PENETRANT TESTING REPORT


REPORT NO.: Page 1 - of - 3
CLIENT: NECO DATE TESTED: JULY 08,2022
PROJECT: PH LNG (ILIJAN) LOCATION TESTED: CARMONA, CAVITE
REF. P.O./J.O. NO SURFACE CONDITIONCLEAN AND DRY
CODE: AWS D1.1 TEST METHOD: WATER WASHABLE
ITEM INSPECTED:TENSION ROD / STRINGER BEAM TYPE: VISIBLE DYE PENETRANT
MATERIAL TYPE: CARBON STEEL CLEANER: SHERWIN
DIA / THICKNESS: PENETRANT: SHERWIN
WELD PROCESS: SMAW DEVELOPER: SHERWIN
DRAWING NO: SURFACE TEMP: AMBIENT
REF. PROCEDURE:WITCO-QCP-03 PENETRATION TIME: 5 MINS DEVELOPING TIME:5 MINS

ITEM DESCRIPTION / LENGTH


WELD JOINT INDICATIONS RESULT
IDENTIFICATION TESTED
TENSION ROD 1 250 MM NRI ACC
2 250 MM NRI ACC
3 250 MM NRI ACC
4 250 MM NRI ACC
5 250 MM NRI ACC
6 250 MM NRI ACC
7 250 MM NRI ACC
8 250 MM NRI ACC
9 250 MM NRI ACC
10 250 MM NRI ACC
11 250 MM NRI ACC
12 250 MM NRI ACC
13 250 MM NRI ACC
14 250 MM NRI ACC
15 250 MM NRI ACC
16 250 MM NRI ACC
17 250 MM NRI ACC
18 250 MM NRI ACC
19 250 MM NRI ACC
20 250 MM NRI ACC
21 250 MM NRI ACC
22 250 MM NRI ACC
23 250 MM NRI ACC
24 250 MM NRI ACC
25 250 MM NRI ACC
26 250 MM NRI ACC
27 250 MM NRI ACC
28 250 MM NRI ACC
NOTE: Attached additional sheet if necessary
EXAMINED BY: WITNESSED BY: APPROVED BY:
INSPECTION & TESTING CORPORATION
Head Office: Unit E-909, 9/F East Tower, Philippine Stock Exchange Centre,
Form No.:
Exchange Road, Ortigas Center, Pasig City 1605 Philippines
QCP.03.F01-1 Page 2 of 3
Testing & Training Facilities: Lot 1-F Sooner Farm Compound, Timbao, Biñan, Laguna
Tel. No: (632) 8571-6744|8687-1580|049-546-2200 | Email: inspection@witco.ph

PENETRANT TESTING REPORT


REXOR ALEGRE
NDT LEVEL II CLIENTS REPRESENTATIVE ASNT NDT LEVEL III/AWS CWI
INSPECTION & TESTING CORPORATION
Head Office: Unit E-909, 9/F East Tower, Philippine Stock Exchange Centre,
Form No.:
Exchange Road, Ortigas Center, Pasig City 1605 Philippines
QCP.03.F01-1 Page 3 of 3
Testing & Training Facilities: Lot 1-F Sooner Farm Compound, Timbao, Biñan, Laguna
Tel. No: (632) 8571-6744|8687-1580|049-546-2200 | Email: inspection@witco.ph

PENETRANT TESTING REPORT


INSPECTION & TESTING CORPORATION
Head Office: Unit E-909, 9/F East Tower, Philippine Stock Exchange Centre,
Form No.:
Exchange Road, Ortigas Center, Pasig City 1605 Philippines
QCP.03.F01-1
Testing & Training Facilities: Lot 1-F Sooner Farm Compound, Timbao, Biñan, Laguna
Tel. No: (632) 8571-6744|8687-1580|049-546-2200 | Email: inspection@witco.ph

PENETRANT TESTING REPORT


REPORT NO.: Page 2 - of - 3
CLIENT: NECO DATE TESTED: JULY 08,2022
PROJECT: PH LNG (ILIJAN) LOCATION TESTED: CARMONA , CAVITE
REF. P.O./J.O. NO SURFACE CONDITIONCLEAN AND DRY
CODE: AWS D1.1 TEST METHOD: WATER WASHABLE
ITEM INSPECTED:TENSION ROD / STRINGER ROD TYPE: VISIBLE DYE PENETRANT
MATERIAL TYPE: CARBON STEEL CLEANER: SHERWIN
DIA / THICKNESS: PENETRANT: SHERWIN
WELD PROCESS: SMAW DEVELOPER: SHERWIN
DRAWING NO: SURFACE TEMP: AMBIENT
REF. PROCEDURE:WITCO-QCP-03 PENETRATION TIME: 5 MINS DEVELOPING TIME:5 MINS

ITEM DESCRIPTION / LENGTH


WELD JOINT INDICATIONS RESULT
IDENTIFICATION TESTED
29 250MM NRI ACC
30 250 MM NRI ACC
31 250 MM NRI ACC
32 250 MM NRI ACC
33 250 MM NRI ACC
34 250 MM NRI ACC
35 250 MM NRI ACC
36 250 MM NRI ACC

STRINGER BEAM A-1 420 MM NRI ACC


A-2 570 MM NRI ACC
B-1 420 MM NRI ACC
B-2 570 MM NRI ACC
***NOTHING FOLLOWS***