V & ALL THE PANELS
Page 3 of 11
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
JOB SAFETY ANALYSIS FOR PRECOMMISSIONING OF 33KV GIS,
CRP PANEL, 11KV, 400V & ALL THE PANELS
A1
IR : Insulation Resistance Test
3.1 Section Ⅰ. Enter general information about the site and job task.
1. Enter the location, date, JSA No. as well as the PTW No.
2. JSA members shall sign the JSA and approved by permit issuer.
3. The Site Manager/HSSE Manager/Supervisor of Contractor shall review the JSA prior to
starting the job and sign this form.
Page 4 of 11
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
JOB SAFETY ANALYSIS FOR PRECOMMISSIONING OF 33KV GIS,
CRP PANEL, 11KV, 400V & ALL THE PANELS
STEP 1: Plan out the TASK SEQUENCE - What are you going to do?
STEP 3: Identify the TOP EVENT – What is the most serious impact caused by the hazard
cause harm or damage?
STEP 4: Identify the on sequences– What is the HSE effects & impact?
STEP 6: Select your BARRIER / CONTROLS – What will be put in place to keep you safe?
STEP 7: Recovery
STEP 8: Allocate the RESPONSIBLE PERSON – Who will do this and how to recovery
STEP 10: Site responsible persons, such as Foreman and HSSE officer, shall REVIEW AND
MONITOR the JSA during the course of the work.
Carry out task as per plan. If any conditions change ---STOP & RE-ASSESS.
Once JSA form (Appendix 1: Job Safety Analysis Form) is completed, it is attached to the
original copy of work permit available at site. On completion of the job, the JSA Form shall
be retained in file with Permit Issuer as a record.
ATTACHMENTS
ATTACHMENT-1: Job Safety Analysis Form
Page 5 of 11
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
JOB SAFETY ANALYSIS FOR PRECOMMISSIONING OF 33KV GIS,
CRP PANEL, 11KV, 400V & ALL THE PANELS
Page 6 of 11
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
JOB SAFETY ANALYSIS FOR PRECOMMISSIONING OF 33KV GIS, CRP
PANEL, 11KV, 400V & ALL THE PANELS
Mobile Plant & Equip: Multimeter, Megger, secondary injection kit, Primary injection kit,
Electrical Commissioning
Vendor Certification, Testing Site HSE Induction, HV test kit, Clamp meter, Breaker analyzer & CT analyzer.
Engineer, Technician, Vendor,
Engineer certification, personnel fire warden Fire Extinguisher, Emergency Retrieval and Rescue Equipment,
Testing Engineer and Safety
qualification Safety / Emergency Equip: Ambulance Two way radios or mobile phone
Officer
CMS INSTALLATION OF RAS MARKAZ CRUDE OIL Review Team Composition: Wang Zhao, Zhao Ziwei, Saravanan, Anum khan, Antony
PARK (PHASE 1) AREA Raju, Wasim Khan
Page 8 of 11
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
JOB SAFETY ANALYSIS FOR PRECOMMISSIONING OF 33KV GIS, CRP
PANEL, 11KV, 400V & ALL THE PANELS
Page 9 of 11
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
JOB SAFETY ANALYSIS FOR PRECOMMISSIONING OF 33KV GIS, CRP
PANEL, 11KV, 400V & ALL THE PANELS
1. Generated waste on the Trip and slip Environment Personnel C1. If possible, avoid generating R1-Apply first
site. Issues C1 – Safety
the waste. Or provide Facility for aid treatment.
2. Unsafe storage of materials Environment Environment proper garbage disposal with Officer
A1 Health
3. messing the cables on the Issues signage. Waste segregate training R2-
site problems
share to all site personnel. Activate
4. urinating at work location Fines and C2- Supervisor
Workers C2. Cables, Tools, Materials should emergency
5. Dumping the waste on the Bad smell Penalties
HOUSKEEPING be stack in a proper manner to response
(Area Cleaning) site Reputation avoid damage or slip and trip. procedure.
6. Poor supervision Presents of C3. All the cables should be C3 - Supervisor
7. Trip insects and Segregated in a proper way.
8. Awkward Body position C4. Need to give welfare facility for R3- paramedic
flies
9. Exposure to fire the workers. (if necessary) R1- First
C5. A. Proper site arrangement for
the waste management. Maintain
the check list for housekeeping.
Continuous inspections and record
for reference.
Page 13 of 11