You are on page 1of 2

University of Santo Tomas

Mechanical Engineering Club

Meeting

Date: April 28, 2020 Venue: Google Meet

Time started: 4:00 PM Time ended: 6:00 PM

ATTENDEES:

5ME and professors.

AGENDA:

1. Transcript of records and diploma


- No final announcement from the Office of the Registrar.
2. Special term
- If there will be a special term, it will be for the whole month of July.
3. INP Grade
- The student will be given an INP grade if the student did not submit the requirements due to
intermittent connection, mental health issues and financial issues.
- The student will be given an INP grade if he/she submitted complete requirements but the
computed GWA did not meet the passing grade or cut-off.
- If the computed GWA is near the cut-off, the student will be put on deliberation.
- If the computed GWA is far from the cut-off, the student can have a remedial examination
from the professor. The student will be given a sufficient time to study.
- INP grade will not show up on portal, will wait instead till December to complete the
requirements given. Once completed, the INP grade will be replaced with a numerical grade.
- For graduating students, the deadline for submission of requirements is until May 31, 2020.
4. ME Department
- The department wants to start giving problem sets at the start of the week which will be
submitted the end of the week.
- The faculty department will upload the revised course plan of their respective subjects.
5. Prime
- No announcement yet from Prime.
- P2,000 is non-refundable.
- Need for clarification: Refund and review classes. Others are fully paid while others are not
yet
- Is everyone willing to go to review classes once PRIME has resumed operation? *Risky and
unable to focus
6. Board Examination
- Definitely there would be no August board examination.
- No official announcement regarding the June, July and August board examinations.
- There would be no mock boards.
7. OJT
- Enroll OJT for special term, no problem if 240-hour requirement is not completed. More on
project based. ME Department will conduct a meeting along with company for the project
based.
- Minimized on-site activity because of pandemic
- Can be done through webinar
- There are 20 existing moa with company from ME department.
- If there’s no existing MOA, the company must coordinate with the department for the
proposed project-based.
- Parents must be willing to sign a waiver for the students.
- OJT adviser: Sir Maraña
8. Power Plant
- Passing powerplant – 60%
- Gradable assessment: 100 maximum score for the first problem set.
9. ME Lab:
- Possible lab reports to be submitted: 1-2
- There would be an alternative learning activity.
University of Santo Tomas
Mechanical Engineering Club

10. ME LAW:
- Is it required to add a summary of the subject or how the subject was understood at the end
of the chapter? (no need)
- No changes should occur, background will suffice. Make presentation look better
- Progress report must be detailed.
- There are research materials about the chapter that will help address this issue
- Process of consultation for 5E to 5A & 5C: If there are concerns or chapters applicable for
hvac or fire pro for instance, the group assigned to those specific topics will assess that part of
5E’s work.
11. ENE
12. Sir Macalolot will upload the revised course plan.
13. Thesis
- Grading system
- 60% – from adviser
- 40% – from peer

You might also like