BEST EXPERIENCE FOR OPERATIONAL EXCELLENCE

/NAR/ IMPROVEMENT IP&E O & M NWR

February 2021
CONTENT

1. NWR P&E Team Daily Major Duties.

2. Resource Optimization.

3. DG sites Status Follow up.

4. DG Critical Maintenance.

5. DC power system Management.

6. DG Refueling

7. Working With EEU Teams.

8. Team Engagement.

9. Some Pictures.
I-P&E O&M NWR
1. NWR P&E TEAM DAILY MAJOR DUTIES
 The performance standby team check NEs status by monitoring.
• Share down sites for power standby teams and all concerned by early SMS.
• The second update by e-mail and SMS for all teams share at least 8 times a day.
• Monitoring and update all handler every sites status proactively, even the issues do not power
shared to other section timely by e-mail, SMS, and phone.
• Monitoring mains disconnected sites and share the team before the sites down.
• Follow up intermittent sites and proposed recommendation action.
• Online support when teams are at remote sites.
• List out DS and FDS ET power solution sites and share to the power team to be handle.
• TT follow up and update.
 Standby teams always check core sites power NEs early entrance and before leaving home
at noon.
 At the end of the week all standby teams send and share under each maintenance center
weekly report for the teams as best experience and knowledge sharing.

4
CON…….

 Supervisors strictly follow up and support the teams, check their weekly report
performed accordingly.
 CM and PM update feedback communicated timely.
 Every time manager and supervisors jointly discussed for any issues and handle
timely.
2. Resource Optimization.
 DG move by business priorities.
 Power solution change
o DG +BB to AC +DG
o DG + BB to Pure solar
o Dual DG to AC+DG
o Solar to AC+ solar
o AC to pure solar
 Backup battery move / relocate by site priorities.
 Secured AC only Hub sites by installing solar for RTN.
3.DG SITES STATUS FOLLOW UP
 PM performed accordingly and DG Run hours.
 Immediate CM and Proactive maintenance.
 Core, HHV, Hub, Cx and BB sites status strictly follow up by monitoring and on site
checked due to these incident minimized.
 Manage hybrid system power solution sites/EMS.
4. DG Critical Maintenance: -
 Mechanical system.
 Control /Electrical system.
 Cooling & Lubricant system.
 Exhaust system.
 Engine over all maintenance.
5.DC POWER SYSTEM MANAGEMENT
 Make load battery assessment
 Configured LLVD and BLVD accordingly
o Follow up solar sites status
o Backup battery top up, terminal cleaning, charging status
o Solar controller setting, LLVD, BLVD, charging current, Boost charge, Float and equalizing
voltage.
o Solar module status, junction box, diodes status
o Charging coefficient
6. DG Refueling:-
 Continues refueling no sites down by refueling problem.
 Fuel tanker upgrading by assigned 2000L.
 Fuel tanker upgrading by cascading two 500L to make 1000L.
 Done Fuel tanker PM accordingly.
7. WORKING WITH EEU TEAMS
 Mostly intermittent line make rehabilitation with them.
 Line obstacles of tree clearance proactively.
 Transformer follow up and managed before lay down.
 When Transformer failed EEU maintained/ replaced soon by priorities.
 Transformer basement replaced by concert poles when upgrading EEU line from 15KV to
33KV.
 When substation outage and 66KV line failed jointly working and minimize resolution
time.
 Energized Long time (TEP) bending AC only and solar under size sites.
8. TEAM ENGAGEMENT
 All teams actively engaged under their respective group.
 Every engagement with action plan and feedback by time frame.
 The feedback evaluated based on PIP.
 Smooth and close relationships with: -
o Functional Operation, Engineering, Rollout and NOMs Teams.
o Jointly working with regional operational sections and support teams.
o Deductively and closely working with EEU teams.
 All teams 24/7 follow up any P&E NEs status.
 Best performed staffs under each maintenance center and group recognized with
certificate quarterly.
9. SOME PICTURES
 During DG over all maintenance
PICTURES CON…
 During DG over all maintenance
PICTURES CON…
 During solar installation for power solution change site 171594 from DG+BB to pure solar
PICTURES CON…
 Solar structure modification and installation for power solution change from DG+ BB
to pure solar for 171580
PICTURES CON…
 Solar sites during Trees shading clearance
PICTURES CON…
 During EEU line Trees clearance
PICTURES CON…

 During EEU line rehabilitation before rainy season


PICTURES CON…
 During EEU Line Transformer H pole replacement at rainy season
PICTURES CON…
 During Transformer replacement at Difficult road accesses.
PICTURES CON…
 Transformer Basement for AC sites by concert H pole and Foundation
PICTURES CON…

 Battery cabinet welding for outdoor site from ideal NE rack.


PICTURES CON…

 During DG move by power solution change


THANK YOU

2/2/2021 22