Electrical Meter and Maximum Load List for Offices

Prepared by: MEP Department Date: 12-May-2013


METER QUANTITY (SHOP DWG) TOWER -B
METER QUANTITY (SHOP DWG) TOWER -A
SL. Max. CB SL. Max. CB
FLOORS SERVING AREA QTY FLOORS SERVING AREA QTY
NO KVA Amp. NO KVA Amp.
1 2nd floor Commercial office # 1 5 30 1 1 2nd floor Commercial office # 4 5 30 1
Commercial office # 2 5 30 1 Commercial office # 5 5 30 1
Commercial office # 3 5 30 1 Commercial office # 6 5 30 1
Cafetria 2*35 100 2
2 3rd floor office # 1 20 60 1 2 3rd floor office # 6 27.0 60.0 1
office # 2 30 60 1 office # 7 18.0 60.0 1
office # 3 20 60 1 GYM Space 45+25 100+60 1
office # 4 13 30 1 GYM Elevator 10 30 1
office # 5 28 60 1
3 4th floor - 9th floor office # 1 20 60 6 3 4th floor - 9th floor office # 7 30 60 6
office # 2 30 60 6 office # 8 40 100 6
office # 3 20 60 6 office # 9 27 60 6
office # 4 13 30 6 office # 10 14 30 6
office # 5 28 60 6 office # 11 13 30 6
office # 6 37 100 6 office # 12 43 100 6
4 10th floor office # 1 23 60 1 4 10th floor office # 7 30 60 1
office # 2 30 60 1 office # 8 38 100 1
office # 3 20 60 1 office # 9 27 60 1
office # 4 13 30 1 office # 10 14 30 1
office # 5 28 60 1 office # 11 13 30 1
office # 6 37 100 1 office # 12 40 100 1
5 11th floor office # 1 23 60 1 5 11th floor office # 7 20 60 1
office # 2 30 60 1 office # 8 39 100 1
office # 3 20 60 1 office # 9 24 60 1
office # 4 13 30 1 office # 10 14 30 1
office # 5 24 60 1 office # 11 13 30 1
office # 6 20 60 1 office # 12 31 100 1

6 12thfloor office # 1 23 60 1 6 12thfloor office # 7 20 60 1


office # 2 30 60 1 office # 8 39 100 1
office # 3 20 60 1 office # 9 24 60 1
office # 4 13 30 1 office # 10 14 30 1
office # 5 24 60 1 office # 11 13 30 1
office # 6 20 60 1 office # 12 31 100
7 13thfloor office # 1 23 60 1 7 13thfloor office # 7 20 60 1
office # 2 30 60 1 office # 8 39 100 1
office # 3 20 60 1 office # 9 10 30 1
office # 4 13 30 1 office # 10 21 60 1
office # 5 24 60 1
office # 6 20 60 1
8 lower roof office space 52 100 1

Breaker Amp 30 60 100


Cable Size 4Cx16 +10 (Earth) 4Cx25 + 16 4Cx35 + 16

Kindly Note:
1- The cable from electrical room till office to be deliverd and installed by tenant .
2- The main cable should be as per table "Reyad cables or equivalent"
3- Office internal panel main breaker should be equal or lower than MDB breaker.
4- All offices external conduits should be EMT and Flexible conduit liquid tight
5- The KVA indicated for each office is the maximum electrical load