1 2 3 4 5 6 7 8 9 10 11 12

THIS DRAWING PRODUCED BY STERLING & WILSON SOLAR LTD. IN CONNECTION WITH THE PROJECT
(-------------- SOLAR PROJECT), INCLUDING ITS COPYRIGHT AND INTELLECTUAL PROPERTY HEREIN, ARE
AND SHALL AT ALL TIMES REMAIN THE PROPERTY OF STERLING & WILSON SOLAR LTD., UNLESS
OTHERWISE AGREED IN WRITING BETWEEN THE PARTIES. IN NO EVENT SHALL THE OWNER COPY OR
USE THE DRAWING FOR ANY PURPOSE OTHER THAN THOSE IN RELATION TO THE PROJECT WITHOUT
THE PRIOR WRITTEN PERMISSION OF STERLING & WILSON SOLAR LTD.

NOTES:
1. DRAWINGS SHALL NOT BE SCALED. FIGURED DIMENSIONS SHALL BE FOLLOWED.
A 2. ALL DIMENSIONS ARE IN MILLIMETERS (mm) & LEVELS ARE IN METERS (m). A
3. ALL WORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH THE PROJECT
SPECIFICATIONS.
4. ANY DISCREPANCY BETWEEN ARCHITECTURAL, STRUCTURAL, ELECTRICAL &
BUILDING SERVICES TO BE REPORTED TO THE CONSULTANT AND RESOLVED
PRIOR TO THE COMMENCEMENT OF WORKS.
5. ANY CONSTRUCTION MATERIAL AS IS ADVISED ON DETAIL DESIGN DRAWING IS
SUBJECTED TO SEPARATE MATERIAL / VENDOR APPROVAL .
6. ALL REINFORCEMENT SHOULD HAVE MINIMUM YIELD
STRENGTH FY = 460 N/mm² AS PER ASTM A615.
7. THE CONCRETE GRADE FOR ALL STRUCTURE SHALL BE C40 (CUBE
STRENGTH=40 N/mm² & CYLINDER STRENGTH OF CONCRETE fc'=32
N/mm²).

LEGEND:
B B
SSL - STRUCTURAL SLAB LEVEL
FPL - FINISHED PAVEMENT LEVEL
TOC - TOP OF CONCRETE
TYP - TYPICAL

- SLAB

C C

SITE SETTING OUT PLAN

D REINFORCEMENT PLAN FOR TANK 1 & 2 D

TENDER PURPOSE ONLY

R0 12-12-2019 FOR TENDER PURPOSE ONLY GSN TNG


E E

No. DATE REMARKS DRN CHK

REVISIONS
PROJECT TITLE:-

REPDO SAUDI ARBIA

CLIENT:-
F F

SECTION A-A

EPC CONTRACTOR :-

STERLING AND WILSON SOLAR PRIVATE LIMITED.


A-25, MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
MATHURA ROAD NEW DELHI-110044.
TEL.: +91-11-66134600, MOB.: +91-8130255139
E-MAIL : delhi.solar@sterlingwilson.com.
WEBSITE : www.sterlingandwilson.com.

G G
DRAWING TITLE:-
FIRE WATER TANK FOUNDATION

DRAWING NO :-
--------------------------------

SECTION B-B
SITE CO-ORDINATES

H
SHEET NO. 1 OF 1 SCALE NTS H

DRAWN GSN PAPER SIZE A1

CHECKED TNG REV NO. R0

APPROVED RMG DATE 12-12-2019


1 2 3 4 5 6 7 8 9 10 11 12