Hydraulic Calculation for Bridge No.

:-61
MAHESANA-TARANGA GAUGE CONVERSION PROJECT

A.) Hydraulic Data

1 Bridge No. 61
2 Latitude 23°56'5.67"N
Longitude 72°40'25.01"E
3 No. of span 2 No.
4 Clear span 6.000 m
5 High Flood Level (Observed at site) HFL 194.32 m
6 Low Water Level LWL 192.255 m
7 Lowest Bed Level LBL 192.255 m
8 Dist in U/S 300 m
9 Level in U/S 192.555 m
10 Dist in D/S 350 m
11 Level in D/S 192.105 m
12 bed Slope 0.00069231
13 Cross-Section area of channel Ac 24.374 m2
14 Wetted perimeter of channel P 19.204 m
15 Rugosity Co-efficient N 0.035
16 Silt Factor f 0.68
17 Bottom of super structure 198.105
18 50 year 24 Hrs. Rainfall R50(24) 28 Cm
19 Area Reduction Factor F 0.81
20 50 year 1 Hrs. Rainfall R50(1) 106.4 mm
Length of the stream from farthest point of the catchment to the
21 L 0.4 km
bridge
22 Area of the Catchment A 0.32 km2
Diff of elevation of bed at farthest point of catchment and the
23 H 0.16 met
bridge.
Hydraulic Calculation for Bridge No. :-61
MAHESANA-TARANGA GAUGE CONVERSION PROJECT

B.) Discharge Calculation by RDSO report RBF-16


0.345
[L^3/H]
Time of Concentration = tc = = 0.729 hrs

C = 0.332 x (R50(24) x F)0.2 = 0.620


tc hr ratio R50(tc)/R50(24) From Graph Fig 4 = x = 0.320
1 hr ratio R50(1)/R50(24) From Graph Fig 4 = y = 0.380

x R50(tc) = k x R50(1) = 89.6 mm


Coefficient K = = 0.842
y
I50=R50(tc)/tc = 122.913 mm/hr
Q50=0.278*C*I50*A = 6.78 met3/sec

C.) Discharge Calculation by Area Velocity Method

Heighest flood Level = 194.32


2
Wetted Area = 24.37 met
Wetted Perimeter = 19.20 met
Increase Height = 0 met
Linear water way = 12.00 met

Ac 24.37
Hydraulic Mean Depth = R = = = 1.269 met
P 19.20
Mannings's Velocity = V = (1/N) x (R ) 2/3 x (S) 1/2 = 0.881 met/sec
Discharge Q = Ac x V = 24.374 x 0.881 = 21.47 met3/sec

HFL for Design Discharge = 194.320 + 0.000 = 194.320


Hydraulic Calculation for Bridge No. :-61
MAHESANA-TARANGA GAUGE CONVERSION PROJECT

D.) Calculation for Scour Depth

Discharge for Foundation = Discharge fromr RBF-16=> 6.78 Q= 6.78 met3/sec


Design Discharge for Foundation = Qd= 1.30 x Q = 8.81 met3/sec ( Sub. Str.- Cl. - 4.4 )

Total Clear Span = 2x6 8.81


Discharge per met width = Qf = = 0.735
= 12 met 12.00

Scour Depth = =1.239 met ( Sub. Str.- Cl. - 4.6.4 ) (From H.F.L.)

Maximum Scour Depth for Abutment = DA = ( 1.25 x D ) = 1.549 met ( Sub. Str.- Cl. - 4.6.6 )
Maximum Scour Depth for Pier = DP = ( 2.0 x D ) = Not Applicable ( Sub. Str.- Cl. - 4.6.6 )
Scour depth below bed level=> 1.549- (194.32-192.255) => -0.52 met Say 0.0 m
For Abutment => Scour Depth-(HFL-Bed level)
(Return Wall,Drop wall &
Curtain Wall)
E.) Summary
1.) Design Discharge 8.81 met3/sec
2.) Vertical Clearance 3.785 met
3.) Permissible Vertical Clearance 0.600 met
4.) Scour Depth below Bed Level 0.00 met