Summary of Allowable bearing pressure based on Shear & Settlement Criteria


Geotechnical investigation work for project "Gauge Conversion of Katosan Road -Becharaji (26.6 km) metre gauge to
Project:- braod gauge along with new MSIL BG siding (Approx 3 KM) at Becharaji with 25 kv AC Electrification in Ahmedabad
division of western railway" in state of Gujarat.

Safe bearing pressures calculated Allowable


Safe Bearing based on Settlement criteria bearing Capacity
Width of Length of capacity based on (Annexure-3)
Depth of suggested (Min.
Borehole no Foundation Foundation shear criteria
Foundation (Mt) of settlement and
(Mt) (Mt) (Annexure-4) For 25 mm For 40 mm shear criteria)
t/m2 settlement t/m2 settlement t/m2 t/m2
0.50 1.00 1.00 27.3 19.0 31.5 19.0
IC-B-BH-09 1.50 1.00 1.00 29.1 20.8 33.3 20.8
3.00 1.00 1.00 31.9 28.4 45.5 28.4
0.50 1.00 1.00 21.3 24.7 40.8 21.3
IC-BH-11 1.50 1.00 1.00 23.4 26.9 43.0 23.4
3.00 1.00 1.00 26.7 20.8 33.3 20.8
0.50 1.00 1.00 25.0 17.2 28.7 17.2
IC-BH-12 1.50 1.00 1.00 27.1 19.2 30.8 19.2
3.00 1.00 1.00 30.2 42.4 67.8 30.2
0.50 1.00 1.00 26.7 30.3 49.8 26.7
IC-B-BH-10 1.50 1.00 1.00 28.8 32.5 51.9 28.8
3.00 1.00 1.00 32.0 45.5 72.7 32.0
0.50 1.00 1.00 21.6 28.7 47.2 21.6
IC--BH-13 1.50 1.00 1.00 23.8 30.9 49.4 23.8
3.00 1.00 1.00 27.1 16.7 26.7 16.7
0.50 1.00 1.00 31.9 17.0 28.5 17.0
IC--B-BH-11 1.50 1.00 1.00 34.2 19.2 30.8 19.2
3.00 1.00 1.00 37.6 20.8 33.3 20.8
0.50 1.00 1.00 32.4 36.4 59.5 32.4
IC--B-BH-12 1.50 1.00 1.00 34.4 38.5 61.5 34.4
3.00 1.00 1.00 37.5 36.8 58.8 36.8
0.50 1.00 1.00 33.5 26.4 43.4 26.4
IC--B-BH-13 1.50 1.00 1.00 35.6 28.4 45.5 28.4
3.00 1.00 1.00 38.6 28.4 45.5 28.4
0.50 1.00 1.00 25.3 28.9 47.4 25.3
IC--B-BH-14 1.50 1.00 1.00 27.3 30.9 49.4 27.3
3.00 1.00 1.00 30.3 16.7 26.7 16.7
0.50 1.00 1.00 22.9 14.7 24.7 14.7
IC--B-BH-15 1.50 1.00 1.00 24.8 16.7 26.7 16.7
3.00 1.00 1.00 27.8 19.2 30.8 19.2
0.50 1.00 1.00 20.7 25.9 42.6 20.7
IC--B-BH-16 1.50 1.00 1.00 22.6 27.8 44.4 22.6
3.00 1.00 1.00 25.4 32.5 51.9 25.4
0.50 1.00 1.00 21.9 23.1 38.1 21.9
IC-BH-16 1.50 1.00 1.00 23.8 25.0 40.0 23.8
3.00 1.00 1.00 26.6 28.4 45.5 26.6
0.50 1.00 1.00 21.0 24.4 40.2 21.0
IC-B-BH-17 1.50 1.00 1.00 22.9 26.3 42.1 22.9
3.00 1.00 1.00 25.7 30.9 49.4 25.7
0.50 1.00 1.00 20.2 37.8 61.6 20.2
IC-B-BH-18 1.50 1.00 1.00 22.1 39.7 63.5 22.1
3.00 1.00 1.00 25.0 26.9 43.0 25.0
0.50 1.00 1.00 21.5 24.9 41.1 21.5
IC-B-BH-19 1.50 1.00 1.00 23.5 26.9 43.0 23.5
3.00 1.00 1.00 26.4 26.9 43.0 26.4
0.50 1.00 1.00 12.5 24.5 40.3 12.5
IC-B-BH-23 1.50 1.00 1.00 14.2 26.3 42.1 14.2
3.00 1.00 1.00 16.9 26.3 42.1 16.9
0.50 1.00 1.00 17.4 31.9 52.2 17.4
IC-B-BH-24 1.50 1.00 1.00 19.2 33.8 54.1 19.2
3.00 1.00 1.00 22.0 26.3 42.1 22.0
0.50 1.00 1.00 12.1 19.0 31.5 12.1
IC-B-BH-25 1.50 1.00 1.00 13.9 20.8 33.3 13.9
3.00 1.00 1.00 16.6 37.3 59.7 16.6
0.50 1.00 1.00 14.5 26.0 42.6 14.5
IC-B-BH-26 1.50 1.00 1.00 16.3 27.8 44.4 16.3
3.00 1.00 1.00 19.0 20.8 33.3 19.0
0.50 1.00 1.00 17.6 17.4 28.9 17.4
IC-B-BH-27 1.50 1.00 1.00 19.5 19.2 30.8 19.2
3.00 1.00 1.00 22.3 19.2 30.8 19.2
0.50 1.00 1.00 21.0 25.9 42.6 21.0
IC-BH-21 1.50 1.00 1.00 22.8 27.8 44.4 22.8
3.00 1.00 1.00 25.6 27.8 44.4 25.6
0.50 1.00 1.00 23.8 17.4 28.9 17.4
IC-B-BH-28 1.50 1.00 1.00 25.7 19.2 30.8 19.2
3.00 1.00 1.00 28.5 26.3 42.1 26.3
0.50 1.00 1.00 18.8 30.6 50.0 18.8
IC-B-BH-29 1.50 1.00 1.00 20.7 32.5 51.9 20.7
3.00 1.00 1.00 23.5 28.4 45.5 23.5
0.50 1.00 1.00 17.6 25.0 41.1 17.6
IC-B-BH-30 1.50 1.00 1.00 19.5 26.9 43.0 19.5
3.00 1.00 1.00 22.3 26.9 43.0 22.3
0.50 1.00 1.00 18.4 29.0 47.5 18.4
IC-B-BH-31 1.50 1.00 1.00 20.3 30.9 49.4 20.3
3.00 1.00 1.00 23.1 32.5 51.9 23.1
0.50 1.00 1.00 19.3 26.6 43.6 19.3
IC-BH-22 1.50 1.00 1.00 21.1 28.4 45.5 21.1
3.00 1.00 1.00 23.8 30.9 49.4 23.8
0.50 1.00 1.00 18.0 47.2 76.7 18.0
1.50 1.00 1.00 19.7 49.0 78.4 19.7
IC-B-BH-32
3.00 1.00 1.00 22.4 54.3 87.0 22.4
6.00 1.00 1.00 53.8 55.6 88.9 53.8
0.50 1.00 1.00 9.5 26.1 42.8 9.5
IC-B-BH-33 1.50 1.00 1.00 11.1 27.8 44.4 11.1
3.00 1.00 1.00 13.6 27.8 44.4 13.6
0.50 1.00 1.00 10.1 32.1 52.4 10.1
IC-B-BH-34 1.50 1.00 1.00 11.8 33.8 54.1 11.8
3.00 1.00 1.00 14.3 36.8 58.8 14.3
0.50 1.00 1.00 11.4 32.0 52.3 11.4
IC-B-BH-35 1.50 1.00 1.00 13.2 33.8 54.1 13.2
3.00 1.00 1.00 15.8 20.8 33.3 15.8
0.50 1.00 1.00 15.3 19.0 31.5 15.3
IC-B-BH-36 1.50 1.00 1.00 17.1 20.8 33.3 17.1
3.00 1.00 1.00 19.8 26.3 42.1 19.8
0.50 1.00 1.00 12.7 7.2 12.6 7.2
IC-B-BH-37 1.50 1.00 1.00 14.4 8.9 14.3 8.9
3.00 1.00 1.00 17.0 16.7 26.7 16.7
0.50 1.00 1.00 12.1 36.7 59.8 12.1
IC-B-BH-40 1.50 1.00 1.00 13.8 38.5 61.5 13.8
3.00 1.00 1.00 16.4 33.8 54.1 16.4
0.50 1.00 1.00 14.4 23.2 38.2 14.4
IC-BH-23 1.50 1.00 1.00 16.1 25.0 40.0 16.1
3.00 1.00 1.00 18.8 32.5 51.9 18.8
0.50 1.00 1.00 8.9 30.8 50.3 8.9
IC-BH-24 1.50 1.00 1.00 10.6 32.5 51.9 10.6
3.00 1.00 1.00 13.0 54.3 87.0 13.0
0.50 1.00 1.00 11.2 24.5 40.3 11.2
IC-B-BH-41 1.50 1.00 1.00 12.9 26.3 42.1 12.9
3.00 1.00 1.00 15.6 26.3 42.1 15.6
0.50 1.00 1.00 15.0 13.8 23.2 13.8
IC-B-BH-43 1.50 1.00 1.00 16.8 15.6 25.0 15.6
3.00 1.00 1.00 19.5 20.8 33.3 19.5
0.50 1.00 1.00 16.6 23.2 38.2 16.6
IC-BH-25 1.50 1.00 1.00 18.4 25.0 40.0 18.4
3.00 1.00 1.00 21.1 26.3 42.1 21.1
0.50 1.00 1.00 13.5 26.0 42.7 13.5
IC-B-BH-44 1.50 1.00 1.00 15.2 27.8 44.4 15.2
3.00 1.00 1.00 17.9 39.7 63.5 17.9
0.50 1.00 1.00 14.0 26.0 42.6 14.0
IC-BH-26 1.50 1.00 1.00 15.8 27.8 44.4 15.8
3.00 1.00 1.00 18.5 39.7 63.5 18.5
0.50 1.00 1.00 17.2 13.8 23.2 13.8
IC-B-BH-45 1.50 1.00 1.00 19.0 15.6 25.0 15.6
3.00 1.00 1.00 21.7 28.4 45.5 21.7
0.50 1.00 1.00 22.4 41.4 67.2 22.4
IC-B-BH-46 1.50 1.00 1.00 24.1 43.1 69.0 24.1
3.00 1.00 1.00 26.7 39.7 63.5 26.7
0.50 1.00 1.00 22.9 19.0 31.5 19.0
IC-BH-27 1.50 1.00 1.00 24.7 20.8 33.3 20.8
3.00 1.00 1.00 27.4 45.5 72.7 27.4

Notes:-
1) The Factor of safety of 2.5 is considerd.
2) The depth of foundation is considerd from the NGL at the time of exploration.
Annexure-1
Summary of Allowable bearing pressure based on Shear & Settlement Criteria
Geotechnical investigation work for project "Gauge Conversion of Katosan Road -Becharaji (26.6 km) metre gauge to
Project:- braod gauge along with new MSIL BG siding (Approx 3 KM) at Becharaji with 25 kv AC Electrification in Ahmedabad
division of western railway" in state of Gujarat.

Safe bearing pressures calculated Allowable


Safe Bearing based on Settlement criteria bearing Capacity
Width of Length of capacity based on (Annexure-3)
Depth of suggested (Min.
Borehole no Foundation Foundation shear criteria
Foundation (Mt) of settlement and
(Mt) (Mt) (Annexure-4) For 25 mm For 40 mm shear criteria)
t/m2 settlement t/m2 settlement t/m2 t/m2

0.50 1.00 1.00 27.5 13.7 23.1 13.7

1.50 1.00 1.00 29.4 15.6 25.0 15.6


IC-B-BH-76

3.00 1.00 1.00 32.2 38.5 61.5 32.2

6.00 1.00 1.00 58.2 39.7 63.5 39.7

Notes:-

1) The Factor of safety of 2.5 is considerd.

2) The depth of foundation is considerd from the NGL at the time of exploration.