1 2 3 4 5 REPUBLIC OF THE PHILIPPINES

1 4 1 OFFICE OF THE BUILDING OFFICIAL


8 BCS - 03
CEBU CITY
AR - 412 40575

2558 8100 10600 11000 10875 2616

2701
BCS-06 BCS-05 BCS-04 BCS - 02 RECOMMENDING APPROVAL AS TO:
BCS-01
AR - 415 AR - 414 AR - 413 AR - 411
AR - 410
HEAD ARCHITECTURAL SECTION DATE:

APPROVED:
TOILET

1909
550X250 EAD RISER 2.5 SQ.M.
FUEL PUMP

2299

2299
5.31 SQ.M. 500x400 FAD RISER 500x400 EAD RISER
-7.35M. ROOM AIR SHAFT
AIRSHAFT 600X400 FAD RISER 600X400 EAD RISER
FF-05

A D-03 A
AR-501 PWD
11 12 13 14 15 16 17 18 19 20
MECHANICAL PARKING PARKING D-02
DN BUILDING OFFICIAL: DATE:
B1 - 38-39 B1 - 36-37 B1 - 35 HWSF AR-501 FIRE EXIT 2

3200

3200
ST-01C 34.49 SQ.M. SERVICE ELEVATOR LOBBY 16.32 SQ.M. ST-02C
AREA TABULATION (GFA)
FAN ROOM -6.22M./ +44.28M. -6.00M./ +44.50M.
6.17 SQ.M. AR-515 7.71 SQ.M. AR-516
FF-04 -6.00M./ +44.50M. ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
-6.30M.
BLS-04 UP FF-04 FAN ROOM BLS-04
10 9 8 7 6 5 4 3 2 1
18.67 SQ.M. 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-09
AR - 408 -6.00M./ +44.50M. AR - 408
AR-501 20F (HALL) 792.44 SQ.M.
B D-02 B
AR-501 19F (LEASING FLOOR) 832.66 SQ.M.

BASEMENT 01 MEZZANINE PROJECTION

PLUMBING SHAFT
2600X350
D-11
AR-501 18F (LEASING FLOOR) 847.43 SQ.M.

ELEVATOR PROJECTION

ELEVATOR PROJECTION

EE CABINET
D-10
17F (LEASING FLOOR) 877.91 SQ.M.

RAMP DRIVEWAY PROJECTION


AR-501
- 7.30M. 16F (LEASING FLOOR) 900.54 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.

TRENCH DRAIN
14F (LEASING FLOOR) 950.91 SQ.M.
6150

6150
BLS-02 D-11 BLS-02 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
AR - 406 - 7.30M. AR - 406 12F (LEASING FLOOR) 1001.19 SQ.M.
FF-08 FF-04 - 6.00M. / +44.50M.
6 7 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
10F (BDO FLOOR) 1041.98 SQ.M.

8% RAMP SLOPE 9F (BDO FLOOR) 1072.98 SQ.M.


DN
B1 - 33-34 8F (BDO FLOOR) 1089.09 SQ.M.
C C 7F (BDO FLOOR) 1111.71 SQ.M.
DN
- 7.30M. 6F (BDO FLOOR) 1134.34 SQ.M.
5F (BDO FLOOR) 1185.72 SQ.M.
ELEVATOR LOBBY 234.71 SQ.M.
MECHANICAL 4F MEZZANINE (PROVISION)
9.36 SQ.M.
-7.20M. B1 - 31-32 PARKING
FF-07 4F (BDO FLOOR) 1185.72 SQ.M.
LOCATION
3F MEZZANINE (PROVISION) 234.71 SQ.M.
B1 - 16 B1 - 15 B1 - 14 B1 - 13 B1 - 12 B1 - 11 B1 - 10 B1 - 09
6325

6325
3F (BDO FLOOR) 1229.58 SQ.M.

RAMP GOING DOWN TO B2


FF-03 2F MEZZANINE (PROVISION) 234.71 SQ.M.
6% RAMP SLOPE
32096

BLS-01 BLS-01 2F (BANK BRANCH) 1149.72 SQ.M.


B1 - 29-30
AR - 405 AR - 405 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.

39918
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE PROJECTION B1 MEZZANINE 288.80 SQ.M.

D-09
B2 (PARKING) 1595.01 SQ.M.
AR-501 BASEMENT 01 B3 (PARKING) 1595.01 SQ.M.
3530

- 6.00M. / +44.50M.
F

4000
MATERIAL RECOVERY FACILITY ESCALATOR PIT B4 (PARKING) 1595.01 SQ.M.
PROJECTION FF-08
30.52 SQ.M. B1 - 27-28
-4.95M./ +45.55 3 LOADING
B5 (PARKING) 1595.01 SQ.M.
FF-07
B6 (PARKING) 1330.63 SQ.M.
UNDERGROUND PARKING

- 6.00M. / +44.50M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
RAMP GOING UP TO

PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
2343

FF-04
B1 41 SLOTS
G UP
B2 40 SLOTS
- 4.80M. / +45.70M.
B1 - 25-26 B3 40 SLOTS
B4 40 SLOTS

B1 - 01 B5 40 SLOTS
2761

B1 - 02
B1 - 03 B6 25 SLOTS
B1 - 04 F TOTAL NO. OF PARKING PROVIDED 238 SLOTS
B1 - 23-24 TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
B1 - 05 B1 - 06
B1 - 07 SCHEDULE OF FLOOR FINISHES
B1 - 08
FF-04 300MMX300MMX12MM WAFFLE TYPE ANTI-SLIP CONCRETE PAVER
4 5 D-11
AR-501
FAN ROOM FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
3563

8.46 SQ.M.
- 4.80M. / +45.70M. 6164 600MMX1200MM WABI SABI TAUPE LAPATTO RECT
FF-08
FF-07
- 4.80M. / +45.70M. G FF-12 600MMX600MM ESP670 PETRALAVA MARFIL
BLS-03 FF-08 - 4.80M. / +45.70M. BLS-03

TRENCH DRAIN
AR - 407 AR - 407
6% RAMP SL B1 - 21-22
OPE HATCHING LEGENDS
1926

AIRSHAFT UP REINFORCED CONCRETE WALL

MECHANICAL
FF-04
B1 - 19-20 PARKING

6030
LOCATION 4" ECOPANEL
3
- 6.00M. / +44.50M.
23
MECHANICAL PARKING
B1 - 17-18

2540 8100 10600 11000 10875 2872 NOTES (FLOOR LEVEL REFERENCE)

A BASEMENT 01 FLOOR PLAN 40575 LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
AR - 201 1 : 100 2 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
BCS - 03 BCS-01 BCS-06 BCS-05 BCS-04 BCS - 02 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 412 AR - 410 AR - 415 AR - 414 AR - 413 AR - 411 PLANS
1 2 5
4
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:16 PM
ARCHITECT BASEMENT 01 FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 201
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
1 2 3 4 5 REPUBLIC OF THE PHILIPPINES
1 4 1 OFFICE OF THE BUILDING OFFICIAL
8 CEBU CITY
40575
BCS - 03
8100 10600 11000 10875
AR - 412
BCS-01 BCS-06 BCS-05 BCS-04 BCS - 02 RECOMMENDING APPROVAL AS TO:
AR - 410 AR - 415 AR - 414 AR - 413 AR - 411

5000
HEAD ARCHITECTURAL SECTION DATE:

APPROVED:
550X250 EAD RISER
500x400 FAD RISER 500x400 EAD RISER AIRSHAFT
AIRSHAFT 600X400 FAD RISER 600X400 EAD RISER

A A
11 12 13 14 15 16 17 18 19

DN D-02
AR-501
BUILDING OFFICIAL: DATE:
FIRE EXIT 01 FIRE EXIT 2

3200

3200
14.67 SQ.M. SERVICE ELEVATOR 16.32 SQ.M. AREA TABULATION (GFA)
ELEVATOR PIT 03
7.72 SQ.M. -3.00M. / +47.50M.
-3.00M. / +47.50M. FF-03 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
BLS-04 UP BLS-04
10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
AR - 408 AR - 408
20F (HALL) 792.44 SQ.M.
B B
19F (LEASING FLOOR) 832.66 SQ.M.
D-06
18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
TELCO 1 17F (LEASING FLOOR) 877.91 SQ.M.
ELEVATOR PIT 02 ELEVATOR PIT 05 11.03 SQ.M.
D-06 16F (LEASING FLOOR) 900.54 SQ.M.
MAIL & COURIER AR-501 15F (LEASING FLOOR) 925.77 SQ.M.
33.73 SQ.M.
-3.00M./ +47.50M. 14F (LEASING FLOOR) 950.91 SQ.M.
6150

6150
SECURITY OPERATIONS CENTER FF-03
BLS-02 RAINWATER FILTRATION 75.68 SQ.M. BLS-02 13F (LEASING FLOOR) 976.05 SQ.M.
17.20 SQ.M. -3.00M. / +47.50M. LOCKERS
9.45 SQ.M. TELCO 2
AR - 406 AR - 406 12F (LEASING FLOOR) 1001.19 SQ.M.
10.80 SQ.M.

6 7 ELEVATOR PIT 01 ELEVATOR PIT 04


D-06 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
AR-501
10F (BDO FLOOR) 1041.98 SQ.M.
9F (BDO FLOOR) 1072.98 SQ.M.
8F (BDO FLOOR) 1089.09 SQ.M.
TELCO 3
C D-06 D-06 10.80 SQ.M. C 7F (BDO FLOOR) 1111.71 SQ.M.

19675
D-06 AR-501 AR-501
D-06 6F (BDO FLOOR) 1134.34 SQ.M.
AR-501
HALLWAY AR-501
21547

55.24 SQ.M. 5F (BDO FLOOR) 1185.72 SQ.M.


D-06 LANDSCAPE PIT LANDSCAPE PIT D-06
AR-501 4F MEZZANINE (PROVISION) 234.71 SQ.M.
AR-501
4F (BDO FLOOR) 1185.72 SQ.M.
OPEN 3F MEZZANINE (PROVISION) 234.71 SQ.M.
TO
6325

6325
BELOW
MAIL & COURIER
3F (BDO FLOOR) 1229.58 SQ.M.
127.81 SQ.M. 2F MEZZANINE (PROVISION) 234.71 SQ.M.
RAINWATER TANK -3.00M. / +47.50M.
36.85 SQ.M. FF-03 2F (BANK BRANCH) 1149.72 SQ.M.
BLS-01 BLS-01
AR - 405 AR - 405 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.

DN B3 (PARKING) 1595.01 SQ.M.


3541

OPEN
F 1 2 3 4 5 6 7 8 9 10

4000
TO B4 (PARKING) 1595.01 SQ.M.
OPEN BELOW
B5 (PARKING) 1595.01 SQ.M.
TO
BELOW B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
OPEN
TO PARKING PROVISIONS
BELOW ESCALATOR PIT E
GF (SURACE PARKING) 12 SLOTS
2332

1921
B1 41 SLOTS
G
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS

6378
B6 25 SLOTS
F TOTAL NO. OF PARKING PROVIDED

4457
238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES

4 5 FF-04 300MMX300MMX12MM WAFFLE TYPE ANTI-SLIP CONCRETE PAVER

OPEN FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING


TO
BELOW FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

G FF-12 600MMX600MM ESP670 PETRALAVA MARFIL


BLS-03 BLS-03
AR - 407 AR - 407
HATCHING LEGENDS

AIRSHAFT REINFORCED CONCRETE WALL

4" ECOPANEL

9759
3
23
MECHANICAL PARKING
BCS - 03
AR - 412

3258 8100 10600 11000 10875 NOTES (FLOOR LEVEL REFERENCE)

LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)


40575
A BASEMENT 01 MEZZANINE FLOOR PLAN 2 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
BCS-01 BCS-06 BCS-05 BCS-04 BCS - 02 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 202 1 : 100 PLANS
AR - 410 AR - 415 AR - 414 AR - 413 AR - 411
1 2 3 4 5
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:18 PM
ARCHITECT BASEMENT 01 MEZZANINE THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
FLOOR PLAN CHECKED: DRAWN:
MMOSER ASSOCIATES
(S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 202
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
1 2 3 5 REPUBLIC OF THE PHILIPPINES
BCS-01
BCS - 03 1 4 BCS-06 BCS-05 4 BCS-04 BCS - 02
1 OFFICE OF THE BUILDING OFFICIAL
8 AR - 410 CEBU CITY
AR - 412 AR - 415 40575 AR - 414 AR - 413 AR - 411

2558 8100 10600 11000 10875

RECOMMENDING APPROVAL AS TO:

HEAD ARCHITECTURAL SECTION DATE:

APPROVED:
TOILET
STORAGE STORAGE 550X250 EAD RISER AIR
5.31 SQ.M.

2299
500x400 FAD RISER 500x400 EAD RISER SHAFT
AIR 14.93 SQ.M. 20.85 SQ.M.
FF-07 600X400 FAD RISER FF-07 600X400 EAD RISER
SHAFT

A A
PWD
PARKING
D-02
DN BUILDING OFFICIAL: DATE:
FIRE EXIT 1 AR-501
B2 - 40 B2 - 39 B2 - 38 B2 - 37 B2 - 36

3200

3200
ST-01D 15.27 SQ.M. SERVICE ELEV. LOBBY FIRE EXIT 02 ST-02E
FAN ROOM 7.71 SQ.M. 16.32 SQ.M. AREA TABULATION (GFA)
AR-515 -9.92M./ +40.58M. AR-517 FAN ROOM
6.52 SQ.M. FF-07 -9.20M./ +41.30M. -9.20M./ +41.30M.
FF-07 18.67 SQ.M. ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
-10.50M./ +40.00M. UP FF-07 -9.20M./ +41.30M.
BLS-04 FF-07 BLS-04
FF-07 20F MEZZANINE (PROVISION) 426.86 SQ.M.
AR - 408 D-02 AR - 408
20F (HALL) 792.44 SQ.M.
B D-11
AR-501 B
19F (LEASING FLOOR) 832.66 SQ.M.

PLUMBING SHAFT
2600X350
AR-501
18F (LEASING FLOOR) 847.43 SQ.M.
D-10
17F (LEASING FLOOR) 877.91 SQ.M.
AR-501
16F (LEASING FLOOR) 900.54 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.

TRENCH DRAIN
14F (LEASING FLOOR) 950.91 SQ.M.
6150

6150
D-11
BLS-02 BLS-02 13F (LEASING FLOOR) 976.05 SQ.M.
-10.50M./ +40.00M. AR-501
AR - 406 FF-08 FF-04 AR - 406 12F (LEASING FLOOR) 1001.19 SQ.M.

6 7 -10.50M./ +40.00M.
-10.50M./ +40.00M. - 9.20M./ +41.30M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
FF-07 10F (BDO FLOOR) 1041.98 SQ.M.
8% RAMP SLOPE 9F (BDO FLOOR) 1072.98 SQ.M.
DN
B2 - 35 8F (BDO FLOOR) 1089.09 SQ.M.
C DN C 7F (BDO FLOOR) 1111.71 SQ.M.
DN
-10.50M./ +40.00M.
- 10.50M./ +40.00M. 6F (BDO FLOOR) 1134.34 SQ.M.
21547

5F (BDO FLOOR) 1185.72 SQ.M.


4F MEZZANINE (PROVISION) 234.71 SQ.M.
B2 - 34
4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.

RAMP GOING TO B3
B2 - 28 B2 - 27 B2 - 26 B2 - 25 B2 - 24 B2 - 23 B2 - 22 B2 - 21
6% RAMP SLOPE
6325

6325
3F (BDO FLOOR) 1229.58 SQ.M.
FF-07 2F MEZZANINE (PROVISION) 234.71 SQ.M.
BLS-01 BLS-01 2F (BANK BRANCH) 1149.72 SQ.M.
B2 - 33
AR - 405 AR - 405 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
ELEVATOR LOBBY
8.33 SQ.M. TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
-10.40M./ +40.10M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
5891
B2 (PARKING) 1595.01 SQ.M.
- 10.91M./ +39.59M.
- 6.71M./ +43.79M. BASEMENT 02 B3 (PARKING) 1595.01 SQ.M.

34919
3530

- 9.20M./ +41.30M.

4000
B4 (PARKING) 1595.01 SQ.M.
F MAINTENANCE PERSONNEL'S PANTRY FF-08 B2 - 32
30.58 SQ.M. B5 (PARKING) 1595.01 SQ.M.
B2 - 16
B6 (PARKING) 1330.63 SQ.M.
RAMP GOING TO B1

FF-07 B2 - 17
B2 - 18 TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
B2 - 19
B2 - 20 PARKING PROVISIONS
D-10
E
GF (SURACE PARKING) 12 SLOTS
2343

AR-501

1921
- 8.00M./ +42.50M.
B1 41 SLOTS
G UP B2 40 SLOTS
B2 - 31 B3 40 SLOTS

- 8.00M./ +42.50M. B4 40 SLOTS


- 8.00M./ +42.50M. B5 40 SLOTS
2761

CONTRACTUALS LOCKER AREA


- 8.00M./ +42.50M.
B6 25 SLOTS
D-10 - 8.00M./ +42.50M.
FF-08 - 9.20M./ +41.30M. F TOTAL NO. OF PARKING PROVIDED

4458
AR-501 FF-08 238 SLOTS
B2 - 30 TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
6% RAMP SLOP
D-11 E SCHEDULE OF FLOOR FINISHES
AR-501
4 5 FF-04 300MMX300MMX12MM WAFFLE TYPE ANTI-SLIP CONCRETE PAVER

FAN ROOM FF-04 FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
3663

8.58 SQ.M.
- 8.00M./ +42.50M. FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT
UP
FF-07 G FF-12 600MMX600MM ESP670 PETRALAVA MARFIL
BLS-03 BLS-03

TRENCH DRAIN
AR - 407 B2 - 01 AR - 407
B2 - 02 B2 - 29

4536
HATCHING LEGENDS
B2 - 03
B2 - 04
1826

AIR B2 - 05 REINFORCED CONCRETE WALL


SHAFT B2 - 06
B2 - 07 D-10
B2 - 08
B2 - 09 AR-501
EE CABINET
B2 - 10
B2 - 11
B2 - 12 4" ECOPANEL
3 B2 - 13
B2 - 14
B2 - 15
23
MDF
11.67 SQ.M.

4330
-9.10M./ +41.40M. BASE BUILDING CORE
FF-07 11.69 SQ.M.
-9.10M./ +41.40M.
FF-07 FF-07

NOTES (FLOOR LEVEL REFERENCE)


2540 8100 10600 11000 10875
A BASEMENT 02 FLOOR PLAN LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
40575 2
AR - 203 1 : 100 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
BCS - 03 BCS-01 BCS-06 BCS-05 BCS-04 BCS - 02 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 412 AR - 410 AR - 415 AR - 413 AR - 411 PLANS
AR - 414
1 2 3 5
4
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:20 PM
ARCHITECT BASEMENT 02 FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 203
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
1 2 3 5 REPUBLIC OF THE PHILIPPINES
BCS - 03 BCS-01 1 4 BCS-06 BCS-05 4 BCS-04 BCS - 02
1 OFFICE OF THE BUILDING OFFICIAL
8 CEBU CITY
AR - 412 AR - 410 AR - 415 40575 AR - 414 AR - 413 AR - 411

2558 8100 10600 11000 10875 2616

RECOMMENDING APPROVAL AS TO:

HEAD ARCHITECTURAL SECTION DATE:

TOILET APPROVED:
5.31 SQ.M. AIR SHAFT

2299

2299
500x400 FAD RISER 500x400 FAD RISER
AIR SHAFT 600X400 FAD RISER 600X400 FAD RISER
FF-07 FF-07

A A
PWD
PARKING D-02
B3 - 40 B3 - 39 B3 - 38 DN B3 - 37 B3 - 36 BUILDING OFFICIAL: DATE:
FIRE EXIT 01 AR-501
SERVICE ELEV. LOBBY FIRE EXIT 02

3200

3200
ST-01D 15.39 SQ.M. ST-02E
AREA TABULATION (GFA)
FAN ROOM -13.12M./ +37.38M. 1354.80 SQ.M. 16.32 SQ.M.
6.52 SQ.M. AR-515 FF-07 -12.40M. / +38.10M. -12.40M. / +38.10M. AR-517 FAN ROOM
- 13.70M./ +36.80M. FF-07 18.67 SQ.M. ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP FF-07
BLS-04 FF-07 -12.40M. / +38.10M. BLS-04
FF-07 20F MEZZANINE (PROVISION) 426.86 SQ.M.
AR - 408 D-02 AR - 408
20F (HALL) 792.44 SQ.M.
B AR-501 B
D-11 19F (LEASING FLOOR) 832.66 SQ.M.

PLUMBING SHAFT
2600X350
AR-501
18F (LEASING FLOOR) 847.43 SQ.M.
17F (LEASING FLOOR) 877.91 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.

TRENCH DRAIN
- 12.40M./ +38.10M. 14F (LEASING FLOOR) 950.91 SQ.M.
6150

6150
BLS-02 - 13.70M./ +36.80M.
D-11 BLS-02 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
AR - 406 FF-08 FF-04 AR - 406 12F (LEASING FLOOR) 1001.19 SQ.M.
- 13.70M./ +36.80M.
6 7 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
FF-07 10F (BDO FLOOR) 1041.98 SQ.M.
8% RAMP SLOPE
DN 9F (BDO FLOOR) 1072.98 SQ.M.
B3 - 35 8F (BDO FLOOR) 1089.09 SQ.M.
UP
C DN
C 7F (BDO FLOOR) 1111.71 SQ.M.
- 13.70M./ +36.80M. 6F (BDO FLOOR) 1134.34 SQ.M.
21547

5F (BDO FLOOR) 1185.72 SQ.M.


4F MEZZANINE (PROVISION) 234.71 SQ.M.
B3 - 34
4F (BDO FLOOR) 1185.72 SQ.M.
MOTORCYCLE PARKING
ELEVATOR LOBBY 3F MEZZANINE (PROVISION) 234.71 SQ.M.
B3 - 25 B3 - 24 B3 - 23 B3 - 22 B3 - 21
6325

6325
8.49 SQ.M. B3 - 28 B3 - 27 B3 - 26
-13.60M./ +36.90M. 3F (BDO FLOOR) 1229.58 SQ.M.

26053
FF-07 2F MEZZANINE (PROVISION) 234.71 SQ.M.
RAMP DOWN GOING TO B4
BLS-01 BLS-01 2F (BANK BRANCH) 1149.72 SQ.M.
B3 - 33
6% RAMP SLOPE

AR - 405 AR - 405 GF MEZZANINE 517.71 SQ.M.


GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
BASEMENT 03 B3 (PARKING) 1595.01 SQ.M.
- 12.40M./ +38.10M.
3530

DRIVER'S LOUNGE

4000
29.69 SQ.M. B4 (PARKING) 1595.01 SQ.M.
F
RAMP UP GOING TO B2

FF-08 B3 - 32
-11.34 M./ +39.16M.
B5 (PARKING) 1595.01 SQ.M.
B3 - 16
B6 (PARKING) 1330.63 SQ.M.
FF-07 B3 - 17
B3 - 18 TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
B3 - 19
B3 - 20 PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
2343

D-10 2000 5907


- 11.20M./ +39.30M. AR-501
B1 41 SLOTS
G UP
B2 40 SLOTS
- 11.20M./ +39.30M. B3 - 31 B3 40 SLOTS
B4 40 SLOTS
MAINTENANCE PERSONNEL LOCKER B5 40 SLOTS

6378
2761

57.16 SQ.M.
-11.20M./ +39.30M.
- 11.20M./ +39.30M. B6 25 SLOTS
D-10
FF-08 AR-501 FF-08 F TOTAL NO. OF PARKING PROVIDED 238 SLOTS
B3 - 30 TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
- 11.20M./ +39.30M. 6% RAMP SLOP
E
D-11 SCHEDULE OF FLOOR FINISHES
AR-501
UP FF-04 300MMX300MMX12MM WAFFLE TYPE ANTI-SLIP CONCRETE PAVER
4 5
FAN ROOM FF-04 FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
3663

8.46 SQ.M.
-11.20M./ +39.30M. FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-07 G
FF-12 600MMX600MM ESP670 PETRALAVA MARFIL
BLS-03 - 12.40M./ +38.10M. BLS-03

TRENCH DRAIN
AR - 407 B3 - 01 AR - 407
B3 - 02 B3 - 29

4536
B3 - 03 HATCHING LEGENDS
B3 - 04
1854

AIR SHAFT
B3 - 05 REINFORCED CONCRETE WALL
B3 - 06
B3 - 07 D-11
B3 - 08
B3 - 09 AR-501
EE CABINET
B3 - 10
B3 - 11
B3 - 12 4" ECOPANEL
3 B3 - 13
B3 - 14
B3 - 15
23

STORAGE
23.77 SQ.M.
- 12.40M./ +38.10M.
FF-07

NOTES (FLOOR LEVEL REFERENCE)


2558 8100 10600 11000 10875
A BASEMENT 03 FLOOR PLAN LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
40575 2
AR - 204 1 : 100 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
BCS - 03 BCS-01 BCS-06 BCS-05 BCS-04 BCS - 02 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 412 AR - 410 AR - 413 AR - 411 PLANS
1 2 AR - 415 3 AR - 414 5
4
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:23 PM
ARCHITECT BASEMENT 03 FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 204
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
1 2 3 5 REPUBLIC OF THE PHILIPPINES
BCS - 03 1 4 4 1 OFFICE OF THE BUILDING OFFICIAL
8 CEBU CITY
AR - 412 40575

2558 8100 10600 11000 10875 2616


BCS-01
BCS-06 BCS-05 BCS-04
AR - 410 RECOMMENDING APPROVAL AS TO:
AR - 415 AR - 414 AR - 413

HEAD ARCHITECTURAL SECTION DATE:

TOILET
APPROVED:
5.31 SQ.M. AIR SHAFT

2299

2299
500x400 FAD RISER 500x400 FAD RISER
AIR SHAFT FF-07 600X400 FAD RISER FF-07 600X400 FAD RISER

A A
PWD
PARKING
D-02
DN BUILDING OFFICIAL: DATE:
B4 - 40 B4 - 39 B4 - 38 FIRE EXIT 01 B4 - 37 B4 - 36 AR-501
FAN ROOM SERVICE ELEV. LOBBY FIRE EXIT 02

3200

3200
ST-01D 15.33 SQ.M. ST-02E
AREA TABULATION (GFA)
6.19 SQ.M. -16.32M./ +34.18M. 7.72 SQ.M. 16.32 SQ.M.
-16.90M./ +33.60M. AR-515 FF-07 -45.60M./+34.90M. -15.60M. / +34.90M. AR-517 FAN ROOM
FF-07 18.67 SQ.M. ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP FF-07
BLS-04 FF-07 -15.60M./ +34.90M. BLS-04
FF-07 20F MEZZANINE (PROVISION) 426.86 SQ.M.
AR - 408 D-02 AR - 408
20F (HALL) 792.44 SQ.M.
B AR-501 B
D-11 19F (LEASING FLOOR) 832.66 SQ.M.

PLUMBING SHAFT
2600X350
AR-501
18F (LEASING FLOOR) 847.43 SQ.M.
17F (LEASING FLOOR) 877.91 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.

TRENCH DRAIN
-15.60M. / +34.90M. 14F (LEASING FLOOR) 950.91 SQ.M.
6150

6150
BLS-02 D-11 BLS-02 13F (LEASING FLOOR) 976.05 SQ.M.
-16.90M. / +33.60M. AR-501
AR - 406 FF-08 -16.90M. / +33.60M. FF-04 AR - 406 12F (LEASING FLOOR) 1001.19 SQ.M.

6 7 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.


FF-07 10F (BDO FLOOR) 1041.98 SQ.M.
8% RAMP SLOPE 9F (BDO FLOOR) 1072.98 SQ.M.
DN
UP B4 - 35 8F (BDO FLOOR) 1089.09 SQ.M.
C C 7F (BDO FLOOR) 1111.71 SQ.M.
DN
-16.90M. / +33.60M. 6F (BDO FLOOR) 1134.34 SQ.M.
21547

5F (BDO FLOOR) 1185.72 SQ.M.


4F MEZZANINE (PROVISION) 234.71 SQ.M.
B4 - 34
4F (BDO FLOOR) 1185.72 SQ.M.
MOTORCYCLE PARKING 3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325
B4 - 28 B4 - 27 B4 - 26 B4 - 25 B4 - 24 B4 - 23 B4 - 22 B4 - 21 3F (BDO FLOOR) 1229.58 SQ.M.

RAMP DOWN DOING GOING TO B5


ELEVATOR LOBBY

26053
FF-07
8.49 SQ.M. 2F MEZZANINE (PROVISION) 234.71 SQ.M.
-16.80M. / +33.70M.
6% RAMP SLOPE

BLS-01 BLS-01 2F (BANK BRANCH) 1149.72 SQ.M.


B4 - 33
AR - 405 AR - 405 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
RAMP UP DOING GOING TO B3
3541

4000
B4 (PARKING) 1595.01 SQ.M.
F BASEMENT
FF-08 04
-15.60M. / +34.90M. B4 - 32 B5 (PARKING) 1595.01 SQ.M.
B4 - 16 B6 (PARKING) 1330.63 SQ.M.
FF-07 B4 - 17 TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
B4 - 18
B4 - 19 PARKING PROVISIONS
B4 - 20 E
GF (SURACE PARKING) 12 SLOTS
2332

D-10

1921
-14.40M. / +36.10M. AR-501 B1 41 SLOTS
G B2 40 SLOTS
UP
B3 40 SLOTS
B4 - 31
B4 40 SLOTS
B5 40 SLOTS
2611

B6 25 SLOTS
FF-08
-14.40M. / +36.10M.
F TOTAL NO. OF PARKING PROVIDED

4458
FF-08 238 SLOTS

B4 - 30 TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS


6% RAMP SL
OPE
D-11 SCHEDULE OF FLOOR FINISHES
AR-501
4 5 UP FF-04 300MMX300MMX12MM WAFFLE TYPE ANTI-SLIP CONCRETE PAVER

FAN ROOM -14.40M. / +36.10M. FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
3813

FF-04
8.73 SQ.M.
-14.40M. / +36.10M. FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-07 G
-15.60M. / +34.90M. FF-12 600MMX600MM ESP670 PETRALAVA MARFIL
BLS-03 BLS-03

TRENCH DRAIN
AR - 407 B4 - 01 AR - 407

4536
B4 - 02 B4 - 29 HATCHING LEGENDS
B4 - 03
1854

B4 - 04 REINFORCED CONCRETE WALL


AIR SHAFT B4 - 05
B4 - 06
B4 - 07 D-11
B4 - 08 AR-501
B4 - 09 EE CABINET
B4 - 10
B4 - 11 4" ECOPANEL
3 B4 - 12
B4 - 13
B4 - 14
23 B4 - 15

STORAGE
23.77 SQ.M.
- 15.60M.
FF-07

A BASEMENT 04 FLOOR PLAN NOTES (FLOOR LEVEL REFERENCE)


2558 8100 10600 11000 10875 2872
AR - 205 1 : 100 LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
40575
2 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
BCS - 03 BCS-01 BCS-06 BCS-05 BCS-04 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 412 PLANS
AR - 410 AR - 415 AR - 414 AR - 413
1 2 3 5
4
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:25 PM
ARCHITECT BASEMENT 04 FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 205
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
BCS - 03 BCS-01
1 1 4 2 BCS-06 3 BCS-05 BCS-04 5 1 OFFICE OF THE BUILDING OFFICIAL
8 AR - 412 AR - 410
4 CEBU CITY
AR - 415 40575 AR - 414 AR - 413

2558 8100 10600 11000 10875 2616

RECOMMENDING APPROVAL AS TO:

HEAD ARCHITECTURAL SECTION DATE:

APPROVED:
TOILET
5.31 SQ.M. 2.5 SQ.M.

2299

2299
500x400 FAD RISER 500x400 FAD RISER AIR SHAFT
AIR SHAFT 600X400 FAD RISER 600X400 FAD RISER
FF-07 FF-07

A A
PWD
10 11 12 13 14 15 16 17 18
PARKING
D-02
B5 - 40 B5 - 39 B5 - 38 DN B5 - 37 B5 - 36 BUILDING OFFICIAL: DATE:
AR-501
FIRE EXIT 01 SERVICE ELEV. LOBBY FIRE EXIT 02

3200

3200
ST-01D 15.33 SQ.M. ST-02E
FAN ROOM 7.71 SQ.M. 16.32 SQ.M. AREA TABULATION (GFA)
AR-515 -19.52M./ +30.98M. - 18.80M. / + 31.70M. - 18.80M. / + 31.70M. AR-517 FAN ROOM
6.19 SQ.M. FF-07
-20.10M./ +30.40M. FF-07 18.67 SQ.M. ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP FF-07
BLS-04 -18.80M./ +31.70M. BLS-04
FF-07 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
FF-07
AR - 408 D-02 AR - 408
20F (HALL) 792.44 SQ.M.
B AR-501 B
D-11 19F (LEASING FLOOR) 832.66 SQ.M.

PLUMBING SHAFT
2600X350
AR-501
D-10
18F (LEASING FLOOR) 847.43 SQ.M.
AR-501 17F (LEASING FLOOR) 877.91 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.

TRENCH DRAIN
14F (LEASING FLOOR) 950.91 SQ.M.
6150

6150
SUMP PIT 01 - 20.10M. / + 30.40M.
BLS-02 D-11 BLS-02 13F (LEASING FLOOR) 976.05 SQ.M.
- 20.10M. / + 30.40M. AR-501
AR - 406 FF-08 FF-04 AR - 406 12F (LEASING FLOOR) 1001.19 SQ.M.
FILE STORAGE - 18.80M. / + 31.70M.
6 7 58.81 SQ.M.
-20.10M./ +30.40M.
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
FF-07 10F (BDO FLOOR) 1041.98 SQ.M.

8% RAMP SLOPE
9F (BDO FLOOR) 1072.98 SQ.M.
DN B5 - 35 8F (BDO FLOOR) 1089.09 SQ.M.
C UP C 7F (BDO FLOOR) 1111.71 SQ.M.
DN
- 20.10M. / + 30.40M. - 20.10M. / + 30.40M. 6F (BDO FLOOR) 1134.34 SQ.M.
21547

5F (BDO FLOOR) 1185.72 SQ.M.


4F MEZZANINE (PROVISION) 234.71 SQ.M.
B5 - 34
4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
ELEVATOR LOBBY B5 - 21 B5 - 22 B5 -23 B5 - 24 B5 - 25 B5 - 26 B5 - 27 B5 - 28
6325

6325
8.49 SQ.M. 3F (BDO FLOOR) 1229.58 SQ.M.
-20.00M./ +30.50M.

26053
FF-07 2F MEZZANINE (PROVISION) 234.71 SQ.M.
RAMP GOING DOWN TO B6
BLS-01 BLS-01 2F (BANK BRANCH) 1149.72 SQ.M.
B5 - 33
6% RAMP SLOPE

AR - 405 AR - 405 GF MEZZANINE 517.71 SQ.M.


GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
BASEMENT 05 B3 (PARKING) 1595.01 SQ.M.
3541

- 18.80M. / +31.70M.

4000
B4 (PARKING) 1595.01 SQ.M.
F FF-08 B5 - 32
CENTRAL STORAGE B5 (PARKING) 1595.01 SQ.M.
B5 - 16
29.69 SQ.M.
-17.46M./ +33.04M. B5 - 17 B6 (PARKING) 1330.63 SQ.M.
RAMP GOING UP TO B4

FF-07 B5 -18 TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.


B5 - 19
B5 - 20 PARKING PROVISIONS
E
D-10
GF (SURACE PARKING) 12 SLOTS
2332

AR-501

1921
- 17.60M. / + 32.90M. B1 41 SLOTS
G UP B2 40 SLOTS
B5 - 31 B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
2611

MOTORCYCLE PARKING B6 25 SLOTS


- 17.60M. / + 32.90M.
FF-08 F TOTAL NO. OF PARKING PROVIDED

4458
FF-08 238 SLOTS
- 17.60M. / + 32.90M. B5 - 30 TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
6% RAMP SLOP
D-11
E SCHEDULE OF FLOOR FINISHES
AR-501
4 5 FF-04 300MMX300MMX12MM WAFFLE TYPE ANTI-SLIP CONCRETE PAVER
UP
FAN ROOM FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
3813

FF-04
8.73 SQ.M. - 18.80M. / + 31.70M.
- 17.60M. / + 32.90M. FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-07 G
FF-12 600MMX600MM ESP670 PETRALAVA MARFIL
BLS-03 BLS-03

TRENCH DRAIN
AR - 407 B5 - 01 AR - 407
B5 - 02 B5 - 29
HATCHING LEGENDS
B5 - 03
B5 - 04
1854

AIR SHAFT B5 - 05 REINFORCED CONCRETE WALL


B5 - 06
B5 - 07 D-11
B5 - 08
B5 - 09 AR-501
EE CABINET
B5 - 10
B5 - 11
4" ECOPANEL

9648
B5 - 12
3 B5 - 13
B5 - 14
B5 - 15
23

STORAGE
23.77 SQ.M.
-18.80 M./ +31.70M.
FF-07

NOTES (FLOOR LEVEL REFERENCE)


A BASEMENT 05 FLOOR PLAN 2558 8100 10600 11000 10875
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
AR - 206 1 : 100 40575 2 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
BCS - 03 BCS-01 BCS-06 BCS-05 BCS-04 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS
AR - 412 AR - 410 AR - 415 AR - 414 AR - 413
1 2 3 5
4
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:28 PM
ARCHITECT BASEMENT 05 FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 206
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
1 BCS-01 REPUBLIC OF THE PHILIPPINES
1 4 2 3 5 1 OFFICE OF THE BUILDING OFFICIAL
8 BCS - 03 AR - 410 BCS-06 BCS-05 4 BCS-04
40575
CEBU CITY
AR - 412 AR - 415 AR - 414 AR - 413

2558 8100 10600 11000 10875

RECOMMENDING APPROVAL AS TO:

HEAD ARCHITECTURAL SECTION DATE:

APPROVED:
2.5 SQ.M.

2299
500x400 FAD RISER 500x400 FAD RISER AIR SHAFT
600X400 FAD RISER 600X400 FAD RISER

A A
D-02 FIRE EXIT 02
AR-501
16.32 SQ.M. BUILDING OFFICIAL: DATE:
SERVICE ELEV. LOBBY -23.00M./+27.50M.

3200

3200
ELEVATOR PIT ST-02E
7.72 SQ.M. FF-07 AREA TABULATION (GFA)
-23.00M./+27.50M. AR-517
ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
FF-07
BLS-04 POTABLE CISTERN TANK PARTITION 02 BLS-04
19.91 SQ.M. 20F MEZZANINE (PROVISION) 426.86 SQ.M.
AR - 408 -25.25M./ +25.25M. AR - 408
20F (HALL) 792.44 SQ.M.
B 98.58 m³
B
19F (LEASING FLOOR) 832.66 SQ.M.
18F (LEASING FLOOR) 847.43 SQ.M.
17F (LEASING FLOOR) 877.91 SQ.M.
MH
16F (LEASING FLOOR) 900.54 SQ.M.

PLUMBING SHAFT
2600X350
POTABLE CISTERN WATER TANK 15F (LEASING FLOOR) 925.77 SQ.M.
68.41 SQ.M. DOMESTIC WATER PUMP ROOM
-25.25M./ +25.25M. 14F (LEASING FLOOR) 950.91 SQ.M.
6150

6150
144.08 SQ.M. SUMP PIT
TOP OF MAT FOOTING -23.00M./+27.50M.
BLS-02 - 24.90M. / +25.60M. 289.51 m³ FF-07 BLS-02 13F (LEASING FLOOR) 976.05 SQ.M.
AR - 406 AR - 406 12F (LEASING FLOOR) 1001.19 SQ.M.
SUMP PIT 02
6 7 - 21.90M. / + 28.60M.
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
10F (BDO FLOOR) 1041.98 SQ.M.
9F (BDO FLOOR) 1072.98 SQ.M.
POTABLE CISTERN TANK
RECOMMENDED COMBINED CAPACITY = 300 CU.M. 8F (BDO FLOOR) 1089.09 SQ.M.
C CURRENT COMBINED CAPACITY = 387.40 CU.M. C 7F (BDO FLOOR) 1111.71 SQ.M.
MH 6F (BDO FLOOR) 1134.34 SQ.M.
21547

5F (BDO FLOOR) 1185.72 SQ.M.


PROVISION FOR UNDERGROUND STP
60.59 SQ.M. 4F MEZZANINE (PROVISION) 234.71 SQ.M.
NON-POTABLE UNDERGROUND WATER TANK
-25.25M./ +25.25M.
31.83 SQ.M. 4F (BDO FLOOR) 1185.72 SQ.M.
NON-POTABLE UNDERGROUND WATER TANK 01 -25.25M./ +25.25M. FF-07
25.53 SQ.M. FF-07 378.67 m³ 3F MEZZANINE (PROVISION) 234.71 SQ.M.
-25.25M./ +25.25M. 167.43 m³
6325

6325
FF-07 NON-POTABLE CISTERN WATER TANK
RECOMMENDED CAPACITY = 204 CU.M. 3F (BDO FLOOR) 1229.58 SQ.M.

26053
121.74 m³
CURRENT COMBINED CAPACITY = 287.69 CU.M. 2F MEZZANINE (PROVISION) 234.71 SQ.M.
DN
BLS-01 BLS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 405 AR - 405 GF MEZZANINE 517.71 SQ.M.

D-10
GF 948.11 SQ.M.
AR-501 TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
1200 B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
3530

4000
B4 (PARKING) 1595.01 SQ.M.
F
STORAGE ROOM B5 (PARKING) 1595.01 SQ.M.
33.38 SQ.M.
B6 - 17 B6 - 18 B6 - 19 B6 - 20 B6 - 21 B6 - 22 B6 - 23 B6 - 24 B6 - 25 B6 (PARKING) 1330.63 SQ.M.
FF-07
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
D-10
GF (SURACE PARKING) 12 SLOTS
2343

AR-501

1921
B1 41 SLOTS
G - 20.80M. / + 29.70M. D-11
AR-501 B2 40 SLOTS
UP B3 40 SLOTS
FILE STORAGE - 20.80M. / + 29.70M. B4 40 SLOTS
61.38 SQ.M.
- 20.80M. / + 29.70M. B5 40 SLOTS
2611

- 20.80M. / + 29.70M.
B6 25 SLOTS
D-10
E TOTAL NO. OF PARKING PROVIDED

4458
AR-501 FF-08 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
6% RAMP SLOP BASEMENT 06
E
D-11 -22.00M./ +28.50M. SCHEDULE OF FLOOR FINISHES
AR-501
FF-08
FF-04 UP FF-04 300MMX300MMX12MM WAFFLE TYPE ANTI-SLIP CONCRETE PAVER
4 5
FF-07
3713

FAN ROOM FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING


- 22.00M. / + 28.50M.
8.88 SQ.M.
- 20.80M. / + 29.70M. FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT
FF-07
F
FF-12 600MMX600MM ESP670 PETRALAVA MARFIL
BLS-03 BLS-03

TRENCH DRAIN
AR - 407 B6 - 01 SUMP PIT 01 AR - 407
B6 - 02 HATCHING LEGENDS
B6 - 03
B6 - 04
AIRSHAFT B6 - 05 REINFORCED CONCRETE WALL
B6 - 06
B6 - 07
B6 - 08
B6 - 09
B6 - 10

8865
B6 - 11 UTILITY SPACE
B6 - 12 4" ECOPANEL
3 B6 - 13
54.67 SQ.M.
-22.00M./ +28.50M.
B6 - 14 FF-07
B6 - 15
23 B6 - 16

D-11
AR-501

NOTES (FLOOR LEVEL REFERENCE)


A BASEMENT 06 FLOOR PLAN 2558 8100 10600 11000 10875 2872
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
40575
AR - 207 1 : 100 2 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
BCS - 03 BCS-01 BCS-06 BCS-05 BCS-04
PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 412 AR - 410 AR - 415 AR - 414 AR - 413 PLANS
1 2 3 5
4
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:30 PM
ARCHITECT BASEMENT 06 FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 207
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
LOT 2, PCS - 07 - 001167 (ROAD) REPUBLIC OF THE PHILIPPINES
1 2 3 DON MARIANO CUI STREET 5
1 4 4 1 OFFICE OF THE BUILDING OFFICIAL
8 40575 CEBU CITY
8100 10600 11000 10875 1075 2243 1000

2101
CS-01 CS-02
5 6 7 8 9
AR - 403 -0.30M. / +50.20M. AR - 404
RECOMMENDING APPROVAL AS TO:

4998
ROAD WIDENING PROVISION ST-07 HEAD ARCHITECTURAL SECTION DATE:
ST-08 DN
GUARD HOUSE AR-524
@2.00M SETBACK FROM PROPERTY LINE AR-524
9.64 SQ.M. APPROVED:

2999
CCTV CANOPY PROJECTION -0.30M. / +50.20M.
ST-09 +0.00M. / +50.50M. DN UP FRESH AIR SHAFT OPENING +0.00M. / +50.50M.
DN EAD RISERS, T/A
DN AR-524 W/ STEEL GRATING COVER

CCTV

LOT 2-B-2, PSD - 072217 - 025026 A


CCTV

D-01
SW-3 SW-4 A
CCTV D-02A D-02
D-02
AR-501 AR-501 AR-501
14 15 16 17 18 19 20 21 22 23 24 25 26 AR-501 26 25 24 23 22 21 20 19 18 17 16 15 14
CCTV
CCTV
DN
CCTV
DN
CCTV CCTV
SERVICE ELEV. LOBBY FIRE EXIT 02 CCTV
BUILDING OFFICIAL: DATE:
PERSONAL DELIVERIES 7.71 SQ.M. 16.32 SQ.M.

3200

3200
ST-02A
15.78 SQ.M. +0.00M. / +50.50M. +0.00M. / +50.50M. AREA TABULATION (GFA)
SW-1 SW-2 +0.00M. / +50.50M. ST-01A
FF-07 AR-520
FF-07 FF-07
FF-07 AR-518 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 1 2 3 4 5 6 7 8 9 10 11 12 13 20F MEZZANINE (PROVISION) 426.86 SQ.M.

@1.00M SETBACK FROM PROPERTY LINE


CCTV 2750 20F (HALL) 792.44 SQ.M.
B B
D-05 19F (LEASING FLOOR) 832.66 SQ.M.
AR-501
CCTV 18F (LEASING FLOOR) 847.43 SQ.M.
CCTV
D-06
PLUMBING SHAFT PLUMBING SHAFT
D-06 3000X325MM 400X325MM
AR-501
17F (LEASING FLOOR) 877.91 SQ.M.
AR-501

ROAD WIDENING PROVISION


ELEVATOR LOBBY
FF-04 16F (LEASING FLOOR) 900.54 SQ.M.
31.28 SQ.M.
+0.00M. / +50.50M. CHWS/R RISER
FF-10 CCTV 15F (LEASING FLOOR) 925.77 SQ.M.
BICYCLE PARKING
14F (LEASING FLOOR) 950.91 SQ.M.
6150

6150
1500 FCC & SECURITY RM
RENTABLE AREA 31.75 SQ.M. 13F (LEASING FLOOR) 976.05 SQ.M.
ELV ROOM +0.00 M. / +50.50M.
48.07 SQ.M. 8.72 SQ.M. FF-11
FF-10 +0.00 M. 12F (LEASING FLOOR) 1001.19 SQ.M.
CCTV FF-07 D-06
6 7 AR-501 ST-10
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
LS-02 EAD RISER AR-525
LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
F/B, T/A
AR - 402 HALLWAY
AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
CCTV
RISER 19.98 SQ.M.
1150X250MM
CCTV
+0.00M. / +50.50M. 8F (BDO FLOOR) 1089.09 SQ.M.
C C1
D-06
MEZZANINE PROJECTION
FF-07 C 7F (BDO FLOOR) 1111.71 SQ.M.
BICYCLE ALLEY

AR-501
D-06
6F (BDO FLOOR) 1134.34 SQ.M.
PAD RISER, AR-501
21151

CCTV
F/A 5F (BDO FLOOR) 1185.72 SQ.M.
4F MEZZANINE (PROVISION) 234.71 SQ.M.
CCTV CCTV CCTV CCTV 4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325
JANITORS STORAGE 3F (BDO FLOOR) 1229.58 SQ.M.

26029
CCTV
6.24 SQ.M. RECEPTION 2F MEZZANINE (PROVISION) 234.71 SQ.M.
BICYCLE PARKING FF-07 10
+0.00M. / +50.50M.
LS-01 FF-10 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
FF-03 TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
C2 C3 C4 C5 C6 B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

LOT 2, PCS - 07 - 001167 (ROAD)


4000
B4 (PARKING) 1595.01 SQ.M.
GROUND FFL

DON MARIANO CUI STREET


+0.00M. / +50.50M. B5 (PARKING) 1595.01 SQ.M.
5477

UP
FF-09 B6 (PARKING) 1330.63 SQ.M.
F
11 TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
C2 PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
ESCALATOR LANDING PROJECTION

DDC
B1 41 SLOTS
G
B2 40 SLOTS
CCTV ATM ROOM
8.69 SQ.M. C8 CCTV B3 40 SLOTS
+0.00 M. / +50.50M. D-06
C7 FF-11
CCTV

AR-501 B4 40 SLOTS
B5 40 SLOTS

6355
CCTV
C9

PROPERTY LINE
B6 25 SLOTS
4348

ATM
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
C9 TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
D-01A
-0.20M. / +50.30M. SCHEDULE OF FLOOR FINISHES
CCTV AR-501

S
CCTV
12 F FF-07
4 5 UP S D-01A
FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

AR-501
SECOND FLOO FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT
R PROJECTION
R-04 S S C10 CCTV FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT
AR-531 ST-06
AR-524 +0.00M. / +50.50M. G FF-10
1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED
PORCELAIN TILE
1 R-04 R-04

3078
R-04
AR-531 AR-531 FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT
2
4890

THIRD FLOOR AR-531


PROJECTION R-04
AR-531 HATCHING LEGENDS
FF-03
FF-02
REINFORCED CONCRETE WALL
-0.20M. / +50.30M.
CCTV

3
4
6" CHB WALL
3 4000
DRIVEWAY
60

23 FF-01
00

-0.30M. / +50.20M. -0.30M. / +50.20M.


DN C A NO

6790
PY PR
OJEC
T ION
EXISTING TREE CANOPY
5743

CS-01 -0.30M. / +50.20M.


AR - 403

NOTES (FLOOR LEVEL REFERENCE)


8100 10600 11000 10875
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
40575
A GROUND FLOOR PLAN CS-02 2 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
-0.56M. / + 50.04M.
AR - 208 1 : 100 AR - 404 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS
1 2 3 5 -0.70M. / +49.80M.
4 UP

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:34 PM
ARCHITECT GROUND FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 208
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 CS-02 RECOMMENDING APPROVAL AS TO:


1 2 3 5
AR - 403 4 AR - 404

40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A A
14 15 16 17 18 19 20 21 22 23 24 25 26 26 25 24 23 22 21 20 19 18 17 16 15 14
D-02
DN DN BUILDING OFFICIAL: DATE:
AR-501
FIRE EXIT 1 SERVICE ELEV. LOBBY FIRE EXIT 2

3200

3200
ST-01A ST-02A
15.39 SQ.M. 7.75 SQ.M. 16.32 SQ.M. AREA TABULATION (GFA)
AR-518 +4.50M./ +55.00M. + 4.50M. / +55.00M. + 4.50M. / +55.00M. AR-520
FF-07 FF-07 FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 1 2 3 4 5 6 7 8 9 10 11 12 13 20F MEZZANINE (PROVISION) 426.86 SQ.M.
20F (HALL) 792.44 SQ.M.
B D-02
B
19F (LEASING FLOOR) 832.66 SQ.M.
AR-501

PLUMBING SHAFT PLUMBING SHAFT 18F (LEASING FLOOR) 847.43 SQ.M.


600X300MM 3000X330MM 17F (LEASING FLOOR) 877.91 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
LEASABLE SPACE
194.00 SQ.M. AHU AHU
15F (LEASING FLOOR) 925.77 SQ.M.
+4.50M./ +55.00M.
14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
PROVISION FOR
50MM CONCRETE TOPPING MEP UTILITY ROOM
63.38 SQ.M. 13F (LEASING FLOOR) 976.05 SQ.M.
+ 4.50M. / +55.00M.
FF-07 12F (LEASING FLOOR) 1001.19 SQ.M.
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR - 402 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
RISER
1150X250MM 8F (BDO FLOOR) 1089.09 SQ.M.
C C

500
7F (BDO FLOOR) 1111.71 SQ.M.
6F (BDO FLOOR) 1134.34 SQ.M.
PAD RISER,
F/A 5F (BDO FLOOR) 1185.72 SQ.M.
BE-01
4F MEZZANINE (PROVISION) 234.71 SQ.M.
22614

4F (BDO FLOOR) 1185.72 SQ.M.


3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01
DDC BE-02 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
UP
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
ESCALATOR PIT B1 (PARKING) 1595.01 SQ.M.
D DEPTH: 1300 (TOP OF SLAB) D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

4000
OPEN B4 (PARKING) 1595.01 SQ.M.
TO
ESCALATOR FFL BELOW B5 (PARKING) 1595.01 SQ.M.
+4.50M. / +55.00M.
FF-09 B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
DN PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
F
B2 40 SLOTS
11927

B3 40 SLOTS
B4 40 SLOTS
G
B5 40 SLOTS
B6 25 SLOTS
MEZZANINE FLOOR
LINE TOLERANCE
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT


F
FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

G FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

8100 10600 11000 10875 HATCHING LEGENDS

REINFORCED CONCRETE WALL


40575

CS-01 CS-02
6" CHB WALL
1 2 3 AR - 404 5
AR - 403 4
CANO
PY PR
O JE C
TION

A MEZZANINE FLOOR PLAN


AR - 209 1 : 100
NOTES (FLOOR LEVEL REFERENCE)

LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)

REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE


PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:37 PM
ARCHITECT GROUND FLOOR MEZZANINE THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
FLOOR PLAN CHECKED: DRAWN:
MMOSER ASSOCIATES
(S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 209
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 CS-02 RECOMMENDING APPROVAL AS TO:


1 2 3
AR - 403 4 AR - 404 5
40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:


EAD RISERS, T/A

A CCTV A
12 13 14 15 16 17 18 19 20 21 22 DN
CCTV
D-02
CCTV DN CCTV
BUILDING OFFICIAL: DATE:
FIRE EXIT 1 AR-501
FIRE EXIT 2

3200

3200
ST-01B 15.39 SQ.M. SERVICE ELEV. LOBBY 16.07 SQ.M. ST-02B
+9.00M. / +59.50M. 8.01 SQ.M.
AREA TABULATION (GFA)
AR-518 +9.00 M. / +59.50M. AR-520
FF-07 +9.00M. / +59.50M. FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP FF-07 UP
11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC

FIREBOX
D-03
DN 15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+8.95 M. / +59.45M. D-06 D-03 650X650
2.59 SQ.M. EXEC. TOILET 1 CCTV CCTV
FF-12 +9.00 M. EAD RISER 17F (LEASING FLOOR) 877.91 SQ.M.
AR-501 AR-501 5.33 SQ.M.
FF-07 +8.95 M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
31.69 SQ.M. FF-12
+9.00M. / + 59.50 15F (LEASING FLOOR) 925.77 SQ.M.

650X650 TEAD RISER


RENTABLE AREA FF-09 D-06 HALLWAY AHU
14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
50.55 SQ.M. TOILET HALLWAY AR-501 9.45 SQ.M. 28.33 SQ.M.
D-07 11.02 SQ.M. +9.00M. / +59.50M. EXEC. TOILET 2 +9.00 M. / +59.50M.
+9.00M. / +59.50M. FF-11 D-03 FF-07
13F (LEASING FLOOR) 976.05 SQ.M.
AR-501 ELV ROOM 3.71 SQ.M.
R-09 FF-11 6.43 SQ.M. +8.95 M.
1500X500 TEAD RISER
AR-501
12F (LEASING FLOOR) 1001.19 SQ.M.
+9.00 M. FF-12
AR-532
FF-07 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
MALE TOILET AR-501 PWD TOILET
AR - 402 16.15 SQ.M. 4.88 SQ.M. 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
+8.95 M. / +59.45M.
D-03 +8.95M. / 59.45M. PAD RISER EAD RISER
FF-12 AR-501 350X350 FF-12 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
5F (BDO FLOOR) 1185.72 SQ.M.
5824 1750 3050 3100 4925 1500 2450 4800
UP 4F MEZZANINE (PROVISION) 234.71 SQ.M.
1
4F (BDO FLOOR) 1185.72 SQ.M.
23703

2
3 3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325
4
5 3F (BDO FLOOR) 1229.58 SQ.M.
6

26566
7
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 8
LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
9
AR - 401 10 AR - 401 GF MEZZANINE 517.71 SQ.M.
ST-04
GF 948.11 SQ.M.
AR-524
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
SECOND FLOOR MEZZANINE PROJECTION B3 (PARKING) 1595.01 SQ.M.

4000
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
PROVISION FOR 50MM
CONCRETE TOPPING TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
8028

PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
F B5 40 SLOTS

6891
B6 25 SLOTS
G
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
SECOND FLOOR TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
LINE TOLERANCE
SCHEDULE OF FLOOR FINISHES
2980

FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

+8.15M. 1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

F FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT


THIRD FLOOR
PROJECTION HATCHING LEGENDS
G
REINFORCED CONCRETE WALL

SECOND FLOOR
+8.15M. LINE TOLERANCE

6" CHB WALL

8100 10600 11000 10875

40575
CS-01 CS-02
AR - 403 AR - 404 NOTES (FLOOR LEVEL REFERENCE)
1 2 3 5
4 +8.15M.
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)

A SECOND FLOOR PLAN REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 210 1 : 100 PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:39 PM
ARCHITECT SECOND FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 210
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 CS-02 RECOMMENDING APPROVAL AS TO:


1 2 3 5
AR - 403 4 AR - 404

40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A A
AOM AIM AIM
12 13 14 15 16 17 18 19 20 21 22
F J

DN
WF TS CCTV

FIRE EXIT 1 SERVICE ELEVATOR LOBBY FIRE EXIT 2


BUILDING OFFICIAL: DATE:

3200

3200
ST-01B 14.67 SQ.M. 8.01 SQ.M. 16.07 SQ.M. ST-02B
+12.75M. / +63.25M. +12.57M./ +63.25M. +12.75M. / +63.25M. AREA TABULATION (GFA)
AR-518 AR-520
FF-07 FF-07 FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP
WF TS

GA
11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.

P
J AIM AIM AOM

20F (HALL) 792.44 SQ.M.


B PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.

FIREBOX
18F (LEASING FLOOR) 847.43 SQ.M.
650X650
EAD RISER 17F (LEASING FLOOR) 877.91 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
CHWS/R RISER
15F (LEASING FLOOR) 925.77 SQ.M.

650X650 TEAD RISER


14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
FF-11
13F (LEASING FLOOR) 976.05 SQ.M.
HANGED AHU
1500X500 TEAD RISER 12F (LEASING FLOOR) 1001.19 SQ.M.
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
LS-02 ELEVATOR LOBBY LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
34.58 SQ.M.
AR - 402 FF-09 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
PAD RISER EAD RISER
350X350 CATWALK 8F (BDO FLOOR) 1089.09 SQ.M.
EAD RISER
C C 7F (BDO FLOOR) 1111.71 SQ.M.
6F (BDO FLOOR) 1134.34 SQ.M.
5F (BDO FLOOR) 1185.72 SQ.M.
DN 4F MEZZANINE (PROVISION) 234.71 SQ.M.
20
1 19
2
4F (BDO FLOOR) 1185.72 SQ.M.
18
3 17 3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325
4 16
25543

SECOND FLOOR MEZZANINE 5 15 3F (BDO FLOOR) 1229.58 SQ.M.


166.08 SQ.M. 6 14
+12.75M./ +63.25M. 7
2F MEZZANINE (PROVISION) 234.71 SQ.M.
13
PROVISION FOR 50MM 8 2F (BANK BRANCH) 1149.72 SQ.M.
LS-01 12 LS-01
CONCRETE TOPPING 9 11
AR - 401 10 AR - 401 GF MEZZANINE 517.71 SQ.M.
ST-04
GF 948.11 SQ.M.

29699
AR-524
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

4000
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
9868

OPEN B1 41 SLOTS
TO
BELOW B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
F TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS

10024
SCHEDULE OF FLOOR FINISHES
G
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS
F
REINFORCED CONCRETE WALL

8100 10600 11000 10875 G


6" CHB WALL
40575

CS-01 CS-02
2 3 5
1 AR - 403 4 AR - 404

A SECOND FLOOR MEZZANINE PLAN


AR - 211 1 : 100
NOTES (FLOOR LEVEL REFERENCE)

LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)

REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE


PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:41 PM
ARCHITECT SECOND FLOOR MEZZANINE THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 211
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 CS-02 RECOMMENDING APPROVAL AS TO:


1 2 3 5
AR - 403 4 AR - 404

40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A SW-3 SW-4 A
CCTV

12 13 14 15 16 17 18 19 20 21 22 22 21 20 19 18 17 16 15 14 13 12
CCTV
D-02
CCTV DN SERVICE ELEV. LOBBY DN CCTV
BUILDING OFFICIAL: DATE:
FIRE EXIT 1 8.01 SQ.M. AR-501
FIRE EXIT 2

3200

3200
ST-01B 15.33 SQ.M. +16.50M. / +67.00M. ST-02B
SW-1 SW-2 +16.50M. / +67.00M. 16.07 SQ.M. AREA TABULATION (GFA)
AR-518
FF-07 FF-07 +16.50M. / +67.00M. AR-520
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
11 10 9 8 7 6 5 4 3 2 1 1 2 3 4 5 6 7 8 9 10 11 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
DDC

FIREBOX
FEMALE TOILET D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+16.45 M. 2.63 SQ.M. D-06 D-03 CCTV CCTV 650X650
FF-12 +16.50 M. EXEC. TOILET 1 EAD RISER 17F (LEASING FLOOR) 877.91 SQ.M.
AR-501 AR-501 5.33 SQ.M.
FF-07 +16.45 M. / +66.95M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
31.74 SQ.M. SERVICE HALLWAY 15F (LEASING FLOOR) 925.77 SQ.M.

650X650 TEAD RISER


+16.50 M. / +67.00M. 9.45 SQ.M.
FF-09 D-06 +16.50M. AHU
14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
TOILET HALLWAY AR-501 FF-11 26.01 SQ.M.
D-07 11.02 SQ.M. +16.50 M.
+16.50M. / +67.00M.
EXEC. TOILET 2
FF-07
13F (LEASING FLOOR) 976.05 SQ.M.
AR-501 ELV ROOM D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 6.39 SQ.M. +16.45 M. 12F (LEASING FLOOR) 1001.19 SQ.M.
+16.50 M. AR-501
FF-12
FF-07 CHWS/R RISER
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
MALE TOILET AR-501 PWD TOILET
AR - 402 16.07 SQ.M. 4.88 SQ.M. 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
+16.45 M. D-03 +16.45 M. PAD RISER EAD RISER
FF-12 AR-501 350X350 FF-12 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER
C C1 D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
5F (BDO FLOOR) 1185.72 SQ.M.
20 4F MEZZANINE (PROVISION) 234.71 SQ.M.
1 19
2
4F (BDO FLOOR) 1185.72 SQ.M.
5824 1750 3050 3100 4925 1500 0 2350 5625 18
3 17 3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325
4 16
25545

5 15 3F (BDO FLOOR) 1229.58 SQ.M.


6 14
7
2F MEZZANINE (PROVISION) 234.71 SQ.M.
13

LS-01 8 12 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.


9 11
AR - 401 10 AR - 401 GF MEZZANINE 517.71 SQ.M.
ST-04
PROVISION FOR 50MM GF 948.11 SQ.M.

30037
AR-524
CONCRETE TOPPING
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
C2 C3 C4 C5 C6 B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

4000
B4 (PARKING) 1595.01 SQ.M.
BDO OFFICE FLOOR B5 (PARKING) 1595.01 SQ.M.
868.48 SQ.M.
+16.50M./ +67.0M. B6 (PARKING) 1330.63 SQ.M.
PROVISION FOR 50MM
CONCRETE TOPPING TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
C2 PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
9870

B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS

10362
SCHEDULE OF FLOOR FINISHES

G C7
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT


THIRD FLOOR
LINE TOLERANCE C8 FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE
C9 600MMX1200MM WABI SABI TAUPE LAPATTO RECT
FF-11
HATCHING LEGENDS
C9 REINFORCED CONCRETE WALL

C10
G 6" CHB WALL
8100 10600 11000 10875
THIRD FLOOR
LINE TOLERANCE
40575

CS-01 CS-02

1 AR - 403 2 3 AR - 404 5
4

NOTES (FLOOR LEVEL REFERENCE)

LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)


A THIRD FLOOR PLAN
REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
AR - 212 1 : 100 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:44 PM
ARCHITECT THIRD FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 212
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 RECOMMENDING APPROVAL AS TO:


1 2 3 CS-02 5
AR - 403 4 AR - 404
40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A A
12 13 14 15 16 17 18 19 20 21 22
CCTV
DN BUILDING OFFICIAL: DATE:
FIRE EXIT 1 SERVICE ELEV. LOBBY FIRE EXIT 2

3200

3200
ST-01B 14.67 SQ.M. 8.01 SQ.M. 16.07 SQ.M. ST-02B
+20.25 M. / +70.25M. +20.25 M./+70.25M. +20.25 M. / +70.25M. AREA TABULATION (GFA)
AR-518 AR-520
FF-07 FF-07 FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP
11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
20F (HALL) 792.44 SQ.M.
B PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
650X650
EAD RISER 18F (LEASING FLOOR) 847.43 SQ.M.
17F (LEASING FLOOR) 877.91 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.

650X650 TEAD RISER


CHW
PIPE SHAFT 14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
FF-11
13F (LEASING FLOOR) 976.05 SQ.M.
HANGED AHU
1500X500 TEAD RISER 12F (LEASING FLOOR) 1001.19 SQ.M.
CHWS/R RISER
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
LS-02 ELEVATOR LOBBY LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
37.96 SQ.M.
AR - 402 FF-09 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
PAD RISER EAD RISER
350X350 8F (BDO FLOOR) 1089.09 SQ.M.
EAD RISER
C C 7F (BDO FLOOR) 1111.71 SQ.M.
6F (BDO FLOOR) 1134.34 SQ.M.
5F (BDO FLOOR) 1185.72 SQ.M.
20 4F MEZZANINE (PROVISION) 234.71 SQ.M.
1 19
2
4F (BDO FLOOR) 1185.72 SQ.M.
18
3 17 3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325
4 16
25288

THIRD FLOOR MEZZANINE 3F (BDO FLOOR) 1229.58 SQ.M.


5 15
167.93 SQ.M.
+20.25M. / +70.25M. 6 14
2F MEZZANINE (PROVISION) 234.71 SQ.M.
7 13
PROVISION FOR 50MM 8 2F (BANK BRANCH) 1149.72 SQ.M.
LS-01 12 LS-01
CONCRETE TOPPING 9 11
AR - 401 10 AR - 401 GF MEZZANINE 517.71 SQ.M.
ST-04
GF 948.11 SQ.M.

29780
AR-524
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

4000
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
9613

B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS

10105
SCHEDULE OF FLOOR FINISHES
G
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

G
6" CHB WALL

8100 10600 11000 10875

40575

CS-01 CS-02
1 2 3 5
AR - 403 4 AR - 404

NOTES (FLOOR LEVEL REFERENCE)

LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)


A THIRD FLOOR MEZZANINE PLAN
REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
AR - 213 1 : 100 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:46 PM
ARCHITECT THIRD FLOOR MEZZANINE THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 213
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 RECOMMENDING APPROVAL AS TO:


1 2 3 CS-02 5
AR - 403 4 AR - 404
40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A CCTV A
12 13 14 15 16 17 18 19 20 21 22
CCTV
D-02
CCTV DN DN CCTV
BUILDING OFFICIAL: DATE:
FIRE EXIT 1 AR-501 FIRE EXIT 2

3200

3200
15.39 SQ.M. SERVICE ELEV. LOBBY 16.07 SQ.M.
+24.00M. / +74.50M. 7.98 SQ.M. +24.00M. / +74.50M.
AREA TABULATION (GFA)
FF-07 +24.00M. / +74.50M. FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP FF-07 UP
11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
DDC

FIREBOX
FEMALE TOILET D-03
15.19 SQ.M. 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+23.95M. / +74.45M. JANITOR'S CLOSET D-06 D-03 CCTV CCTV 650X650
FF-12 EXEC. TOILET 1 EAD RISER 17F (LEASING FLOOR) 877.91 SQ.M.
2.63 SQ.M. AR-501 AR-501 5.33 SQ.M.
+24.00 M. +23.95 M. / +74.45M.
FF-07 16F (LEASING FLOOR) 900.54 SQ.M.
ELEVATOR LOBBY FF-12
31.74 SQ.M. SERVICE HALLWAY 15F (LEASING FLOOR) 925.77 SQ.M.

650X650 TEAD RISER


+24.00M. / + 74.50M. 9.42 SQ.M.
FF-09 D-06 +24.00M. AHU 14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
TOILET HALLWAY FF-11 28.93 SQ.M.
AR-501
D-07 11.02 SQ.M. +24.00 M. / +74.50M.
+24.00M. / +74.50M. EXEC. TOILET 2
FF-07
13F (LEASING FLOOR) 976.05 SQ.M.
AR-501 D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 ELV ROOM +23.95 M. / +74.45M. 12F (LEASING FLOOR) 1001.19 SQ.M.
AR-501
6.39 SQ.M. FF-12
+24.00 M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501 PWD
MALE TOILET
AR - 402 16.15 SQ.M.
4.88 SQ.M. 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03 +23.95 M. / +74.45M. PAD RISER EAD RISER
+23.95 M. / +74.45M.
350X350 FF-12
FF-12 AR-501
CCTV EAD RISER
8F (BDO FLOOR) 1089.09 SQ.M.
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
5F (BDO FLOOR) 1185.72 SQ.M.
1750 3050 3100 4925 1500 2450 4800
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
24616

6325

6325
PROVISION FOR 50MM 3F (BDO FLOOR) 1229.58 SQ.M.
CONCRETE TOPPING
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 ST-07 AR - 401 GF MEZZANINE 517.71 SQ.M.

29108
AR-518
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

4000
B4 (PARKING) 1595.01 SQ.M.
BDO OFFICE FLOOR
B5 (PARKING) 1595.01 SQ.M.
832.29 SQ.M.
+24.00M./ +74.50M.
B6 (PARKING) 1330.63 SQ.M.
PROVISION FOR 50MM
CONCRETE TOPPING TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
8941

GF (SURACE PARKING) 12 SLOTS


B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS

9433
G
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
FOURTH FLOOR
LINE TOLERANCE FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

FOURTH FLOOR 6" CHB WALL


LINE TOLERANCE

8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
A FOURTH FLOOR PLAN
CS-01 CS-02 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
AR - 214 1 : 100 1 2 3 4 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 403 AR - 404 PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:49 PM
ARCHITECT FOURTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 214
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 CS-02
AR - 403 AR - 404
RECOMMENDING APPROVAL AS TO:
1 2 3 5
4
40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A A
AOM AIM AIM
12 13 14 15 16 17 18 19 20 21 22
F J

DN
WF TS CCTV

FIRE EXIT 1 SERVICE ELEV. LOBBY FIRE EXIT 2 BUILDING OFFICIAL: DATE:

3200

3200
ST-01B 14.67 SQ.M. 8.01 SQ.M. 16.07 SQ.M. ST-02B
AREA TABULATION (GFA)
AR-518 +27.75 M. / +78.25M. +27.75M. / +78.25M. +27.75 M. / +78.25M. AR-520
FF-07 FF-07 FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP
WF TS

GA
11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.

P
J AIM AIM AOM

20F (HALL) 792.44 SQ.M.


B PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.

FIREBOX
18F (LEASING FLOOR) 847.43 SQ.M.
650X650
EAD RISER 17F (LEASING FLOOR) 877.91 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.

650X650 TEAD RISER


14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
FF-11
13F (LEASING FLOOR) 976.05 SQ.M.
HANGED AHU
1500X500 TEAD RISER 12F (LEASING FLOOR) 1001.19 SQ.M.
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
LS-02 ELEVATOR LOBBY LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
37.68 SQ.M.
AR - 402 FF-09 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
PAD RISER EAD RISER
350X350 8F (BDO FLOOR) 1089.09 SQ.M.
EAD RISER
C C 7F (BDO FLOOR) 1111.71 SQ.M.
6F (BDO FLOOR) 1134.34 SQ.M.
5F (BDO FLOOR) 1185.72 SQ.M.
20 4F MEZZANINE (PROVISION) 234.71 SQ.M.
1 19
2
4F (BDO FLOOR) 1185.72 SQ.M.
18
3 17 3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325
4 16
FOURTH FLOOR MEZZANINE 5 15 3F (BDO FLOOR) 1229.58 SQ.M.
166.56 SQ.M. 6 14
+27.75M/ + 78.25M. 2F MEZZANINE (PROVISION) 234.71 SQ.M.
7 13
PROVISION FOR 50MM 8 2F (BANK BRANCH) 1149.72 SQ.M.
LS-01 12 LS-01
CONCRETE TOPPING 9 11
AR - 401 10 AR - 401 GF MEZZANINE 517.71 SQ.M.
ST-04
GF 948.11 SQ.M.
AR-524
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

4000
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
A FOURTH FLOOR MEZZANINE FLOOR PLAN
CS-01 CS-02 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
AR - 215 1 : 100 1 2 3 4 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 403 AR - 404 PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:52 PM
ARCHITECT FOURTH MEZZANINE FLOOR THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
PLAN CHECKED: DRAWN:
MMOSER ASSOCIATES
(S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 215
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 RECOMMENDING APPROVAL AS TO:


1 2 3 CS-02 5
AR - 403 4 AR - 404
40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A SW-3 SW-4 A
CCTV

14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
DN FIRE EXIT 1 SERVICE ELEV. LOBBY DN
CCTV
15.33 SQ.M. 7.97 SQ.M. AR-501
CCTV
BUILDING OFFICIAL: DATE:
FIRE EXIT 2

3200

3200
ST-01A +31.50M. +31.50M./ +82.00M. ST-02A
16.07 SQ.M. AREA TABULATION (GFA)
SW-1 SW-2 AR-518 FF-07 FF-07 +31.50M./ +82.00M. AR-520
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.

FIRE CABINET
FEMALE TOILET DDC 650X650

FIREBOX
D-03
EAD RISER 18F (LEASING FLOOR) 847.43 SQ.M.
15.19 SQ.M. AR-501 JANITORS CLOSET
+31.45M. / +81.95M. D-06 D-03
2.63 SQ.M. EXEC. TOILET 1 CCTV CCTV
17F (LEASING FLOOR) 877.91 SQ.M.
FF-12 +31.50M. AR-501 AR-501 5.33 SQ.M.
FF-07 +31.50M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
33.32 SQ.M.
+31.50M. / +82.00M. 15F (LEASING FLOOR) 925.77 SQ.M.

800X400 TEAD RISER


SERVICE HALLWAY
FF-09 D-06 9.45 SQ.M. AHU 14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
TOILET HALLWAY AR-501 +31.50M. / +82.00M. 28.93 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 +31.50M. / +82.00 13F (LEASING FLOOR) 976.05 SQ.M.
+31.50M./ +82.00M. FF-07
AR-501 D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 +31.50M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV ROOM AR-501
FF-12
6.39 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+31.50M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
MALE TOILET
AR - 402 16.07 SQ.M. PWD TOILET 850X850 850X850 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03
4.88 SQ.M. PAD RISER EAD RISER
+31.45 M. / +81.95M.
FF-12 AR-501 350X350 +31.50M. 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER FF-12
C C1 D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
23677

3F MEZZANINE (PROVISION) 234.71 SQ.M.


6325

6325
3F (BDO FLOOR) 1229.58 SQ.M.
5824 1750 11075 1500 2450 4800
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.

28169
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
C2 C3 C4 C5 C6 B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

4000
B4 (PARKING) 1595.01 SQ.M.
BDO OFFICE FLOOR B5 (PARKING) 1595.01 SQ.M.
+31.50./ +82.00M.
B6 (PARKING) 1330.63 SQ.M.
PROVISION FOR 150MM
RAISED FLOORING TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
8003

C2 PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
G C7
TOTAL NO. OF PARKING PROVIDED 238 SLOTS

8495
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
FIFTH FLOOR C8
LINE TOLERANCE SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
C9
FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT


C9 1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED
FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

C10
HATCHING LEGENDS
G REINFORCED CONCRETE WALL

FIFTH FLOOR
LINE TOLERANCE

6" CHB WALL

CS-01 CS-02
AR - 403 4 AR - 404

A FIFTH FLOOR PLAN 8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
AR - 216 1 : 100 40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)

REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE


1 2 3 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:56 PM
ARCHITECT FIFTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 216
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 CS-02 RECOMMENDING APPROVAL AS TO:


1 2 3 5
AR - 403 4 AR - 404

40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A SW-3 SW-4 A
CCTV

14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV DN FIRE EXIT 1 SERVICE ELEV. LOBBY DN CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. AR-501
7.97 SQ.M. FIRE EXIT 2

3200

3200
ST-01A +36.00M. / +86.50M. ST-02A
+36.00M. / +86.50M. 16.07 SQ.M. AREA TABULATION (GFA)
SW-1 SW-2 AR-518 FF-07 FF-07 +36.00M. / +86.50M. AR-520
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02 20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC 650X650

FIREBOX
D-03 EAD RISER
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
+35.95M. / +86.45M. AR-501
2.63 SQ.M. D-06 D-03
FF-12 EXEC. TOILET 02 CCTV CCTV
17F (LEASING FLOOR) 877.91 SQ.M.
+36.00 M. AR-501 AR-501 5.33 SQ.M.
FF-07 +35.95M. / +86.45M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.37 SQ.M.
+36.00M. / +86.50M. 15F (LEASING FLOOR) 925.77 SQ.M.

800X400 TEAD RISER


SERVICE HALLWAY
FF-09 D-06 9.45 SQ.M. AHU
14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
HALLWAY +36.00M. / +86.50M. 28.93 SQ.M.
AR-501 +36.00M. / +86.50M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 01 13F (LEASING FLOOR) 976.05 SQ.M.
+36.00M. / +86.50M. FF-07
AR-501 D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 +35.95M. / +86.45M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV ROOM AR-501
FF-12
6.39 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+36.00 M.
LS-02 FF-07 D-04 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
MALE TOILET AR-501
AR - 402 16.07 SQ.M. PWD 850X850 850X850 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03 4.88 SQ.M. PAD RISER EAD RISER
+35.95M. / +86.45M.
350X350 +35.95M. / +86.45M.
FF-12 AR-501
EAD RISER
8F (BDO FLOOR) 1089.09 SQ.M.
CCTV FF-12
C C1 D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
HALLWAY
39.37 SQ.M. 5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
23116

5824 1750 11075 1500 2450 4800


4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
2F (BANK BRANCH) 1149.72 SQ.M.

27608
LS-01 LS-01
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
C2 C3 C4 C5 C6 B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

4000
B4 (PARKING) 1595.01 SQ.M.
BDO OFFICE FLOOR B5 (PARKING) 1595.01 SQ.M.
773.95 SQ.M.
+38.00M./ +86.50M. B6 (PARKING) 1330.63 SQ.M.
PROVISION FOR 150MM
RAISED FLOORING TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
7441

C2 PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
G
B6 25 SLOTS

7933
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
SIXTH FLOOR
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
LINE TOLERANCE
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

G HATCHING LEGENDS

REINFORCED CONCRETE WALL


SIXTH FLOOR
LINE TOLERANCE

6" CHB WALL

A SIXTH FLOOR PLAN 8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
AR - 217 1 : 100 40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)

CS-01 CS-02 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE


1 2 3 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 403 AR - 404 PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:58 PM
ARCHITECT SIXTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 217
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 CS-02 RECOMMENDING APPROVAL AS TO:


1 2 3 5
AR - 403 4 AR - 404

40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV DN FIRE EXIT 1 SERVICE ELEV. LOBBY DN
DN CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. 7.97 SQ.M. AR-501
FIRE EXIT 2
+40.50M. / +91.00M. ST-02A

3200

3200
ST-01A +40.50M. / +91.00M. 16.07 SQ.M.
FF-07 +40.50M. / +91.00M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP
2725
UP
UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC 650X650

FIREBOX
D-03
15.19 SQ.M. EAD RISER 18F (LEASING FLOOR) 847.43 SQ.M.
+40.45 M./ +90.95M. AR-501 JANITORS CLOSET
2.63 SQ.M. D-06 D-03
FF-12 EXEC. TOILET 01 CCTV CCTV
17F (LEASING FLOOR) 877.91 SQ.M.
+40.50M. AR-501 AR-501 5.18 SQ.M.
FF-07 +40.45 M./ +90.95M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.48 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.

800X400 TEAD RISER


+40.50M. / +91.00M. SERVICE HALLWAY
FF-09 D-06 9.45 SQ.M. AHU 14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
TOILET HALLWAY AR-501 +40.50M. / +91.00M. 28.93 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 02 +40.50M. / +91.00M. 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
+40.50M. / +91.00M. D-03 3.71 SQ.M. FF-07
1500X500 TEAD RISER FF-11 +40.45 M./ +90.95M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV ROOM AR-501
6.39 SQ.M. FF-12
+40.50M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
AR - 402 MALE TOILET 850X850 850X850 AR - 402
PWD TOILET 9F (BDO FLOOR) 1072.98 SQ.M.
16.07 SQ.M. D-03 PAD RISER EAD RISER
+40.45 M./ +90.95M. 4.88 SQ.M.
FF-12 AR-501 350X350 +40.45 M./ +90.95M. 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
HALLWAY
39.37 SQ.M. 5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
22557

4F MEZZANINE (PROVISION) 234.71 SQ.M.


4F (BDO FLOOR) 1185.72 SQ.M.
5824 1750 11075 1500 2450 4800 3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.

27049
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

4000
B4 (PARKING) 1595.01 SQ.M.
BDO OFFICE FLOOR B5 (PARKING) 1595.01 SQ.M.
754.35 SQ.M.
+44.50M./ +91.00 M. B6 (PARKING) 1330.63 SQ.M.
PROVISION FOR 150MM
6883

RAISED FLOORING TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.


PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS

G B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS

7375
SEVENTH FLOOR
LINE TOLERANCE TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

G FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS
SEVENTH FLOOR
LINE TOLERANCE REINFORCED CONCRETE WALL

6" CHB WALL

8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
A SEVENTH FLOOR PLAN
REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
AR - 218 1 : 100 1 CS-01 CS-02
2 3 4 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 403 AR - 404 PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:02 PM
ARCHITECT SEVENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 218
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 CS-02 RECOMMENDING APPROVAL AS TO:


1 2 3 5
AR - 403 4 AR - 404

40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV DN FIRE EXIT 01 SERVICE ELEV. LOBBY DN CCTV
BUILDING OFFICIAL: DATE:
15.39 SQ.M. AR-501
FIRE EXIT 02
7.97 SQ.M. ST-02A

3200

3200
ST-01A +45.00 M./ +95.50M. +45.00 M./ +95.50M. 16.07 SQ.M.
FF-07 +45.00 M./ +95.50M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC 650X650

FIREBOX
D-03
15.19 SQ.M. EAD RISER 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
JANITORS CLOSET
+44.95 M./ +95.45M. 2.63 SQ.M. D-06 D-03 EXEC. TOILET 01 CCTV CCTV
17F (LEASING FLOOR) 877.91 SQ.M.
FF-12 +45.00 M./ +95.50M.
AR-501 AR-501 5.18 SQ.M.
FF-07 +44.95 M./ +95.45M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.05 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.

800X400 TEAD RISER


+45.00 M./ +95.50M. SERVICE HALLWAY
FF-09 D-06
9.45 SQ.M. AHU 14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
TOILET HALLWAY AR-501 +45.00 M./ +95.50M. 28.93 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 02 +45.00 M./ +95.50M. 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
+45.00 M./ +95.50M. 3.71 SQ.M. FF-07
D-03
1500X500 TEAD RISER FF-11 +44.95 M./ +95.45M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV ROOM AR-501
FF-12
6.39 SQ.M.
+45.00 M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
MALE TOILET
AR - 402 16.07 SQ.M.
PWD TOILET 850X850 850X850 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03 4.88 SQ.M. PAD RISER EAD RISER
+44.95 M./ +95.45M.
350X350 +44.95 M./ +95.45M.
FF-12 AR-501
EAD RISER
8F (BDO FLOOR) 1089.09 SQ.M.
CCTV FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
HALLWAY
39.37 SQ.M. 5F (BDO FLOOR) 1185.72 SQ.M.
21997

FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
5824 1750 11075 1500 7250 3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325
3F (BDO FLOOR) 1229.58 SQ.M.

26489
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

4000
B4 (PARKING) 1595.01 SQ.M.
BDO OFFICE FLOOR B5 (PARKING) 1595.01 SQ.M.
732.69 SQ.M.
+45.00M./ +95.50M. B6 (PARKING) 1330.63 SQ.M.
6323

PROVISION FOR 150MM


RAISED FLOORING TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS

G B3 40 SLOTS
B4 40 SLOTS

EIGHTH FLOOR
B5 40 SLOTS

6815
LINE TOLERANCE B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

G FF-10
1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED
PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

EIGHTH FLOOR
LINE TOLERANCE HATCHING LEGENDS

REINFORCED CONCRETE WALL

4 6" CHB WALL

A EIGHTH FLOOR PLAN


AR - 219 1 : 100
8100 10600 11000 10875
NOTES (FLOOR LEVEL REFERENCE)
40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)

CS-01 CS-02 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE


1 AR - 403
2 3 AR - 404 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:06 PM
ARCHITECT EIGHTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 219
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

1 CS-01 CS-02 RECOMMENDING APPROVAL AS TO:


2 3 5
AR - 403 4 AR - 404

40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV DN FIRE EXIT 01 SERVICE ELEV. LOBBY DN
DN CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. AR-501FIRE EXIT 02
7.97 SQ.M. ST-02A

3200

3200
ST-01A +49.50 M. / +100.00M. +49.50 M. / +100.00M. 16.07 SQ.M.
FF-07 +49.50 M. / +100.00M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
DDC 650X650

FIREBOX
FEMALE TOILET D-03
EAD RISER
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+49.45 M. / +99.95M. 2.63 SQ.M. D-06 D-03 CCTV CCTV
FF-12 +49.50 M. EXEC. TOILET 1 17F (LEASING FLOOR) 877.91 SQ.M.
AR-501 AR-501 5.33 SQ.M.
FF-07 +49.45 M. / +99.95M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.05 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.

800X400 TEAD RISER


+49.50 M. / +100.00M. SERVICE HALLWAY
FF-09 D-06 9.45 SQ.M. AHU 14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
TOILET HALLWAY AR-501 +49.50 M. 28.93 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 +49.50 M. / +100.00M. 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
+49.50 M. / +100.00M. D-03 3.71 SQ.M. FF-07
1500X500 TEAD RISER FF-11 +49.45 M. / +99.95M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV ROOM AR-501
FF-12
6.04 SQ.M.
+49.50 M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
MALE TOILET
AR - 402 16.07 SQ.M.
PWD TOILET 850X850 850X850 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03 4.88 SQ.M. PAD RISER EAD RISER
+49.45 M. / +99.95M. +49.45 M. / +99.95M.
FF-12 AR-501 350X350 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
HALLWAY
21437

39.37 SQ.M. 5F (BDO FLOOR) 1185.72 SQ.M.


FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
1750 11075 1500 2450 4800
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325
3F (BDO FLOOR) 1229.58 SQ.M.

25929
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

4000
B4 (PARKING) 1595.01 SQ.M.
BDO RETAIL OFFICE B5 (PARKING) 1595.01 SQ.M.
712.14 SQ.M.
5762

+49.50M./ +100.00M. B6 (PARKING) 1330.63 SQ.M.


PROVISION FOR 150MM
RAISED FLOORING TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
G B2 40 SLOTS
B3 40 SLOTS
NINTH FLOOR
LINE TOLERANCE
B4 40 SLOTS

6254
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

G FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE
NINTH FLOOR 600MMX1200MM WABI SABI TAUPE LAPATTO RECT
LINE TOLERANCE FF-11
HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
A NINTH FLOOR PLAN REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
CS-01 CS-02
AR - 220 1 : 100 1 2 3 4 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 403 AR - 404 PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:11 PM
ARCHITECT NINTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 220
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 CS-02 RECOMMENDING APPROVAL AS TO:


1 2 3 5
AR - 403 4 AR - 404

40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A CCTV A
CCTV
D-02
CCTV DN FIRE EXIT 01 SERVICE ELEV. LOBBY DN
DN CCTV
BUILDING OFFICIAL: DATE:
15.39 SQ.M. 7.97 SQ.M.
AR-501FIRE EXIT
ST-02A

3200

3200
ST-01A +54.00 M. / +104.50M. +54.00 M. / +104.50M. 16.07 SQ.M. AREA TABULATION (GFA)
AR-514 FF-07 FF-07 +54.00 M. / +104.50M. AR-515
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
UP
20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
DDC 650X650

FIREBOX
FEMALE TOILET D-03
EAD RISER
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+53.95 M. / +104.45M. 2.63 SQ.M. D-06 D-03 EXEC. TOILET 1 CCTV CCTV
FF-12 +54.00 M. 17F (LEASING FLOOR) 877.91 SQ.M.
AR-501 AR-501 5.33 SQ.M.
FF-07 +53.95 M. / +104.45M.
ELEVATOR LOBBY
16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.05 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.

800X400 TEAD RISER


+54.00 M. / +104.50M. SERVICE HALLWAY
FF-09 D-06 9.45 SQ.M. AHU 14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
TOILET HALLWAY AR-501
+54.00 M. 28.93 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 +54.00 M. / +104.50M. 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
+54.00 M. / +104.50M. 3.71 SQ.M. FF-07
D-03
1500X500 TEAD RISER FF-11 +53.95 M. / +104.45M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV ROOM AR-501
FF-12
5.80 SQ.M.
+54.00 M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
AR - 402 MALE TOILET PWD 850X850 850X850 AR - 402
16.07 SQ.M. D-03 PAD RISER EAD RISER 9F (BDO FLOOR) 1072.98 SQ.M.
+53.95 M. / +104.45M. 4.88 SQ.M.
FF-12 AR-501 350X350 +53.95 M. / +104.45M. 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
20877

HALLWAY
39.37 SQ.M. 5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
5824 1750 6150 4925 1500 2450 4800 4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325

25369
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

4000
B4 (PARKING) 1595.01 SQ.M.
BDO OFFICE FLOOR B5 (PARKING) 1595.01 SQ.M.
5202

691.29 SQ.M.
+54.00/ +104.50M. B6 (PARKING) 1330.63 SQ.M.
PROVISION FOR 150MM
RAISED FLOORING TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
G B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
TENTH FLOOR
LINE TOLERANCE
B4 40 SLOTS

5694
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

G FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


TENTH FLOOR FF-10 PORCELAIN TILE
LINE TOLERANCE
FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

A TENTH FLOOR PLAN 8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
AR - 221 1 : 100 40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)

CS-01 CS-02 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE


1 AR - 403 2 3 4 AR - 404 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:17 PM
ARCHITECT TENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 221
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 CS-02 RECOMMENDING APPROVAL AS TO:


AR - 403 4 AR - 404
1 2 3 5
HEAD ARCHITECTURAL SECTION DATE:
40575
APPROVED:
8100 10600 11000 10875

A CCTV A
CCTV
D-02
FIRE EXIT
DN DN
CCTV
15.33 SQ.M. SERVICE ELEV. LOBBY AR-501
CCTV
BUILDING OFFICIAL: DATE:
FIRE EXIT

3200

3200
ST-01C + 58.50 M./ +109.00M. 7.97 SQ.M. ST-02C
+ 58.50 M./ +109.00M. 16.07 SQ.M. AREA TABULATION (GFA)

FLUE GAS PIPE EXCHANGE


AR-515 FF-07 + 58.50 M./ +109.00M. AR-516
FF-07
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
DDC

FIREBOX
DDC DDC 18F (LEASING FLOOR) 847.43 SQ.M.
JANITORS CLOSET
2.63 SQ.M. D-05 PWD CCTV CCTV 650X650
+ 58.50 M./ +109.00M. EAD RISER 17F (LEASING FLOOR) 877.91 SQ.M.
AR-501 5.33 SQ.M.
DAY TANK FF-07 D-06 +58.45 M./ +108.95M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
AR-501 FF-12
DAY TANK 32.45 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.

700X600 TEAD RISER


+ 58.50 M./ +109.00M.
FF-07 AHU 14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
38.58 SQ.M.
SERVICE HALLWAY + 58.50 M./ +109.00M.
D-06
9.45 SQ.M. 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501 FF-07
+ 58.50 M./ +109.00M.
1500X500 TEAD RISER
ELV RM FF-07 12F (LEASING FLOOR) 1001.19 SQ.M.
DAY TANK
FF-07 6.39 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+ 58.50 M.
LS-02 FF-07 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR - 402 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
PAD RISER EAD RISER
D-08
350X350 8F (BDO FLOOR) 1089.09 SQ.M.
GPS GPS GPS GPS GPS EAD RISER AR-501
C C 7F (BDO FLOOR) 1111.71 SQ.M.
20317

6F (BDO FLOOR) 1134.34 SQ.M.


D-09 5008 11075 1500 7250
AR-501
5F (BDO FLOOR) 1185.72 SQ.M.
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
FF-07 3F MEZZANINE (PROVISION) 234.71 SQ.M.

24809
6325

6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
D-09 D-09 D-09
LS-01 AR-501 AR-501 AR-501 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
TX-2 B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
PAHU AND CHILLER ROOM

4000
201.16 SQ.M. INCOMING B4 (PARKING) 1595.01 SQ.M.
4643

+ 58.50 M./ +109.00M.


FF-07 LVSG ROOM B5 (PARKING) 1595.01 SQ.M.
39.39 SQ.M.
+58.50M./ +109.00M. B6 (PARKING) 1330.63 SQ.M.
FF-07 FF-07
TX-2 TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
G LVSG-1 GF (SURACE PARKING) 12 SLOTS
TX-1
B1 41 SLOTS
TX-1 B2 40 SLOTS
ELEVENTH FLOOR
LINE TOLERANCE B3 40 SLOTS
SPARE

5135
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
G FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

ELEVENTH FLOOR FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT


LINE TOLERANCE
1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED
FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
A ELEVENTH FLOOR PLAN 40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
AR - 222 1 : 100
CS-01 CS-02 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
1 2 3 4 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 403 AR - 404 PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:22 PM
ARCHITECT ELEVENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 222
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 CS-02 RECOMMENDING APPROVAL AS TO:


1 2 3 5
AR - 403 4 AR - 404

40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV DN FIRE EXIT 1 SERVICE ELEV. LOBBY DN DN CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. 8.00 SQ.M. AR-501
FIRE EXIT 2 ST-02A

3200

3200
ST-01A + 64.50 M./ +115.00M. + 64.50 M./ +115.00M. 16.07 SQ.M.
FF-07 AR-515
AREA TABULATION (GFA)
AR-514 FF-07 + 64.50 M./ +115.00M.
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC

FIREBOX
D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+63.45 M./ +114.95M. 2.63 SQ.M. D-06 D-03 CCTV CCTV 650X650
FF-12 + 64.50 M. AR-501 EXEC. TOILET 1 17F (LEASING FLOOR) 877.91 SQ.M.
AR-501 EAD RISER
5.24 SQ.M.
FF-07 +63.45 M./ +114.95M.
ELEVATOR LOBBY
16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
31.84 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.

700X600 TEAD RISER


+ 64.50 M./ +115.00M.
SERVICE HALLWAY
FF-09 D-06 AHU 14F (LEASING FLOOR) 950.91 SQ.M.
9.45 SQ.M.

6150

6150
TOILET HALLWAY AR-501 + 64.50 M. 29.11 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 + 64.50 M./ +115.00M. 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
+ 64.50 M./ +115.00M. 3.71 SQ.M. FF-07
D-03
1500X500 TEAD RISER FF-11 +63.45 M./ +114.95M. 12F (LEASING FLOOR) 1001.19 SQ.M.
TELCO / IT AR-501
FF-12
6.04 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+ 64.50 M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
MALE TOILET AR-501
AR - 402 16.21 SQ.M.
PWD TOILET 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03 4.88 SQ.M. PAD RISER EAD RISER
+63.45 M./ +114.95M.
350X350 +63.45 M./ +114.95M.
FF-12 AR-501
EAD RISER
8F (BDO FLOOR) 1089.09 SQ.M.
CCTV FF-12
C D-08 C
19553

7F (BDO FLOOR) 1111.71 SQ.M.


AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
5824 1750 11075 1500 2450 4800
5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.

24045
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
LEASABLE SPACE B2 (PARKING) 1595.01 SQ.M.
631.83 SQ.M.
+64.50M./ +115.00M. B3 (PARKING) 1595.01 SQ.M.
PROVISION FOR 50MM
3878

4000
CONCRETE TOPPING B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
G
PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
TWELFTH FLOOR B1 41 SLOTS
LINE TOLERANCE
B2 40 SLOTS
B3 40 SLOTS

4370
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
G SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

TWELFTH FLOOR FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT


LINE TOLERANCE
FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
A TWELFTH FLOOR PLAN
REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
AR - 223 1 : 100 CS-01 CS-02
1 2 3 4 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 403 AR - 404 PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:27 PM
ARCHITECT TWELFTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 223
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 CS-02 RECOMMENDING APPROVAL AS TO:


1 2 3 5
AR - 403 4 AR - 404

40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV DN FIRE EXIT 1 SERVICE ELEV. LOBBY DN CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. 8.00 SQ.M. AR-501FIREEXIT 2
ST-02A

3200

3200
ST-01A + 69.00 M./ +119.50M. +69.00./ +119.50M. 16.07 SQ.M.
FF-07 + 69.00 M./ +119.50M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC

FIREBOX
D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
+68.95/ +119.45 AR-501
2.63 SQ.M. D-06 D-03
EXEC. TOILET 1 CCTV CCTV 650X650
FF-12 + 69.00 M. EAD RISER 17F (LEASING FLOOR) 877.91 SQ.M.
AR-501 AR-501 5.09 SQ.M.
FF-07 +68.95 M. 16F (LEASING FLOOR) 900.54 SQ.M.
ELEVATOR LOBBY FF-12
32.69 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.

700X600 TEAD RISER


+69.00M./ +119.50M. SERVICE HALLWAY
FF-09 D-06 9.45 SQ.M. AHU 14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
TOILET HALLWAY AR-501
+69.00M./ +119.50M. 29.11 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 + 69.00 M./ +119.50M. 13F (LEASING FLOOR) 976.05 SQ.M.
+69.00M./ +119.50M. FF-07
AR-501 D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 +68.95 M. 12F (LEASING FLOOR) 1001.19 SQ.M.
TELCO / IT AR-501
FF-12
6.04 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+ 69.00 M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
AR - 402 MALE TOILET PWD 800X800 800X800 AR - 402
16.21 SQ.M. D-03 4.88 SQ.M. PAD RISER EAD RISER 9F (BDO FLOOR) 1072.98 SQ.M.
+ 68.95 M./ +119.45M. +68.95 M.
FF-12 AR-501 350X350 8F (BDO FLOOR) 1089.09 SQ.M.
EAD RISER FF-12
18983

CCTV
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
5824 1750 11075 1500 2450 4800
5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.

23475
4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
LEASABLE SPACE
617.91 SQ.M. B2 (PARKING) 1595.01 SQ.M.
+69.00M./ +119.50M.
B3 (PARKING) 1595.01 SQ.M.
3308

PROVISION FOR 50MM

4000
CONCRETE TOPPING B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
G
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
THIRTEENTH FLOOR GF (SURACE PARKING) 12 SLOTS
LINE TOLERANCE
B1 41 SLOTS
B2 40 SLOTS

3800
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
G TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
THIRTEENTH FLOOR FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
LINE TOLERANCE
FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
A THIRTEENTH FLOOR PLAN 40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
AR - 224 1 : 100
CS-01 CS-02 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
1 AR - 403 2 3 4 AR - 404 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:32 PM
ARCHITECT THIRTEENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 224
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 CS-02 RECOMMENDING APPROVAL AS TO:


1 2 3 5
AR - 403 4 AR - 404

40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV DN FIRE EXIT 1 SERVICE ELEV. LOBBY DN CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. AR-501
8.01 SQ.M. FIRE EXIT 2 ST-02A

3200

3200
ST-01A + 73.50 M./ +124.00M. 16.07 SQ.M.
FF-07
+ 73.50 M./ +124.00M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07 + 73.50 M./ +124.00M.
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
DDC

FIREBOX
FEMALE TOILET D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+ 73.45 M./ +123.95M. 2.63 SQ.M. D-06 D-03 CCTV CCTV 650X650
FF-12 EXEC. TOILET 01 17F (LEASING FLOOR) 877.91 SQ.M.
+ 73.50 M. AR-501 AR-501 EAD RISER
5.09 SQ.M.
FF-07 + 73.45 M./ +123.95M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.01 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.

700X600 TEAD RISER


+ 73.50 M./ +124.00M. SERVICE HALLWAY
FF-09 D-06 9.45 SQ.M. AHU 14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
TOILET HALLWAY AR-501 73.50 M./ +124.00M.
+ 29.11 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 02 + 73.50 M./ +124.00M. 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
+ 73.50 M./ +124.00M. 3.71 SQ.M. FF-07
D-03
1500X500 TEAD RISER FF-11 + 73.45 M./ +123.95M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV ROOM AR-501
FF-12
6.29 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+ 73.50 M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
AR - 402 PWD 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
MALE TOILET D-03
4.88 SQ.M. PAD RISER EAD RISER
18423

16.21 SQ.M.
FF-12 AR-501 350X350 + 73.45 M./ +123.95M. 8F (BDO FLOOR) 1089.09 SQ.M.
+ 73.45 M./ +123.95M. CCTV EAD RISER FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
5824 1750 11075 1500 2450 4800 5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.

22915
4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
LEASABLE SPACE
B2 (PARKING) 1595.01 SQ.M.
606.05 SQ.M.
2748

+73.50M./ +124.00M.
B3 (PARKING) 1595.01 SQ.M.
PROVISION FOR 50MM

4000
CONCRETE TOPPING B4 (PARKING) 1595.01 SQ.M.

G B5 (PARKING) 1595.01 SQ.M.


B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
FOURTEENTH FLOOR PARKING PROVISIONS
LINE TOLERANCE E
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS

3240
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
G TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
FOURTEENTH FLOOR SCHEDULE OF FLOOR FINISHES
LINE TOLERANCE
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
A FOURTEENTH FLOOR PLAN 40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
AR - 225 1 : 100
REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
CS-01 CS-02
1 2 3 4 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 403 AR - 404 PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:38 PM
ARCHITECT FOURTEENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 225
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 CS-02 RECOMMENDING APPROVAL AS TO:


1 2 3 5
AR - 403 4 AR - 404

40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
DN FIRE EXIT 1 SERVICE ELEV. LOBBY DN
CCTV
8.01 SQ.M. AR-501FIRE EXIT 2
CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. ST-02A

3200

3200
ST-01A +78.00M./ +128.50M. +78.00M./ +128.50M. 16.07 SQ.M.
FF-07 +78.00M./ +128.50M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP 2725 UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC

FIREBOX
D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+77.95 M./ +128.45M. 2.63 SQ.M. D-06 D-03 650X650
FF-12 EXEC. TOILET 1 CCTV CCTV
17F (LEASING FLOOR) 877.91 SQ.M.
+78.00 M. EAD RISER
AR-501 AR-501 5.09 SQ.M.
FF-07 +77.95 M./ +128.45M.
ELEVATOR LOBBY
16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.11 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.

700X600 TEAD RISER


+78.00M./ +128.50M. SERVICE HALLWAY
FF-09 D-06
9.45 SQ.M. AHU 14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
TOILET HALLWAY AR-501 +78.00M./ +128.50M. 29.11 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 +78.00M./ +128.50M. 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
+78.00M./ +128.50M. D-03 3.71 SQ.M. FF-07
1500X500 TEAD RISER FF-11 +77.95 M./ +128.45M. 12F (LEASING FLOOR) 1001.19 SQ.M.
TELCO / IT AR-501
FF-12
5.80 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+78.00 M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
MALE TOILET
AR - 402 16.21 SQ.M. PWD TOILET 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03 PAD RISER EAD RISER
17958

+77.95 M./ +128.45M. 4.88 SQ.M.


FF-12 AR-501 350X350 +77.95 M./ +128.45M. 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
5824 1750 11075 1500 2450 4800
5F (BDO FLOOR) 1185.72 SQ.M.
FF-13

22450
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
LEASABLE SPACE
B2 (PARKING) 1595.01 SQ.M.
2283

565.51 SQ.M.
+78.00M./ +128.50M.
B3 (PARKING) 1595.01 SQ.M.
PROVISION FOR 50MM
CONCRETE TOPPING B4 (PARKING) 1595.01 SQ.M.
G
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.

6776
FIFTEENTH FLOOR TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
LINE TOLERANCE
PARKING PROVISIONS
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
G B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
FIFTEENTH FLOOR TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
LINE TOLERANCE
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
A FIFTEENTH FLOOR PLAN 40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
AR - 226 1 : 100
CS-01 CS-02 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
1 2 3 4 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 403 AR - 404 PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:45 PM
ARCHITECT FIFTEENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 226
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 CS-02 RECOMMENDING APPROVAL AS TO:


1 2 3 5
AR - 403 4 AR - 404

40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
DN FIRE EXIT 1 SERVICE ELEV. LOBBY DN
CCTV
15.33 SQ.M. AR-501FIRE EXIT 2
CCTV
BUILDING OFFICIAL: DATE:
8.00 SQ.M. ST-02A

3200

3200
ST-01A +82.50 M./ +133.00M. +82.50 M./ +133.00M. 16.07 SQ.M.
FF-07 +82.50 M./ +133.00M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP 2725 UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
DDC

FIREBOX
FEMALE TOILET D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+ 82.45 M./ +132.95M. 2.63 SQ.M. D-06 D-03 650X650
FF-12 EXEC. TOILET 1 CCTV CCTV
17F (LEASING FLOOR) 877.91 SQ.M.
+82.50 M. AR-501 AR-501 5.09 SQ.M. EAD RISER
FF-07 + 82.45 M./ +132.95M.
ELEVATOR LOBBY
16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.11 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.

700X600 TEAD RISER


+82.50 M./ +133.00M. SERVICE HALLWAY
FF-09 D-06
9.45 SQ.M. AHU 14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
TOILET HALLWAY +82.50 M. 29.11 SQ.M.
AR-501
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 +82.50 M./ +133.00M. 13F (LEASING FLOOR) 976.05 SQ.M.
+82.50 M./ +133.00M. FF-07
AR-501 D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 + 82.45 M./ +132.95M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV ROOM AR-501
FF-12
6.29 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+82.50 M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
MALE TOILET
AR - 402 800X800 800X800 AR - 402
17403

16.21 SQ.M. D-03 PWD TOILET PAD RISER EAD RISER 9F (BDO FLOOR) 1072.98 SQ.M.
+ 82.45 M./ +132.95M. 4.88 SQ.M.
FF-12 AR-501 350X350 + 82.45 M./ +132.95M. 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
HALLWAY
39.37 SQ.M. 5F (BDO FLOOR) 1185.72 SQ.M.

21895
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
5824 1750 11075 1500 2450 4800
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325

6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
1728

LEASABLE SPACE
553.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
+82.50M./ +133.00M.
G B3 (PARKING) 1595.01 SQ.M.
PROVISION FOR 50MM
CONCRETE TOPPING B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
SIXTEENTH FLOOR B6 (PARKING) 1330.63 SQ.M.

6220
LINE TOLERANCE
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
G
B5 40 SLOTS
B6 25 SLOTS
SIXTEENTH FLOOR TOTAL NO. OF PARKING PROVIDED 238 SLOTS
LINE TOLERANCE
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT


4 1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED
FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
A SIXTEENTH FLOOR PLAN 40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
AR - 227 1 : 100
CS-01 CS-02 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
1 2 3 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 403 AR - 404 PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:54 PM
ARCHITECT SIXTEENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 227
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 CS-02 RECOMMENDING APPROVAL AS TO:


1 2 3 5
AR - 403 4 AR - 404

40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV DN FIRE EXIT 01 SERVICE ELEV. LOBBY DN CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. 8.01 SQ.M. AR-501
FIRE EXIT 02 ST-02A

3200

3200
ST-01A +87.00 M./ +137.50M. +87.00 M./ +137.50M. 16.07 SQ.M.
FF-07 AR-515
AREA TABULATION (GFA)
AR-514 FF-07 +87.00 M./ +137.50M.
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC

FIREBOX
D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+86.95 M./ +137.45M. 2.63 SQ.M. D-06 D-03 CCTV CCTV 650X650
FF-12 EXEC. WC 1 17F (LEASING FLOOR) 877.91 SQ.M.
+87.00 M. AR-501 AR-501 EAD RISER
5.24 SQ.M.
FF-07 +86.95 M./ +137.45M. 16F (LEASING FLOOR) 900.54 SQ.M.
ELEVATOR LOBBY FF-12
32.11 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.

700X600 TEAD RISER


+87.00 M./ +137.50M. SERVICE HALLWAY
FF-09 D-06
9.45 SQ.M. AHU 14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
TOILET HALLWAY AR-501 +86.95 M./ +137.45M. 29.11 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. WC 2 +87.00 M./ +137.50M. 13F (LEASING FLOOR) 976.05 SQ.M.
+87.00 M./ +137.50M. FF-07
AR-501 D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 +86.95 M./ +137.45M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV AR-501
FF-12
6.29 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+87.00 M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
16843

AR-501
MALE TOILET
AR - 402 16.21 SQ.M.
PWD 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03 4.88 SQ.M. PAD RISER EAD RISER
+86.95 M./ +137.45M.
350X350 +86.95 M./ +137.45M.
FF-12 AR-501
EAD RISER
8F (BDO FLOOR) 1089.09 SQ.M.
CCTV FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.

21335
5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
5824 1750 11075 1500 2450 4800

6325
3F (BDO FLOOR) 1229.58 SQ.M.
7493

2F MEZZANINE (PROVISION) 234.71 SQ.M.


LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D
B1 MEZZANINE 288.80 SQ.M.
LEASABLE SPACE
G 531.41 SQ.M.
+87.00M./ +137.50M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
PROVISION FOR 50MM
CONCRETE TOPPING B4 (PARKING) 1595.01 SQ.M.
SEVENTEENTH FLOOR
LINE TOLERANCE
B5 (PARKING) 1595.01 SQ.M.

5660
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
G
B4 40 SLOTS
B5 40 SLOTS
SEVENTEENTH FLOOR
LINE TOLERANCE
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
A SEVENTEENTH FLOOR PLAN 40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
AR - 228 1 : 100
CS-01 CS-02
REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
1 AR - 403 2 3 4 AR - 404 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:31:03 PM
ARCHITECT SEVENTEENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 228
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 RECOMMENDING APPROVAL AS TO:


1 2 3 CS-02 5
AR - 403 4 AR - 404
40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
DN FIRE EXIT 01 SERVICE ELEV. LOBBY DN
CCTV
15.33 SQ.M. FIRE EXIT
AR-501 02
CCTV
BUILDING OFFICIAL: DATE:
8.00 SQ.M. ST-02A

3200

3200
ST-01A +91.50 M./ +142.00M. +91.50 M./ +142.00M. 16.07 SQ.M.
FF-07 +91.50 M./ +142.00M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP 2725 UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
DDC

FIREBOX
FEMALE TOILET D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+91.45M./ +141.95M. 2.63 SQ.M. D-06 D-03 CCTV CCTV 650X650
FF-12 EXEC. TOILET 1 17F (LEASING FLOOR) 877.91 SQ.M.
+91.50 M. AR-501 AR-501 EAD RISER
5.09 SQ.M.
FF-07 +91.45M./ +141.95M.
ELEVATOR LOBBY
16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.27 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.

700X600 TEAD RISER


+91.50 M./ +142.00M. SERVICE HALLWAY
FF-09 D-06 9.45 SQ.M. AHU 14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
TOILET HALLWAY +91.50M. 29.11 SQ.M.
AR-501
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 +91.50 M./ +142.00M. 13F (LEASING FLOOR) 976.05 SQ.M.
+91.50 M./ +142.00M. FF-07
AR-501 D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 +91.45M./ +141.95M. 12F (LEASING FLOOR) 1001.19 SQ.M.
TELCO / IT AR-501
FF-12
6.39 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+91.50 M.
16262

FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
AR - 402 MALE TOILET PWD TOILET 800X800 800X800 AR - 402
16.21 SQ.M. D-03 PAD RISER EAD RISER 9F (BDO FLOOR) 1072.98 SQ.M.
4.88 SQ.M.
+91.45M./ +141.95M. 350X350 +91.45M./ +141.95M.
FF-12 AR-501
EAD RISER
8F (BDO FLOOR) 1089.09 SQ.M.
CCTV FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.

20754
HALLWAY
39.37 SQ.M. 5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
5824 1750 11075 1500 2450 4800
3F MEZZANINE (PROVISION) 234.71 SQ.M.

6325
3F (BDO FLOOR) 1229.58 SQ.M.
6912

2F MEZZANINE (PROVISION) 234.71 SQ.M.


LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D
G B1 MEZZANINE 288.80 SQ.M.
LEASABLE SPACE
504.19 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
+91.50M./ +142.00M.
B3 (PARKING) 1595.01 SQ.M.
EIGHTEENTH FLOOR PROVISION FOR 50MM
LINE TOLERANCE CONCRETE TOPPING B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.

5079
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS

G B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
EIGHTEENTH FLOOR
LINE TOLERANCE B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
A EIGHTEENTH FLOOR PLAN 40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
AR - 229 1 : 100
CS-01 CS-02 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
1 AR - 403 2 3 4 AR - 404 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:31:09 PM
ARCHITECT EIGHTEENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 229
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 RECOMMENDING APPROVAL AS TO:


1 2 3 4 CS-02 5
AR - 403
AR - 404
40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV FIRE EXIT 01 SERVICE ELEV. LOBBY DN CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. 8.00 SQ.M. AR-501FIRE EXIT 02
ST-02A

3200

3200
ST-01A +96.00 M./ +146.50M. +96.00 M./ +146.50M. 16.07 SQ.M.
FF-07 +96.00 M./ +146.50M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC

FIREBOX
D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+96.00 M./ +146.50M. 2.63 SQ.M. D-06 D-03 CCTV CCTV 650X650
FF-12 + 96.00 M. EXEC. TOILET 1
EAD RISER 17F (LEASING FLOOR) 877.91 SQ.M.
AR-501 AR-501
FF-07 5.26 SQ.M.
ELEVATOR LOBBY +95.95M./ +146.45M. 16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.11 SQ.M.
+96.00 M./ +146.50M. 15F (LEASING FLOOR) 925.77 SQ.M.

700X600 TEAD RISER


SERVICE HALLWAY
FF-09 D-06
9.45 SQ.M. AHU 14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
TOILET HALLWAY AR-501 +96.00 M. 29.11 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 +96.00 M./ +146.50M. 13F (LEASING FLOOR) 976.05 SQ.M.
+96.00 M./ +146.50M. FF-07
AR-501 D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 +95.95M./ +146.45M. 12F (LEASING FLOOR) 1001.19 SQ.M.
TELCO / IT AR-501
FF-12
5.80 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
15723

+ 96.00 M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
MALE TOILET
AR - 402 16.21 SQ.M. PWD TOILET 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03
4.88 SQ.M. PAD RISER EAD RISER
+96.00 M./ +146.50M.
FF-12 AR-501 350X350 +95.95M./ +146.45M. 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501

20215
HALLWAY 6F (BDO FLOOR) 1134.34 SQ.M.
39.37 SQ.M.
+96.00M./ +146.50M. 5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
5824 1750 11075 1500 2450 4800
3F MEZZANINE (PROVISION) 234.71 SQ.M.

6325
6373

3F (BDO FLOOR) 1229.58 SQ.M.


2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
G B1 (PARKING) 1595.01 SQ.M.
D
B1 MEZZANINE 288.80 SQ.M.
LEASABLE SPACE
483.64 SQ.M. B2 (PARKING) 1595.01 SQ.M.
NINETEENTH FLOOR +96.00M./ +146.50M.
LINE TOLERANCE B3 (PARKING) 1595.01 SQ.M.
PROVISION FOR 50MM
CONCRETE TOPPING B4 (PARKING) 1595.01 SQ.M.

4540
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
GF (SURACE PARKING) 12 SLOTS
G B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
NINETEENTH FLOOR
LINE TOLERANCE B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
A NINETEENTH FLOOR PLAN 40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
AR - 230 1 : 100
CS-01 CS-02
REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
1 AR - 403 2 3 4 AR - 404 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:31:15 PM
ARCHITECT NINETEENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 230
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

RCS-A RCS-B RCS - D RCS-C


AR - 416 AR - 416 AR - 416
5 RECOMMENDING APPROVAL AS TO:
1 2 3 AR - 416
4
40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A CCTV A
ST-07
12 13 14 15 16 17 18 19 20 21 22
CCTV
AR-518 D-02
DN FIRE EXIT 01 SERVICE ELEV. LOBBY DN
CCTV
8.00 SQ.M. AR-501FIRE EXIT 02
CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M.

3200

3200
ST-01B +100.50 M./ +151.00M. +100.50 M./ +151.00M. 16.07 SQ.M. ST-02B
FF-07 +100.50 M./ +151.00M. AREA TABULATION (GFA)
AR-518 FF-07 AR-520
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
DDC

FIREBOX
FEMALE TOILET D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+100.45 M./ +150.95M. 2.63 SQ.M. D-06 D-03 CCTV CCTV 650X650
FF-12 EXEC. TOILET 1 17F (LEASING FLOOR) 877.91 SQ.M.
+100.50 M. AR-501 AR-501 EAD RISER
5.26 SQ.M.
DN FF-07 +100.45 M./ +150.95M. 16F (LEASING FLOOR) 900.54 SQ.M.
ELEVATOR LOBBY FF-12
32.11 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.

700X600 TEAD RISER


+100.50 M./ +151.00M. SERVICE HALLWAY
D-06 AHU
FF-09 9.45 SQ.M. 14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
TOILET HALLWAY AR-501 +100.50 M. 29.11 SQ.M.
D-07 10.97 SQ.M. FF-11 +100.50 M./ +151.00M.
+100.50 M./ +151.00M. EXEC. TOILET 2 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501 D-03 3.71 SQ.M. FF-07
1500X500 TEAD RISER FF-11 +100.45 M./ +150.95M. 12F (LEASING FLOOR) 1001.19 SQ.M.
TELCO / IT AR-501
FF-12
15163

6.04 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.


+100.50 M.
FF-07 D-04
RLS-B RLS-B 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
AR - 417 MALE TOILET D-03 800X800 800X800 AR - 417
PWD TOILET 9F (BDO FLOOR) 1072.98 SQ.M.
15.77 SQ.M. AR-501 PAD RISER EAD RISER
+100.45 M./ +150.95M. 4.88 SQ.M.
FF-12 350X350 +100.45 M./ +150.95M. 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.

19655
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
HALLWAY 5F (BDO FLOOR) 1185.72 SQ.M.
39.37 SQ.M.
FF-13 4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
5813

6325
TWENTIETH FLOOR MEZZANINE PROJECTION 3F (BDO FLOOR) 1229.58 SQ.M.
5824 1750 11075 1500 2450 4800
2F MEZZANINE (PROVISION) 234.71 SQ.M.
2F (BANK BRANCH) 1149.72 SQ.M.
GF MEZZANINE 517.71 SQ.M.
LEASABLE SPACE GF 948.11 SQ.M.
458.04 SQ.M.
G +100.50M./ +151.00M. TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
PROVISION FOR 50MM
B1 (PARKING) 1595.01 SQ.M.
CONCRETE TOPPING D
B1 MEZZANINE 288.80 SQ.M.
TWENTIETH FLOOR
LINE TOLERANCE B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

3980
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
G GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
TWENTIETH FLOOR
LINE TOLERANCE B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
A TWENTIETH FLOOR PLAN 40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
AR - 231 1 : 100
RCS-A RCS-B RCS - D RCS-C
REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
1 2 AR - 416 3 AR - 416 4 AR - 416 AR - 416 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:31:22 PM
ARCHITECT TWENTIETH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 231
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 RCS-A RCS-B RCS - D RCS-C CS-02


AR - 403 AR - 416 AR - 416 4 AR - 416 AR - 416 AR - 404 RECOMMENDING APPROVAL AS TO:
1 2 3 5
40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A CCTV A
12 13 14 15 16 17 18 19 20 21 22
ST-07 CCTV

AR-518
DN DN BUILDING OFFICIAL: DATE:
SERVICE ELEV. LOBBY ST-02A

3200

3200
ST-01A
8.01 SQ.M. AR-515
AREA TABULATION (GFA)
AR-514 +104.25M./+154.75M.
FF-07 FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP FF-07 UP
11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
20F (HALL) 792.44 SQ.M.
B PLUMBING SHAFT PLUMBING SHAFT B
RLS-A 600X300MM 3000X325MM RLS-A 19F (LEASING FLOOR) 832.66 SQ.M.

FIREBOX
AR - 417 AR - 417 18F (LEASING FLOOR) 847.43 SQ.M.
700X600 650X650 17F (LEASING FLOOR) 877.91 SQ.M.
EAD RISER EAD RISER
DN TWEENTIETH FLOOR MEZZANINE STORAGE
118.52 SQ.M. 7.49 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
+104.25M./ 154.75M. FF-07 15F (LEASING FLOOR) 925.77 SQ.M.

700X600 TEAD RISER


PROVISION FOR 50MM
CONCRETE TOPPING 14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
SERVICE HALLWAY 13F (LEASING FLOOR) 976.05 SQ.M.
9.45 SQ.M.
1500X500 TEAD RISER +104.25M. 12F (LEASING FLOOR) 1001.19 SQ.M.
FF-11
15113

FF-11
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
ELEVATOR LOBBY
LS-02 RLS-B 37.65 SQ.M. LS-02 RLS-B 10F (BDO FLOOR) 1041.98 SQ.M.
TOILET +104.25M./+154.75M.
AR - 402 AR - 417 6.05 SQ.M. FF-09 800X800 800X800 AR - 402 AR - 417 9F (BDO FLOOR) 1072.98 SQ.M.
+104.20/ +154.70M. PAD RISER EAD RISER
350X350 8F (BDO FLOOR) 1089.09 SQ.M.
FF-12 EAD RISER
C C 7F (BDO FLOOR) 1111.71 SQ.M.

19605
6F (BDO FLOOR) 1134.34 SQ.M.
HALLWAY
107.57 SQ.M. 5F (BDO FLOOR) 1185.72 SQ.M.
+104.25/ 154.75M.
PROVISION FOR 50MM 4F MEZZANINE (PROVISION) 234.71 SQ.M.
CONCRETE TOPPING
RLS-C RLS-C 4F (BDO FLOOR) 1185.72 SQ.M.
AR - 418 AR - 418 3F MEZZANINE (PROVISION) 234.71 SQ.M.
5763

6325
R-13 3F (BDO FLOOR) 1229.58 SQ.M.
AR-533
OPEN 2F MEZZANINE (PROVISION) 234.71 SQ.M.
TO
LS-01 BELOW LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
G
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

3930
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
G GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
A TWENTIETH FLOOR MEZZANINE FLOOR PLAN 40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
AR - 232 1 : 100 CS-01 RCS-A RCS-B RCS - D RCS-C CS-02
REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
1 AR - 403 2 AR - 416 3 AR - 416 4 AR - 416 AR - 416 AR - 404 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:31:29 PM
ARCHITECT TWEENTIETH MEZZANINE FLOOR THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
PLAN CHECKED: DRAWN:
MMOSER ASSOCIATES
(S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 232
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

RCS-A
RCS-B RCS - D RCS-C
AR - 416 4 RECOMMENDING APPROVAL AS TO:
1 2 3 AR - 416 AR - 416 AR - 416 5
40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

A A
DDC
CCTV
D-02
DN DN
FIRE EXIT 01 BUILDING OFFICIAL: DATE:
SERVICE ELEVATOR LOBBY AR-501

3200

3200
ST-01B 14.67 SQ.M. ST-02D
+108.00M./ +158.50
MELD BATTERY
PANEL X5
7.90 SQ.M. AREA TABULATION (GFA)
AR-514
FF-07 +108.00M./ +158.50 AR-516
CONTROL PANEL
PE3
FF-07 FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP
CONTROL PANEL
CONTROL PANEL 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02 PE5
PE2
AR-501 20F (HALL) 792.44 SQ.M.
B ATTACHMENT B
RLS-A ATTACHMENT PANEL
PNL PE5 CCTV
RLS-A 19F (LEASING FLOOR) 832.66 SQ.M.

1500
CCTV
PE2-PE3
GRP.
AR - 417 CTRL
AR - 417 18F (LEASING FLOOR) 847.43 SQ.M.
17F (LEASING FLOOR) 877.91 SQ.M.
PE 02, 03 ,05 MACHINE ROOM HEIGHT
47.21 SQ.M. 16F (LEASING FLOOR) 900.54 SQ.M.
+108.00M./ +158.50M.
15F (LEASING FLOOR) 925.77 SQ.M.
676
14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
NON-POTABLE ELEVATED 13F (LEASING FLOOR) 976.05 SQ.M.

DDC
WATER TANK
14437
CAP = 102 CU.M. 12F (LEASING FLOOR) 1001.19 SQ.M.
FIRE PUMP ROOM
21.56 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+108.00M./ +158.50M.
RLS-B FF-07 RLS-B 10F (BDO FLOOR) 1041.98 SQ.M.
AR - 417 AR - 417 9F (BDO FLOOR) 1072.98 SQ.M.
8F (BDO FLOOR) 1089.09 SQ.M.

18929
C PUMP ROOM FOR POTABLE AND NON POTABLE C 7F (BDO FLOOR) 1111.71 SQ.M.
7.25 SQ.M.
+108.00M./ +158.50 6F (BDO FLOOR) 1134.34 SQ.M.
ST-03 FF-07
UP AR-522 5F (BDO FLOOR) 1185.72 SQ.M.
DDC
4F MEZZANINE (PROVISION) 234.71 SQ.M.
RLS-C RLS-C 4F (BDO FLOOR) 1185.72 SQ.M.
5087

ELEVATED MAKE-UP
AR - 418 WATER TANK AR - 418 3F MEZZANINE (PROVISION) 234.71 SQ.M.

6325
POTABLE ELEVATED
3F (BDO FLOOR) 1229.58 SQ.M.
WATER TANK
2F MEZZANINE (PROVISION) 234.71 SQ.M.
2F (BANK BRANCH) 1149.72 SQ.M.

G GF MEZZANINE 517.71 SQ.M.


GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
ROOF DECK FLOOR
B1 (PARKING) 1595.01 SQ.M.
LINE TOLERANCE D
HELIPAD PROJECTION B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

3251
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
G PARKING PROVISIONS
GF (SURACE PARKING) 12 SLOTS
ROOF DECK FLOOR
B1 41 SLOTS
LINE TOLERANCE
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

8100 10600 11000 10875

A ROOF DECK FLOOR PLAN 40575


NOTES (FLOOR LEVEL REFERENCE)

AR - 233 1 : 100 LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)


RCS-A RCS-B 4 RCS - D RCS-C REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
1 2 AR - 416 3 AR - 416 AR - 416 AR - 416 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:31:37 PM
ARCHITECT ROOFDECK FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 233
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

4 RECOMMENDING APPROVAL AS TO:


1 2 3 5
CS-01 RCS-A RCS-B RCS-C CS-02
AR - 403 AR - 416 40575 AR - 416 AR - 416 AR - 404 HEAD ARCHITECTURAL SECTION DATE:
8100 10600 11000 10875 APPROVED:

A A

DN BUILDING OFFICIAL: DATE:

3200

3200
AREA TABULATION (GFA)
ROOF DECK 02 LEVEL ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
+111.00M./+161.50M. UP
20F MEZZANINE (PROVISION) 426.86 SQ.M.
20F (HALL) 792.44 SQ.M.
B B
RLS-A RLS-A 19F (LEASING FLOOR) 832.66 SQ.M.
AR - 417 FIRE TANK AR - 417 18F (LEASING FLOOR) 847.43 SQ.M.

ACCU UNITS
9350
17F (LEASING FLOOR) 877.91 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.
14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
13F (LEASING FLOOR) 976.05 SQ.M.
CONTROL PANEL
PE-01
CONTROL PANEL ATTACHMENT PANEL
PE-04 PE-01, PE-04
12F (LEASING FLOOR) 1001.19 SQ.M.

PE 01 & 04 MACHINE ROOM FFL 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
LS-02 RLS-B 29.14 SQ.M. RLS-B LS-02
+110.40M./ +160.90M. 10F (BDO FLOOR) 1041.98 SQ.M.
AR - 402 AR - 417 AR - 417 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
8F (BDO FLOOR) 1089.09 SQ.M.
C C 7F (BDO FLOOR) 1111.71 SQ.M.

19675
6F (BDO FLOOR) 1134.34 SQ.M.
ROOF DECK TOP OF PUMP ROOM
+108.00M./+158.50M. DN 5F (BDO FLOOR) 1185.72 SQ.M.
+111.15M./+161.65M.
4F MEZZANINE (PROVISION) 234.71 SQ.M.
RLS-C RLS-C 4F (BDO FLOOR) 1185.72 SQ.M.
AR - 418 ST-03 AR - 418 3F MEZZANINE (PROVISION) 234.71 SQ.M.
UP

6325
AR-522
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

4000
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

8100 10600 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
A ROOF DECK LEVEL 02 40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
AR - 234 1 : 100
CS-01 RCS-A RCS-B CS-02
RCS-C REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
1 AR - 403 2 AR - 416 3 AR - 416 4 AR - 416
AR - 404 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:31:46 PM
ARCHITECT ROOF DECK LEVEL 02 THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 234
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

CS-01 2
RCS-A RCS-B RCS - D RCS-C CS-02
1 AR - 403 3 5
AR - 416 AR - 416 4 AR - 416 AR - 416 AR - 404 RECOMMENDING APPROVAL AS TO:

40575
HEAD ARCHITECTURAL SECTION DATE:
8100 10600 11000 10875 APPROVED:

+111.00M. / +161.50M.

A A
ST-02C
TOP OF MACHINE ROOM SLAB SE-01 MACHINE ROOM
DN AR-516 BUILDING OFFICIAL: DATE:
+111.15M./+161.65M. 19.16 SQ.M.

3200

3200
CCTV
AREA TABULATION (GFA)
+114.20M./+164.70M.
ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP
20F MEZZANINE (PROVISION) 426.86 SQ.M.
ST-02I
20F (HALL) 792.44 SQ.M.
B AR-522 B
RLS-A RLS-A 19F (LEASING FLOOR) 832.66 SQ.M.
AR - 417 AR - 417 18F (LEASING FLOOR) 847.43 SQ.M.
17F (LEASING FLOOR) 877.91 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.
14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
13F (LEASING FLOOR) 976.05 SQ.M.
14437

12F (LEASING FLOOR) 1001.19 SQ.M.


TOP OF MACHINE ROOM SLAB
+114.00M./+164.50M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
LS-02 RLS-B LS-02 RLS-B 10F (BDO FLOOR) 1041.98 SQ.M.
AR - 402 AR - 417 AR - 402 AR - 417 9F (BDO FLOOR) 1072.98 SQ.M.
8F (BDO FLOOR) 1089.09 SQ.M.

18929
C C 7F (BDO FLOOR) 1111.71 SQ.M.
6F (BDO FLOOR) 1134.34 SQ.M.
DN TOP OF PUMP ROOM 5F (BDO FLOOR) 1185.72 SQ.M.
+111.15M./+161.65M.
4F MEZZANINE (PROVISION) 234.71 SQ.M.
RLS-C RLS-C 4F (BDO FLOOR) 1185.72 SQ.M.
5087

AR - 418 ST-03 AR - 418 3F MEZZANINE (PROVISION) 234.71 SQ.M.

6325
AR-522 UP
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 G AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
+111.00M. / +161.50M. TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D
HELIPAD PROJECTION B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.

3254
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
G
PARKING PROVISIONS
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
4 TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

18700 11000 10875


NOTES (FLOOR LEVEL REFERENCE)
A ROOF DECK MEZZANINE FLOOR PLAN 40575
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
AR - 235 1 : 100
CS-01 RCS-A RCS-B RCS - D RCS-C CS-02 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
1 AR - 403 2 AR - 416 3 AR - 416 AR - 416 AR - 416 AR - 404 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:31:55 PM
ARCHITECT ROOF DECK MEZZANINE FLOOR THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
PLAN CHECKED: DRAWN:
MMOSER ASSOCIATES
(S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 235
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

RCS-A RCS - D RCS-C


CS-01 AR - 416 RCS-B CS-02
4 AR - 416 AR - 416 RECOMMENDING APPROVAL AS TO:
1 AR - 403
2 3 AR - 416 AR - 404
5
40575 HEAD ARCHITECTURAL SECTION DATE:

8100 10600 11000 10875 APPROVED:

+110.65M. / +161.10M. +118.00M. / +168.50M.

A A
3000 10280 3000
BUILDING OFFICIAL: DATE:
SAFETY ZONE FATO/TLOF SAFETY ZONE

3200

3200
AREA TABULATION (GFA)
ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
1 2 3 4 5 20F MEZZANINE (PROVISION) 426.86 SQ.M.
ST-02I
20F (HALL) 792.44 SQ.M.
B 1110 9 8 6
AR-522 B
RLS-A RLS-A 19F (LEASING FLOOR) 832.66 SQ.M.
7
AR - 417 12 AR - 417 18F (LEASING FLOOR) 847.43 SQ.M.
1413

9350
1615 17F (LEASING FLOOR) 877.91 SQ.M.
191817 16F (LEASING FLOOR) 900.54 SQ.M.
20
2221 15F (LEASING FLOOR) 925.77 SQ.M.
DN
14F (LEASING FLOOR) 950.91 SQ.M.

6150

6150
13F (LEASING FLOOR) 976.05 SQ.M.
12F (LEASING FLOOR) 1001.19 SQ.M.

H 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.

15675
LS-02 RLS-B LS-02 RLS-B 10F (BDO FLOOR) 1041.98 SQ.M.
AR - 402 AR - 417 AR - 402 AR - 417 9F (BDO FLOOR) 1072.98 SQ.M.

DN 8F (BDO FLOOR) 1089.09 SQ.M.


C C 7F (BDO FLOOR) 1111.71 SQ.M.
6F (BDO FLOOR) 1134.34 SQ.M.
5F (BDO FLOOR) 1185.72 SQ.M.
ST-03 4F MEZZANINE (PROVISION) 234.71 SQ.M.
AR-523
+118.00M. / +168.50M.
RLS-C RLS-C 4F (BDO FLOOR) 1185.72 SQ.M.
AR - 418 AR - 418 3F MEZZANINE (PROVISION) 234.71 SQ.M.

6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
+110.65M. / +161.10M. TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
+118.00M. / +168.50M. TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING

FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT

1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED


FF-10 PORCELAIN TILE

FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT

HATCHING LEGENDS

REINFORCED CONCRETE WALL

6" CHB WALL

8100 10600 11000 10875


A HELIPAD FLOOR PLAN 40575
NOTES (FLOOR LEVEL REFERENCE)

AR - 236 1 : 100 LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)

CS-01 RCS-A RCS-B RCS - D RCS-C CS-02 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
1 AR - 403 2 AR - 416 3 AR - 416 4 AR - 416 AR - 416 AR - 404 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS

SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:32:04 PM
ARCHITECT HELIPAD FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 236
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:

You might also like