Production , Bricks per day Bricks per day 5000 10000 15000 20000 25000

No of days in a month Day 30 30 30 30 30


Production per month in Lakhs 1.5 3 4.5 6 7.5
Brick weight kg/brick 3 3 3 3 3
Capacity in tons tons per day 15 30 45 60 75
Cost of a brick Rs 6 6 6 6 6
Revenue per day Rs 30000 60000 90000 120000 150000
Revenue per month Rs 900000 1800000 2700000 3600000 4500000
Crore 0.09 0.18 0.27 0.36 0.45
Raw material
clay 1500 1500 1500 1500 1500
bricks per ton 1500 1500 1500 1500 1500
Fuel cost
man power cost
Energy Cost
Maintenace/accessories

Capacity/Product per car Ton 2.5


tonnage required per day Ton 50
cars per day 20
hours per day 24
pushing rate hr/car 1.2
maximum firing hours hours 48
hous required per car hour 1.2
No of cars in all zone Cars 40

Length of a car m 2
width of a car m
height of a car m

Total length of the kiln m 80

Length of preheating zone m 40


Length of firing zone m 10
Length of cooling zone m 30

No of cars in Preheating zone Cars 20


No of cars in Firing zone Cars 5
No of cars in cooling zone Cars 15

spare cars nos 10