PT. Indra Karya (Persero) is a State-Owned Enterprise that
was founded in 1961 and engaged in the construction field as
a Contractor Company. In 1972 the company was
reorganized into engineering and management consulting
services. Since then, the company has been growing and able
to establish itself as a leading Engineering Consultant
Company in Indonesia.

As an important preliminary step, PT. Indra Karya (Persero)


focuses its business in electric power and water resources
development. The success in achieving the initial goals, has
encouraged PT. Indra Karya (Persero) to expand the fields,
such as: Buildings and Factories, Transportation (Toll Roads,
Bridges, Ports, Airports, Train Facilities / Infrastructure / LRT),
Community Empowerment, Public Housing, Sanitation,
Water Waste and Drainage, Regional Development, Industrial Development / Specific
Areas in line with current development market segment in Indonesia.

PT Indra Karya (Persero) has been succeeded in completing all the contract assignments
handled professionally both as Independent Company or as Joint Venture Lead Firms.
This achievement cannot be separated from the support of human resources of the
company. PT. Indra Karya (Persero) also has its own Land Laboratory, integrated planning
studio, integrated online project implementation monitoring system (EKPP), ISO
9001:2015, OHSAS 18001:2007 as well as backup support for professionals in their fields
to foster a second opinion culture on products produced by PT. Indra Karya (Persero).

In the next five years, PT. Indra Karya (Persero) has a plan to strengthen and diversify the
business into an EXPANDED CONSULTANTS, specifically the expansion of the water and
energy resources business (upstream-mid-downstream), thus PT. Indra Karya (Persero)
will become Engineering, Developer and Industry at the same time. Engineering
activities as an upstream part,will continue to handle the consulting work that has been
carried out so far. Developer activities as part of the center will act as a developer of
reservoirs / ponds / situ for the management of clean water, wastewater, energy,
cultivation and tourism. Industrial activities as a downstream part run an
industrialization business, namely bottled drinking water (AMDK) that already has a
trademark called INFRESH, , this industry provides clean water from river water sources,
reservoirs, ground water, sea water to supply the needs of the Special Area. PT. Indra
Karya has been entrusted to carry out A Large Scale Engineering Projects with high
technology as Lead Firm Consultants Association for IBRD finances projects (Central Java
Transmission & Substantion also Musi HEPP Project) and ADB (HEPP Tanggari II and
Sengguruh HPP).

Our hope, this Company Profile can be one of the sources of information that is useful
forservice users in an attempt to implement their development program. For this reason,
we express our deepest gratitude for all the help and support of the stakeholders in our
efforts to develop PT. Indra Karya (Persero).

President Director.

Gok Ari Joso Simamora, ST., MM

www.indrakarya.co.id
Major Field of
SPECIALIZATION
and type of
CONSULTING SERVICES

Water Ÿ DAM
Resources Ÿ Irrigation
Ÿ Flood Management
Development Ÿ Clean Water & Waste Water
Ÿ Water Supply
Ÿ Water Resources
Development

Energy Ÿ Hydro Power Plant


Ÿ Solar Power Plant
Ÿ Oils and Gas Power Plant
Ÿ Coal Power Plant
Ÿ Transmission Line & Substation

Road, Bridge and Ÿ Road and Bridge


Ÿ Railway
Transportation Ÿ Harbour / Port
Ÿ Airport
Ÿ Highway

Building Ÿ Commercial Building


Ÿ Non Commercial Building
Ÿ Industrial Estate & Tourism

Other Ÿ Environmental
Ÿ Community & Social
Ÿ Tunneling
Ÿ Soil & laboratory
Ÿ Drinking Water
Ÿ Clean Water
Ÿ Water Supply
CONSTRUCTION ACTIVITY Ÿ Realty Management
Ÿ Project Proposal
Ÿ Pre Feasibility Study
Ÿ Feasibility Study
CONSTRUCTION
Ÿ Detail Design
SUPERVISION
Ÿ Supervision
Ÿ Construction CONSTRUCTION
Ÿ Operation and Maintenance DESIGN Services
MANAGEMENT Ÿ Quality
Ÿ Energy Audit Ÿ Master planning
Ÿ Control of Design Ÿ Quantity
Ÿ Block plan
Activities Ÿ Preliminary Design Ÿ Construction Progress)
Ÿ Construction SURVEY and
Ÿ Design Development
Supervision INVESTIGATION
Ÿ Detailed Design/
Ÿ Topographical & Mapping Survey
Ÿ Value Engineering Construction
Ÿ Geological & Geotechnical Survey
DEVELOPER and INDUSTRY Documents :
Ÿ Hydrology & Hydrometeorology
Ÿ Drinking Water (Drawings, Technical
Ÿ Geophysical Exploration Survey
Ÿ Clean Water specification, Cost
Ÿ Laboratory Test (geotechnical, building
Ÿ Water Supply plan, Administrative
Ÿ Realty Management
material, hydraulics, sanitary, others)
conditions)
Applied research and investigation on
engineering,
calibration and repair of survey,
geological and laboratory instruments

www.indrakarya.co.id
BOARD OF
COMMISSIONERS
Airlangga Mardjono, ST., MT. Teddy Poernama, SE, M.I.Kom.,MIPR
President Commisioners Commisioners

BOARD OF
DIRECTOR

Gok Ari Joso Simamora, ST., MM Ir. Eko Budiono


President Director Director

ORGANIZATION
STRUCTURE

www.indrakarya.co.id
2019 - 2023
COMMITMENT

VISION
“ To be one of the best integrated Engineering, Developer and Water Resources
Industry Company in Asia “

MISSION
Ÿ Providing high-quality and highly competitive consultancy services both in
domestic and international markets, and fostering profit (profit oriented) by
conducting business activities that can increase the value of the company.

Ÿ Implementing Business Ethics to promote Good Corporate Governance

Ÿ Making expert PT Indra Karya has high competence and has requirements that can
be accepted by the international consulting services industry and can provide
excellent service to service users for each assignment.

Ÿ Participate and implement and support government policies and programs in the
field of economy and national development in general.

Ÿ Becoming a pioneer of business activities that have not been carried out by the
private sector and actively providing guidance / fostering business activities,
especially small business and cooperatives.

www.indrakarya.co.id
Head Office
Jl. Biru Laut X Kav 9 Jakarta 13340 Telp. (021) 8192636, (021) 8354237 Fax. (021) 8192179, (021) 8290120

HEAD & REGIONAL Division of Engineering I

OFFICE
Jl. Surabaya 3 A, Malang 65115 (0341) 551311 Fax (0341) 551463

Division of Engineering II
Jl. Ketileng Raya 16, Semarang 50276 Telp. (024) 6725046 Fax. (024) 6725046

Division of Engineering III


Jl. Biru Laut X Kav 9 Jakarta 13340 Telp. (021) 8192636 Fax. (021) 8192179

Division of Special Business and Investment


Jl. Biru Laut X Kav 9 Jakarta 13340 Telp. (021) 8192636 Fax. (021) 8192179

Division of Survey and Investigation


Jl. Janti Barat 27 - Malang 65149 Telp. (0341) 362261 Fax. (0341) 324402

• Division of Engineering II
• Head Office
• Division of Engineering III
• Division of Special Business and Investment

• Division of Engineering I
• Division of Survey and Investigation

Area of
EXPERTISE Water Resources Development
Energy
Road/Bridges/Tranportation
Building
Other

www.indrakarya.co.id
USP of
PT. Indra Karya (Persero)

Water Resources Development


Survey & Investigation/Study/Detailed Engineering/Construction Supervison

for over 1000 Projects


in Dam, Irrigation, Water Resources, Flood Control, Ground Water, Agriculture etc
Contributed in Development of Irrigation Potential of Over 1 Million Ha.

Tunnel
Pre-feasibility/Study/Construction Supervison

for over 100 Dam Tunnel Projects with length of approximately 100 KM
more than 5 Road Tunnels and Railway Tunnels Project with length of approximately 10 KM

Energy
Pre-feasibility/Study/Construction Supervison

for over 100 Hydro Power Projects with an installed capacity of more than 10.000 MW
250 Solar Power Projects with an installed capacity of more than 1000 MW
2 Oils and Gas Power Projects with an installed capacity of more than 100 MW
5 Coal Power Projects with an installed capacity of more than 1000 MW
Contributed in Transmission Line & Substation Length of approximately 5000 KM

Transportation
Survey & Investigation/Study/Detailed Engineering/Construction Supervison

for over 60 Projects in Road / Toll Road include Tunneling more than 2000 KM
5 Projects Railway with length more than 200 KM
20 Port / Harbour Projects

www.indrakarya.co.id
PROJECT
THE GOVERNMENT of the REPUBLIC of INDONESIA
Ÿ Kementerian Pekerjaan Umum dan Perumahan Rakyat Indonesia OWNER
Ÿ Kementerian Energi dan Sumber Daya Mineral Indonesia
Ÿ Kementerian Kelautan dan Perikanan Indonesia
Ÿ Kementerian Perhubungan Indonesia
Ÿ Kementerian Pendidikan dan Kebudayaan Indonesia
Ÿ Kementerian Pertanian Indonesia
Ÿ Kementerian Lingkungan Hidup dan Kehutanan Indonesia
Ÿ Kementerian Desa, Pembangunan Daerah Tertinggal, dan Transmigrasi Indonesia
Ÿ Kementerian Dalam Negeri Indonesia
Ÿ Kementerian Kesehatan Indonesia
Ÿ Kementerian Perencanaan Pembangunan Nasional Indonesia
Ÿ Kepolisian Negara Republik Indonesia
Ÿ Badan Tenaga Nuklir Nasional INDONESIAN STATE OWNED ENTERPRISES
Ÿ Badan Pengusahaan Batam Ÿ PT Perusahaan Listrik Negara (Persero)
Ÿ Badan Koordinasi Penanaman Modal Ÿ PT Pembangkitan Jawa-Bali
Ÿ Badan Nasional Penanggulangan Bencana Ÿ PT Indonesia Power
Ÿ Pemerintah Provinsi Nangroe Aceh Darussalam Ÿ PT Jakarta Industrial Estate Pulogadung (Persero)
Ÿ Pemerintah Provinsi Riau Ÿ PT Kawasan Berikat Nusantara (Persero)
Ÿ Pemerintah Provinsi Sumatera Selatan Ÿ Perum Jasa Tirta 1
Ÿ Pemerintah Provinsi Lampung Ÿ Perum Jasa Tirta 2
Ÿ Pemerintah Provinsi Banten Ÿ Perum Pembangunan Perumahan Nasional
Ÿ Pemerintah Provinsi DKI Jakarta Ÿ Perum Percetakan Uang Republik Indonesia
Ÿ Pemerintah Provinsi Jawa Tengah Ÿ PT PAL Indonesia (Persero)
Ÿ Pemerintah Provinsi Jawa Timur Ÿ Perum BULOG
Ÿ Pemerintah Provinsi Kalimantan Barat Ÿ PT Kereta Api Indonesia (Persero)
Ÿ Pemerintah Provinsi Kalimantan Timur Ÿ PT Adhi Karya (Persero)
Ÿ Pemerintah Provinsi Kalimantan Selatan Ÿ PT Brantas Abipraya (Persero)
Ÿ Pemerintah Provinsi Sulawesi Utara Ÿ PT Hutama Karya (Persero)
Ÿ Pemerintah Provinsi Sulawesi Tengah Ÿ PT Pembangunan Perumahan (Persero) Tbk
Ÿ Pemerintah Provinsi Sulawesi Selatan Ÿ PT Waskita Karya (Persero) Tbk
Ÿ Pemerintah Provinsi Gorontalo Ÿ PT Jasa Marga (Persero) Tbk
Ÿ Pemerintah Provinsi Bali Ÿ PT Garuda Indonesia (Persero) Tbk
Ÿ Pemerintah Provinsi Nusa Tenggara Barat Ÿ PT Aneka Tambang (Persero) Tbk
Ÿ Pemerintah Provinsi Nusa Tenggara Timur Ÿ PT Pelabuhan Indonesia III (Persero)
Ÿ Pemerintah Provinsi Papua Ÿ PT Bank Mandiri (Persero) Tbk
Ÿ PT Perusahaan Gas Negara (Persero) Tbk
INTERNATIONAL CLIENT / ASSOCIATED Ÿ PT Rajawali Nusantara Indonesia (Persero)
Ÿ NIPPON KOEI Ÿ PT PP Berdikari (Persero)
Ÿ NEWJEC Inc. Ÿ PT Sang Hyang Seri (Persero)
Ÿ Tokyo Electric Power Services Co., Ltd Ÿ PT Pengembangan Pariwisata Indonesia (Persero)
Ÿ CTI Engineering Co., Ltd Ÿ Perum Perikanan Indonesia
Ÿ Oriental Consultant Global Co., Ltd Ÿ PT Rekayasa Industri
Ÿ Yachiyo Engineering Co., Ltd
Ÿ Sinotech Engineering Consultant, Ltd
Ÿ CECI Engineering Consultant, Inc., NATIONAL CLIENT / ASSOSIATED Ÿ PT Multi Phi Beta
Ÿ Korea Rural Community Corp Ÿ PT Bina Karya (Persero) Ÿ PT Multimera Harapan
Ÿ SMEC International Pty Ltd Ÿ PT Indah Karya (Persero) Ÿ PT Barunadri
Ÿ CONSIA Consultant Ÿ PT Yodya Karya (Persero) Ÿ PT Mettana
Ÿ EGIS EAU Ÿ PT Virama Karya (Persero) Ÿ PT Geo Ace
Ÿ Mott MacDonald Ÿ PT Kwarsa Hexagon Ÿ PT Raya Consult
Ÿ Binnie Black & Veatch Ÿ PT Wiratman Ÿ PT INNAKO
Ÿ Paolo Lotti Consultant Ÿ PT Tata Guna Patria Ÿ PT Bina Wira Wedha
Ÿ WAPCOS Limited Ÿ PT Ciriajasa Ÿ PT Ika Adya Perkasa
Ÿ Fichtner Ÿ PT DACREA Ÿ PT Amythas
Ÿ Royal HaskoningDHV

www.indrakarya.co.id
Water Resources Development
West Java, Indonesia
Jatigede Dam Project Type of Services :
Planning, Hydrologycal Analysis, Detailed Design, Construction Supervision

The Jatigede Dam is a rock embankment dam at the


Cimanuk River in Sumedang Regency, West Java,
Indonesia. its located 19 km east of the town of
Sumedang. Construction of the dam started on2008
and it was completed on 2015. The power station is
expected to be commissioned in 2019.

The main purpose of the dam is irrigation but it will


also for flood control, water supply and hydro
electric power generation. Water in the reservoir
will be used to serve a irrigation 90.000 Ha of
farmland and the power station is expected to have
a 110 MW capacity.

Detailed design in 2005 with this following specification: Dam will be a 110 m high and 1,715 m long rock-fill with center core
dam embankment. Its crest will be 12 m wide and the volume of dam is 6,700,000 m3. The dam's spillway will be a chute-type
on the center of the downstream face. It will be controlled by four radial gates and have a discharge capacity of 4,468 m3/s.
The irrigation intake is located below the spillway.
6 3 6 3
The reservoir volume is 980 x 10 m and effective storage capacity of which 877 x 10 m . The purpose of dam is also for water
supply and power generation. The catchment area encompasses 1,462 km2 while the reservoir surface area of 41.22 km2.
The dam's crest elevation is 265 m and the normal reservoir elevation 260 m. The intake for the power plant is located on the
right abutment with 3,050 m long head-race tunnel before reaching the power plant downstream. The power plant will
contain of two 55 MW Francis turbine-generators (total capacity 110 MW) with a design hydraulic head of 170 m.

West Sumbawa, Indonesia


Bintang Bano Dam Project Type of Services :
Planning, Hydrologycal Analysis, Detailed Design, Construction Supervision
The Bintang Bano Dam is located at Brang Rea River,
Bangkat Monte village, Brang Rea sub-district West
Sumbawa District.
Bintang Bano dam is an rock embankment dam
located in the province of West Nusa Tenggara, in
the district of West Sumbawa.
Bintang Bano dam is one of 13 large dams which is
one of development agenda of ministry of PUPR
fiscal year 2015.
6 3
The reservoir capacity of the dam is 65.84 x 10 m
where the purpose of the dam is to irrigate an area
of 6,695 Ha, to reduce flood discharge by 647
m3/sec, a raw water supply of 0.55 m3/sec and to
generate electricity of 9.00 MW.
The height of dam is 72 m

www.indrakarya.co.id
Water Resources Development
Kupang, Indonesia
Rotiklot DAM Project Type of Services :
Geological Study, Model Test and Certification, Construction Supervision

The Rotiklot dam is located at Mota Rotiklot river,


Fatukiti village, Kakuluk Mesak Sub-district and Belu
District.

The Rotiklot dam is a center core rock fill type, 42.5


m height, with side channel type of the spillway,
total volume of the reservoir is 3.3 x 106 m3

The purpose of dam are:


Ÿ Irrigation water for Rotiklot area of 139 Ha
n
(Paddy) and Ainiba area of 500 Ha of palawija (2
in dry season)
Ÿ Flood control at Ainiba area
Ÿ Raw water and for Atapupu harbor of 40 l/sec

North Sulawesi, Indonesia


Lolak DAM Project Type of Services :
Geological Study, Model Test and Certification, Construction Supervision

The Lolak dam is located at Lolak river, Pindal


village, Lolak Sub-district, Bolaang Mangondow
district and North Sulawesi Province. The location
of dam about 210 Km from Manado city.

The Lolak dam is a center core rock fill type, 58 m


height, with side channel type of the spillway. Total
volume of the reservoir is 16,10 x 106m3

The purpose of dam is:


Ÿ Irrigation water for right Lolak area of 1,214 Ha
Ÿ Irrigation water for left Lolak area of 1,000 Ha
Ÿ Raw water 500 l/sec
Ÿ Mini Hydro power 2.43 MW
Ÿ Water conservation and tourism

www.indrakarya.co.id
Water Resources Development
Banten, Indonesia
Karian DAM Project Type of Services :
Geological Study, Model Test and Certification, Construction Supervision

Construction of the Karian Dam was started on June


2015 which is scheduled to be finished on June
2019.

Location of the project at Rangkasbitung


subdistrict, Lebak regency and Banten Province.

Owner of the Karian project is Minister of General


Water Resources and Housing, Directorate of Water
Resources “Balai Besar Wilayah Sungai Cidanau -
Ciujung - Cidurian”

The purpose of Karian Dam are:


3
Ÿ Raw Water for Lebak Regency, South Tangerang and Jakarta as much as approx 9.1 m /sec
Ÿ Irrigation water for Ciujung area of 22,000 Ha
3
Ÿ Raw water for Cilegon city as much as 5.5 m /sec
3
Ÿ Flood control as 60.8 m for the downstream area of the dam
Ÿ Recreation area and Mini Hydro power for 1.8 MW

The dam is center core rock fill type, with dam height is 63.5 m. The spillway is 2 gates of radial with 12.5 m width and 13.4 m
height

Bali, Indonesia
Titab DAM Project Type of Services :
Geological Study, Model Test and Certification, Construction Supervision

The Titab dam is located at Tukad Saba river, at 4


(four) villages that are: Telaga, Busungbiu, Titab and
Ring dikit Sub-district of Busungbiu and Ularam,
Seririt Sub-district, Buleleng district.

the dam is center core random fill with 59.90 m


height.
The spillway is un gated side channel with 30 m
width.

The purpose of the Titab dam are:


Ÿ Irrigation water for Saba area 1,396 Ha
Ÿ Irrigation water for Puluram area 398 Ha
3
Ÿ Raw water 0,35 m /sec
Ÿ Mini Hydro Power 2 x 0.75 MW

www.indrakarya.co.id
Water Resources Development
West Java, Indonesia
Rentang Irrigation Modernization Project Cirebon & Indramayu
Rentang Irrigation Sub-project, SWS Cimanuk-Cisanggarung Type of Services :
Supervison Construction

Modernization of Mechanical and Electrical


Equipment and Civil Work Rentang Barrage and
Secondary Canal Cirebon included:

Ÿ Barrage (Main Weir)


Ÿ Cipelang Intake
Ÿ Sindopraja Intake
Ÿ Cipelang Sediment Excluder
Ÿ Sindopraja Sediment Excluder
Ÿ Control and Electrical Works
Ÿ Designed of Gate Houses and Electrification at
Secondary Canal

Central Java, Indonesia


Integrated Water Resources And Flood Management Project
for Semarang City Type of Services :
Planning, Hydrological Analysis, Detailed Design, Construction Supervision

Semarang City, Capital of Central Java Province with


an area of 373.67 square kilometers facing
problems :

Ÿ Great flood disaster in 1973, 1988, 1990 and


1993.
Ÿ Floods in 1990 caused 47 of people death.
Ÿ Lack of raw water supply especially in the dry
season.

To solve the problem is to be done 3 component


activities are :
Ÿ Component A : Normalization of Western
Channel / Kaligarang Flood canal
Ÿ Component B : Construction of Jatibarang Dam
Ÿ Component C : Drainage Improvement
Semarang City
6 3
The Jatibarang dam is zonal type embankment, with height at 77 m with reservoir volume of 13.60 x 10 m
The Jatibarang Dam construction project as of the component B ,started from November 2009 and has been finished on
June 2014.
The purpose of Jatibarang dam are:
3
Ÿ To reduce the flood for Semarang city as of 170 m /sec
Ÿ To increase conservation at the Garang catchment area
Ÿ Mini Hydro Power fo 1.5 MW
Ÿ As tourism area

www.indrakarya.co.id
Water Resources Development
Sulawesi, Indonesia
The Comprehensive Study on Water Resources Development
in Sulawesi Island Type of Services :
Formulation of Master Plan

A macro study of the potential that can be


developed and other issues related to human
resources, which the output is to develop
sustainable strategic water resources management
plan in Sulawesi with prioritizing the Water Surface.
The purpose of this study is to increase the water
resistance in Sulawesi based on proportional
allocations and distributions in quantity and
continuity.

Scope Of Work :
Ÿ Identification and inventory critical issues, consisting of water quality and quantity, flood and drought, and institutions
across the river basin
Ÿ Model and verification of urban and rural land use at the present, and simulation to predict the future land use, , urban
and rural distribution until 2050, by using spatial system dynamic model which is Sulawesi Spatial Model
Ÿ Simulation is from some scenario from selected river areas, involve alternative policy of spatial planning, water resistance
and food , flood mitigation, and development of water reservoir
Ÿ Conduct discussion together with relevant Local Government related to data clarification and analysis result on each
Province.
Ÿ Developing strategy, management and investation to prioritize sector, (including structural efforts and non-structural)
inter river basin flows, and the impact on A National Scale.

Sumatra, Indonesia
Sumatera Water Resources Strategic Study (SWRSS) Phase II Type of Services :
Formulation of Master Plan

Macro Study related to develop the Potential and


human resource issues, the output is The positive
impact after infrastructure development (road,
railways, dams, airports, ports, malls, tourism,
terminals etc.) to migration system and Land Use
Transformation and the water requirements.

Parameters used are demographic trends, Land Use


Trends, Government policies in the infrastructure
sector, government policies to accelerate
development ( construction of 65 dams in 2015-
2019, a million hectares rice field program in
Indonesia)

Scope Of Works :
Ÿ Identifications and Inventarisations critical issues, consisting of water quality and quantity, flood and drought,
institutions across the river basin
Ÿ Model and verification land using in urban and rural area for the present, and simulation for prediction land using,
urban and rural distribution for the future until 2050 by spatial system dynamic model of Sumatera Spatial Model
Ÿ Simulation from some scenario from selected river areas, consisting of alternative policy of spatial planning, water
resistance and flood, flood mitigation and development water reservoir
Ÿ Conduct discussion together with relevant Local Government related to data clarification and analysis result on each
Province.
Ÿ Developing strategy, management and investation to prioritize sector, (including structural efforts and non-structural)
inter river basin flows, and the impact on A National Scale.
Ÿ Implementation of Workshop in Sumatera Island for delivering the results of interim analysis

www.indrakarya.co.id
Energy
Malang, Indonesia
Consulting Services for Supervision Ampelgading
Type of Services :
Hydroelectric Power Plant (HEPP) Supervision Construction

PLTA Ampelgading project Located in Tawangsari


Village and Purwoharjo Village, Ampelgading Sub-
district, Malang Urban Village , East Java Province,
exactly between 112º54'32,28" East Longitude and
80º15'42,62" South Latitude,

Purposes and Objectives :


In accordance with long-term plan PT. PLN (Persero)
Main Of Java Plant and Network, Bali and Nusa
Tenggara Ampelgading Hydroelectric Power Plant,
to get the energy resource/ low price electricity and
utilization water resource for society benefit and
well-being.

Scope Of Supervision Works:


Ÿ Roads and Facilities
Ÿ Conduit 1 & 2 ( Weir, Open Canal and Tunnel )
Ÿ Reservoir
Ÿ Headrace Channel
Ÿ Head Tank
Ÿ Penstock ID 1,400.00 mm ( with length of upstream part 326.86 m; Down Stream part 345,26 m and Bifurcation 2 x
10.00 m )
Ÿ Power House & Tailrace.

West Lombok, Indonesia


Supervision for Construction of Steam Power Plant
(PLTU) 2 NTB – Lombok (2 x 25 MW) Type of Services :
Construction Supervision

Scope Of Consulting services :


Ÿ Carry out Construction Supervision
Ÿ Commissioning
Ÿ Generator Testing
Ÿ QA/QC
Ÿ Inspection Of Material and Equipment
Ÿ UKL/UPL Monitoring.

Capacity : 2 x 25 Megawatt
Fuel : Low Rank Coal
Source of Fund : APLN
Type Of Contract : Turnkey (EPC)

The Lombok 2x25 MW Steam Electric Power Plant, NTB is the First Coal-fired Power Plant in NTB and this is a part of
Government Program to replace fuel oil.

Jeranjang Steam Electric Power Plant Construction consist of two parts which is worth US$ 30.7 million and in Rupiah
reach out Rp 354.3 billion. Lombok Steam Electric Power Plant – NTB is a Power Plant with the need of Coal predicted
each 195,000 Ton Per Year. This Numbers of Coal equivalent to 69,000 Kilo Liter BBM per year. So with the operation of
Steam Electric Power Plant is estimated able to save operating Cost 370 Billion Rupiah per Year (compared if using Fuel).

During it's construction, the three Steam Electric Power Plant Project in Jeranjang (1 x 25 MW and 2 x 25 MW) are
estimated to hire 2000 worker.

www.indrakarya.co.id
Roads/Bridges/Transportation
Flores, Indonesia
Road Engineering Design on the Flores Island
Type of Services :
(West Section) Survey Investigation, Detailed Design
The project includes the planning, design,
operation and maintenance of roads, bridges to
ensure safe and effective transportation of people
and goods in west side of Flores island.

By using standards of highway in Indonesia, our


team must take into account future traffic flows,
design of highway intersection/interchanges,
geometric alignment and design, highway
pavement materials and design, structural design of
pavement thickness, and pavement maintenance.

Project scope:
Ÿ Malwatar - Labuan Bajo Kab. Manggarai Barat =
10 KM
Ÿ Bts. Kota Ruteng - Malwatar = 8 KM
Ÿ Km. 210 - Bts. Kota Ruten -KM. 35-Kab. Manggarai Timur - Kab. Manggarai = 10 KM
Ÿ Km. 210 - Bts. Kab. Manggarai -Batas Kota Waingapu-Kab. Manggarai Timur = 10 KM
Ÿ Bts. Kab. Manggarai - Sp. Bajawa -KM. 35-Kab. Ngada - Kab. Manggarai Timur = 10 KM
Ÿ Bts. Kota Bajawa - Malanuza = 5 KM
Ÿ Malanuza - Gako = 10 KM
Ÿ Km. 210 - Bts. Kota Ruteng -KM. 35-Kab. Manggarai Timur - Kab. Manggarai
Ÿ Bts. Kota Ruteng - Reo - Kedindi Kab. Manggarai - Kab. Manggarai Barat
Ÿ Bts. Kota Ruteng - Km. 210 Kab. Manggarai Timur - Kab. Manggarai
Ÿ Sp. Nggorang - Sp. Wangkuang - Kondo (Peningkatan) Kab. Manggarai
Ÿ Kondo - Sp. Noa - Hita (Peningkatan) Kab. Manggarai

Palembang, Indonesia
Palembang Light Rail Transit Type of Services :
Construction Supervision

The Palembang Light Rail Transit (Palembang LRT) is


a light metro system that currently is under
construction in Palembang, the capital province of
South Sumatera.
Connect to Sultan Mahmud Badaruddin
International Airport and Jakabaring stadium
complex.
The project is built to facilitate the 2018 Asian
Games.

There will be 13 station constructed for Palembang


LRT with length 23 kilometer divided by 5 route
zone including the bridge.

www.indrakarya.co.id
Roads/Bridges/Transportation
DKI Jakarta-West Java, Indonesia

Jakarta Light Rail Transit Type of Services :


Construction Supervision

Jakarta LRT (Jakarta Light Rail Transit) is a light


metro system that currently is under construction in
Jakarta, the capital city of Indonesia.

It has 2 (two) executing authorities: 1) Routes within


Jakarta will be implemented by DKI provincial
goverment. 2) where as routes that connect Grater
jakarta will be implemented by the central
goverment.

The system is planned to connect Jakarta city center


with suburbs in Greater Jakarta such as Bekasi,
Bogor and Depok

Construction Phase:
Ÿ Phase 1 (Cibubur - Cawang, Bekasi Timur - Cawang, Cawang-Dukuh Atas) 42.1 kilometres, 18 station.
Phase 1A (Cibubur - Dukuh Atas) 24.2 kilometres
Phase 1B (Bekasi Timur - Cawang - Dukuh Atas) 17.9 kilometres
Ÿ Phase 2 (Cibubur - Bogor, Dukuh Atas - Palmerah - Senayan, Palmerah - Grogol) 41.5 kilometres

Palembang, Indonesia
Musi VI Bridge
Type of Services :
Construction Supervision

The bridge that linking between SM. Mansyur


Street in Ilir barat (IB) II Sub-District with Faqih
Usman Street in SU I sub-District Palembang City is
constructed for transportation infrastructure
support before of Asian Games 2018.

Construction was started on November 2015 the


height from the surface of the river about 16 meter,
the bridge's length is 710 meter completed with
steel arch, length of approach upstream and
downstream : 350 meter
Pile slab upstream and downstream : 220 meter
Bridge's width : 11.5 meter

www.indrakarya.co.id
Building
Osaka, Japan
Higashi-Osaka House-map Repair Type of Services :
Geographic Information System

Scope Of Works :
Updating GIS Map for Urban Planning / Housing Of
Higashi Osaka Residence.

This project is a Project Work Depiction Geographic


Information System on making Urban Planning
adjusted with The latest Aerial Photos.

Therefore The latest Higashi Osaka Urban can be


obatined without survey.

Results:
Ÿ Generate updating the latest map of Higashi Osaka Plot
Ÿ Updating the additional building and identity number of building
Ÿ Updating the residents database each building
Ÿ Updating Number of building accordance with Building function.

East Java, Indonesia


Submarine Facility Building At PT. PAL Indonesia (Persero) Type of Services :
Construction Management

The construction management service cover of four


activities that are: Packages B1, B2, B3 and C.
Package B1 includes Supervision for Main works;
Ÿ 1. Main steel structure, OHTC and Roof
Ÿ 2. Ground floor slabs
Ÿ 3. Foundations for columns and PHPL machines
Ÿ 4. Piles for foundations and slabs.
Package B2 includes Review and Supervision for
PHPL Shop and SIU Assembly Shop and Mechanical-
Electrical;
Ÿ 1. Steel structure
Ÿ 2. Ground floor slabs, Wall Claddings etc.
Ÿ 3. Architecture, Ceiling and Painting etc.
Ÿ 4. Mechanical; Compressors, Big-door etc.
Ÿ 5. Electrical MV Substation and LV Distribution
Package B3 includes Review Design for Sub-Factory, GRP Shop, Blasting Shop, Paint Shop and Mechanical-Electrical;
1. Steel structure
2. Ground floor slabs and girders
3. Mechanical, OHTC, Blasting Machine
4. Electrical MV Substation Sub-Factory and LV Distribution

Package C includes Review Design and Supervision for Drainage, Shop-pier, remodeling Office and Warehouse, fire
fighting, CCTV and Mechanical-Electrical Work;
1. Civil work
2. Architecture
3. Mechanical, AC, Piping works
4. Electrical, lighting in door and out door
www.indrakarya.co.id
Others
West Java, Indonesia
Geological Investigation for Detailed Design of Ciawi Dam
Type of Services :
Survey Investigation

Activities of Core Drilling covering of


Sampling, description of soil layers, and activities
of Permeability test.

Activities of Large Scale Laboratory Test


To obtain the values of the cohesion Parameters
(C) and the internal sliding angle (Ø) and used as
the basis of the design.
Activities of Laboratory Test Atterberg Limit,
to know the plastic limit and of the sample tested
for the project.

Several Location in Indonesia


Business Investment Drinking Water Industry Type of Services :
Business Development

This is an implementation of our concept in the


management of natural resources, from upstream
to downstream. If in the upstream we manage
water resources, then we also take part in the
management of the downstream, in the utilization
of water as a source of clean water and drinking
water.
In accordance with the government program, as
one of our SOEs has made a breakthrough, among
others in the field of manufacturing drinking water
in Packing (AMDK), the provision of clean water /
drinking water, the provision of industrial
machinery (water treatment) as well as activities
procurement of construction materials and
instrumentation which support the activity.

PT Indra Karya (Persero) offers the best solution for water management in Indonesia, and is ready to cooperate with all
parties in the utilization of this renewable resource in terms of:
Ÿ The process of building a drinking water plant
Ÿ Design packaging and production process
Ÿ Design and manufacture of water treatment tools
Ÿ Water supply network and water installation ready to drink
Services to several clients from various industries, which are:
Ÿ Monitoring and maintenance of water supply facilities and storage tanks
Ÿ Observation wells / slope stability instruments (observation wells / slope stability instruments)
Ÿ Ground water assessment for open pit mining slope design
Ÿ Study hydroisotopes and hydro geochemistry for tailings / waste dump areas
We also have experience in water source audit services and supporting facilities, as well as in environmental due
dilligence as part of the assessment process of an infrastructure facility.

www.indrakarya.co.id
Others
Several Location in Indonesia
Industrial Waste Water and Water Treatment
Type of Services :
Business Development

Scheme of Waste Water Purification Process

The synergy of BUMN for waste water treatment and supplying of clean water to the special area that have difficulty
of clean water could be done with the cooperation pattern with other BUMN with the principle of mutual
cooperation.

Pattern of synergy: Profit and Loss Sharing, Operation and Maintenance only, Contract by volume, Build, Operate and
Transfer, and Build, Transfer and Operate.

PT. Indra Karya (Persero) as a service Provider, and other BUMN as user.
Sources of Water: Rivers, Lakes, Wells, Waste water and Sea water.

www.indrakarya.co.id
International
MANAGEMENT SYSTEM STANDARS

Company
AWARD

www.indrakarya.co.id
Corporate
VALUE
A Solid professional team is the best guarantee of engineering technology
services involve with Human resources are the greatest asset. Our staff
comprise of about 1,100 certified professional, technical and management
personnel in totally.

In witch more than 100 certified permanent experts of various disciplines


and over 1,000 non-permanent experts.

With supported by the professional staff, self-owned rock and soil


laboratory and also supported by multi disciplines expert, PT. Indra Karya
(Persero) can able to do planning, studying designing structure and
construction supervision / Construction management timely in good
quality, reasonable cost, functionable and safety.

Our Motto:
“ SAFER, STRONGER and FASTER “

PT Indra Karya (Persero) as a state-owned technical consulting services company that is expected to provide reliable
engineering solutions for service users and believes that customer satisfaction for us is very important. The value for
us is to pay close attention to the needs of service users by adjusting their competencies. To remain consistent in
realizing the vision and mission of PT Indra Karya (Persero) with all our heart and in every step of our work we base our
"INDRA" Corporate Values

INTEGRITY
Prioritizing corporate interests, being honest and transparent and developing team collaboration for progress and
shared prosperity.

NEW IDEA
Always generate new ideas in the creation of new works both products, processes and systems.

DISCIPLINE
Keep promises, obey the law, regulations, ethics and complete each assignment according to quality, time and cost.

RESPECT
Respect both inside and outside the organization to respect each person with the characteristic attitude of treating
others with respect and respect, not tolerating discrimination in any form, seeking the best solution (win / win) in all
problems and respecting local culture and habits.

AGILITY
Continue to move to make a breakthrough in getting assignments from various service users and provide the best
results and added value and understand the needs of service users, provide the best service to achieve service user
satisfaction and make work safety a top priority in carrying out each activity.

www.indrakarya.co.id
Galery

www.indrakarya.co.id
www.indrakarya.co.id

Jl. Biru Laut X Kav.9 Cawang


Jakarta 13340, Indonesia
Telp. +62 (021) 8192636 / (021) 8354237
Fax. +62 (21) 8192179 / (021) 8290120
Email : indrakarya@indrakarya.co.id
pt.indra.karya
PT_IndraKarya
LIST OF EXPERIENCE
ENERGY SECTOR
LIST OF EXPERIENCES ENERGY SECTOR
PT INDRA KARYA (PERSERO)

EMPLOYER CONTRACT
No NAME OF WORKS TYPE OF WORK LOCATION
NAME NO. / DATE PRICE (Rp.)

SUPERVISION - ENERGY

Construction Supervision Consultant Services for the EBT Wind 05/U.5/Div.PP/X/2019,


1 Supervision Bondowoso PT. Indah Karya (Persero) 509.150.000
Turbine Project in Bondowoso 10/Oct/19

Tapian Nauli Regency,


Turbine-Generator Foundation Repair, Investigation Soil and SE Unit 1 018.PJ/PL/DAN.02.01/UPK
2 Supervision Central Tapanuli , North PT. PLN (Persero) 2.668.110.540
UPK Labuhan Angin LBA/2019, 22/Aug/19
Sumatra

Kaur Regency, Bengkulu 001/BHE-SPK/II/2019 ,


3 Supervision of PLTM Padang Guci 2 Development Supervision Brantas Hidro 1.089.900.000
Province 02/Feb/19
Kamojang Generation Unit
Supervision of Commissioning and Post-Construction Assessment 001-PJ-061-KMJ-2019,
4 Supervision & Generation Services Unit PT Indonesia Power 881.818.181
Services for Rehabilitation of Cooling Tower Unit 2 PLTP Gunung Salak 01/Feb/19
2 PLTP Gunung Salak
274.PJ/061/IP/2017,
5 Construction Supervision of the Harjosari PLTM 3 x 3.3 MW EPC Project Supervision Pekalongan, Central Java PT. Indonesia Power 106.705.238
30/Nov/17
No. 002/BCE-
Supervision of the Construction of the Sako 1 PLTM (2 x 3 MW) Pesisir Pesisir Regency Selatan,
6 Supervision PT. Brantas Prospek Energi IKA/KK/IX/2017 , 991.350.000
Selatan Regency, West Sumatra West Sumatera
04/Sep/17
No. 003/BPE-
Supervision of Development of PLTM Maiting Hulu 2 (2 x 4 MW) North North Toraja Regency,
7 Supervision PT. Brantas Prospek Energi IKA/KK/IX/2017 , 991.350.000
Toraja Regency, South Sulawesi South Sulawesi
04/Sep/17
001/BNJE-
Sinjai Regency ,South PT Brantas Nipah Jaya
8 Supervision of the Development of Tangka PLTM (2 x 3.15 MW) District Supervision IKA/KK/IX/2017, 1.003.350.000
Sulawesi Energi
04/Sep/17

Wakatobi Regency, 025.PJ/041/UIPKITSULPA


9 Construction Supervision of PLTU Wangi-Wangi ( 2 X 3 MW ) Supervision PT. PLN 8.425.900.000
Southeast Sulawaesi MA/12, 26/Sep/12

PPK Non Fisik, Direktorat


SPK-10/91.04/PPK-
Energy Conservation Monitoring Through Partnership Program (Fiscal Kepulauan Riau, Riau, Java, Jenderal Energi Baru,
10 Supervision NFIV/V/EBTKE/2013, 833.250.000
Year 2013) Kalimantan, Sulawesi Terbarukan dan Konservasi
27/May/13
Energi
22.PJ/RE/XII/2009 - ASM-
Tanah Laut Regency, South
11 Supervision of PLTU Asam-asam ( 2 x 65 MW ), Amendment-5 Supervision PLN, REKADAYA SB03-B2-CM-05-R, 5.040.508.167
Kalimantan
29/Dec/09

Construction Supervision and Quality Assurance / Quality Control of 22.PJ/RE/XII/2009,


12 Supervision South Kalimantan PT. Rekadaya Elektrika 4.762.654.380
PLTU Asam-Asam Units 3 & 4 (South Kalimantan PLTU) 2 X 65 MW 29/Dec/10

LBK-B2-CT-01-R,
13 Construction Supervision of PLTU 2 NTB Lombok 2 x 25, Addendum 1 Supervision Lombok Regency , NTB PT. Rekadaya Elektrika 5.823.168.862
01/Sep/09

MANAGEMENT CONSTRUCTION - ENERGY

003/KTR/AH-IK/CIKOPO-
1 Construction Management of Cikopo-2 West Java PLTM Development MK Cikopo, West Java PT. Arkora Hydro 908.000.000
II/VII/2012, 25/Jul/12
EMPLOYER CONTRACT
No NAME OF WORKS TYPE OF WORK LOCATION
NAME NO. / DATE PRICE (Rp.)

DESIGN - ENERGY

No.
1 Review Design EPC PLTM Gunungwugul 2x 1,5 MW Design Banjar Negara Central Java PT Indonesia Power 093.SKP/612/KDEPPSJ/20 1.656.357.273
17 , 01/Dec/17
Detail Engineering Design (DED) Pembangunan PLTA Poigar - 2 (2 x PT. Minahasa Brantas 001/MBE-DED/POIGAR-
2 Design South Minahasa Regency 3.614.850.000
15,0 MW) Energi 2/VIII/2017, 21/Aug/17
No.236. PJ/61/DIR/2012,
3 Upper Cisokan Pumped Storage Power Plant Project Design West Bandung , West Java PLN 7.765.909.091
22/Oct/12

Technical Bidding Documents for the EPC Project of PLTM Cileunca 2 x Pangalengan - Bandung No. 201.SPK/061/IP/2017 ,
4 Design PT INDONESIA POWER 164.000.000
500 kW Pangalengan - Bandung West Java West Java 29/Sep/17

Detailed Engineering Design for SION Minihydro Power Plant (2 x 6 Humbang Hasundutan 003/DED/CME-IK/02-17,
5 Design PT. Citra Multi Sinergi 1.720.150.000
MW) in Kab. Humbang Hasundutan North Sumatra Regency, North Sumatra 16/Jan/17

Dirjen Energi Baru, SPK-10/91.04/PPK-


Preparation of Front End Engineering Design (FEED) Development of Kota baru, South
6 Design Terbarukan dan Konservasi PNF/DEA/V/2016, 2.506.250.000
Low Quality Coal Gasification Power Plant Kalimantan
Energi 20/May/16

001/AGT.DIR-
Owner Engineer Mini-hydro Power Plant Sapaya PLTM, Gowa Regency, Gowa Regency South PT Punggawa Nagata
7 Design PNDH/IK/VI/2015, 2.681.750.000
South Sulawesi Sulawesi Dinamika Hidro
18/Jun/15
094/JDG/OL/III/2013, 25
8 Detail Design of PLTM Cianten 1 (2 X 1 MW) Design Bogor Regency, West Java PT. Jaya Dinamika Geohidro 455.500.000
Maret 2013, 25/Mar/13
093/JDG/OL/III/2013, 25
9 Detail Design of PLTM Cianten 1B (2 X 3,1 MW) Design Bogor Regency, West Java PT. Jaya Dinamika Geohidro 455.500.000
Maret 2013, 25/Mar/13
092/JDG/OL/III/2013, 25
10 Detail Design of PLTM Cianten 3 (2 X 3 MW) Design Bogor Regency, West Java PT. Jaya Dinamika Geohidro 455.500.000
Maret 2013, 25/Mar/13
North Toraja Regency , Addendum 04/DIR-
11 Addendum to Topographical Measurement of DED PLTM Maiting 2 Design PT. Nagata Dinamika 140.000.000
South Sulawesi ND/II/2013, 11/Feb/13

Feasibility Study Consultant Services and Detailed Design of PLTM Cipandak. Subang Regency, 007.PJ/Um/DIR/VIII/2012,
12 Design PT. Sinergi Solusi Utama 2.377.430.000
Cipandak A, PLTM Cipandak B, PLTM Cipandak C, PLTM Cipandak D West Java 28/Aug/12

Review Design, Details Design, Assistance and Commissioning of PLTM


PT. Hutama Karya (Persero) Wil.II/Zhr.665/KTR-
13 Cirompang, Cihikeu Village and Bungbulang Village, Bungbulang Design Garut - West Java 2.454.545.455
Wilayah II Cirompang/03, 03/Oct/11
District, West Java Province

Supply Engineer and Administrative Personnel to Support Construction 005.PJ/REC/VI/2011,


14 Design Jayapura Regency, Papua PT. Rekadaya 15.828.788.309
Supervision of Genyem Hydroelectric Power Plant (2x10 MW) 01/Jun/11

PT. Indonesia Power Unit


Consultancy Services for Certification of Saguling Hydroelectric Dam 058.PJ/061/UBPSGL/2011,
15 Design Cimahi, West Bandung Bisnis Pembangkitan 2.323.132.000
(Dam Saguling, Pulo, Playangan, Cipanunjang) UBP, Saguling 28/Apr/11
Saguling
048/KCI-IK/IX/JKT/2010,
16 Concept Design Mining Infrastructures - Kendilo Coal Indonesia Design East Kalimantan PT. Kendilo Coal Indonesia 119.300.000
30/Sep/10
EMPLOYER CONTRACT
No NAME OF WORKS TYPE OF WORK LOCATION
NAME NO. / DATE PRICE (Rp.)

Feasibility Study on the Potential of PLTM/PLTA, Detailed Design and Pacitan Regency, 007.PJ/KONS/061/2010
PT. Pembangkitan Jawa Bali
17 Tender Documents for Lodoyo Hydroelectric Power Plants for PT. PJB Design Trenggalek, Blitar, Malang & dan 025.B-PS/PEMAS/IKA- 1.936.464.000
(PT. PJB)
Brantas Generation Unit Lumajang WI/XI/2010, 08/Dec/11

STUDY - ENERGY

Topographical work, geological investigations, study of connection to


005/BTE-KK-
the 20 kV PLN network and feasibility study of PLTM (3x1.7 MW)
1 Study Sumatra Barat PT Brantas Total Energi T.SI.SKL.SINT/XI/2018, 900.000.000
Batanghari Motion Weir in Dharmasraya Regency, West Sumatra
06/Nov/18
Provincet

Dirjen Energi Baru, SPK-25/91.04/PPK-


Study of Connecting Centralized Solar Power Plants (PLTS) Hybrid PLT Kecamatan Siantan,
2 Study Terbarukan dan Konservasi PNF/DEA/VI/2016, 299.068.182
Diesel III Kabupaten Anambas Riau
Energi 21/Jun/16
Dirjen Energi Baru, SPK-26/91.04/PPK-
Kec. Rangsang, Kabupaten
3 Study of Connecting Centralized Solar Power Plants (PLTS) Hybrid PLT Study Terbarukan dan Konservasi PNF/DEA/VI/2016, 300.613.636
Kepulauan Meranti Riau
Diesel IV Energi 21/Jun/16
Dirjen Energi Baru, SPK-27/91.04/PPK-
Study of Connecting Centralized Solar Power Plants (PLTS) Hybrid PLT Kec. Rangsang, Kabupaten
4 Study Terbarukan dan Konservasi PNF/DEA/VI/2016, 311.522.727
Diesel V Kepulauan Meranti Riau
Energi 21/Jun/16
Kab. Nunukan (Sei Dirjen Energi Baru, SPK-28/91.04/PPK-
Study of Connecting Centralized Solar Power Plants (PLTS) Hybrid PLT
5 Study Manggaris & Sebuku) Terbarukan dan Konservasi PNF/DEA/VI/2016, 463.227.273
Diesel VI
Kalimantan Utara Energi 21/Jun/16
Kab. Nunukan (Sei
Dirjen Energi Baru, SPK-23/91.04/PPK-
Study of Connecting Centralized Solar Power Plants (PLTS) Hybrid PLT Manggaris & Sebuku) &
6 Study Terbarukan dan Konservasi PNF/DEA/VI/2016, 558.568.182
Diesel I Kab. Malinau (Sayan)
Energi 17/Jun/16
Kalimantan Utara
Kab. Nunukan (Sbatik
Dirjen Energi Baru, SPK-24/91.04/PPK-
Study of Connection of Centralized Solar Power Plant (PLTS) Hybrid Tengah & Tulin Onsoi) &
7 Study Terbarukan dan Konservasi PNF/DEA/VI/2016, 558.113.636
PLT Diesel II Kab. Malinau (Lumbis
Energi 17/Jun/16
Ogon) Kalimantan Utara

Preparation of Feasibility Studies and DED for Solar Power Plants Kalimantan Barat, Dirjen Energi Baru, SPK-11/91.04/PPK-
8 (PLTS) Centralized in Priority Border Locations in the Provinces of Study Kalimantan Utara dan Nusa Terbarukan dan Konservasi PNF/DEA/V/2016, 1.219.636.364
West Kalimantan, North Kalimantan and East Nusa Tenggara Tenggara Timur Energi 20/May/16

Dirjen Energi Baru, SPK-12/91.04/PPK-


Preparation of Feasibility Study and DED for Solar Power Plants (PLTS)
9 Study Provinsi Riau Terbarukan dan Konservasi PNF/DEA/V/2016, 1.193.272.727
Centralized in Priority Border Locations in Riau Province
Energi 20/May/16

Pre-Feasibility Study Update and Feasibility Level Design for NJ/MTG/2015/03,


10 Study Provinsi Jawa Barat NEWJEC Inc. 1.621.454.545
Matenggeng Pumped Storage Power Plant Project 18/May/15

Consulting Services for the Preparation of Operational and Financial


Kabupaten Rembang, Jawa PT. PLN (Persero) Unit 102.PJ/041/UPJB/2014,
11 Feasibility Studies, Risks and Making Basic Designs and Jetty Expansion Study 347.850.000
Tengah Pembangkitan Jawa Bali 20/Nov/14
of PLTU Rembang

Consultancy Services for Environmental Impact Analysis Studies, Muara Kabupaten Murung Raya, PT. Perdana Prima 009/KK/PPS-
12 Study 1.561.818.182
Juloi Hydroelectric Power Plant, Central Kalimantan Kalimantan Tengah Sejahtera IKA/VIII/2014, 20/Aug/14
EMPLOYER CONTRACT
No NAME OF WORKS TYPE OF WORK LOCATION
NAME NO. / DATE PRICE (Rp.)

S-011/DIR-
Revision of the Feasibility Study Report for the Ma'dong PLTM in North Kabupaten Toraja Utara
13 Study PT. Nagata Dinamika NDHMD/IX/2014, 70.000.000
Toraja Regency Sulsel
17/Sep/14

Consulting Services for Feasibility Studies of PLTM Buakayu Hulu and Kab Tana Toraja Sulawesi 004/AGT.DIR-
14 Study PT. Nagata Dinamika 1.273.175.000
PLTM Buakayu Hilir in Tana Toraja Regency, South Sulawesi Selatan ND/IK/IX/2014, 17/Sep/14

Study and Development Assistance for PLTM Cirompang (4x2MW) SPK-38/01/LAR-DC,


15 Study Kab. Garut, Jawa Barat PT Danareksa Capital 477.675.000
Garut . Regency 28/May/14
Ditjen Energi Baru, SPK-7/91.04/PPK-
16 Energy Audit in the Textile and Paper Sector Study Jakarta Terbarukan dan Konservasi NFIV/IV/EBTKE/2014, 3.963.265.000
Energi ESDM 16/Apr/14
Ditjen Energi Baru, SPK-8/91.04/PPK-
17 Energy Conservation Monitoring Through Partnership Program Study Jakarta Terbarukan dan Konservasi NFIV/IV/EBTKE/2014, 868.800.000
Energi ESDM 16/Apr/14

Feasibility Study of Telaga Waja Ayu PLTMH Stage-2 in Rendang Kab. Karangasem Propinsi 02/BL/TEMDR/X12,
18 Study PT. JDG 250.000.000
District, Karangasem Regency, Bali Province Bali 18/Oct/13

Feasibility Study of PLTM Binuang-1 & 2, Binuang River, North Luwu Kab. Luwu Utara, Sulawesi 001/BD/ND-IK/V/2013,
19 Study PT. Nagata Dinamika 1.447.500.000
Regency, South Sulawesi Selatan 28/May/13
PPK Non Fisik, Direktorat
SPK-4/91.04/PPK-
Jabar, Sumsel, Sumut, Jenderal Energi Baru,
20 Energy Audit in Energy Supply Industry (Fiscal Year 2013) Study NFIV/V/EBTKE/2013, 979.600.000
Kalbar & Sulsel Terbarukan dan Konservasi
27/May/13
Energi
DKI Jakarta, Sumut, Sumsel, PPK Non Fisik, Direktorat
SPK-6/91.04/PPK-
Sulsel, Banten, Jabar, Jateng, Jenderal Energi Baru,
21 Energy Audit in Metal and Textile Industry (Fiscal Year 2013) Study NFIV/V/EBTKE/2013, 2.990.240.000
DI Yogyakarta, Jatim, Kaltim Terbarukan dan Konservasi
27/May/13
& Bali Energi
Feasibility Study and Basic Design of PLTM Liki-Mitra Kerinci (RNI Kabupaten Solok Selatan, PT Mitra Kerinci (RNI 01/MK/PLTM/175/III/201
22 Study 3.059.000.000
Group) Sumatera Barat Group) 3, 13/Mar/13

Feasibility Study of Telaga Waja Ayu PLTMH Stage-2 in Rendang sub- 02/BL/TEMDR/X/12,
23 Study Kab. Karangasem, Bali PT. JDG 250.000.000
district, Karangasem district, Bali Province 18/Oct/12

Feasibility Study and Detailed Design of PLTM Cipandak A, PLTM 007.Pj/Um/DIR/VIII/2012,


24 Study Cipandak PT. Sinergi Solusi Utama 2.377.430.000
Cipandak B, PLTM Cipandak C and PLTM Cipandak D 28/Aug/12

Consulting Services for Feasibility Study of the Bone River Kabupaten Bone Bolango No.018/MOU/AE/10/2012,
25 Study PT. APAT ENERGI 1.080.909.091
Hydroelectric Power Plant, Bone Bolango Regency, Gorontalo Province Provinsi Gorontalo 05/Oct/12

Satker Dirjen Energi Baru, SPK-64/91.04/PPK-


Sumatera, Jawa, Kalimantan
26 Energy Conservation Monitoring Through Partnership Program Study Terbarukan dan Konservasi NFI/X/EBTKE/2012, 901.505.000
& Sulawesi
Energi 02/Oct/12
PPK Non Fisik. Direktorat
SPK-15/91.04/PPK-
Sumut, Sumsel, Sulsel, Jabar Jenderal Energi Baru,
27 Study NFI/VI/EBTKE/2012, 1.119.717.500
Energy Audit in Energy Supply Industry (Fiscal Year 2012) & Jatim Terbarukan dan Konservasi
Tanggal, 27/Jun/12
Energi
EMPLOYER CONTRACT
No NAME OF WORKS TYPE OF WORK LOCATION
NAME NO. / DATE PRICE (Rp.)

Investigation Department,
China Water Resources
Hydrology Study Works for Site Investigation for Karama River October 17, 2011,
28 Study Sulawesi Barat Beifang Investigation, 465.553.000
Hydropower Project in West Sulawesi Province 17/Oct/11
Design and Research Co.
Ltd., P.R.China
004.03/DIR-
PT. North Sumatera Hydro
29 Batang Toru Hydro Electric Power Plant Feasibility Study Study Batang Toru, Sumatera BPH/NSHE/VI/2011, 7.128.924.000
Energy
01/Jun/11
Kaltim, Sumut, Sumsel, Direktorat Jenderal Energi
Feasibility Study of New Energy and Renewable Energy Development SPK-07/JK-03/IX/2011,
30 Study Sulut, Maluku, Gorontalo, Baru, Terbarukan Dan 757.955.000
(Fiscal Year 2011) 30/Sep/11
NTT Konservasi Energi
SPK-11/JK-04/IX/2011,
Direktorat Jenderal Energi
Amandemen 01.AMD/SPK-
31 Energy Audit in Energy Supply Industry (Fiscal Year 2011) Study Tersebar Wil Indonesia Baru, Terbarukan Dan 1.278.612.500
11/PPK-NF/X/2011, 19 Okt
Konservasi Energi
2011, 26/Sep/11
SPK-05/JK-04/VIII/2011,
Direktorat Jenderal Energi Amandemen 01.AMD/SPK-
32 Energy Audit in Metal and Textile Industry (Fiscal Year 2011) Study Jawa, Bali, Sumatera Baru, Terbarukan Dan 05/PPK-NF/X/2011, 3.590.100.000
Konservasi Energi tanggal 25 Okt 2011,
26/Aug/11
Review of the Feasibility Study of PLTM in the Sesaot and Cakranegara 017/DIRTDR/SPK-
33 Study Propinsi NTB PT. Tirta Daya Rinjani 300.000.000
NTB IK/VIII/2011, 15/Aug/11

Feasibility Study and Detailed Engineering Design of HEPP Sikundur, PT. Listrindo Natarong 002.C/LNE-IK/VIII/2010,
34 Study Sumatera Utara 825.000.000
Phak-Pak Regency, North Sumatra Province Energi 20/Aug/10

SURVEY INVESTIGATION - ENERGY

Muara Enim - South


1 Geological Investigation of PLTU of Muara Enim Bukit Asam S/I PT. AB Omah Geo No. 005/II/2020, 29/Jan/20 209.000.000
Sumatra
Engineering Geological Investigation (Additional) Location Of Penstock PT. Indra Karya Divisi 151.UM/IKA-DEI/IX/2018,
2 S/I South Sulawesi 165.500.000
& Tower Transmission - Larona Plta Engineering I 03/Sep/18
Asam-asam South
3 Laboratory Test of Geomechanic Asam-Asam South Kalimantan S/I PT. AB Oma Geo 054/VIII/2017, 11/Aug/17 26.725.000
Kalimantan

PO No. L-CJP(S)15-0184 ,
4 Technicians & Density Equipment Rental for PLTU Tanjung Jati B S/I Kembang Regency, Jepara PT. Central Java Power 1.186.000.000
19/Nov/15

LION POWER ENERGI &


Lab. Geoteknik - Divisi S/I - LPE-PLN/I/2015,
5 Geomechanic Labolatory Test LPE and PLN Project South Sumatera S/I PRIMA LAZUARDI 65.105.000
PT.Indra Karya - Malang 26/Jan/15
NUSANTARA PROJECT

Muara Juloi Hydro Power Plant Project In Central Kalimantan (Muara Murung Raya Regency, Soosung Engineering Co., August 23, of 2013,
6 S/I 354.545.454
Juloi Hydro Power Plant Survey & Investigation) Central Kalimantan Ltd 23/Aug/13

Investigation Department,
China Water Resources
Borehole Drilling Works for Site Investigation for Karama River
7 S/I West Sulawesi Beifang Investigation, No. 1,, 20/Jan/11 3.166.185.000
Hydropower Project in West Sulawesi