Professional Documents
Culture Documents
Not for construction. Part of a student project and not based on a legal survey.
and privilege to inform and make decisions related to the
era cy)
landscape comes with the obligation to acknowledge the
history of settler colonization and the forced removal and
Index
Confed erasure of indigenous people from the land.
nd
nla
aw
Marquis | Rosenwinkel
i (D Farm & Wilderness is located on land that was stolen from the Land Statement............................................................ 1
ak Abenaki People of the Dawn by European colonists. This land
SPRING 2022
Introduction & Goals..................................................... 2
ban is known to the Abenaki people as N’dakinna, or “homeland.”
Existing Conditions....................................................... 3
a The Abenaki People of the Dawn have continually inhabited
W
Land Statement
Final Design: Overview.................................................17
Final Design................................................................18
Final Design (spread)...................................................19
This map, developed by Native Land Digital (a not-for-profit organization in Canada), shows an
estimation of the territories that Indigenous people of colonized New England inhabited. Farm and Welcome Center..........................................................20
Wilderness is located on the ancestral homelands of the Abenaki People of the Dawn and Wabanaki Natural Play Area.........................................................21
(Dawnland Confederacy). Main Parking Lot.........................................................22
Housing......................................................................23
Universal Access Trail...................................................24
Maintenance Area & Staff Parking..................................25
Grading & Stormwater Plan..........................................26
Planting Palettes.........................................................27
Planting Palettes (cont.)...............................................28
Construction Details, Precedents, & Cost Estimate ���������29 1/29
Introduction Client Goals
Farm & Wilderness (F&W) is a summer COOLIDGE
camp organization that provides STATE FOR-
immersive outdoor experiences for youth EST
among the forests, hills, and lakes of A' An inviting arrival experience
south-central Vermont. Many of its summer ARRIVAL
AREA Farm & Wilderness wants its landscape to
camps are located on a 620-acre parcel on
the eastern side of Woodward Reservoir in provide a welcoming experience to both new
Plymouth, Vermont. The property rests on and returning visitors by incorporating clear
A and intuitive wayfinding and accessibility to all,
a forested, east-facing hillside that slopes COOLIDGE
down to the reservoir. The camps are STATE FOR- while reflecting the organization’s values.
lower down in the valley near the reservoir, EST
Not for construction. Part of a student project and not based on a legal survey.
HALL LOTS
while much of the hillside is conserved for
habitat and outdoor recreation as forest
legacy land.
F&W is hoping to reimagine the arrival
area to this property, which is situated on
A new welcome center
Marquis | Rosenwinkel
the northern tip of Woodward Reservoir.
This space provides the first impression to F&W is in the process of designing a new, multi-
SPRING 2022
visitors and campers upon arrival. Many use Welcome Center that will provide its staff,
within the organization feel this space is Above: F&W is located in the hills and campers, and greater community with space
confusing, uninviting, and inaccessible forest of south central Vermont. to gather, relax, and learn. The organization
to many of its visitors. Instead, Farm & wants to explore appropriate locations for this
Wilderness envisions an arrival experience Right: F&W owns a 620-acre parcel east
Welcome Center and envision the landscape
that is beautiful and engaging, provides of Route 100 in Plymouth VT, as well as
around a predetermined building footprint.
clearer wayfinding, and generates the joy 4 parcels west of Route 100.
and excitement that campers feel on the rest
of the property.
As part of this vision, F&W is considering how the space might accommodate future
uses and invitations to the public. This includes the siting of a welcome center and a
public and universal access trail. In addition, Farm & Wilderness is considering what
it would take to expand its programming beyond just the summer months. Doing
so would require more winterized housing for staff. Farm & Wilderness would like to
Year-round housing for staff
explore options for siting housing both in the arrival area and on the Hall Lots, which F&W would like to explore suitable locations
are four other parcels that it owns on the other side of Route 100. and configurations for year-round housing for
F&W PROPERTY CONSERVED LAND LOCATION OF CAMPS 50 people. The sites they would like to consider
FO AT GE
CO
ST
ST OLID
RE E
CO
ST
AD
RO
OIR
100
S
RV
S
NE
SE
E
UT
ER
RE
RO
ILD
RD
VT
&W
WA
M
R
WO
FA
NTS
HALL LOTS ARRIVAL AREA 2/29
Existing Conditions
The arrival area to Farm & Wilderness is situated on the northern tip programming. Open fields located below the hillside are often used
of Woodward Reservoir where town-owned Farm & Wilderness Road for play, livestock grazing, large gatherings, and in some locations,
extends off Route 100. The road first travels over the dam that holds in for spreading the compost from the many composting toilets on the
the reservoir, which then loops north in a ‘U’ shape. From there it travels property.
south to the location of the overnight camps. The arrival area shown in Three are three larger buildings including an office, day camp, and
the map to the right is roughly 30 acres in size. It has very undulating maintenance building as well as several smaller structures like outhouses
topography that slopes down to the reservoir and Reservoir Brook, which and open-air cabins tucked in the woods. The amount of activities and
flows to the north off Farm & Wilderness property. needs of the arrival area has given it a somewhat utilitarian appearance
Northern hardwood forest covers much of the hillside that rises up to in certain locations. Immediate upon arrival is a view of large gravel
the east, which is contiguous with Farm & Wilderness’ forest legacy land parking lots and the maintenance building. Although both are critical
and the Coolidge State Forest. There is little space below the hillside for the camp’s operations, they contribute to a confusing and somewhat
Not for construction. Part of a student project and not based on a legal survey.
that is not heavily used by Farm & Wilderness for their operations and uninviting experience for visitors.
Marquis | Rosenwinkel
SPRING 2022
6
1 2 3
5
Maintenance Building | Hosts some Staff Offices | Located on a small hill above Barn Day Camp | Located along F&W Road and
staff offices, garage stalls, and space for Farm and Wilderness Rd, the staff offices welcomes 80 to 100 campers ages 4 to 7 per
supporting projects and storing equipment. are held in an old farmhouse. According to session through the summer months.
F&W, its location makes it difficult to find
for first-time visitors.
4
3
Existing Conditions
401 Farm And Wilderness Rd, Plymouth, VT 05056
Farm and Wilderness, Inc
2
4 5 6
Woodward Reservoir Beach | A sandy and Fair Fields | Another highly used area is the Parking Lots | A series of parking lots are
gently sloping beach provides an excellent fair fields which host a large event at the used for day camp pick-up and drop-off, as
place to swim. The beach is used daily in the end of the summer when parents reunite well as parking for seasonal staff vehicles.
summer by campers and occasionally by with their kids and celebrate the joys of The parking lots receive some public use
Barn Day Camp parents. Farm & Wilderness camp! during the offseason for folks who enjoy
is required to staff a lifeguard when anyone is walking along F&W Rd.
swimming here.
3/29
Community
Mission
Meaningful work, joyful play, and rugged Staff Input on Arrival Space
outdoor living. This map illustrates areas that a group of camp staff stakeholders,
including administrative staff and camp directors, feel are assets,
Farm & Wilderness currently runs seven camp programs per summer constraints, or areas to change in the Woodward arrival area. The staff
for ages 4 to 17. The camps provide immersive, outdoor experiences and camp directors present at the community meeting on May 6, 2022
that focus on simple living, organic farming, and wilderness training. expressed appreciation for the lovely views over the reservoir and rolling
The organization aims to uphold its mission and values in an fields; the amenities useful to daily operations, like the maintenance
environment that is inclusive and accessible to children regardless of facility; and places of high ecological and agricultural value, like
Not for construction. Part of a student project and not based on a legal survey.
economic or social background. pollinator habitats and lawns to pasture their animals. The stakeholders’
concerns about the space included unwelcoming views, parts of the
F&W has a long history of pursuing equity and inclusion. It was one road that feel unsafe, and difficult or counterintuitive wayfinding.
of the first racially integrated summer camps in the United States. Ideas for how the space
Throughout its nearly 80 years of operation, the organization has also could be improved included
adapted to changing social values and new research about human incorporating more gathering
Marquis | Rosenwinkel
needs. Today, there is careful effort put towards honoring the identity spaces, more gardens, and
of each member of the community, particularly in the area of its
SPRING 2022
more opportunity for public
gender-inclusive camp structures. education about F&W’s
F&W employs 16 year-round staff members, 9 camp directors, and resources.
approximately 200 seasonal staff. Camp directors and seasonal staff Other potential stakeholders
live on-site during the summer months; 10 to 15 year-round staff live to this project, who have not
off-site and commute in; and a handful of year-round staff live on-site yet been directly involved,
all months of the year. include parents/guardians
of Barn Day Camp campers,
the campers themselves,
and members of the public
“At Farm & Wilderness summer camps in Vermont, we believe
whom the Welcome Center
that a diverse community makes us stronger and more and Accessible Trail are meant
resilient. Our Quaker heritage lays out the concept of the to serve. Keeping these
‘Light of the Spirit’ in each person and we work each year stakeholders engaged through
to live up to this ideal. Our goal is to provide an open and the review process will help
affirming space for children, young people and staff, where ensure that the project serves
they feel welcomed for who they are, not feel pressured to be the community. F&W Staff offer their input on the
something else.” arrival space at the May 6th community
Community
Where the F&W community meets the greater community…
Farm & Wilderness began the process of designing a Welcome Center over 10
years ago. Employees identified the need for a space that would serve many
different purposes; i.e. provide amenities for seasonal staff, offer a space to
display the abundant archive, incorporate a large meeting room that could be
used by F&W or be available to rent, and serve as a place where Farm & Wilderness
could better interact with the public. The design of this building has gone through
many iterations, and while Farm and Wilderness will be ultimately responsible for
determining the programming of the building and how it will fit the community,
the goal of this project is to imagine how that building could fit the landscape.
4/29
Pedestrian & Vehicle Circulation
Vehicle Circulation Roads Pedestrian Circulation
The junction of Farm and Wilderness Road and Route 100 at the north • Route 100: State-owned, 50mph, 1,000 cars The often steep and undulating topography in this
entrance of Woodward Reservoir serves as the main arrival to the summer daily; “Summer Camp Area” signs at either area creates challenges for pedestrian circulation.
camps. External vehicular traffic (i.e., vehicles that are not staff or camp end of Farm and Wilderness Road on Route Shown on the map are commonly taken routes
vehicles) typically circulates between the intersection of Route 100 and 100 between zones of use (specifically the parking
the parking lots. Larger trucks, i.e., delivery trucks and trash/recycling • Farm and Wilderness Road: Town-owned, lot, main office, soccer field, fair fields, swimming
trucks, enter off Route 100 and travel to the maintenance facility, using 15mph, minimal outside traffic daily, leads to area, and shelters) in the arrival area. These
the open space to turn around. Other large vehicles like shuttle buses also camps along Woodward then exits south informal paths are worn down to mineral soil
use the maintenance facility space to turn around. in places from heavy foot traffic, and some are
Parking
Not for construction. Part of a student project and not based on a legal survey.
Along Farm & Wilderness Road past the maintenance facility and current showing signs of entrenchment, compaction, and
parking lots, vehicular traffic is mostly limited to internal camp vehicles. erosion. See sheet 6 (Snapshots of Circulation)
• Barn Day Camp parking lot: 5K square feet,
Camp employees run trash and recycling to the maintenance facility once for a detailed analysis of different patterns of
requires spaces for 70 vehicles
daily, and camp vans come and go when bringing campers on excursions. circulation at different times throughout the
• Main Lot: 10k square feet season. All of these routes contain slopes greater
Farm & Wilderness has made efforts to reduce its use of gas-powered
vehicles in recent years, shifting to electric vehicles and staying on-site • Summer Staff/Overflow Parking: 25K square than 12%, and many of them have a narrow and
Marquis | Rosenwinkel
when possible. feet uneven treadway, so there are no universally
accessible paths between zones of use at the
SPRING 2022
• Extra spaces by Maintenance Facility and Main arrival area. Highlighted in red are broad areas
Office that receive heavy foot traffic—the kettle pond
is used as a soccer field; the fair fields hold over
Design Implications a thousand people on fair day; and each of
The roads near and bisecting the focus area are their camps runs daily swimming lessons by the
MORE under state and town jurisdiction, so any changes
PARKING reservoir.
to these roads may require permitting, extended
review processes. Adding buildings and parking
lots to the arrival space could change patterns Design Implications
of pedestrian and vehicular circulation. Parking
is a heavy demand on the spatial requirements The steep slopes in this arrival area present
of this site. The space that is currently allocated the greatest constraint to accessibility. In order
to Barn Day Camp parking does not adequately for paths that connect zones of use to meet
accommodate the demand. If there are accessibility standards, longer routes and
/ significant grading may be necessary.
O W opportunities to relieve this pressure through
ERF L offsite or non-spatial means, like encouraging use
OV
VEHICLE 5/29
TRAFFIC
Snapshots of Circulation
The Woodward arrival area is a multi-use space with complex operations that change at different times of the year. The maps below describe vehicular and pedestrian
circulation on different days of the Farm & Wilderness season, which require different logistical patterns. Each logistical operation is broken down into spatial
requirements that the final design should aim to accommodate. Some of these spatial requirements are currently met by the existing conditions of the site. Some
conditions need improvements to achieve the client goals, particularly around accessibility.
H/
TRASCLING
RECY
Not for construction. Part of a student project and not based on a legal survey.
Marquis | Rosenwinkel
SPRING 2022
Snapshots of Circulation
Barn Day Camp Pickup and Dropoff Summer Dropoff Fair Day
PEDESTRIAN TRAFFIC
VEHICLE TRAFFIC
✔ Spatial requirements currently met
✘ Conditions that need improvement
6/29
Arrival Sequence & Views
Farm & Wilderness feels that the current arrival sequence at the main entrance
to the property does not inspire a feeling of joy, community, and comfort. Upon
entering from Route 100, visitors are greeted by a quick and somewhat obstructed
view of the Woodward Reservoir to the right and Reservoir Brook to the left. Staff
report that the steep drop to the river feels precarious, especially in high vehicles
like the 12-passenger camp vans. The view then narrows through mature white
pines on both sides as the road curves left, then opens again to long views of
the existing parking lots and maintenance building. New visitors report feeling
confused about where to go at this point and often head towards the maintenance
facility, thinking that it’s the main office. The main office is an additional 1,300 feet
Not for construction. Part of a student project and not based on a legal survey.
farther on Farm and Wilderness Road, across from the Barn Day Camp building.
Parking for these facilities requires walking several hundred feet over steeply sloped
terrain without formal paths. The first view of the property looks south over Woodward
Reservoir at the turn off Route 100.
Arrival Sequence
Marquis | Rosenwinkel
• Turn from Route 100 at North Entrance
SPRING 2022
• Glimpse of Woodward Reservoir
• View narrows through mature pines
• View opens to parking lots
• Long sightline to maintenance facility
• Long drive around loop to get to Main Office
Design Implications
Views are the main contributing factor to the unwelcoming arrival sequence. After
the brief view of the reservoir when first entering the property, the dominating
views do not convey the joyful play, meaningful work, and rugged outdoor living The view then narrows between berms and mature white
After emerging from the berms and white pines, the view
opens to a long view of the maintenance building and
parking lots. The road also appears to fork to the right
due to the topography change blocking the view of the
Barn Day Camp parking lot.
7/29
Slopes
The arrival area sits at the bottom of a valley, with a steep hillside rising up Accessible Paths and Trails | Steep slopes across the site also constrain the
directly to the east of the site and to the west of Route 100. The slopes on these layout of accessible paths and trails. Paths that are ADA accessible must not
hillsides often exceed 33%, shown in the darkest shade of blue on the map to exceed 8.3% in slope. Paths that are ABA accessible must not exceed 12% slope
the right. This is the angle at which most soils will begin to slough off, or erode, for any distance greater than 10 feet. In order to provide equitable freedom of
without support from vegetation, boulders, and rocks. movement across the site, it may be necessary for paths to run parallel with
Flatter areas within the arrival area are less than 15% in slope and are often contour or be regraded.
heavily trafficked areas. They include the roads, parking lots, maintenance
area, soccer fields, fair fields, and dam spillway (shown by white, and lighter Topography as an Asset | The undulating topography creates interesting and
shades of blue). There is little flat space on the site that is not developed or unique views and places for play. Many of the eskers and built mounds are also
utilized by the camp for their programming and operations. used to host larger gatherings, acting as a natural amphitheater. They also offer A
Not for construction. Part of a student project and not based on a legal survey.
Most of the flat spaces are also not continuous, but instead separated by opportunities to separate spaces, making some parts of the landscape private
sinuous and steep mounds and berms. Many of these mounds have been from others. Highlighting these landforms and making accessible paths to high
designed and shaped by humans over the years. The berms along the dam points could help create unique experiences and preserve a connection to the
spillway and which the fair fields rest atop are the result of the reconstruction geologic past.
of the Woodward dam in the 1980s. It’s also possible that some of the mounds
are the result of past glaciation. Eskers are gravel and sand deposits formed by
Marquis | Rosenwinkel
retreating glaciers at the end of the last ice age. The hills that form extended
SPRING 2022
peninsulas out into Woodward Reservoir beginning at the southern extent
of the map may be naturally occurring eskers. Both constructed berms and
natural eskers separate spaces by blocking views from below and making
movement between areas more difficult. However, the vantage points from the
top reveal expansive views.
2
Design Implications
Siting Buildings | The steep slopes that cover much of the arrival area pose a
challenge to siting buildings including the welcome center and staff housing. 1 A'
Constructing on slopes that are greater than 15% can be more expensive
and disruptive to soil health, hydrology, and vegetation. Steep slopes hinder 1 2
development on the hillside to the east of the site, the sides of eskers, and
the land adjacent to Reservoir Brook and Woodward reservoir. In order to Left: The rolling hills surrounding the fair field create unique places for
incorporate new buildings, the arrangement and uses of areas with less than play and offer unique views.
15% slope may need to be changed or reorganized. Right: Steep slopes separate areas of high use ,creating steep paths to
destinations such as Barn Day Camp.
SS
RO
NE
SECTION A - A'
SS
ER
NE
ILD
ER
&W
RM
T
ILD
D
LO
BE
EL
M
&W
100
NG
R
FI
OK
OR
FA
E
KI
O
R
M
Slopes
BR
UT
E
R
KE
CC
FA
PA
RO
OIR
Slope
SO
ES
RV
VT
SE
ESKER OR BERM
RE
0 - 5%
15 - 25%
5 - 8.3%
>30%
8.3 - 15%
VERTICAL EXAGGERATION X2
8/29
Drainage, Stormwater, & Soils
Drainage & Stormwater Design Implications
Surface water generally flows east to west across the arrival area towards Reservoir Retaining and Slowing Stormwater | In order to protect local and regional
Brook and Woodward Reservoir. There are a series of swales and culverts which water resources, any new impervious surfaces, including buildings, roads, and
channel runoff around and off developed spaces and into retention basins. For parking lots, will need to be supported by stormwater systems that help to
example, water that flows down the east hillside catches on a swale that runs along slow increased runoff from those surfaces. Doing so is important to protect the
Farm & Wilderness Road and flows under the road through a culvert into a retention water quality of Woodward Reservoir and the Ottauquechee River. It will also
basin, which also serves as the soccer field. help reduce peak flows in rivers during storms and therefore assist the region to
These basins slow stormwater and allow pollutants and sediment to settle out before adapt to more severe and frequent flooding events.
entering the brook and reservoir. Overflows still drain into these bodies of water Siting Buildings | Both the housing and welcome center will require on-site
and can contribute to downstream flooding, erosion, and pollution. There are a few septic systems. Soils that are suited for septic systems exist across most of the
Not for construction. Part of a student project and not based on a legal survey.
areas where the stormwater system is not functioning well. Some swales and culverts arrival area but exclude the hillside to the east of Farm and Wilderness Road.
are becoming blocked by gravel which is pushed off the road from a snow plow. In
addition, there is a portion of Farm & Wilderness Road that washes out because of
poor grading that allows water to run down the length of the steep road. SOILS
EXCESSIVELY DRAINED AND WELL TO MODERATELY
WELL SUITED FOR SEPTIC
Marquis | Rosenwinkel
Soils
SPRING 2022
Most soils in the arrival area are an excessively drained loamy sand that helps to WELL DRAINED AND NOT SUITED FOR SEPTIC
infiltrate water quickly on site. These soils, represented by the yellow on the map at
right, are also well suited for on-site septic systems according to data from NRCS. The DRAINAGE & STORMWATER
steeper hillsides are composed of a well drained glacial till but are not suited for septic
due to the steep slopes. These areas are shaded purple. EROSION CULVERT
Not for construction. Part of a student project and not based on a legal survey.
and staff offices. Connecting new buildings to the grid would require
The town bylaws also show that the arrival area is within a shoreland
extending single-phase lines to the buildings. Above-ground lines may
overlay district. The shoreland overlay district requires any new
impact views while burying lines may cost more. However, burying lines
structure be set back 75 feet from Woodward Reservoir. The state of
could have the added benefit of creating greater resilience to power
Vermont also regulates activities within 250 feet of the shoreline via the
outages during storms.
Shoreland Protection Act. Permits are required from the state in order
Marquis | Rosenwinkel
to build or expand structures and other impervious surfaces, or clear
vegetation within this zone. Wells and Septic | Wells and septic systems will be needed for any new
SPRING 2022
There is also a flood hazard protection overlay district designated year-round buildings in the arrival area. If capacity allows, it may be
in Plymouth’s town bylaws along Reservoir Brook. The extent of easiest and least expensive for new buildings to share wells and septic
the overlay is determined by the river corridor area that is defined systems with already existing buildings. There are currently two leach
by the Vermont Agency of Natural Resources. This overlay restricts fields north of the soccer field that serve Timberlake summer camp to
development that would diminish water quality, impair floodplain the south of the site. In addition, there is a planned leach field for Barn
services, or increase vulnerability to the hazards of floods. Day Camp that is to be sited in the low point below the fair fields.
If there is a need to drill new wells, their location will need to comply
with Vermont regulations. According to Vermont’s Chapter 21 Water
Design Implications Supply Rules, wells must be sited 25 feet from roads and parking lots,
A design may best avoid legal constraints by siting buildings and 50 feet from subsurface wastewater piping and related tanks, and 10
impervious surfaces outside the zoning setback, protected shoreland feet from buildings. The distance a well can be from a leach field is
area, and river corridor area. Areas that avoid the zoning setback and determined by a calculation that incorporates the daily demand of the
adhere to environmental regulations include the east hillside, space well and the size of the leach field. The EPA, however, recommends 50
around the staff office building, the solar fields and open space east of feet of separation between wells and leach fields. The 50-foot buffer
Farm and Wilderness currently harvests renewable energy. The current solar array, located towards the
northern edge of the clearing in the Woodward arrival area, produces 80,000 kilowatt hours (kwh) per
year on average. The roof-mounted panels at Tamarack Farm produce 18,000 kwh per year. F&W's yearly
electric usage is currently around 100,000 kwh. As F&W has made progress towards reducing its use of fossil MAINTENANCE MAINTENANCE
BUILDING BUILDING
fuels, its electricity usage has risen to fulfill those demands, and it is in the process of implementing plans
to further reduce its use of fossil fuels. The organization's yearly net CO2 emissions have been trending
downwards over the last ten years.
The solar irradiation analysis maps at right show the amount of irradiation within the Woodward arrival
area at the Winter Solstice and Summer Solstice, which provide an estimate of the minimum and maximum
daily averages throughout the year. Maximum irradiation differs greatly between the Winter and Summer
Not for construction. Part of a student project and not based on a legal survey.
Solstice, reaching about 550 watt hours per square meter in the winter and over 7,000 in the summer.
Locations in the Woodward Arrival area that receive the most irradiation are in cleared areas, such as the fair PARKING PARKING
fields, parking lots, kettle pond, leach field, and raised landform by the maintenance building. On the Winter LOTS LEACH LOTS LEACH
Solstice, when the sun overall is weakest, irradiation tends to be strongest on south- and west-facing slopes. FIELDS FIELDS
The raised landform near the maintenance building appears to have the best solar potential at all times of
the year.
Marquis | Rosenwinkel
KETTLE KETTLE
SPRING 2022
POND POND
Design Implications
The addition of structures, especially those that would be open year-round, will require more power to FAIR FIELDS FAIR FIELDS
operate. Siting and designing future buildings, especially those that will be used for winter housing, should
be sited for optimal direct solar gain and passive heating and cooling to help keep F&W's CO2 emissions on
a downward trend. F&W does have some existing structures that may be converted to year-round housing, BARN DAY Structures
Woodward Parcels
BARN DAY Structures
Woodward Parcels
which is a good way to fulfill its housing needs while reducing disturbance from new construction; however,
CAMP Irradiation Watt Hours per Square Meter Daily CAMP Irradiation Watt Hours per Square Meter D
Band 1 (Gray) Band 1 (Gray)
these buildings may be poorly insulated and less efficient to heat and may not be oriented for solar gain, so <= 4000.0000
4000.0000 - 5000.0000
<= 400.0000
400.0000 - 450.0000
additional measures may need to be taken to keep the need for fossil fuel and combustion low. WOODWARD WOODWARD
5000.0000 - 6000.0000 450.0000 - 500.0000
Structures Structures
Woodward Parcels Woodward Parcels
Irradiation Watt Hours per Square Meter Daily Irradiation Watt Hours per Square Meter Daily
Band 1 (Gray) Band 1 (Gray)
<= 4000.0000 <= 400.0000
4000.0000 - 5000.0000
5000.0000 - 6000.0000
Solar Irradiation at 400.0000 - 450.0000 Solar Irradiation
Summer Solstice at Winter Solstice
450.0000 - 500.0000
Following best practices for passive solar gain when siting and designing buildings will help reduce energy
demands related to summer cooling and winter heating. A south- or southwest-facing roof is also most
suitable for mounting PV panels. View of the solar array north of the
maintenance building from Barn Day 11/29
Camp.
Summary Analysis: Woodward Arrival Neither
al t &
se
ge
asset nor
Ch s s e
ge
l en
As
The table below illustrates the implications of major observations across the Woodward Arrival
le n
challenge
A
site for each goal.
al
Ch
Observation Arrival Experience Welcome Center Housing Trail & Accessibility
Topography undulates and some Topographic changes define Steep slopes constrain areas for Steep slopes constrain areas for Steep slopes constrain alignment
slopes are steep. the space and give it a unique construction, but also create construction, but also create of a <12% grade, but offer range
character. views. views. of trail experience.
Topography creates site Views over reservoir brook are Some suitable building sites have Some suitable building sites have Rolling slopes offer opportunities
dynamics of prospect (scenic scenic, but also feel precarious. scenic views of the surrounding scenic views of the surrounding for rest after climbs and scenic
Not for construction. Part of a student project and not based on a legal survey.
views out) and refuge (sense of hills and reservoir. hills and reservoir. views.
enclosure and protection).
The alignment of F&W Road The road orientation and views Neutral Neutral Neutral
includes long sightlines to the along it create a confusing
maintenance building upon first wayfinding experience for new
arrival and a complicated path to visitors, as guests are inclined
the main office. to approach the maintenance
Marquis | Rosenwinkel
building instead of the main
office.
SPRING 2022
Parking lots are some of While it is easy to find the The parking lot location is central Neutral Neutral
the first things a visitor sees parking lots, it can then be and easy for new visitors to find.
when entering the Farm and difficult to find where to go,
Wilderness property. and the utilitarian views feel
unwelcoming.
Soils are sandy and well draining. Neutral Most soils within the Woodward Most soils within the Woodward Soils will help drain water and
area can infiltrate runoff from area can infiltrate runoff from help prevent low or flat spots
new impervious surface like new impervious surface like from becoming saturated.
parking and roofs, and soils are parking and roofs, and soils are
suitable for septic. suitable for septic.
The area has existing features The utilitarian needs of the space Siting buildings within areas that Siting buildings within areas that Siting a trail near a utilitarian
and disturbed areas such as an impact its aesthetic value. have already been disturbed have already been disturbed feature may not feel like a
5%
building.
.3
>2
<5
>8
Steep slopes divide zones of use. Berms can help break up Areas that may be suitable for Areas that may be suitable for Longer paths and more
undesired views and keep building may actually be less building may actually be less significant grading may be
pedestrian and vehicle traffic suitable if they are difficult to suitable if they are difficult to required to provide accessible
separate, but it becomes more access from other zones of use. access from other zones of use. pedestrian access between the
challenging to move between housing and other zones of use.
zones of use once parked.
Farm & Wilderness recently acquired four lots that are part There are two other parcels that make up the Hall Lots which
of an undeveloped subdivision known as the Hall Lots. The Farm & Wilderness does not own, as well as a 120-acre commons. ARRIVAL AREA
four parcels, across Route 100 from its summer camps, sit on According to the deed for the lots, Farm & Wilderness may have ACCESS ROAD
a heavily wooded hillside that rises up from the west side of some jurisdiction over the commons depending on the status of F&W ROAD
Woodward Reservoir. Farm & Wilderness would like to explore the organization which originally oversaw the care for this land.
whether the Hall Lots are well suited for siting year-round staff While there remains ambiguity within the language of the deed
surrounding this, the commons will be included in analysis of
COOLIDGE F&W
housing. STATE FOR-
the Hall Lots for staff housing in the case that Farm & Wilderness EST
could legally develop on this land.
F&W
Not for construction. Part of a student project and not based on a legal survey.
1
WILDERNESS 3
SHELTER 2
Access & Circulation to the Hall Lots
Access to the Hall Lots is provided by a private gravel drive
Marquis | Rosenwinkel
which comes off Route 100 approximately 850 feet south of
F&W
SPRING 2022
Farm & Wilderness Road. A slight bend in Route 100 to the
south of the gravel drive makes it difficult to see oncoming
traffic from the intersection. The gravel drive quickly ascends
the hill and winds its way through each Hall Lot parcel but
just barely enters the southernmost parcel which Farm &
ROUT
Wilderness owns. The only structure on the lots is a recently
WOODWARD
constructed wilderness shelter at the end of the gravel drive
on F&W second most northern parcel.
E 100
The drive is currently not usable by vehicle as thirteen
culverts along its path have been washed out. During a site
visit in March of 2022, small intermittent streams crossed 1
RESERVOIR
Not for construction. Part of a student project and not based on a legal survey.
that share many characteristics with the Hall
Lots. The design team did observe a diverse
understory of herbaceous spring ephemerals
on an early spring site visit, which included
populations of early blue cohosh (Caulophyllum
giganetum), wild leek (Allium tricoccum), both
Marquis | Rosenwinkel
shown at left, as well as trout lily (Erythronium
americanum) and dutchman’s breeches
SPRING 2022
(Dicentra cucullaria).
Design Implications
phyllite
metawacke metawacke
schist
pegmatite pegmatite
phyllite
schist
A fullphyllite
ecological assessment including rare plant inventory should be completed
schist
before moving forward in the development process. Conceptual designs and
Slopes Bedrock & Surficial Geology suitable building locations proposed in this plan were based on the level of
There are extremely steep slopes across the Hall Lots, often above 33%. Slopes The parcels lay across two bands of bedrock; the west side of the parcels is assessment the design team was able to complete during the analysis period,
greater than 33% are most subject to erosion if disturbed. Areas to the south are less underlain by schist, and the east side falls on a band of dolomitic phyllite. A band which included analysis of slopes, access, and observed level of disturbance.
steep and disturbance from construction may pose less of a risk of erosion, but access of dolostone bedrock runs along Woodward Reservoir farther east. Phyllite and However, if a full assessment by a forester or ecologist reveals the presence of
by road is more difficult. There are, however, a few isolated locations near the road dolostone are both dolomitic bedrock types, which typically create rich, alkaline rare species, this should preclude building in any of the proposed locations. Areas
where slopes are less than 33%. These areas may be most suitable for building, as soils. Dolomitic bedrock is regionally uncommon and can give rise to ecologically where species that may be threatened by over-collection grow, such as American
the cost and disturbance would be lowest where slopes are gentle, and flatter areas significant plant communities and habitat, especially where bedrock is close to ginseng and wild leek, should remain less accessible to the public to protect the
are more suitable for septic. Siting buildings on slopes less than 8.3% would make the surface and is oriented on a north-facing slope. According to the 1970 Surficial future of these populations.
it easiest to achieve universal accessibility around the buildings. Above 8.3%, more Geologic Map of Vermont, surficial geology on these parcels is characterized by The Hall Lots appear to be ecologically significant, and they could offer Farm
significant grading or longer paths parallel to contour would be required to achieve glacial till, which “[reflects] the topography of the underlying bedrock surface,” and and Wilderness an important opportunity to extend their conservation efforts.
accessible path slopes. is “thicker in the valleys and thinner in the uplands.” Development may be possible but should be considered with great care, and low-
impact building techniques should be employed wherever possible.
14/29
Hall Lots: Summary & Building Suitability
The Hall Lots provide Farm & Wilderness with an opportunity to site staff greatly constrains where housing could be built. In addition, if vehicle access
housing away from its main property. This could alleviate current or future to the lots is desired, the access road would require repair due to several
spatial constraints to siting new buildings found on other parts of its culvert washouts. Maintaining the road may also be difficult as climate
properties. Even though it's in need of repair, the access road provides the forecasts predict stronger storms that would make future washouts more
existing infrastructure needed to access the lots. In addition, the forested likely. In addition, the underlying bedrock and adjacency to larger expanses
hillside offers a nature-immersed space, away from the summer camps, of conserved land suggest that it may be important to protect the Hall
that could provide room for solitude and rest for staff. Lots from development for habitat purposes. Lastly, siting housing across
Route 100 from Farm & Wilderness’ main property could create a dangerous
However, initial analysis of the Hall Lots revealed several obstacles to siting pedestrian crossing.
housing on the Farm & Wilderness owned parcels. The lack of space with
slopes less than 15% and with soil that is suitable for on-site septic systems
Not for construction. Part of a student project and not based on a legal survey.
Marquis | Rosenwinkel
Building Suitability
SPRING 2022
The many constraints to building on the Hall Lots left only a few places
that seemed well suited for housing. An overlay of the analyses revealed
two locations that could potentially serve as building locations if Farm
& Wilderness decides to further explore this option in the future. Both
locations are on land with less than 15% slope and with soils moderately
to well suited for on-site septic. They also are located near where the
access road joins Route 100 in order that less of the road would need to be
repaired, maintained, or extended in order to access the housing by vehicle.
F&W
ONS
northern Hall Lot parcel owned by Farm & Wilderness. It is a wooded site
AD
F&W ROAD
COMM
on a part of the hillside that levels off for an approximately 3,500-square-
foot area. It is adjacent to the access road prior to any of the culvert RO
SS
washouts. Vehicle access would require repairing a small section of road
CE
The second site is located on the Commons lot that Farm & Wilderness does
WELCOME
CENTER WELCOME
WELCOME CENTER
MAIN
Not for construction. Part of a student project and not based on a legal survey.
CENTER PARKING
MAIN MAIN
PARKING PARKING
WELCOME
CENTER B.D.C.
Marquis | Rosenwinkel
PARKING
MAIN PLAY AREA
SPRING 2022
PARKING
HOUSING ACCESSIBLE
TRAIL ACCESSIBLE HOUSING ACCESSIBLE HOUSING
TRAIL TRAIL
HOUSING
ACCESSIBLE
TRAIL
VIEWING
PLATFORM
Design Alternatives
401 Farm And Wilderness Rd, Plymouth, VT 05056
Farm and Wilderness, Inc
This design makes the most of existing conditions and In this design, parking is relocated from the first leg This concept makes use of the interesting topography In this concept, Farm and Wilderness road is rerouted
infrastructure to minimize disturbance in other areas. The of the loop road to the kettle pond, removing it from and natural features of the site to create a playscape to approach the Welcome Center more directly, which
Welcome Center is sited on an existing graded pad near the the arrival sequence. The lot accommodates up to that greets visitors on their first arrival. In this is sited on the flat, cleared area east of the maintenance
entrance so it is immediately visible upon arrival. A main lot 100 vehicles and harvests the strong solar irradiation alternative, the Welcome Center is sited on the building. Parking in this design is split between the
accommodates parking for the Welcome Center and Barn with PV shades. The Welcome Center rises over a long highpoint at the north of the site, which has beautiful right and left sides of the road, with a lot specifically
Day Camp Dropoff, and additional parking is sited near the view of green landscape features like a vegetated views out over the reservoir. A reinforced turf, intended for Barn Day Camp dropoff and a 40 to
solar array. Bunkhouses and cabins accommodate at least 50 bioretention basin and a relocated soccer field around permeable parking lot provides parking for Barn Day 50-person lot northwest of Farm and Wilderness Road
additional people in the Woodward Arrival area. An accessible the first leg of the loop. Housing is minimal in this Camp dropoff as well as the Welcome Center, with for the Welcome Center. This design also incorporates
trail traverses across the fair fields, through the woods near design, so more capacity may be needed in other places several spaces tucked into the slope on the other side a reinforced turf lawn for overflow parking. Elements
Barn Day Camp, to a viewing platform along the reservoir. on the property, like at the Hall Lots. An accessible of Farm and Wilderness Road to provide direct access from the other alternatives could be incorporated into
trail loops through wildflower meadows that frame the to the Welcome Center. This concept supports about this design to meet housing and access goals.
fairgrounds and leads to the reservoir swimming area. half of the housing needs in the Woodward Area in a
bunkhouse and cabins, so housing for 20 to 30 would
be needed elsewhere on the property. There are also
gardens and a “natural” playscape that could be
available to the public when appropriate, in addition
to the accessible trail, which switchbacks up the west-
facing slope to provide access to the Forest Legacy
Land.
16/29
Final Design: Overview HOUSING
MAIN PARKING LOT
WELCOME CENTER
Not for construction. Part of a student project and not based on a legal survey.
Marquis | Rosenwinkel
SPRING 2022
Final Design: Overview
401 Farm And Wilderness Rd, Plymouth, VT 05056
Farm and Wilderness, Inc
The final design welcomes visitors to Farm & Wilderness with an experience that is engaging, inviting, and reflective of the Final Design...................................................... 18 - 19
values of the Farm & Wilderness community. The Welcome Center greets visitors at the first turn on F&W Road, framed by stands
of trees and gardens. The parking lot, while located in a similar position to its current location, is lined by trees and planted Welcome Center.............................................. 20
stormwater swales, therefore helping to naturalize it within the landscape. Four new buildings for year round staff housing are
sited on flatter locations north and east of F&W Road and provide staff with privacy and a place to connect with one another. Natural Play Area............................................. 21
ADA accessible paths connect the parking lot, Welcome Center, and Barn Day Camp. An ABA accessible path extends from Main Parking Lot.............................................. 22
the Welcome Center, through gardens, meadows, and woods, to a viewing platform over Woodward Reservoir. Patios, decks,
interactive gardens, and play spaces connect buildings and parking to the landscape, providing opportunities to engage with Housing............................................................ 23
the natural beauty of Farm & Wilderness.
Universal Access Trail...................................... 24
Maintenance Building & Staff Parking........... 25 17/29
Final Design
1 Welcome Center 5 25-Vehicle Permeable Parking Lot
The Welcome Center greets visitors at the first turn of Farm & A 25-vehicle capacity parking lot for seasonal staff vehicles is sited
Wilderness Road. It is immediately visible upon turning onto north of the maintenance building, below the solar field, in an area
5
the road, making it a clear destination. Trees and gardens that is already cleared and relatively flat. The parking lot allows
planted around the building help to blend it with the landscape. most seasonal staff vehicles to be out of sight of visitors. Since this
Constructing the building on an existing gravel pad minimizes lot is adjacent to a steep slope that runs down to Reservoir Brook, it
the need to clear land for construction, though some regrading is is important that some or all of it is built with a permeable surface.
necessary. The building is oriented with the roof facing south for
solar gain. 6 Adjusted Entrance to Maintenance Building
Not for construction. Part of a student project and not based on a legal survey.
A berm fully screens the current long sightline to the maintenance
2 Year-Round Housing building from the first turn of Farm & Wilderness Road. Vehicles 6
Year-round housing for fifty staff is incorporated into multiple approaching from the main entrance must take a 90 degree turn to
buildings that run northeast to southeast of Farm & Wilderness enter the driveway. This aims to improve intuitive wayfinding by
Road. Clusters of staff housing with communal outdoor spaces making the entrance to the maintenance facility feel less prominent
creates a village feel. Since office space is moved to the Welcome to new visitors.
Marquis | Rosenwinkel
Center, the current office building to the southeast is converted
to housing for six to eight people. A dormitory style building with 7 Accessible Trail
SPRING 2022
capacity for 16 people is sited adjacent to this converted building. A berm fully screens the current long sightline to the maintenance 3
A path runs to the north from these buildings to another group of building from the first turn of Farm & Wilderness Road. Vehicles
staff housing structures. A similarly sized dormitory building with approaching from the main entrance must take a 90 degree turn to
capacity for sixteen people is sited on a raised, flat and cleared enter the driveway. This aims to improve intuitive wayfinding by 2
area east of the maintenance building. Two smaller cabins are built making the entrance to the maintenance facility feel less prominent
in the woods on the hillside from the logging road which leads to to new visitors. 1
the Buehl House. The dormitory-style buildings can accommodate
larger groups while the smaller cabins can be used for staff that 8 Wildflower Meadows
require more privacy or can be rented to small groups as needed. 4
Pollinator-friendly meadows frame the fair fields, creating greater
habitat value than the currently mown lawn, and insulating
3 83-Vehicle Parking Lot campers from the road. The densely vegetated meadows also
An 83-vehicle capacity parking lot is designed to maximize discourage geese from the area and therefore provide greater 8
efficiency, manage stormwater, and provide easy and safe access opportunity for grazing livestock.
to the rest of Farm & Wilderness. Although still very visible upon
arrival, the parking lot is buffered from the road by a vegetated
swale lined with trees. Paths span the length of the parking lot,
helping to minimize vehicle and pedestrian conflict. The parking lot
lanes are paved while the stalls are semi-pervious reinforced turf 7
Final Design
A garden interspersed with rustic play features extends south
from the Welcome Center, inviting visitors out into this part of the
landscape. The gardens include native vegetation beneficial for
pollinators, birds, and other wildlife in addition to edible plants
that can be gathered by office staff, visitors, and Barn Day Camp
campers. Play features are built into slopes, inspiring creative
movement across the rolling topography. The gardens and
playscape are sheltered from the parking lots, but adjacent to the
Welcome Center and the ABA trailhead, making it highly accessible
and visible for visitors. At the same time, it is screened from Barn
Day Camp and at a lower elevation, thus allowing separation and
privacy
18/29
SOLAR ARRAY
Final Design
K ROO
16-PERSON BUNKHOUSE
I R B
STAFF GARDEN BEDS
00
VO
1
ER
TE
ROAD
RES
ROU
S S
NE
D ER
WIL
M&
FAR
KETTLE
POND
DAM SPILLWAY
WELCOME CENTER
PERGOLA AND PATIO
GARDEN PLAY AREA
FAIR BARN DAY CAMP
TERRACES FIELDS
MEADOW
ACCESSIBLE TRAIL
OBSERVATION DECK 16-PERSON BUNKHOUSE
RENOVATED FARMHOUSE
GATHERING SPACE
WOODWARD RESERVOIR
Marquis | Rosenwinkel
Final Design
SPRING 2022
Farm and Wilderness, Inc
401 Farm And Wilderness Rd, Plymouth, VT 05056 Not for construction. Part of a student project and not based on a legal survey.
19/29
PERGOLA
Welcome Center
1 Welcome Center
The Welcome Center is visible soon after turning onto Farm and Wilderness Road
from Route 100, making it a clear destination and focal point on the landscape.
The building is close to the parking lot to the north and sidewalks help to separate
pedestrians from vehicles. Accessible paths connect the Welcome Canter to Barn
Day Camp and a longer out-and-back trail that leads to an overlook of Woodward
Reservoir. Constructing the Welcome Center on an existing gravel pad minimizes 6
clearing that would be required for construction in undisturbed areas.
Not for construction. Part of a student project and not based on a legal survey.
2 Gathering Space
An arbor frames the transition from the Welcome Center porch to an outdoor gravel
patio that could be used as an outdoor classroom or lounge. A pergola built from 1
rough-cut wood harvested from F&W's property provides shelter over a circle of cut
log seats for planned gatherings, and additional tables and seating allow employees 5
Marquis | Rosenwinkel
and visitors to enjoy a break outdoors. This area is shaded from the south by the
existing sugar maples that once flanked the approach to F&W.
SPRING 2022
3 Garden Play Area
The corner gathering space transitions south into a nature-inspired play area with
play structures made from materials found on site, like boulders and logs from trees
removed during construction. The design prioritizes loose parts and adventure play
with varying levels of challenge for different age groups.
6
4 Terraces
2
The berm to the north side of the old entrance road is removed to create seat-height
terraces that define the space to the southeast of the Welcome Center, creating an
amphitheater-like effect for larger gatherings.
5 Esker Orchard 4
A grove of mixed fruit trees is perched on top of the berm to the east of the Welcome
Welcome Center
watching soccer games in the kettle pond.
3
6 Bioretention Basins
Bioretention basins collect and filter stormwater runoff from the parking lots
and Welcome Center roof, also adding visual interest and habitat for birds and
pollinators. Overflow drains help to prevent flooding during extreme weather TERRACES
events.
0 20 40 60 80 20/29
Natural Play Area
1 Maple Climber SECRET CAVERN
The aging maple trees located on top of the berm on the north side of the old road
have been removed, as their age and declining health mean they pose a safety
hazard. In this design they are given new life by transforming the limbs into a
climbing structure. Inspired by a structure at the Missouri Botanical Garden.
2 Stump Steps 1
Tree trunks removed during construction are bucked and set into the hillside at
Not for construction. Part of a student project and not based on a legal survey.
uneven heights to create challenging stairs.
2
3 Secret Cavern
At the top of the steep hillside to the east of the play area, a small area is
Marquis | Rosenwinkel
excavated, reinforced with stone, and covered with a turf roof to create a kid-sized
play cave. This cave should be engineered with safety in mind.
SPRING 2022
4 Sand Pit
The natural low point in the topography is filled with sand--a geologically
appropriate feature that offers a chance for kids of all ages to dig, fling, construct,
and destroy. 6 4
5 Woven Tunnel
Campers can help construct a tunnel woven from live twigs and watch their
creation grow year after year, even as they outgrow it.
5
6 Hill-slide
The hill-slide is the fastest way from the top of the hillside to the bottom of the
3
sand pit.
21/29
0 20 40 60 80
Main Parking Lot
1 Bioretention Swales 3 Paved Two-Way Traffic Lanes
Two bioretention swales run the length of the Each parking aisle is 26 feet wide and allows for
parking lot, intercepting and cleaning stormwater two-way traffic. Access to the parking lot from Farm
runoff from the parking lot and esker to the east. & Wilderness Road is allowed at the most southern
The swales are planted with a combination of and northern points of the parking lot creating easy
understory plant species and small trees which are and clear movement through the parking lot. 1
all drought and flood tolerant. The trees provide
shade for cars and buffer the parking lot from initial
arrival views. The swales move water south to a 4 83 Reinforced Turf Parking Stalls
detention basin southeast of the Welcome Center,
Not for construction. Part of a student project and not based on a legal survey.
83 parking stalls nine feet wide by eighteen feet
which overflows to a second detention basin on the
long are aligned in three curving rows east to west.
other side of Farm & Wilderness Road.
Reinforced turf allows stormwater to permeate
and gives the parking lot a greener appearance. 83
2
spaces provide enough parking for office staff, Barn
2 Accessible Paths with Minimal Day Camp parents, and a few visitors.
Traffic Crossings
Marquis | Rosenwinkel
ADA paths run alongside the easternmost
SPRING 2022
vegetated swale and the middle line of gardens 5 4 Accessible Parking Stalls
and trees. They also run alongside the adjacent 4 additional parking stalls provide accessible
parking stalls, making them easily accessible. parking close to the Welcome Center without
Their adjacency to the swales and trees provides requiring any traffic crossings. Three of the four 3
visitors with shaded and green walkways as they spaces are wider and are adjacent to an access
make their way south to the Welcome Center or aisle, making them van accessible.
Day Camp. The easternmost walkway requires zero
traffic crossings and western walkway requires one
traffic crossing in front of the Welcome Center.
4
A'
A
REINFORCED TURF STONE- VEGETATED PATH TO BDC
BIORETENTION SWALE
PARKING STALL DUST BERM 5
PATH
FILL TURFGRIDS WITH
TOPSOIL AND TOP WITH
SEED
CONCRETE CELLULAR
TURFGRID
2" SAND BASE
4X ZOOM 4" AGGREGATE SUB-BASE WELCOME CENTER
22/29
PREPARED SUBGRADE
Housing NORTH HOUSING
The Woodward Arrival Area could support housing for the goal of 50 people through 1
a combination of new buildings and conversion of existing structures. Development
density helps reduce disturbance and creates the feel of a village. The North Housing
node accommodates up to 24, and the South Housing node accommodates up to 26.
North Housing
1 Bunkhouse and Cabins
Not for construction. Part of a student project and not based on a legal survey.
A bunkhouse looks out over the mountains and reservoir from the high point
at the northeast corner of the arrival area can accommodate up to 16 people.
Two smaller cabins located north of this duplex along the forest road can
accommodate up to 4 people each, but would be comfortable for a single
person or couple if a more private accommodation is desired.
Gathering Space
Marquis | Rosenwinkel
2
A fire pit and patio offer space for staff to unwind and connect after work and 2
SPRING 2022
SOUTH HOUSING
on weekends.
The forest road is expanded and surfaced with gravel to create a driveway and
A
parking for five vehicles close to the bunkhouse. The forest road continues to NEW
E
provide access to the private cabins, as well as the proposed Buehl triplex that BUNKHOUS
is currently in development. PATHWAYS
7
South Housing
E
SHARED
FARMHOUS
accommodate approximately 10 beds. An additional bunkhouse is placed VIEW OF NORTH HOUSING FROM F&W ROAD BACKYARD
6
Housing
The new bunkhouse incorporates a porch that offers a scenic view north of
Killington. The two bunkhouses share a side/backyard. Perhaps an outdoor
kitchen or pizza oven?
7
Driveway, Paths, and Parking PARKING
The existing driveway provides access to the bunkhouse and farmhouse, and
there is room for 6 to 7 cars to park without need for significant expansion of
the driveway. A crushed-stone-surfaced pathway connects the north porch of
the new bunkhouse to the gathering space west of the farmhouse.
A
23/29
Universal Access Trail
Trailhead Kiosk Through the Woods Below Barn Day Camp
Signs for the trail begin near the parking lot, guiding visitors to a The trail then winds into the mixed conifer and deciduous forest
more detailed trailhead kiosk just south of the welcome center. The to the southwest of Barn Day Camp, making its way south towards
kiosk incorporates important information about the accessibility the shore of Woodward Reservoir. This area is quite steep and will
of the trail to allow users to make informed decisions on whether require careful construction to avoid erosion on the hillside. The
it suits their abilities. This information should include the trail trail runs parallel to contour, slowly lowering in elevation until it
length, type of surface, typical and minimum tread width, typical reaches a lake viewing platform with a view out to the dwarf-shrub
and maximum running slope, and the typical and maximum cross bog.
slope. The kiosk is also an opportunity to share information with TRAILHEAD KIOSK
visitors about Farm & Wilderness, the natural environment, and the
Not for construction. Part of a student project and not based on a legal survey.
Indigenous and colonial history of people on the landscape. To a Lake Viewing Platform
A raised lake viewing platform stretches from the trail out above
the shore, providing an area of rest and observation overlooking
Alongside the Fair Day Berm the water and the rare dwarf shrub bog which floats just to the
The trail begins framed by meadow and gardens near the playscape. south. The quiet inlet of the reservoir is a place for solitude and rest,
Marquis | Rosenwinkel
It then slowly climbs the hillside that serves as seating for Fair Day surrounded by woodlands and the water. The lake viewing platform
ALON G
events. The trail moves mostly parallel with contours, to maintain allows universal access to view a habitat that rarely is accessible to
SPRING 2022
slopes that are compliant with ABA standards. It slowly gains those with limited mobility. S ID
ET
elevation, leading to expansive views across the fair fields and out
HE
over the area surrounding the Welcome Center.
FAIR DAY B
ER
M
Farm & Wilderness Accessible Trail
Specifications
P
Y CAM
• Distance to Lake View
DA
· 1000 feet
ARN
• Trail width
WB
ELO
· 3.5 feet
SB
O OD
EW
· 10% for 10 feet H TH
· 5%
• Surface Material
VIEW ING PLATFORM
· Compacted Stone Dust LAKE
A
TO
24/29
Maintenance Area & Staff Parking
1 Entrance to Maintenance Facility 3 Staff Gathering & Gardens
The access to the maintenance building from F&W Road is shifted A 15-foot-by-15-foot patio is tucked into the a south corner of the
approximately 30 feet to the east. Wayfinding becomes more clear, maintenance building, providing a gathering and resting space for
as this removes the long sightline to the maintenance building that Farm & Wilderness staff who work in the building. Raised planting
makes it so prominent upon arrival. The entrance does become more boxes hem in the patio from the road and line the outside wall
visible to drivers as they get closer. This entrance is also aligned with adjacent to two parking spaces. The planting boxes help to soften the
an access point to the main parking lot in order to create flexible edges of the building, knitting it into the landscape.
movement for larger vehicles and trailers.
Not for construction. Part of a student project and not based on a legal survey.
2 25-Vehicle Capacity Overflow Staff Parking
25 parking stalls, 10 feet wide by 20 feet long, are sited north of the 2
maintenance facility and below the solar field. This site is already
relatively flat, clear, and compacted. The stalls allow room for vans
and pickup trucks and provide a space for seasonal staff vehicles to
Marquis | Rosenwinkel
be parked away from the arrival experience. The trash and recycling
containers are moved to the southwest of the maintenance building.
SPRING 2022
Since this lot is adjacent to a steep slope that runs down to Reservoir
Brook, it is particularly important that it has a permeable surface.
Additionally, vegetated bioswales and buffers around the parking lot
help to intercept stormwater before it flows down the slope to the
brook.
25/29
Grading & Stormwater Plan
Parking Lot and Welcome Center Grading
The parking lot is sited on an area that is currently 3 to7 feet lower in elevation than the proposed location of the Welcome
Center. The design proposes regrading this site to have more gradual elevation change in order to allow more universally
accessible paths and movement from the parking lot to the Welcome Center.
The parking lot area is filled 1 to 4 feet higher than its current elevation Because of this the road is also raised slightly in order
to be near the same elevation as the parking lot. The parking lot lowers in elevation north to south, with the middle slightly
raised in order to shed water out towards the two bioretention swales. The existing gravel pad that the Welcome Center is
Not for construction. Part of a student project and not based on a legal survey.
sited on is lowered approximately 2 feet in order to meet the grade of the adjacent parking lot.
Marquis | Rosenwinkel
This is true for the path that runs up the berm to the east of the parking lot. The path slowly works uphill. It then approaches
SPRING 2022
the stepped retaining walls, which creates terraces that allow greater room for the path to traverse.
Stormwater System
The two bioretention swales running north
to south alongside the parking lot are
graded to be between 1 to 2 feet in height.
The sides of the swales are less than 33%
in slope, which is the angle at which soil
begins to erode without support from
plants and boulders. The swales drain
south into vegetated detention basins
graded to be 3 to 5 feet in depth.
CHANNEL FLOW
This grading plan is conceptual. Further input from an engineer and landscape architect would be needed to
determine the precise grading needed to accommodate the design. A more detailed grading plan may also reveal
DETENTION BASIN changes needed in the design such as path alignment and stormwater drainage.
26/29
Planting Palettes
Bioswales and Detention Basins
The selected trees, shrubs, and understory plants are capable of growing in both moist and dry conditions, making them well equipped for the varying moisture
conditions in the bioswales and detention basins. These plants are also chosen for the benefit they provide to pollinators, birds, and small mammals, as well as their
complimentary color and textural characteristics through the seasons.
understory
Not for construction. Part of a student project and not based on a legal survey.
Marquis | Rosenwinkel
tree shrub
SPRING 2022
elderberry golden Alexander cardinal flower switch grass
Perennial Garden
This list comprises a mix of reliable native and non-native perennial plants that form complementary
Planting Palettes
within the context of a more orderly landscape. They can be planted densely to minimize the sunlight
that reaches the ground, thus diminishing the germination of unwanted plants in the seedbank.
Not for construction. Part of a student project and not based on a legal survey.
shrub
Marquis | Rosenwinkel
Orchard
SPRING 2022
These fruit trees and shrubs were selected for their affinity for sandy, well-drained soil, cold hardiness, and ripening time. While unconventional choices for an orchard,
their fruits will be more likely to ripen in time for campers to enjoy before returning home for the summer.
showy goldenrod
28/29
sundial lupine
Construction Details & Precedents
Tree Planting ABA Trail Playscape Reinforced Turf Bioretention Swales
Not for construction. Part of a student project and not based on a legal survey.
An ABA trail made of compacted stone dust Playscapes can utilize materials already found Concrete-block, reinforced turf creates a Bioswales in the parking lot at the Missouri Botanical
provides a solid, durable, and universally across the landscape such as logs and boulders, permeable surface and softens the typical Gardens are spanned by wooden bridges. The Design in
accessible footpath. Typically, the gravel base reorganizing them into creative shapes and utilitarian appearance of parking lots. this plan incorporates several similar bridges that allow
is 4 to 6 inches deep and lined underneath by a purposes. Like in the design, the above photo visitors to Farm & Wilderness to cross these vegetated
Image: Custom Stoneworks & Design, Inc.,
protective weed barrier fabric. shows logs that create a playful edge to a sand swales and experience them from a slightly elevated
Baltimore, MD
pit, that are also fun to balance on. Using found position.
Image: Timber and Stone, LLC | Spruce Peak
material is more sustainable and blends the
Pathways, Stowe, VT Image: Pashek + MTR | Missouri Botanical Garden, St.
Marquis | Rosenwinkel
playscape into its surrounding environment.
Louis, MO
Image: Anne O'C. Albrecht Nature Playscape, St.
SPRING 2022
Louis, MO