PT Indra Karya (Persero) has been succeeded in completing all the contract assignments
handled professionally both as Independent Company or as Joint Venture Lead Firms.
This achievement cannot be separated from the support of human resources of the
company. PT. Indra Karya (Persero) also has its own Land Laboratory, integrated planning
studio, integrated online project implementation monitoring system (EKPP), ISO
9001:2015, OHSAS 18001:2007 as well as backup support for professionals in their fields
to foster a second opinion culture on products produced by PT. Indra Karya (Persero).
In the next five years, PT. Indra Karya (Persero) has a plan to strengthen and diversify the
business into an EXPANDED CONSULTANTS, specifically the expansion of the water and
energy resources business (upstream-mid-downstream), thus PT. Indra Karya (Persero)
will become Engineering, Developer and Industry at the same time. Engineering
activities as an upstream part,will continue to handle the consulting work that has been
carried out so far. Developer activities as part of the center will act as a developer of
reservoirs / ponds / situ for the management of clean water, wastewater, energy,
cultivation and tourism. Industrial activities as a downstream part run an
industrialization business, namely bottled drinking water (AMDK) that already has a
trademark called INFRESH, , this industry provides clean water from river water sources,
reservoirs, ground water, sea water to supply the needs of the Special Area. PT. Indra
Karya has been entrusted to carry out A Large Scale Engineering Projects with high
technology as Lead Firm Consultants Association for IBRD finances projects (Central Java
Transmission & Substantion also Musi HEPP Project) and ADB (HEPP Tanggari II and
Sengguruh HPP).
Our hope, this Company Profile can be one of the sources of information that is useful
forservice users in an attempt to implement their development program. For this reason,
we express our deepest gratitude for all the help and support of the stakeholders in our
efforts to develop PT. Indra Karya (Persero).
President Director.
www.indrakarya.co.id
Major Field of
SPECIALIZATION
and type of
CONSULTING SERVICES
Water Ÿ DAM
Resources Ÿ Irrigation
Ÿ Flood Management
Development Ÿ Clean Water & Waste Water
Ÿ Water Supply
Ÿ Water Resources
Development
Other Ÿ Environmental
Ÿ Community & Social
Ÿ Tunneling
Ÿ Soil & laboratory
Ÿ Drinking Water
Ÿ Clean Water
Ÿ Water Supply
CONSTRUCTION ACTIVITY Ÿ Realty Management
Ÿ Project Proposal
Ÿ Pre Feasibility Study
Ÿ Feasibility Study
CONSTRUCTION
Ÿ Detail Design
SUPERVISION
Ÿ Supervision
Ÿ Construction CONSTRUCTION
Ÿ Operation and Maintenance DESIGN Services
MANAGEMENT Ÿ Quality
Ÿ Energy Audit Ÿ Master planning
Ÿ Control of Design Ÿ Quantity
Ÿ Block plan
Activities Ÿ Preliminary Design Ÿ Construction Progress)
Ÿ Construction SURVEY and
Ÿ Design Development
Supervision INVESTIGATION
Ÿ Detailed Design/
Ÿ Topographical & Mapping Survey
Ÿ Value Engineering Construction
Ÿ Geological & Geotechnical Survey
DEVELOPER and INDUSTRY Documents :
Ÿ Hydrology & Hydrometeorology
Ÿ Drinking Water (Drawings, Technical
Ÿ Geophysical Exploration Survey
Ÿ Clean Water specification, Cost
Ÿ Laboratory Test (geotechnical, building
Ÿ Water Supply plan, Administrative
Ÿ Realty Management
material, hydraulics, sanitary, others)
conditions)
Applied research and investigation on
engineering,
calibration and repair of survey,
geological and laboratory instruments
www.indrakarya.co.id
BOARD OF
COMMISSIONERS
Airlangga Mardjono, ST., MT. Teddy Poernama, SE, M.I.Kom.,MIPR
President Commisioners Commisioners
BOARD OF
DIRECTOR
ORGANIZATION
STRUCTURE
www.indrakarya.co.id
2019 - 2023
COMMITMENT
VISION
“ To be one of the best integrated Engineering, Developer and Water Resources
Industry Company in Asia “
MISSION
Ÿ Providing high-quality and highly competitive consultancy services both in
domestic and international markets, and fostering profit (profit oriented) by
conducting business activities that can increase the value of the company.
Ÿ Making expert PT Indra Karya has high competence and has requirements that can
be accepted by the international consulting services industry and can provide
excellent service to service users for each assignment.
Ÿ Participate and implement and support government policies and programs in the
field of economy and national development in general.
Ÿ Becoming a pioneer of business activities that have not been carried out by the
private sector and actively providing guidance / fostering business activities,
especially small business and cooperatives.
www.indrakarya.co.id
Head Office
Jl. Biru Laut X Kav 9 Jakarta 13340 Telp. (021) 8192636, (021) 8354237 Fax. (021) 8192179, (021) 8290120
OFFICE
Jl. Surabaya 3 A, Malang 65115 (0341) 551311 Fax (0341) 551463
Division of Engineering II
Jl. Ketileng Raya 16, Semarang 50276 Telp. (024) 6725046 Fax. (024) 6725046
• Division of Engineering II
• Head Office
• Division of Engineering III
• Division of Special Business and Investment
• Division of Engineering I
• Division of Survey and Investigation
Area of
EXPERTISE Water Resources Development
Energy
Road/Bridges/Tranportation
Building
Other
www.indrakarya.co.id
USP of
PT. Indra Karya (Persero)
Tunnel
Pre-feasibility/Study/Construction Supervison
for over 100 Dam Tunnel Projects with length of approximately 100 KM
more than 5 Road Tunnels and Railway Tunnels Project with length of approximately 10 KM
Energy
Pre-feasibility/Study/Construction Supervison
for over 100 Hydro Power Projects with an installed capacity of more than 10.000 MW
250 Solar Power Projects with an installed capacity of more than 1000 MW
2 Oils and Gas Power Projects with an installed capacity of more than 100 MW
5 Coal Power Projects with an installed capacity of more than 1000 MW
Contributed in Transmission Line & Substation Length of approximately 5000 KM
Transportation
Survey & Investigation/Study/Detailed Engineering/Construction Supervison
for over 60 Projects in Road / Toll Road include Tunneling more than 2000 KM
5 Projects Railway with length more than 200 KM
20 Port / Harbour Projects
www.indrakarya.co.id
PROJECT
THE GOVERNMENT of the REPUBLIC of INDONESIA
Ÿ Kementerian Pekerjaan Umum dan Perumahan Rakyat Indonesia OWNER
Ÿ Kementerian Energi dan Sumber Daya Mineral Indonesia
Ÿ Kementerian Kelautan dan Perikanan Indonesia
Ÿ Kementerian Perhubungan Indonesia
Ÿ Kementerian Pendidikan dan Kebudayaan Indonesia
Ÿ Kementerian Pertanian Indonesia
Ÿ Kementerian Lingkungan Hidup dan Kehutanan Indonesia
Ÿ Kementerian Desa, Pembangunan Daerah Tertinggal, dan Transmigrasi Indonesia
Ÿ Kementerian Dalam Negeri Indonesia
Ÿ Kementerian Kesehatan Indonesia
Ÿ Kementerian Perencanaan Pembangunan Nasional Indonesia
Ÿ Kepolisian Negara Republik Indonesia
Ÿ Badan Tenaga Nuklir Nasional INDONESIAN STATE OWNED ENTERPRISES
Ÿ Badan Pengusahaan Batam Ÿ PT Perusahaan Listrik Negara (Persero)
Ÿ Badan Koordinasi Penanaman Modal Ÿ PT Pembangkitan Jawa-Bali
Ÿ Badan Nasional Penanggulangan Bencana Ÿ PT Indonesia Power
Ÿ Pemerintah Provinsi Nangroe Aceh Darussalam Ÿ PT Jakarta Industrial Estate Pulogadung (Persero)
Ÿ Pemerintah Provinsi Riau Ÿ PT Kawasan Berikat Nusantara (Persero)
Ÿ Pemerintah Provinsi Sumatera Selatan Ÿ Perum Jasa Tirta 1
Ÿ Pemerintah Provinsi Lampung Ÿ Perum Jasa Tirta 2
Ÿ Pemerintah Provinsi Banten Ÿ Perum Pembangunan Perumahan Nasional
Ÿ Pemerintah Provinsi DKI Jakarta Ÿ Perum Percetakan Uang Republik Indonesia
Ÿ Pemerintah Provinsi Jawa Tengah Ÿ PT PAL Indonesia (Persero)
Ÿ Pemerintah Provinsi Jawa Timur Ÿ Perum BULOG
Ÿ Pemerintah Provinsi Kalimantan Barat Ÿ PT Kereta Api Indonesia (Persero)
Ÿ Pemerintah Provinsi Kalimantan Timur Ÿ PT Adhi Karya (Persero)
Ÿ Pemerintah Provinsi Kalimantan Selatan Ÿ PT Brantas Abipraya (Persero)
Ÿ Pemerintah Provinsi Sulawesi Utara Ÿ PT Hutama Karya (Persero)
Ÿ Pemerintah Provinsi Sulawesi Tengah Ÿ PT Pembangunan Perumahan (Persero) Tbk
Ÿ Pemerintah Provinsi Sulawesi Selatan Ÿ PT Waskita Karya (Persero) Tbk
Ÿ Pemerintah Provinsi Gorontalo Ÿ PT Jasa Marga (Persero) Tbk
Ÿ Pemerintah Provinsi Bali Ÿ PT Garuda Indonesia (Persero) Tbk
Ÿ Pemerintah Provinsi Nusa Tenggara Barat Ÿ PT Aneka Tambang (Persero) Tbk
Ÿ Pemerintah Provinsi Nusa Tenggara Timur Ÿ PT Pelabuhan Indonesia III (Persero)
Ÿ Pemerintah Provinsi Papua Ÿ PT Bank Mandiri (Persero) Tbk
Ÿ PT Perusahaan Gas Negara (Persero) Tbk
INTERNATIONAL CLIENT / ASSOCIATED Ÿ PT Rajawali Nusantara Indonesia (Persero)
Ÿ NIPPON KOEI Ÿ PT PP Berdikari (Persero)
Ÿ NEWJEC Inc. Ÿ PT Sang Hyang Seri (Persero)
Ÿ Tokyo Electric Power Services Co., Ltd Ÿ PT Pengembangan Pariwisata Indonesia (Persero)
Ÿ CTI Engineering Co., Ltd Ÿ Perum Perikanan Indonesia
Ÿ Oriental Consultant Global Co., Ltd Ÿ PT Rekayasa Industri
Ÿ Yachiyo Engineering Co., Ltd
Ÿ Sinotech Engineering Consultant, Ltd
Ÿ CECI Engineering Consultant, Inc., NATIONAL CLIENT / ASSOSIATED Ÿ PT Multi Phi Beta
Ÿ Korea Rural Community Corp Ÿ PT Bina Karya (Persero) Ÿ PT Multimera Harapan
Ÿ SMEC International Pty Ltd Ÿ PT Indah Karya (Persero) Ÿ PT Barunadri
Ÿ CONSIA Consultant Ÿ PT Yodya Karya (Persero) Ÿ PT Mettana
Ÿ EGIS EAU Ÿ PT Virama Karya (Persero) Ÿ PT Geo Ace
Ÿ Mott MacDonald Ÿ PT Kwarsa Hexagon Ÿ PT Raya Consult
Ÿ Binnie Black & Veatch Ÿ PT Wiratman Ÿ PT INNAKO
Ÿ Paolo Lotti Consultant Ÿ PT Tata Guna Patria Ÿ PT Bina Wira Wedha
Ÿ WAPCOS Limited Ÿ PT Ciriajasa Ÿ PT Ika Adya Perkasa
Ÿ Fichtner Ÿ PT DACREA Ÿ PT Amythas
Ÿ Royal HaskoningDHV
www.indrakarya.co.id
Water Resources Development
West Java, Indonesia
Jatigede Dam Project Type of Services :
Planning, Hydrologycal Analysis, Detailed Design, Construction Supervision
Detailed design in 2005 with this following specification: Dam will be a 110 m high and 1,715 m long rock-fill with center core
dam embankment. Its crest will be 12 m wide and the volume of dam is 6,700,000 m3. The dam's spillway will be a chute-type
on the center of the downstream face. It will be controlled by four radial gates and have a discharge capacity of 4,468 m3/s.
The irrigation intake is located below the spillway.
6 3 6 3
The reservoir volume is 980 x 10 m and effective storage capacity of which 877 x 10 m . The purpose of dam is also for water
supply and power generation. The catchment area encompasses 1,462 km2 while the reservoir surface area of 41.22 km2.
The dam's crest elevation is 265 m and the normal reservoir elevation 260 m. The intake for the power plant is located on the
right abutment with 3,050 m long head-race tunnel before reaching the power plant downstream. The power plant will
contain of two 55 MW Francis turbine-generators (total capacity 110 MW) with a design hydraulic head of 170 m.
www.indrakarya.co.id
Water Resources Development
Kupang, Indonesia
Rotiklot DAM Project Type of Services :
Geological Study, Model Test and Certification, Construction Supervision
www.indrakarya.co.id
Water Resources Development
Banten, Indonesia
Karian DAM Project Type of Services :
Geological Study, Model Test and Certification, Construction Supervision
The dam is center core rock fill type, with dam height is 63.5 m. The spillway is 2 gates of radial with 12.5 m width and 13.4 m
height
Bali, Indonesia
Titab DAM Project Type of Services :
Geological Study, Model Test and Certification, Construction Supervision
www.indrakarya.co.id
Water Resources Development
West Java, Indonesia
Rentang Irrigation Modernization Project Cirebon & Indramayu
Rentang Irrigation Sub-project, SWS Cimanuk-Cisanggarung Type of Services :
Supervison Construction
www.indrakarya.co.id
Water Resources Development
Sulawesi, Indonesia
The Comprehensive Study on Water Resources Development
in Sulawesi Island Type of Services :
Formulation of Master Plan
Scope Of Work :
Ÿ Identification and inventory critical issues, consisting of water quality and quantity, flood and drought, and institutions
across the river basin
Ÿ Model and verification of urban and rural land use at the present, and simulation to predict the future land use, , urban
and rural distribution until 2050, by using spatial system dynamic model which is Sulawesi Spatial Model
Ÿ Simulation is from some scenario from selected river areas, involve alternative policy of spatial planning, water resistance
and food , flood mitigation, and development of water reservoir
Ÿ Conduct discussion together with relevant Local Government related to data clarification and analysis result on each
Province.
Ÿ Developing strategy, management and investation to prioritize sector, (including structural efforts and non-structural)
inter river basin flows, and the impact on A National Scale.
Sumatra, Indonesia
Sumatera Water Resources Strategic Study (SWRSS) Phase II Type of Services :
Formulation of Master Plan
Scope Of Works :
Ÿ Identifications and Inventarisations critical issues, consisting of water quality and quantity, flood and drought,
institutions across the river basin
Ÿ Model and verification land using in urban and rural area for the present, and simulation for prediction land using,
urban and rural distribution for the future until 2050 by spatial system dynamic model of Sumatera Spatial Model
Ÿ Simulation from some scenario from selected river areas, consisting of alternative policy of spatial planning, water
resistance and flood, flood mitigation and development water reservoir
Ÿ Conduct discussion together with relevant Local Government related to data clarification and analysis result on each
Province.
Ÿ Developing strategy, management and investation to prioritize sector, (including structural efforts and non-structural)
inter river basin flows, and the impact on A National Scale.
Ÿ Implementation of Workshop in Sumatera Island for delivering the results of interim analysis
www.indrakarya.co.id
Energy
Malang, Indonesia
Consulting Services for Supervision Ampelgading
Type of Services :
Hydroelectric Power Plant (HEPP) Supervision Construction
Capacity : 2 x 25 Megawatt
Fuel : Low Rank Coal
Source of Fund : APLN
Type Of Contract : Turnkey (EPC)
The Lombok 2x25 MW Steam Electric Power Plant, NTB is the First Coal-fired Power Plant in NTB and this is a part of
Government Program to replace fuel oil.
Jeranjang Steam Electric Power Plant Construction consist of two parts which is worth US$ 30.7 million and in Rupiah
reach out Rp 354.3 billion. Lombok Steam Electric Power Plant – NTB is a Power Plant with the need of Coal predicted
each 195,000 Ton Per Year. This Numbers of Coal equivalent to 69,000 Kilo Liter BBM per year. So with the operation of
Steam Electric Power Plant is estimated able to save operating Cost 370 Billion Rupiah per Year (compared if using Fuel).
During it's construction, the three Steam Electric Power Plant Project in Jeranjang (1 x 25 MW and 2 x 25 MW) are
estimated to hire 2000 worker.
www.indrakarya.co.id
Roads/Bridges/Transportation
Flores, Indonesia
Road Engineering Design on the Flores Island
Type of Services :
(West Section) Survey Investigation, Detailed Design
The project includes the planning, design,
operation and maintenance of roads, bridges to
ensure safe and effective transportation of people
and goods in west side of Flores island.
Project scope:
Ÿ Malwatar - Labuan Bajo Kab. Manggarai Barat =
10 KM
Ÿ Bts. Kota Ruteng - Malwatar = 8 KM
Ÿ Km. 210 - Bts. Kota Ruten -KM. 35-Kab. Manggarai Timur - Kab. Manggarai = 10 KM
Ÿ Km. 210 - Bts. Kab. Manggarai -Batas Kota Waingapu-Kab. Manggarai Timur = 10 KM
Ÿ Bts. Kab. Manggarai - Sp. Bajawa -KM. 35-Kab. Ngada - Kab. Manggarai Timur = 10 KM
Ÿ Bts. Kota Bajawa - Malanuza = 5 KM
Ÿ Malanuza - Gako = 10 KM
Ÿ Km. 210 - Bts. Kota Ruteng -KM. 35-Kab. Manggarai Timur - Kab. Manggarai
Ÿ Bts. Kota Ruteng - Reo - Kedindi Kab. Manggarai - Kab. Manggarai Barat
Ÿ Bts. Kota Ruteng - Km. 210 Kab. Manggarai Timur - Kab. Manggarai
Ÿ Sp. Nggorang - Sp. Wangkuang - Kondo (Peningkatan) Kab. Manggarai
Ÿ Kondo - Sp. Noa - Hita (Peningkatan) Kab. Manggarai
Palembang, Indonesia
Palembang Light Rail Transit Type of Services :
Construction Supervision
www.indrakarya.co.id
Roads/Bridges/Transportation
DKI Jakarta-West Java, Indonesia
Construction Phase:
Ÿ Phase 1 (Cibubur - Cawang, Bekasi Timur - Cawang, Cawang-Dukuh Atas) 42.1 kilometres, 18 station.
Phase 1A (Cibubur - Dukuh Atas) 24.2 kilometres
Phase 1B (Bekasi Timur - Cawang - Dukuh Atas) 17.9 kilometres
Ÿ Phase 2 (Cibubur - Bogor, Dukuh Atas - Palmerah - Senayan, Palmerah - Grogol) 41.5 kilometres
Palembang, Indonesia
Musi VI Bridge
Type of Services :
Construction Supervision
www.indrakarya.co.id
Building
Osaka, Japan
Higashi-Osaka House-map Repair Type of Services :
Geographic Information System
Scope Of Works :
Updating GIS Map for Urban Planning / Housing Of
Higashi Osaka Residence.
Results:
Ÿ Generate updating the latest map of Higashi Osaka Plot
Ÿ Updating the additional building and identity number of building
Ÿ Updating the residents database each building
Ÿ Updating Number of building accordance with Building function.
Package C includes Review Design and Supervision for Drainage, Shop-pier, remodeling Office and Warehouse, fire
fighting, CCTV and Mechanical-Electrical Work;
1. Civil work
2. Architecture
3. Mechanical, AC, Piping works
4. Electrical, lighting in door and out door
www.indrakarya.co.id
Others
West Java, Indonesia
Geological Investigation for Detailed Design of Ciawi Dam
Type of Services :
Survey Investigation
PT Indra Karya (Persero) offers the best solution for water management in Indonesia, and is ready to cooperate with all
parties in the utilization of this renewable resource in terms of:
Ÿ The process of building a drinking water plant
Ÿ Design packaging and production process
Ÿ Design and manufacture of water treatment tools
Ÿ Water supply network and water installation ready to drink
Services to several clients from various industries, which are:
Ÿ Monitoring and maintenance of water supply facilities and storage tanks
Ÿ Observation wells / slope stability instruments (observation wells / slope stability instruments)
Ÿ Ground water assessment for open pit mining slope design
Ÿ Study hydroisotopes and hydro geochemistry for tailings / waste dump areas
We also have experience in water source audit services and supporting facilities, as well as in environmental due
dilligence as part of the assessment process of an infrastructure facility.
www.indrakarya.co.id
Others
Several Location in Indonesia
Industrial Waste Water and Water Treatment
Type of Services :
Business Development
The synergy of BUMN for waste water treatment and supplying of clean water to the special area that have difficulty
of clean water could be done with the cooperation pattern with other BUMN with the principle of mutual
cooperation.
Pattern of synergy: Profit and Loss Sharing, Operation and Maintenance only, Contract by volume, Build, Operate and
Transfer, and Build, Transfer and Operate.
PT. Indra Karya (Persero) as a service Provider, and other BUMN as user.
Sources of Water: Rivers, Lakes, Wells, Waste water and Sea water.
www.indrakarya.co.id
International
MANAGEMENT SYSTEM STANDARS
Company
AWARD
www.indrakarya.co.id
Corporate
VALUE
A Solid professional team is the best guarantee of engineering technology
services involve with Human resources are the greatest asset. Our staff
comprise of about 1,100 certified professional, technical and management
personnel in totally.
Our Motto:
“ SAFER, STRONGER and FASTER “
PT Indra Karya (Persero) as a state-owned technical consulting services company that is expected to provide reliable
engineering solutions for service users and believes that customer satisfaction for us is very important. The value for
us is to pay close attention to the needs of service users by adjusting their competencies. To remain consistent in
realizing the vision and mission of PT Indra Karya (Persero) with all our heart and in every step of our work we base our
"INDRA" Corporate Values
INTEGRITY
Prioritizing corporate interests, being honest and transparent and developing team collaboration for progress and
shared prosperity.
NEW IDEA
Always generate new ideas in the creation of new works both products, processes and systems.
DISCIPLINE
Keep promises, obey the law, regulations, ethics and complete each assignment according to quality, time and cost.
RESPECT
Respect both inside and outside the organization to respect each person with the characteristic attitude of treating
others with respect and respect, not tolerating discrimination in any form, seeking the best solution (win / win) in all
problems and respecting local culture and habits.
AGILITY
Continue to move to make a breakthrough in getting assignments from various service users and provide the best
results and added value and understand the needs of service users, provide the best service to achieve service user
satisfaction and make work safety a top priority in carrying out each activity.
www.indrakarya.co.id
Galery
www.indrakarya.co.id
www.indrakarya.co.id
EMPLOYER CONTRACT
No NAME OF WORKS TYPE OF WORK LOCATION
NAME NO. / DATE PRICE (Rp.)
SUPERVISION - ENERGY
LBK-B2-CT-01-R,
13 Construction Supervision of PLTU 2 NTB Lombok 2 x 25, Addendum 1 Supervision Lombok Regency , NTB PT. Rekadaya Elektrika 5.823.168.862
01/Sep/09
003/KTR/AH-IK/CIKOPO-
1 Construction Management of Cikopo-2 West Java PLTM Development MK Cikopo, West Java PT. Arkora Hydro 908.000.000
II/VII/2012, 25/Jul/12
EMPLOYER CONTRACT
No NAME OF WORKS TYPE OF WORK LOCATION
NAME NO. / DATE PRICE (Rp.)
DESIGN - ENERGY
No.
1 Review Design EPC PLTM Gunungwugul 2x 1,5 MW Design Banjar Negara Central Java PT Indonesia Power 093.SKP/612/KDEPPSJ/20 1.656.357.273
17 , 01/Dec/17
Detail Engineering Design (DED) Pembangunan PLTA Poigar - 2 (2 x PT. Minahasa Brantas 001/MBE-DED/POIGAR-
2 Design South Minahasa Regency 3.614.850.000
15,0 MW) Energi 2/VIII/2017, 21/Aug/17
No.236. PJ/61/DIR/2012,
3 Upper Cisokan Pumped Storage Power Plant Project Design West Bandung , West Java PLN 7.765.909.091
22/Oct/12
Technical Bidding Documents for the EPC Project of PLTM Cileunca 2 x Pangalengan - Bandung No. 201.SPK/061/IP/2017 ,
4 Design PT INDONESIA POWER 164.000.000
500 kW Pangalengan - Bandung West Java West Java 29/Sep/17
Detailed Engineering Design for SION Minihydro Power Plant (2 x 6 Humbang Hasundutan 003/DED/CME-IK/02-17,
5 Design PT. Citra Multi Sinergi 1.720.150.000
MW) in Kab. Humbang Hasundutan North Sumatra Regency, North Sumatra 16/Jan/17
001/AGT.DIR-
Owner Engineer Mini-hydro Power Plant Sapaya PLTM, Gowa Regency, Gowa Regency South PT Punggawa Nagata
7 Design PNDH/IK/VI/2015, 2.681.750.000
South Sulawesi Sulawesi Dinamika Hidro
18/Jun/15
094/JDG/OL/III/2013, 25
8 Detail Design of PLTM Cianten 1 (2 X 1 MW) Design Bogor Regency, West Java PT. Jaya Dinamika Geohidro 455.500.000
Maret 2013, 25/Mar/13
093/JDG/OL/III/2013, 25
9 Detail Design of PLTM Cianten 1B (2 X 3,1 MW) Design Bogor Regency, West Java PT. Jaya Dinamika Geohidro 455.500.000
Maret 2013, 25/Mar/13
092/JDG/OL/III/2013, 25
10 Detail Design of PLTM Cianten 3 (2 X 3 MW) Design Bogor Regency, West Java PT. Jaya Dinamika Geohidro 455.500.000
Maret 2013, 25/Mar/13
North Toraja Regency , Addendum 04/DIR-
11 Addendum to Topographical Measurement of DED PLTM Maiting 2 Design PT. Nagata Dinamika 140.000.000
South Sulawesi ND/II/2013, 11/Feb/13
Feasibility Study Consultant Services and Detailed Design of PLTM Cipandak. Subang Regency, 007.PJ/Um/DIR/VIII/2012,
12 Design PT. Sinergi Solusi Utama 2.377.430.000
Cipandak A, PLTM Cipandak B, PLTM Cipandak C, PLTM Cipandak D West Java 28/Aug/12
Feasibility Study on the Potential of PLTM/PLTA, Detailed Design and Pacitan Regency, 007.PJ/KONS/061/2010
PT. Pembangkitan Jawa Bali
17 Tender Documents for Lodoyo Hydroelectric Power Plants for PT. PJB Design Trenggalek, Blitar, Malang & dan 025.B-PS/PEMAS/IKA- 1.936.464.000
(PT. PJB)
Brantas Generation Unit Lumajang WI/XI/2010, 08/Dec/11
STUDY - ENERGY
Preparation of Feasibility Studies and DED for Solar Power Plants Kalimantan Barat, Dirjen Energi Baru, SPK-11/91.04/PPK-
8 (PLTS) Centralized in Priority Border Locations in the Provinces of Study Kalimantan Utara dan Nusa Terbarukan dan Konservasi PNF/DEA/V/2016, 1.219.636.364
West Kalimantan, North Kalimantan and East Nusa Tenggara Tenggara Timur Energi 20/May/16
Consultancy Services for Environmental Impact Analysis Studies, Muara Kabupaten Murung Raya, PT. Perdana Prima 009/KK/PPS-
12 Study 1.561.818.182
Juloi Hydroelectric Power Plant, Central Kalimantan Kalimantan Tengah Sejahtera IKA/VIII/2014, 20/Aug/14
EMPLOYER CONTRACT
No NAME OF WORKS TYPE OF WORK LOCATION
NAME NO. / DATE PRICE (Rp.)
S-011/DIR-
Revision of the Feasibility Study Report for the Ma'dong PLTM in North Kabupaten Toraja Utara
13 Study PT. Nagata Dinamika NDHMD/IX/2014, 70.000.000
Toraja Regency Sulsel
17/Sep/14
Consulting Services for Feasibility Studies of PLTM Buakayu Hulu and Kab Tana Toraja Sulawesi 004/AGT.DIR-
14 Study PT. Nagata Dinamika 1.273.175.000
PLTM Buakayu Hilir in Tana Toraja Regency, South Sulawesi Selatan ND/IK/IX/2014, 17/Sep/14
Feasibility Study of Telaga Waja Ayu PLTMH Stage-2 in Rendang Kab. Karangasem Propinsi 02/BL/TEMDR/X12,
18 Study PT. JDG 250.000.000
District, Karangasem Regency, Bali Province Bali 18/Oct/13
Feasibility Study of PLTM Binuang-1 & 2, Binuang River, North Luwu Kab. Luwu Utara, Sulawesi 001/BD/ND-IK/V/2013,
19 Study PT. Nagata Dinamika 1.447.500.000
Regency, South Sulawesi Selatan 28/May/13
PPK Non Fisik, Direktorat
SPK-4/91.04/PPK-
Jabar, Sumsel, Sumut, Jenderal Energi Baru,
20 Energy Audit in Energy Supply Industry (Fiscal Year 2013) Study NFIV/V/EBTKE/2013, 979.600.000
Kalbar & Sulsel Terbarukan dan Konservasi
27/May/13
Energi
DKI Jakarta, Sumut, Sumsel, PPK Non Fisik, Direktorat
SPK-6/91.04/PPK-
Sulsel, Banten, Jabar, Jateng, Jenderal Energi Baru,
21 Energy Audit in Metal and Textile Industry (Fiscal Year 2013) Study NFIV/V/EBTKE/2013, 2.990.240.000
DI Yogyakarta, Jatim, Kaltim Terbarukan dan Konservasi
27/May/13
& Bali Energi
Feasibility Study and Basic Design of PLTM Liki-Mitra Kerinci (RNI Kabupaten Solok Selatan, PT Mitra Kerinci (RNI 01/MK/PLTM/175/III/201
22 Study 3.059.000.000
Group) Sumatera Barat Group) 3, 13/Mar/13
Feasibility Study of Telaga Waja Ayu PLTMH Stage-2 in Rendang sub- 02/BL/TEMDR/X/12,
23 Study Kab. Karangasem, Bali PT. JDG 250.000.000
district, Karangasem district, Bali Province 18/Oct/12
Consulting Services for Feasibility Study of the Bone River Kabupaten Bone Bolango No.018/MOU/AE/10/2012,
25 Study PT. APAT ENERGI 1.080.909.091
Hydroelectric Power Plant, Bone Bolango Regency, Gorontalo Province Provinsi Gorontalo 05/Oct/12
Investigation Department,
China Water Resources
Hydrology Study Works for Site Investigation for Karama River October 17, 2011,
28 Study Sulawesi Barat Beifang Investigation, 465.553.000
Hydropower Project in West Sulawesi Province 17/Oct/11
Design and Research Co.
Ltd., P.R.China
004.03/DIR-
PT. North Sumatera Hydro
29 Batang Toru Hydro Electric Power Plant Feasibility Study Study Batang Toru, Sumatera BPH/NSHE/VI/2011, 7.128.924.000
Energy
01/Jun/11
Kaltim, Sumut, Sumsel, Direktorat Jenderal Energi
Feasibility Study of New Energy and Renewable Energy Development SPK-07/JK-03/IX/2011,
30 Study Sulut, Maluku, Gorontalo, Baru, Terbarukan Dan 757.955.000
(Fiscal Year 2011) 30/Sep/11
NTT Konservasi Energi
SPK-11/JK-04/IX/2011,
Direktorat Jenderal Energi
Amandemen 01.AMD/SPK-
31 Energy Audit in Energy Supply Industry (Fiscal Year 2011) Study Tersebar Wil Indonesia Baru, Terbarukan Dan 1.278.612.500
11/PPK-NF/X/2011, 19 Okt
Konservasi Energi
2011, 26/Sep/11
SPK-05/JK-04/VIII/2011,
Direktorat Jenderal Energi Amandemen 01.AMD/SPK-
32 Energy Audit in Metal and Textile Industry (Fiscal Year 2011) Study Jawa, Bali, Sumatera Baru, Terbarukan Dan 05/PPK-NF/X/2011, 3.590.100.000
Konservasi Energi tanggal 25 Okt 2011,
26/Aug/11
Review of the Feasibility Study of PLTM in the Sesaot and Cakranegara 017/DIRTDR/SPK-
33 Study Propinsi NTB PT. Tirta Daya Rinjani 300.000.000
NTB IK/VIII/2011, 15/Aug/11
Feasibility Study and Detailed Engineering Design of HEPP Sikundur, PT. Listrindo Natarong 002.C/LNE-IK/VIII/2010,
34 Study Sumatera Utara 825.000.000
Phak-Pak Regency, North Sumatra Province Energi 20/Aug/10
PO No. L-CJP(S)15-0184 ,
4 Technicians & Density Equipment Rental for PLTU Tanjung Jati B S/I Kembang Regency, Jepara PT. Central Java Power 1.186.000.000
19/Nov/15
Muara Juloi Hydro Power Plant Project In Central Kalimantan (Muara Murung Raya Regency, Soosung Engineering Co., August 23, of 2013,
6 S/I 354.545.454
Juloi Hydro Power Plant Survey & Investigation) Central Kalimantan Ltd 23/Aug/13
Investigation Department,
China Water Resources
Borehole Drilling Works for Site Investigation for Karama River
7 S/I West Sulawesi Beifang Investigation, No. 1,, 20/Jan/11 3.166.185.000
Hydropower Project in West Sulawesi
Design and Research Co.
Ltd., P.R.China