Condition SPF
Discharge Q (m /s)
3
2400
No. of Bays Operative Nos. 3
Reservoir Level (masl) 2292.00
Check for Bucket Setting Elevation
Width of Flow B (m) 31.00
Discharge Intensity q = Q/B (m2/s) 77.42
Tail Water Level (m) 2266.80
H1 = Res Level-Buck Inv Level (m) 42.00
H = Res Level-Crest Level (m) 22.00
H3 = Res Level-Tail Water Level (m) 25.20
d3 = Tail Water Level - Bucket Inv EL (m) 16.80
d3/H1 0.40
Discharge Parameter FD = q/(gH13)1/2 90.81
hb/H1 (From Fig 4 IS 7365) 0.31
hb Height of roller above bucket invert (m) 13.02
hb/H3 0.77
Good Energy Dissipation is obtained when hb/H3 is between 0.75 and 0.90
Setting of Bucket Acceptable
Velocity at the Entrance of Bucket vt (m/s) 22.24
va/vt (From fig 7) 0.80
va (m/s) 17.79
d1 Depth of Flow entering Bucket (m) 4.35
F1 Froude Number of flow entering bucket 2.72
Sequent Depth d2 (m/s) 14.72
d3/d2 1.14
Good Energy Dissipation is obtained when d3/d2 is between 1.10 and 1.40
Setting of Bucket Acceptable