Professional Documents
Culture Documents
SHORT DPR
RIG: GD CHITRA WELL: WO_5#J DATE: 05.06.2022
FINAL TD: 2985 M LAST CSG: 20"/423M
NEXT OPERATION: CMT DRILLING, CLEAR CMT UP TO 500M. POOH. CMT PLUG JOB FOR SIDE TRACKING.
PIT DETAILS:
URGENT REQUIREMENT: KCL, PHPA, XC, PAC-R, PAC-LV, CHS, POLYOL, EP-LUBE, SF(NW), BENTONITE
NOTE: RECEIVED CHEMICALS FROM G S ANJALI(KCL-12JB, C/SODA-01 JB, S/ASH-01 JB, PHPA-02JB, PAC LV
07JB,PAC R-09 JB, POLYOL-01PLT, CHS-03PLT, SOLTEX-04JB)
OPERATIONAL PROBLEMS (MANPOWER/EQUIPMENT):
ONBOARD CREW DETAILS
Name (CPF No) Designation No. of Days Completed
ONGC
1. PRADEEP UPADHYAY (106630) FE. Chemist 08 Days
2. JAYANTAJIT BARUAH (106255) SUPTG CHEMIST 04 DAYS
Contract
TD
05.06.2022
TH: 500M.
ACTIVE OR RESERVE
RAW MUD
HSD MIXED GEL MUD
GEL MUD
KCL SOLN
ACTIVE/GEL MUD
RAW MUD
KCL SOLN
B. GEL HI VIS
BALANCE REQUIREMEN
T
156
3
121
70 80
280
400
60 160
3.5 32
80 80
0.2 1
0.75 1
4
0.25 2
2
4
4 2
0
1
1
0
0
0 6
0 6
0
0 12
6 18
18
0
0
0
0 12
1 12
0
0.5
0
80
2
08 Days
04 DAYS