Professional Documents
Culture Documents
RIVERS
STATE
PHONE: + 2438038125494,
NIGERIA +2349060001660
E-MAIL: solzeek@yahoo.com, solzeeks@gmail.com
EZEH SOLOMON ONYEKACHI
OBJECTIVE
PERSONALDATA
DATEOFBIRTH 28TH
November,1987.
GENDER Male.
STATE OORIGIN Enugu State.
MARITALSTATUS Single.
INSTITUTION(S)ATTENDED
National Youth Service(NYSC)
Warri City College, Warri
Enugu State University of Science and Technology
Enugu State.
TRAININGS ACHIEVED
Survival at sea escape
Swimming training
Nitrogen pumping
Course on hydro-testing
COMPUTERSKILLS
Auto CAD
Microsoft Excel Worksheet
Microsoft Word
Power point
Corel Draw
WORKEXPERIENCE
Responsibilities
Tool Store personnel.
Color Coding of Equipment.
In-house Testing of Equipment, Pipe, Flange and Hose.
In-House Cleaning Operations.
Mobilization of Equipment for Off-Shores and On-Shores Operation.
Buguma Swamp Pigging Operation (Equipment Operator).
Saipem Hydro-Testing Operation, Saipem Yard (Instrument and Equipment Operator)
Ensure Equipment Maintenance and Servicing.
Entrepose DBN [UFR team] c/o TOTAL
Project: Egina Hookup
Duration: Sept. 11 2018 – Feb 2019
Position: Roustabout
Job description:
. Installation of Riser heads
. Installation of Umblicas
. Gas, production line installation
. Deploying and retrieving of HP
. Deploying and retrieving Deflectors
. Deploying and retrieving of Flange
. Preparation of Hydro Test materials
. Deploying of wire sling into well head
. loosing of Riser heads
When oil is transported to a tanker, the rigger fits and links all the pipes together.
controlling and monitoring the safe movement of heavy equipment.
mobilizing the rig by setting it up. responsible for setting up all the
pulleys and cable systems that are used to move large and heavy objects.
Installation of Riser heads
Installation of Umblicas
Job Description:
Laying of pipeline J-legs (Sub-sea), planning and transferring of
Clamps
14 ‘‘ X 10.1mm HSE 3 layer polypropylènes (3 LPP) Pipeline
14 ‘‘ X 27mm HSE 5 LPP
FLET (Flow Line End Termination) by using of two crane (Tandem Lift)
And also working with loading arm (LDA),
Internal Line up clamp (TLC)
Bouyance modules
Lifting Polley
Bulky item handling system (BIHS)
Morring activities
Receiving of cargo barge and demobilization
Saipem FDS2
Rigger
Job Description
Installation of valves
Offloading and back loading of materials
Preparation for the installation of spool
Preparation for the installation of bottom and top assembly
Grinding of pipes
Pipe flame treatment and wrapping
Repair of damage coated pipes
Chipping and painting
General site cleanup
Stena Drilling
Roustabout
Job Description
Offloading and back loading of materials
Valves installation
REFREES
Prof. Odukwe
Senior Lecturer, Mechanical/ Production Engineering Department,
Enugu State University of Science and Technology
Frank Ezeh
Senior Information Analyst
Baker Hughes Nigeria
+2348032018935