You are on page 1of 3

BLOCK 15-1/05 LAC DA VANG OIL

DEVELOPMENT
ITB PACKAGE FOR GAS DEHYDRATION
PACKAGE

VENDOR’S
SCOPE C or X COMPLIAN
SUBJECT CONTRACTOR/COMPANY’S REQUIREMENTS
** CE /
REF.
DEVIATION

1.0 SCOPE OF 1.1 The VENDOR shall be responsible for the engineering design, supplies of
SUPPLY materials, manufacture, assembly, inspection, testing, special tools and test
equipment, certification, painting, packing, preservation, preparation for shipment,
documentation, delivery, support services for installation, pre-commissioning,
commissioning and start-up of Gas Dehydration Package in accordance with this
specification, data sheets, attachments, sketches, drawings and applicable
Codes, Standards and project specifications referred herewith.

1.1 The Gas Dehydration Package shall be delivered in a complete operational


package and include, but not limited to the following;

Tag No Description Qty.

13-MAF-2301 Glycol Contactor 1 x 100%

13-MBF-2315 Dry Gas Filter Coalescer 1 x 100%

13-ZZZ-3300 Glycol Regeneration Package 1 x 100%


1.2 The Glycol Regeneration Package (13-ZZZ-3300) shall include, but not limited to

**VENDOR shall indicate in this column “C” for full compliance and “X” for
deviation/exception.
Document Number: MCB-0004-11AA-M-A27-0013 Revision B2
BLOCK 15-1/05 LAC DA VANG OIL
DEVELOPMENT
ITB PACKAGE FOR GAS DEHYDRATION
PACKAGE

VENDOR’S
SCOPE C or X COMPLIAN
SUBJECT CONTRACTOR/COMPANY’S REQUIREMENTS
** CE /
REF.
DEVIATION

the following:

Tag No Description Qty.

13-MBD-2310 Glycol Flash Vessel 1 x 100%

13-MAJ-2320A/B Glycol Cartridge Filters 2 x 100%

13-MAJ-2325 Glycol Charcoal Filter 1 x 10%

13-HAL-2370 Glycol Cooler 1 x 100%

13-PBB-2330A/B Glycol Circulation Pumps 2 x 100%

13-HBG-2345 Hot Glycol Heat Exchanger 1 x 100%

13-HBG-2340 Cold Glycol Heat Exchanger 1 x 100%

13-HBG-2360 Glycol Reflux Condenser 1 x 100%

13-MBD-2365 Glycol Still Column 1 x 100%

13-MBD-2355 Glycol Stripping Column 1 x 100%

**VENDOR shall indicate in this column “C” for full compliance and “X” for
deviation/exception.
Document Number: MCB-0004-11AA-M-A27-0013 Revision B2
BLOCK 15-1/05 LAC DA VANG OIL
DEVELOPMENT
ITB PACKAGE FOR GAS DEHYDRATION
PACKAGE

VENDOR’S
SCOPE C or X COMPLIAN
SUBJECT CONTRACTOR/COMPANY’S REQUIREMENTS
** CE /
REF.
DEVIATION

13-MBD-2340 Glycol Surge Vessel 1 x 100%

13-NBC-2350 Glycol Reboiler 1 x 100%

13-HAP-2351A/B Glycol Reboiler Heaters c/w Heater 2 x 50%


Thyristor Control Panel (installed
indoor)

13-ABJ-2340 Antifoam Tank 1 x 100%

13-ABJ-2350 pH Tank 1 x 100%

13-PBB-2345 Antifoam Injection Pump 1 x 100%

13-PBB-2355 pH Injection Pump 1 x 100%

1.3 The VENDOR’s scope of supply for the Gas Dehydration Package shall include,
but not limited to the following;

a) Process design and sizing of Gas Dehydration Package to dehydrate wet


natural gas stream based on UFD, PFD, P&ID, the requirements and
operating conditions specified herein and Equipment Layout in Appendix D.

b) Gas Dehydration Package shall consist of all equipment but not limited as

**VENDOR shall indicate in this column “C” for full compliance and “X” for
deviation/exception.
Document Number: MCB-0004-11AA-M-A27-0013 Revision B2

You might also like