You are on page 1of 2

Name Of Work:- Construction of Gated Barrage at ADALA-1 Tq. OSMANABAD Dist.

OSMANABAD

Salient Features of the project.


1 Location ADALA-1
i Toposheet No. E
ii Name of river GODAVARI
iii Name of village ADALA-1
2 Total catchment area 27.40
3 50 % Dependable rainfall 762.51
4 Total discharge 131.74
5 Lowest river bed 648.30
6 Lowest sill R. L. 649.20
7 Full supply R. L. 651.70
8 High flood R. L. 652.00
9 Afflux high flood R. L. 652.30
10 Hight of water column above top of weir 0.60
11 Storage 58.23
12 Command Area
13 Lead for material
Cement 0 15
Steel 0 15
Sand 0 25
Metal 0 35
Rubble 0 35.00
ANABAD Dist.

Sq Km.
mm,
Cumecs
M.
M.
M.
M.
M.
M.
TCM
Ha

Km.
Km.
Km.
Km.
Km.

You might also like