Professional Documents
Culture Documents
__________________________________________________________________________________
CASE STUDY
MAINTENANCE IMPLEMENTATION IN INDUSTRY
COURSE NAME:
MAINTENANCE MANAGEMENT SYSTEM
BBJ31604
NAME
MATRIC NO
DATE
BBJ31604 - Maintenance Management System (MMS) Case Study
1. Objectives
To familiarize the student about:
i. Implementation of maintenance system or activities in industry.
ii. Writing technical reports.
iii. Presentation of the findings.
2.3. Please refer to Case Study Technical Report Rubric form uploaded in Author system
and sample of technical report format.
2.5. Please refer to Case Study Presentation Rubric form uploaded in Author system.
2.6. Case Study Checklist Psychomotor and Affective need to be filled and verified by
industry supervisor.
3. Submission
3.2. Submit the technical report, presentation slide, link video, all filled evaluation forms
including the logbook to Author system before 16 July 2022, 11:55 PM.
3.3. Please refer to overall submission checklist form for BBJ31604 subject.
BBJ31604 - Maintenance Management System (MMS) Case Study
Please
No Items Action by Due Date
Tick
16 July 2022
11:55 PM
3. Logbook Student