L&T CONSTRUCTION QUALITY MANAGEMENT SYSTEM

WATER & EFFLUENT TREATMENT IC PROJECT QUALITY MANUAL

PRE POUR CARD LTCD/WET/PQM/IT/F02 Issue-J Rev-0 Sheet 01 of 02

Report No. Date :


Package Name: Contract Agreement No.
Mix Design for Report No. :
concrete: Nominal /Design
Area / Bldg / structure Start Time:
( Exact Location if
rquire attach drawing):
Grade of Concrete Finish Time
Description of Work / Drg Ref.
Description Items / Check Required Actual Remarks
A. Form work 1. Fixing / bracing/
supports
2. Base compaction
3. Level
4. Plumb
5. Storey height
6. Cleanliness
7. Form oil application
8. Cut-outs
9. Grout tightness

B. Reinforcement 1. Position
2. No. & size
3. Anchorage
4. Spacing
5. Lapping
6. Cover
7. Cleanliness
8. Dowel bars
9. Links
10. Bar Bending
Shedule No. ( Lap
Length)
12. Binding / welding

C. Openings 1. Position
2. Size
3. Trimming bars
4.Alignment
5. Embedments
6. Water proofing if any

7. Construction joint
perparation

Note:- (Pour card to accompany PHOTOS of checks for each Pre pour shuttering & Barbinding arrangement)
L&T Construction - Execution L&T Construction - QA&QC Client / TPI

© LARSEN & TOUBRO LIMITED – CONSTRUCTION 2015– ALL RIGHTS RESERVED

Sensitivity: LNT Construction Internal Use


#
L&T CONSTRUCTION QUALITY MANAGEMENT SYSTEM

WATER & EFFLUENT TREATMENT IC PROJECT QUALITY MANUAL

POST POUR CARD LTCD/WET/PQM/IT/F02 Issue-J Rev-0 Sheet 02 of 02

Report No. Date :


Package Name: Contract Agreement No. :
Mix Design for Report No. :
concrete: Nominal /Design
Area / Bldg / structure Start Time:
( Exact Location if
rquire attach drawing):
Grade of Concrete Finish Time
Description of Work / Drg Ref.
Description Items / Check Required Actual Remarks

1. Compaction type
2. Vibrators
3. Quantity of concrete
A. During Pouring
4. Cement consumption
5. Slump

1. Mix code
2. Quantity
3. Measuring box for manual concrete
B. Sampling
4. Batch Sheet For RMC & Weigh
Batcher
5. No. of samples& Identity
1. Observation for honeycombing.

2. Line & Level


3. Surface finish.
4. Cracks and pores
5. Method of Curing
6. Checked for stripping/Removing of
formwork support etc. after specified
duration of stripping time

C. Post Pour

7. Checked for Position of embedment

8.Repair and finish all surface defects


by specification / approved method

9. Surface of part of structure is


alright and allowed for subsequent
activity / backfilling
10. Others if any
Note:- (Pour card to accompany PHOTOS of checks for each Post pour after deshuttering & concrete finishing quality)