Name Of Work:- Construction of Gated Barrage at ADALA-1 Tq. OSMANABAD Dist.
OSMANABAD
13.0 Final Parameters
1 Road Top Level RTL = NA m
2 Avg Bank Ground Level BGL = 652.1 m 3 Soffit level BSL = NA m 4 Afflux High Flood Level AHFL = 652.3 m 5 High Flood Level HFL = 652 m 6 HFL modified at d/s of bhandara HFL' = 652.0 m 7 Weir Crest Level WCL = 651.7 m 8 Gate Sill Level SGL = 649.2 m 9 Lowest Nalla/Stream Bed Level NBL = 648.3 m 10 Stilling Basin top Level SBL = 648.20 m 11 End Sill Top Level ESL = 648.50 m 12 Design Scour Depth Level DSL = 648.67 m 13 Weir Founding Level WFL = 647.70 m 14 Cut-off Founding Level CFL = 647.20 m 15 Crest width of Weir Wc = 0.75 m 16 Length of Weir Lw = 41 m 17 Height of weir above lowest NBL Hw = 2.5 m 19 No of notches for 2 m wide gates Nsg = 8 No 20 Clear size of Gate (bg x hg) 2 x 2 m 21 No of gate leaf of 2mx0.5m Ngates = 32 No 22 Length of Cusion in stilling basin Lc = 2.00 m 23 Depth of Cusion in stilling basin Dc = 0.5 m 24 Floor thickness of Stilling Basin for T1 = 0.5 m 25 middel 1/3rd part Floor thickness of Stilling Basin for f or T2 = 0.5 m 26 tail1/3rd partearthern Bund level Top levelof 652.44 m. 27 Top level of Divide wall 652.9 m. 28 Top level of Guide wall 652.5 m. 29 Length of U/s stream 0.00 m Length of D/s stream 0.00 m. 30 Hight of Weir 3.50 m. 31 Gross Capacity 58.23 TCM 31 Irriigable Area Ha 32 Design Flood 132 Cumecs 33 Spread area 3543.75 Sq Mtr. 34 Stream Gradient 1 : 900 Slope
Water Conservation Officer Sub Divisional Water Conservation Officer
OSMANABAD Soil and Water Conservation Sub Divison. OSMANABAD