Professional Documents
Culture Documents
2701
BCS-06 BCS-05 BCS-04 BCS - 02 RECOMMENDING APPROVAL AS TO:
BCS-01
AR - 415 AR - 414 AR - 413 AR - 411
AR - 410
HEAD ARCHITECTURAL SECTION DATE:
APPROVED:
TOILET
1909
550X250 EAD RISER 2.5 SQ.M.
FUEL PUMP
2299
2299
5.31 SQ.M. 500x400 FAD RISER 500x400 EAD RISER
-7.35M. ROOM AIR SHAFT
AIRSHAFT 600X400 FAD RISER 600X400 EAD RISER
FF-05
A D-03 A
AR-501 PWD
11 12 13 14 15 16 17 18 19 20
MECHANICAL PARKING PARKING D-02
DN BUILDING OFFICIAL: DATE:
B1 - 38-39 B1 - 36-37 B1 - 35 HWSF AR-501 FIRE EXIT 2
3200
3200
ST-01C 34.49 SQ.M. SERVICE ELEVATOR LOBBY 16.32 SQ.M. ST-02C
AREA TABULATION (GFA)
FAN ROOM -6.22M./ +44.28M. -6.00M./ +44.50M.
6.17 SQ.M. AR-515 7.71 SQ.M. AR-516
FF-04 -6.00M./ +44.50M. ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
-6.30M.
BLS-04 UP FF-04 FAN ROOM BLS-04
10 9 8 7 6 5 4 3 2 1
18.67 SQ.M. 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-09
AR - 408 -6.00M./ +44.50M. AR - 408
AR-501 20F (HALL) 792.44 SQ.M.
B D-02 B
AR-501 19F (LEASING FLOOR) 832.66 SQ.M.
PLUMBING SHAFT
2600X350
D-11
AR-501 18F (LEASING FLOOR) 847.43 SQ.M.
ELEVATOR PROJECTION
ELEVATOR PROJECTION
EE CABINET
D-10
17F (LEASING FLOOR) 877.91 SQ.M.
TRENCH DRAIN
14F (LEASING FLOOR) 950.91 SQ.M.
6150
6150
BLS-02 D-11 BLS-02 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
AR - 406 - 7.30M. AR - 406 12F (LEASING FLOOR) 1001.19 SQ.M.
FF-08 FF-04 - 6.00M. / +44.50M.
6 7 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
10F (BDO FLOOR) 1041.98 SQ.M.
6325
3F (BDO FLOOR) 1229.58 SQ.M.
39918
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE PROJECTION B1 MEZZANINE 288.80 SQ.M.
D-09
B2 (PARKING) 1595.01 SQ.M.
AR-501 BASEMENT 01 B3 (PARKING) 1595.01 SQ.M.
3530
- 6.00M. / +44.50M.
F
4000
MATERIAL RECOVERY FACILITY ESCALATOR PIT B4 (PARKING) 1595.01 SQ.M.
PROJECTION FF-08
30.52 SQ.M. B1 - 27-28
-4.95M./ +45.55 3 LOADING
B5 (PARKING) 1595.01 SQ.M.
FF-07
B6 (PARKING) 1330.63 SQ.M.
UNDERGROUND PARKING
- 6.00M. / +44.50M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
RAMP GOING UP TO
PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
2343
FF-04
B1 41 SLOTS
G UP
B2 40 SLOTS
- 4.80M. / +45.70M.
B1 - 25-26 B3 40 SLOTS
B4 40 SLOTS
B1 - 01 B5 40 SLOTS
2761
B1 - 02
B1 - 03 B6 25 SLOTS
B1 - 04 F TOTAL NO. OF PARKING PROVIDED 238 SLOTS
B1 - 23-24 TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
B1 - 05 B1 - 06
B1 - 07 SCHEDULE OF FLOOR FINISHES
B1 - 08
FF-04 300MMX300MMX12MM WAFFLE TYPE ANTI-SLIP CONCRETE PAVER
4 5 D-11
AR-501
FAN ROOM FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
3563
8.46 SQ.M.
- 4.80M. / +45.70M. 6164 600MMX1200MM WABI SABI TAUPE LAPATTO RECT
FF-08
FF-07
- 4.80M. / +45.70M. G FF-12 600MMX600MM ESP670 PETRALAVA MARFIL
BLS-03 FF-08 - 4.80M. / +45.70M. BLS-03
TRENCH DRAIN
AR - 407 AR - 407
6% RAMP SL B1 - 21-22
OPE HATCHING LEGENDS
1926
MECHANICAL
FF-04
B1 - 19-20 PARKING
6030
LOCATION 4" ECOPANEL
3
- 6.00M. / +44.50M.
23
MECHANICAL PARKING
B1 - 17-18
2540 8100 10600 11000 10875 2872 NOTES (FLOOR LEVEL REFERENCE)
A BASEMENT 01 FLOOR PLAN 40575 LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
AR - 201 1 : 100 2 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
BCS - 03 BCS-01 BCS-06 BCS-05 BCS-04 BCS - 02 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 412 AR - 410 AR - 415 AR - 414 AR - 413 AR - 411 PLANS
1 2 5
4
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:16 PM
ARCHITECT BASEMENT 01 FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 201
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
1 2 3 4 5 REPUBLIC OF THE PHILIPPINES
1 4 1 OFFICE OF THE BUILDING OFFICIAL
8 CEBU CITY
40575
BCS - 03
8100 10600 11000 10875
AR - 412
BCS-01 BCS-06 BCS-05 BCS-04 BCS - 02 RECOMMENDING APPROVAL AS TO:
AR - 410 AR - 415 AR - 414 AR - 413 AR - 411
5000
HEAD ARCHITECTURAL SECTION DATE:
APPROVED:
550X250 EAD RISER
500x400 FAD RISER 500x400 EAD RISER AIRSHAFT
AIRSHAFT 600X400 FAD RISER 600X400 EAD RISER
A A
11 12 13 14 15 16 17 18 19
DN D-02
AR-501
BUILDING OFFICIAL: DATE:
FIRE EXIT 01 FIRE EXIT 2
3200
3200
14.67 SQ.M. SERVICE ELEVATOR 16.32 SQ.M. AREA TABULATION (GFA)
ELEVATOR PIT 03
7.72 SQ.M. -3.00M. / +47.50M.
-3.00M. / +47.50M. FF-03 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
BLS-04 UP BLS-04
10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
AR - 408 AR - 408
20F (HALL) 792.44 SQ.M.
B B
19F (LEASING FLOOR) 832.66 SQ.M.
D-06
18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
TELCO 1 17F (LEASING FLOOR) 877.91 SQ.M.
ELEVATOR PIT 02 ELEVATOR PIT 05 11.03 SQ.M.
D-06 16F (LEASING FLOOR) 900.54 SQ.M.
MAIL & COURIER AR-501 15F (LEASING FLOOR) 925.77 SQ.M.
33.73 SQ.M.
-3.00M./ +47.50M. 14F (LEASING FLOOR) 950.91 SQ.M.
6150
6150
SECURITY OPERATIONS CENTER FF-03
BLS-02 RAINWATER FILTRATION 75.68 SQ.M. BLS-02 13F (LEASING FLOOR) 976.05 SQ.M.
17.20 SQ.M. -3.00M. / +47.50M. LOCKERS
9.45 SQ.M. TELCO 2
AR - 406 AR - 406 12F (LEASING FLOOR) 1001.19 SQ.M.
10.80 SQ.M.
19675
D-06 AR-501 AR-501
D-06 6F (BDO FLOOR) 1134.34 SQ.M.
AR-501
HALLWAY AR-501
21547
6325
BELOW
MAIL & COURIER
3F (BDO FLOOR) 1229.58 SQ.M.
127.81 SQ.M. 2F MEZZANINE (PROVISION) 234.71 SQ.M.
RAINWATER TANK -3.00M. / +47.50M.
36.85 SQ.M. FF-03 2F (BANK BRANCH) 1149.72 SQ.M.
BLS-01 BLS-01
AR - 405 AR - 405 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
OPEN
F 1 2 3 4 5 6 7 8 9 10
4000
TO B4 (PARKING) 1595.01 SQ.M.
OPEN BELOW
B5 (PARKING) 1595.01 SQ.M.
TO
BELOW B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
OPEN
TO PARKING PROVISIONS
BELOW ESCALATOR PIT E
GF (SURACE PARKING) 12 SLOTS
2332
1921
B1 41 SLOTS
G
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
6378
B6 25 SLOTS
F TOTAL NO. OF PARKING PROVIDED
4457
238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
4" ECOPANEL
9759
3
23
MECHANICAL PARKING
BCS - 03
AR - 412
APPROVED:
TOILET
STORAGE STORAGE 550X250 EAD RISER AIR
5.31 SQ.M.
2299
500x400 FAD RISER 500x400 EAD RISER SHAFT
AIR 14.93 SQ.M. 20.85 SQ.M.
FF-07 600X400 FAD RISER FF-07 600X400 EAD RISER
SHAFT
A A
PWD
PARKING
D-02
DN BUILDING OFFICIAL: DATE:
FIRE EXIT 1 AR-501
B2 - 40 B2 - 39 B2 - 38 B2 - 37 B2 - 36
3200
3200
ST-01D 15.27 SQ.M. SERVICE ELEV. LOBBY FIRE EXIT 02 ST-02E
FAN ROOM 7.71 SQ.M. 16.32 SQ.M. AREA TABULATION (GFA)
AR-515 -9.92M./ +40.58M. AR-517 FAN ROOM
6.52 SQ.M. FF-07 -9.20M./ +41.30M. -9.20M./ +41.30M.
FF-07 18.67 SQ.M. ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
-10.50M./ +40.00M. UP FF-07 -9.20M./ +41.30M.
BLS-04 FF-07 BLS-04
FF-07 20F MEZZANINE (PROVISION) 426.86 SQ.M.
AR - 408 D-02 AR - 408
20F (HALL) 792.44 SQ.M.
B D-11
AR-501 B
19F (LEASING FLOOR) 832.66 SQ.M.
PLUMBING SHAFT
2600X350
AR-501
18F (LEASING FLOOR) 847.43 SQ.M.
D-10
17F (LEASING FLOOR) 877.91 SQ.M.
AR-501
16F (LEASING FLOOR) 900.54 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.
TRENCH DRAIN
14F (LEASING FLOOR) 950.91 SQ.M.
6150
6150
D-11
BLS-02 BLS-02 13F (LEASING FLOOR) 976.05 SQ.M.
-10.50M./ +40.00M. AR-501
AR - 406 FF-08 FF-04 AR - 406 12F (LEASING FLOOR) 1001.19 SQ.M.
6 7 -10.50M./ +40.00M.
-10.50M./ +40.00M. - 9.20M./ +41.30M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
FF-07 10F (BDO FLOOR) 1041.98 SQ.M.
8% RAMP SLOPE 9F (BDO FLOOR) 1072.98 SQ.M.
DN
B2 - 35 8F (BDO FLOOR) 1089.09 SQ.M.
C DN C 7F (BDO FLOOR) 1111.71 SQ.M.
DN
-10.50M./ +40.00M.
- 10.50M./ +40.00M. 6F (BDO FLOOR) 1134.34 SQ.M.
21547
RAMP GOING TO B3
B2 - 28 B2 - 27 B2 - 26 B2 - 25 B2 - 24 B2 - 23 B2 - 22 B2 - 21
6% RAMP SLOPE
6325
6325
3F (BDO FLOOR) 1229.58 SQ.M.
FF-07 2F MEZZANINE (PROVISION) 234.71 SQ.M.
BLS-01 BLS-01 2F (BANK BRANCH) 1149.72 SQ.M.
B2 - 33
AR - 405 AR - 405 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
ELEVATOR LOBBY
8.33 SQ.M. TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
-10.40M./ +40.10M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
5891
B2 (PARKING) 1595.01 SQ.M.
- 10.91M./ +39.59M.
- 6.71M./ +43.79M. BASEMENT 02 B3 (PARKING) 1595.01 SQ.M.
34919
3530
- 9.20M./ +41.30M.
4000
B4 (PARKING) 1595.01 SQ.M.
F MAINTENANCE PERSONNEL'S PANTRY FF-08 B2 - 32
30.58 SQ.M. B5 (PARKING) 1595.01 SQ.M.
B2 - 16
B6 (PARKING) 1330.63 SQ.M.
RAMP GOING TO B1
FF-07 B2 - 17
B2 - 18 TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
B2 - 19
B2 - 20 PARKING PROVISIONS
D-10
E
GF (SURACE PARKING) 12 SLOTS
2343
AR-501
1921
- 8.00M./ +42.50M.
B1 41 SLOTS
G UP B2 40 SLOTS
B2 - 31 B3 40 SLOTS
4458
AR-501 FF-08 238 SLOTS
B2 - 30 TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
6% RAMP SLOP
D-11 E SCHEDULE OF FLOOR FINISHES
AR-501
4 5 FF-04 300MMX300MMX12MM WAFFLE TYPE ANTI-SLIP CONCRETE PAVER
FAN ROOM FF-04 FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
3663
8.58 SQ.M.
- 8.00M./ +42.50M. FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT
UP
FF-07 G FF-12 600MMX600MM ESP670 PETRALAVA MARFIL
BLS-03 BLS-03
TRENCH DRAIN
AR - 407 B2 - 01 AR - 407
B2 - 02 B2 - 29
4536
HATCHING LEGENDS
B2 - 03
B2 - 04
1826
4330
-9.10M./ +41.40M. BASE BUILDING CORE
FF-07 11.69 SQ.M.
-9.10M./ +41.40M.
FF-07 FF-07
TOILET APPROVED:
5.31 SQ.M. AIR SHAFT
2299
2299
500x400 FAD RISER 500x400 FAD RISER
AIR SHAFT 600X400 FAD RISER 600X400 FAD RISER
FF-07 FF-07
A A
PWD
PARKING D-02
B3 - 40 B3 - 39 B3 - 38 DN B3 - 37 B3 - 36 BUILDING OFFICIAL: DATE:
FIRE EXIT 01 AR-501
SERVICE ELEV. LOBBY FIRE EXIT 02
3200
3200
ST-01D 15.39 SQ.M. ST-02E
AREA TABULATION (GFA)
FAN ROOM -13.12M./ +37.38M. 1354.80 SQ.M. 16.32 SQ.M.
6.52 SQ.M. AR-515 FF-07 -12.40M. / +38.10M. -12.40M. / +38.10M. AR-517 FAN ROOM
- 13.70M./ +36.80M. FF-07 18.67 SQ.M. ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP FF-07
BLS-04 FF-07 -12.40M. / +38.10M. BLS-04
FF-07 20F MEZZANINE (PROVISION) 426.86 SQ.M.
AR - 408 D-02 AR - 408
20F (HALL) 792.44 SQ.M.
B AR-501 B
D-11 19F (LEASING FLOOR) 832.66 SQ.M.
PLUMBING SHAFT
2600X350
AR-501
18F (LEASING FLOOR) 847.43 SQ.M.
17F (LEASING FLOOR) 877.91 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.
TRENCH DRAIN
- 12.40M./ +38.10M. 14F (LEASING FLOOR) 950.91 SQ.M.
6150
6150
BLS-02 - 13.70M./ +36.80M.
D-11 BLS-02 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
AR - 406 FF-08 FF-04 AR - 406 12F (LEASING FLOOR) 1001.19 SQ.M.
- 13.70M./ +36.80M.
6 7 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
FF-07 10F (BDO FLOOR) 1041.98 SQ.M.
8% RAMP SLOPE
DN 9F (BDO FLOOR) 1072.98 SQ.M.
B3 - 35 8F (BDO FLOOR) 1089.09 SQ.M.
UP
C DN
C 7F (BDO FLOOR) 1111.71 SQ.M.
- 13.70M./ +36.80M. 6F (BDO FLOOR) 1134.34 SQ.M.
21547
6325
8.49 SQ.M. B3 - 28 B3 - 27 B3 - 26
-13.60M./ +36.90M. 3F (BDO FLOOR) 1229.58 SQ.M.
26053
FF-07 2F MEZZANINE (PROVISION) 234.71 SQ.M.
RAMP DOWN GOING TO B4
BLS-01 BLS-01 2F (BANK BRANCH) 1149.72 SQ.M.
B3 - 33
6% RAMP SLOPE
DRIVER'S LOUNGE
4000
29.69 SQ.M. B4 (PARKING) 1595.01 SQ.M.
F
RAMP UP GOING TO B2
FF-08 B3 - 32
-11.34 M./ +39.16M.
B5 (PARKING) 1595.01 SQ.M.
B3 - 16
B6 (PARKING) 1330.63 SQ.M.
FF-07 B3 - 17
B3 - 18 TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
B3 - 19
B3 - 20 PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
2343
6378
2761
57.16 SQ.M.
-11.20M./ +39.30M.
- 11.20M./ +39.30M. B6 25 SLOTS
D-10
FF-08 AR-501 FF-08 F TOTAL NO. OF PARKING PROVIDED 238 SLOTS
B3 - 30 TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
- 11.20M./ +39.30M. 6% RAMP SLOP
E
D-11 SCHEDULE OF FLOOR FINISHES
AR-501
UP FF-04 300MMX300MMX12MM WAFFLE TYPE ANTI-SLIP CONCRETE PAVER
4 5
FAN ROOM FF-04 FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
3663
8.46 SQ.M.
-11.20M./ +39.30M. FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT
FF-07 G
FF-12 600MMX600MM ESP670 PETRALAVA MARFIL
BLS-03 - 12.40M./ +38.10M. BLS-03
TRENCH DRAIN
AR - 407 B3 - 01 AR - 407
B3 - 02 B3 - 29
4536
B3 - 03 HATCHING LEGENDS
B3 - 04
1854
AIR SHAFT
B3 - 05 REINFORCED CONCRETE WALL
B3 - 06
B3 - 07 D-11
B3 - 08
B3 - 09 AR-501
EE CABINET
B3 - 10
B3 - 11
B3 - 12 4" ECOPANEL
3 B3 - 13
B3 - 14
B3 - 15
23
STORAGE
23.77 SQ.M.
- 12.40M./ +38.10M.
FF-07
TOILET
APPROVED:
5.31 SQ.M. AIR SHAFT
2299
2299
500x400 FAD RISER 500x400 FAD RISER
AIR SHAFT FF-07 600X400 FAD RISER FF-07 600X400 FAD RISER
A A
PWD
PARKING
D-02
DN BUILDING OFFICIAL: DATE:
B4 - 40 B4 - 39 B4 - 38 FIRE EXIT 01 B4 - 37 B4 - 36 AR-501
FAN ROOM SERVICE ELEV. LOBBY FIRE EXIT 02
3200
3200
ST-01D 15.33 SQ.M. ST-02E
AREA TABULATION (GFA)
6.19 SQ.M. -16.32M./ +34.18M. 7.72 SQ.M. 16.32 SQ.M.
-16.90M./ +33.60M. AR-515 FF-07 -45.60M./+34.90M. -15.60M. / +34.90M. AR-517 FAN ROOM
FF-07 18.67 SQ.M. ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP FF-07
BLS-04 FF-07 -15.60M./ +34.90M. BLS-04
FF-07 20F MEZZANINE (PROVISION) 426.86 SQ.M.
AR - 408 D-02 AR - 408
20F (HALL) 792.44 SQ.M.
B AR-501 B
D-11 19F (LEASING FLOOR) 832.66 SQ.M.
PLUMBING SHAFT
2600X350
AR-501
18F (LEASING FLOOR) 847.43 SQ.M.
17F (LEASING FLOOR) 877.91 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.
TRENCH DRAIN
-15.60M. / +34.90M. 14F (LEASING FLOOR) 950.91 SQ.M.
6150
6150
BLS-02 D-11 BLS-02 13F (LEASING FLOOR) 976.05 SQ.M.
-16.90M. / +33.60M. AR-501
AR - 406 FF-08 -16.90M. / +33.60M. FF-04 AR - 406 12F (LEASING FLOOR) 1001.19 SQ.M.
6325
B4 - 28 B4 - 27 B4 - 26 B4 - 25 B4 - 24 B4 - 23 B4 - 22 B4 - 21 3F (BDO FLOOR) 1229.58 SQ.M.
26053
FF-07
8.49 SQ.M. 2F MEZZANINE (PROVISION) 234.71 SQ.M.
-16.80M. / +33.70M.
6% RAMP SLOPE
4000
B4 (PARKING) 1595.01 SQ.M.
F BASEMENT
FF-08 04
-15.60M. / +34.90M. B4 - 32 B5 (PARKING) 1595.01 SQ.M.
B4 - 16 B6 (PARKING) 1330.63 SQ.M.
FF-07 B4 - 17 TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
B4 - 18
B4 - 19 PARKING PROVISIONS
B4 - 20 E
GF (SURACE PARKING) 12 SLOTS
2332
D-10
1921
-14.40M. / +36.10M. AR-501 B1 41 SLOTS
G B2 40 SLOTS
UP
B3 40 SLOTS
B4 - 31
B4 40 SLOTS
B5 40 SLOTS
2611
B6 25 SLOTS
FF-08
-14.40M. / +36.10M.
F TOTAL NO. OF PARKING PROVIDED
4458
FF-08 238 SLOTS
FAN ROOM -14.40M. / +36.10M. FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
3813
FF-04
8.73 SQ.M.
-14.40M. / +36.10M. FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT
FF-07 G
-15.60M. / +34.90M. FF-12 600MMX600MM ESP670 PETRALAVA MARFIL
BLS-03 BLS-03
TRENCH DRAIN
AR - 407 B4 - 01 AR - 407
4536
B4 - 02 B4 - 29 HATCHING LEGENDS
B4 - 03
1854
STORAGE
23.77 SQ.M.
- 15.60M.
FF-07
APPROVED:
TOILET
5.31 SQ.M. 2.5 SQ.M.
2299
2299
500x400 FAD RISER 500x400 FAD RISER AIR SHAFT
AIR SHAFT 600X400 FAD RISER 600X400 FAD RISER
FF-07 FF-07
A A
PWD
10 11 12 13 14 15 16 17 18
PARKING
D-02
B5 - 40 B5 - 39 B5 - 38 DN B5 - 37 B5 - 36 BUILDING OFFICIAL: DATE:
AR-501
FIRE EXIT 01 SERVICE ELEV. LOBBY FIRE EXIT 02
3200
3200
ST-01D 15.33 SQ.M. ST-02E
FAN ROOM 7.71 SQ.M. 16.32 SQ.M. AREA TABULATION (GFA)
AR-515 -19.52M./ +30.98M. - 18.80M. / + 31.70M. - 18.80M. / + 31.70M. AR-517 FAN ROOM
6.19 SQ.M. FF-07
-20.10M./ +30.40M. FF-07 18.67 SQ.M. ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP FF-07
BLS-04 -18.80M./ +31.70M. BLS-04
FF-07 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
FF-07
AR - 408 D-02 AR - 408
20F (HALL) 792.44 SQ.M.
B AR-501 B
D-11 19F (LEASING FLOOR) 832.66 SQ.M.
PLUMBING SHAFT
2600X350
AR-501
D-10
18F (LEASING FLOOR) 847.43 SQ.M.
AR-501 17F (LEASING FLOOR) 877.91 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.
TRENCH DRAIN
14F (LEASING FLOOR) 950.91 SQ.M.
6150
6150
SUMP PIT 01 - 20.10M. / + 30.40M.
BLS-02 D-11 BLS-02 13F (LEASING FLOOR) 976.05 SQ.M.
- 20.10M. / + 30.40M. AR-501
AR - 406 FF-08 FF-04 AR - 406 12F (LEASING FLOOR) 1001.19 SQ.M.
FILE STORAGE - 18.80M. / + 31.70M.
6 7 58.81 SQ.M.
-20.10M./ +30.40M.
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
FF-07 10F (BDO FLOOR) 1041.98 SQ.M.
8% RAMP SLOPE
9F (BDO FLOOR) 1072.98 SQ.M.
DN B5 - 35 8F (BDO FLOOR) 1089.09 SQ.M.
C UP C 7F (BDO FLOOR) 1111.71 SQ.M.
DN
- 20.10M. / + 30.40M. - 20.10M. / + 30.40M. 6F (BDO FLOOR) 1134.34 SQ.M.
21547
6325
8.49 SQ.M. 3F (BDO FLOOR) 1229.58 SQ.M.
-20.00M./ +30.50M.
26053
FF-07 2F MEZZANINE (PROVISION) 234.71 SQ.M.
RAMP GOING DOWN TO B6
BLS-01 BLS-01 2F (BANK BRANCH) 1149.72 SQ.M.
B5 - 33
6% RAMP SLOPE
- 18.80M. / +31.70M.
4000
B4 (PARKING) 1595.01 SQ.M.
F FF-08 B5 - 32
CENTRAL STORAGE B5 (PARKING) 1595.01 SQ.M.
B5 - 16
29.69 SQ.M.
-17.46M./ +33.04M. B5 - 17 B6 (PARKING) 1330.63 SQ.M.
RAMP GOING UP TO B4
AR-501
1921
- 17.60M. / + 32.90M. B1 41 SLOTS
G UP B2 40 SLOTS
B5 - 31 B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
2611
4458
FF-08 238 SLOTS
- 17.60M. / + 32.90M. B5 - 30 TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
6% RAMP SLOP
D-11
E SCHEDULE OF FLOOR FINISHES
AR-501
4 5 FF-04 300MMX300MMX12MM WAFFLE TYPE ANTI-SLIP CONCRETE PAVER
UP
FAN ROOM FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
3813
FF-04
8.73 SQ.M. - 18.80M. / + 31.70M.
- 17.60M. / + 32.90M. FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT
FF-07 G
FF-12 600MMX600MM ESP670 PETRALAVA MARFIL
BLS-03 BLS-03
TRENCH DRAIN
AR - 407 B5 - 01 AR - 407
B5 - 02 B5 - 29
HATCHING LEGENDS
B5 - 03
B5 - 04
1854
9648
B5 - 12
3 B5 - 13
B5 - 14
B5 - 15
23
STORAGE
23.77 SQ.M.
-18.80 M./ +31.70M.
FF-07
APPROVED:
2.5 SQ.M.
2299
500x400 FAD RISER 500x400 FAD RISER AIR SHAFT
600X400 FAD RISER 600X400 FAD RISER
A A
D-02 FIRE EXIT 02
AR-501
16.32 SQ.M. BUILDING OFFICIAL: DATE:
SERVICE ELEV. LOBBY -23.00M./+27.50M.
3200
3200
ELEVATOR PIT ST-02E
7.72 SQ.M. FF-07 AREA TABULATION (GFA)
-23.00M./+27.50M. AR-517
ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
FF-07
BLS-04 POTABLE CISTERN TANK PARTITION 02 BLS-04
19.91 SQ.M. 20F MEZZANINE (PROVISION) 426.86 SQ.M.
AR - 408 -25.25M./ +25.25M. AR - 408
20F (HALL) 792.44 SQ.M.
B 98.58 m³
B
19F (LEASING FLOOR) 832.66 SQ.M.
18F (LEASING FLOOR) 847.43 SQ.M.
17F (LEASING FLOOR) 877.91 SQ.M.
MH
16F (LEASING FLOOR) 900.54 SQ.M.
PLUMBING SHAFT
2600X350
POTABLE CISTERN WATER TANK 15F (LEASING FLOOR) 925.77 SQ.M.
68.41 SQ.M. DOMESTIC WATER PUMP ROOM
-25.25M./ +25.25M. 14F (LEASING FLOOR) 950.91 SQ.M.
6150
6150
144.08 SQ.M. SUMP PIT
TOP OF MAT FOOTING -23.00M./+27.50M.
BLS-02 - 24.90M. / +25.60M. 289.51 m³ FF-07 BLS-02 13F (LEASING FLOOR) 976.05 SQ.M.
AR - 406 AR - 406 12F (LEASING FLOOR) 1001.19 SQ.M.
SUMP PIT 02
6 7 - 21.90M. / + 28.60M.
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
10F (BDO FLOOR) 1041.98 SQ.M.
9F (BDO FLOOR) 1072.98 SQ.M.
POTABLE CISTERN TANK
RECOMMENDED COMBINED CAPACITY = 300 CU.M. 8F (BDO FLOOR) 1089.09 SQ.M.
C CURRENT COMBINED CAPACITY = 387.40 CU.M. C 7F (BDO FLOOR) 1111.71 SQ.M.
MH 6F (BDO FLOOR) 1134.34 SQ.M.
21547
6325
FF-07 NON-POTABLE CISTERN WATER TANK
RECOMMENDED CAPACITY = 204 CU.M. 3F (BDO FLOOR) 1229.58 SQ.M.
26053
121.74 m³
CURRENT COMBINED CAPACITY = 287.69 CU.M. 2F MEZZANINE (PROVISION) 234.71 SQ.M.
DN
BLS-01 BLS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 405 AR - 405 GF MEZZANINE 517.71 SQ.M.
D-10
GF 948.11 SQ.M.
AR-501 TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
1200 B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
3530
4000
B4 (PARKING) 1595.01 SQ.M.
F
STORAGE ROOM B5 (PARKING) 1595.01 SQ.M.
33.38 SQ.M.
B6 - 17 B6 - 18 B6 - 19 B6 - 20 B6 - 21 B6 - 22 B6 - 23 B6 - 24 B6 - 25 B6 (PARKING) 1330.63 SQ.M.
FF-07
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
D-10
GF (SURACE PARKING) 12 SLOTS
2343
AR-501
1921
B1 41 SLOTS
G - 20.80M. / + 29.70M. D-11
AR-501 B2 40 SLOTS
UP B3 40 SLOTS
FILE STORAGE - 20.80M. / + 29.70M. B4 40 SLOTS
61.38 SQ.M.
- 20.80M. / + 29.70M. B5 40 SLOTS
2611
- 20.80M. / + 29.70M.
B6 25 SLOTS
D-10
E TOTAL NO. OF PARKING PROVIDED
4458
AR-501 FF-08 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
6% RAMP SLOP BASEMENT 06
E
D-11 -22.00M./ +28.50M. SCHEDULE OF FLOOR FINISHES
AR-501
FF-08
FF-04 UP FF-04 300MMX300MMX12MM WAFFLE TYPE ANTI-SLIP CONCRETE PAVER
4 5
FF-07
3713
TRENCH DRAIN
AR - 407 B6 - 01 SUMP PIT 01 AR - 407
B6 - 02 HATCHING LEGENDS
B6 - 03
B6 - 04
AIRSHAFT B6 - 05 REINFORCED CONCRETE WALL
B6 - 06
B6 - 07
B6 - 08
B6 - 09
B6 - 10
8865
B6 - 11 UTILITY SPACE
B6 - 12 4" ECOPANEL
3 B6 - 13
54.67 SQ.M.
-22.00M./ +28.50M.
B6 - 14 FF-07
B6 - 15
23 B6 - 16
D-11
AR-501
2101
CS-01 CS-02
5 6 7 8 9
AR - 403 -0.30M. / +50.20M. AR - 404
RECOMMENDING APPROVAL AS TO:
4998
ROAD WIDENING PROVISION ST-07 HEAD ARCHITECTURAL SECTION DATE:
ST-08 DN
GUARD HOUSE AR-524
@2.00M SETBACK FROM PROPERTY LINE AR-524
9.64 SQ.M. APPROVED:
2999
CCTV CANOPY PROJECTION -0.30M. / +50.20M.
ST-09 +0.00M. / +50.50M. DN UP FRESH AIR SHAFT OPENING +0.00M. / +50.50M.
DN EAD RISERS, T/A
DN AR-524 W/ STEEL GRATING COVER
CCTV
D-01
SW-3 SW-4 A
CCTV D-02A D-02
D-02
AR-501 AR-501 AR-501
14 15 16 17 18 19 20 21 22 23 24 25 26 AR-501 26 25 24 23 22 21 20 19 18 17 16 15 14
CCTV
CCTV
DN
CCTV
DN
CCTV CCTV
SERVICE ELEV. LOBBY FIRE EXIT 02 CCTV
BUILDING OFFICIAL: DATE:
PERSONAL DELIVERIES 7.71 SQ.M. 16.32 SQ.M.
3200
3200
ST-02A
15.78 SQ.M. +0.00M. / +50.50M. +0.00M. / +50.50M. AREA TABULATION (GFA)
SW-1 SW-2 +0.00M. / +50.50M. ST-01A
FF-07 AR-520
FF-07 FF-07
FF-07 AR-518 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 1 2 3 4 5 6 7 8 9 10 11 12 13 20F MEZZANINE (PROVISION) 426.86 SQ.M.
6150
1500 FCC & SECURITY RM
RENTABLE AREA 31.75 SQ.M. 13F (LEASING FLOOR) 976.05 SQ.M.
ELV ROOM +0.00 M. / +50.50M.
48.07 SQ.M. 8.72 SQ.M. FF-11
FF-10 +0.00 M. 12F (LEASING FLOOR) 1001.19 SQ.M.
CCTV FF-07 D-06
6 7 AR-501 ST-10
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
LS-02 EAD RISER AR-525
LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
F/B, T/A
AR - 402 HALLWAY
AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
CCTV
RISER 19.98 SQ.M.
1150X250MM
CCTV
+0.00M. / +50.50M. 8F (BDO FLOOR) 1089.09 SQ.M.
C C1
D-06
MEZZANINE PROJECTION
FF-07 C 7F (BDO FLOOR) 1111.71 SQ.M.
BICYCLE ALLEY
AR-501
D-06
6F (BDO FLOOR) 1134.34 SQ.M.
PAD RISER, AR-501
21151
CCTV
F/A 5F (BDO FLOOR) 1185.72 SQ.M.
4F MEZZANINE (PROVISION) 234.71 SQ.M.
CCTV CCTV CCTV CCTV 4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325
6325
JANITORS STORAGE 3F (BDO FLOOR) 1229.58 SQ.M.
26029
CCTV
6.24 SQ.M. RECEPTION 2F MEZZANINE (PROVISION) 234.71 SQ.M.
BICYCLE PARKING FF-07 10
+0.00M. / +50.50M.
LS-01 FF-10 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
FF-03 TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
C2 C3 C4 C5 C6 B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
UP
FF-09 B6 (PARKING) 1330.63 SQ.M.
F
11 TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
C2 PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
ESCALATOR LANDING PROJECTION
DDC
B1 41 SLOTS
G
B2 40 SLOTS
CCTV ATM ROOM
8.69 SQ.M. C8 CCTV B3 40 SLOTS
+0.00 M. / +50.50M. D-06
C7 FF-11
CCTV
AR-501 B4 40 SLOTS
B5 40 SLOTS
6355
CCTV
C9
PROPERTY LINE
B6 25 SLOTS
4348
ATM
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
C9 TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
D-01A
-0.20M. / +50.30M. SCHEDULE OF FLOOR FINISHES
CCTV AR-501
S
CCTV
12 F FF-07
4 5 UP S D-01A
FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
AR-501
SECOND FLOO FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT
R PROJECTION
R-04 S S C10 CCTV FF-09 1200MMX600MMX10MM BEIGE POLISHED ROMAN TRAVERTINE LIGHT
AR-531 ST-06
AR-524 +0.00M. / +50.50M. G FF-10
1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED
PORCELAIN TILE
1 R-04 R-04
3078
R-04
AR-531 AR-531 FF-11 600MMX1200MM WABI SABI TAUPE LAPATTO RECT
2
4890
3
4
6" CHB WALL
3 4000
DRIVEWAY
60
23 FF-01
00
6790
PY PR
OJEC
T ION
EXISTING TREE CANOPY
5743
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:34 PM
ARCHITECT GROUND FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 208
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A A
14 15 16 17 18 19 20 21 22 23 24 25 26 26 25 24 23 22 21 20 19 18 17 16 15 14
D-02
DN DN BUILDING OFFICIAL: DATE:
AR-501
FIRE EXIT 1 SERVICE ELEV. LOBBY FIRE EXIT 2
3200
3200
ST-01A ST-02A
15.39 SQ.M. 7.75 SQ.M. 16.32 SQ.M. AREA TABULATION (GFA)
AR-518 +4.50M./ +55.00M. + 4.50M. / +55.00M. + 4.50M. / +55.00M. AR-520
FF-07 FF-07 FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 1 2 3 4 5 6 7 8 9 10 11 12 13 20F MEZZANINE (PROVISION) 426.86 SQ.M.
20F (HALL) 792.44 SQ.M.
B D-02
B
19F (LEASING FLOOR) 832.66 SQ.M.
AR-501
6150
6150
PROVISION FOR
50MM CONCRETE TOPPING MEP UTILITY ROOM
63.38 SQ.M. 13F (LEASING FLOOR) 976.05 SQ.M.
+ 4.50M. / +55.00M.
FF-07 12F (LEASING FLOOR) 1001.19 SQ.M.
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR - 402 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
RISER
1150X250MM 8F (BDO FLOOR) 1089.09 SQ.M.
C C
500
7F (BDO FLOOR) 1111.71 SQ.M.
6F (BDO FLOOR) 1134.34 SQ.M.
PAD RISER,
F/A 5F (BDO FLOOR) 1185.72 SQ.M.
BE-01
4F MEZZANINE (PROVISION) 234.71 SQ.M.
22614
6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01
DDC BE-02 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
UP
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
ESCALATOR PIT B1 (PARKING) 1595.01 SQ.M.
D DEPTH: 1300 (TOP OF SLAB) D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
4000
OPEN B4 (PARKING) 1595.01 SQ.M.
TO
ESCALATOR FFL BELOW B5 (PARKING) 1595.01 SQ.M.
+4.50M. / +55.00M.
FF-09 B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
DN PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
F
B2 40 SLOTS
11927
B3 40 SLOTS
B4 40 SLOTS
G
B5 40 SLOTS
B6 25 SLOTS
MEZZANINE FLOOR
LINE TOLERANCE
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
CS-01 CS-02
6" CHB WALL
1 2 3 AR - 404 5
AR - 403 4
CANO
PY PR
O JE C
TION
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:37 PM
ARCHITECT GROUND FLOOR MEZZANINE THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
FLOOR PLAN CHECKED: DRAWN:
MMOSER ASSOCIATES
(S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 209
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A CCTV A
12 13 14 15 16 17 18 19 20 21 22 DN
CCTV
D-02
CCTV DN CCTV
BUILDING OFFICIAL: DATE:
FIRE EXIT 1 AR-501
FIRE EXIT 2
3200
3200
ST-01B 15.39 SQ.M. SERVICE ELEV. LOBBY 16.07 SQ.M. ST-02B
+9.00M. / +59.50M. 8.01 SQ.M.
AREA TABULATION (GFA)
AR-518 +9.00 M. / +59.50M. AR-520
FF-07 +9.00M. / +59.50M. FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP FF-07 UP
11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC
FIREBOX
D-03
DN 15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+8.95 M. / +59.45M. D-06 D-03 650X650
2.59 SQ.M. EXEC. TOILET 1 CCTV CCTV
FF-12 +9.00 M. EAD RISER 17F (LEASING FLOOR) 877.91 SQ.M.
AR-501 AR-501 5.33 SQ.M.
FF-07 +8.95 M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
31.69 SQ.M. FF-12
+9.00M. / + 59.50 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
50.55 SQ.M. TOILET HALLWAY AR-501 9.45 SQ.M. 28.33 SQ.M.
D-07 11.02 SQ.M. +9.00M. / +59.50M. EXEC. TOILET 2 +9.00 M. / +59.50M.
+9.00M. / +59.50M. FF-11 D-03 FF-07
13F (LEASING FLOOR) 976.05 SQ.M.
AR-501 ELV ROOM 3.71 SQ.M.
R-09 FF-11 6.43 SQ.M. +8.95 M.
1500X500 TEAD RISER
AR-501
12F (LEASING FLOOR) 1001.19 SQ.M.
+9.00 M. FF-12
AR-532
FF-07 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
MALE TOILET AR-501 PWD TOILET
AR - 402 16.15 SQ.M. 4.88 SQ.M. 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
+8.95 M. / +59.45M.
D-03 +8.95M. / 59.45M. PAD RISER EAD RISER
FF-12 AR-501 350X350 FF-12 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
5F (BDO FLOOR) 1185.72 SQ.M.
5824 1750 3050 3100 4925 1500 2450 4800
UP 4F MEZZANINE (PROVISION) 234.71 SQ.M.
1
4F (BDO FLOOR) 1185.72 SQ.M.
23703
2
3 3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325
6325
4
5 3F (BDO FLOOR) 1229.58 SQ.M.
6
26566
7
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 8
LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
9
AR - 401 10 AR - 401 GF MEZZANINE 517.71 SQ.M.
ST-04
GF 948.11 SQ.M.
AR-524
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
SECOND FLOOR MEZZANINE PROJECTION B3 (PARKING) 1595.01 SQ.M.
4000
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
PROVISION FOR 50MM
CONCRETE TOPPING TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
8028
PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
F B5 40 SLOTS
6891
B6 25 SLOTS
G
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
SECOND FLOOR TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
LINE TOLERANCE
SCHEDULE OF FLOOR FINISHES
2980
SECOND FLOOR
+8.15M. LINE TOLERANCE
40575
CS-01 CS-02
AR - 403 AR - 404 NOTES (FLOOR LEVEL REFERENCE)
1 2 3 5
4 +8.15M.
LEVEL REFERENCE = @ +0.00M. (GROUND FLOOR FINISH)
A SECOND FLOOR PLAN REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
AR - 210 1 : 100 PLANS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:39 PM
ARCHITECT SECOND FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 210
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A A
AOM AIM AIM
12 13 14 15 16 17 18 19 20 21 22
F J
DN
WF TS CCTV
3200
3200
ST-01B 14.67 SQ.M. 8.01 SQ.M. 16.07 SQ.M. ST-02B
+12.75M. / +63.25M. +12.57M./ +63.25M. +12.75M. / +63.25M. AREA TABULATION (GFA)
AR-518 AR-520
FF-07 FF-07 FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP
WF TS
GA
11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
P
J AIM AIM AOM
FIREBOX
18F (LEASING FLOOR) 847.43 SQ.M.
650X650
EAD RISER 17F (LEASING FLOOR) 877.91 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
CHWS/R RISER
15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
FF-11
13F (LEASING FLOOR) 976.05 SQ.M.
HANGED AHU
1500X500 TEAD RISER 12F (LEASING FLOOR) 1001.19 SQ.M.
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
LS-02 ELEVATOR LOBBY LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
34.58 SQ.M.
AR - 402 FF-09 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
PAD RISER EAD RISER
350X350 CATWALK 8F (BDO FLOOR) 1089.09 SQ.M.
EAD RISER
C C 7F (BDO FLOOR) 1111.71 SQ.M.
6F (BDO FLOOR) 1134.34 SQ.M.
5F (BDO FLOOR) 1185.72 SQ.M.
DN 4F MEZZANINE (PROVISION) 234.71 SQ.M.
20
1 19
2
4F (BDO FLOOR) 1185.72 SQ.M.
18
3 17 3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325
6325
4 16
25543
29699
AR-524
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
4000
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
9868
OPEN B1 41 SLOTS
TO
BELOW B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
F TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
10024
SCHEDULE OF FLOOR FINISHES
G
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
F
REINFORCED CONCRETE WALL
CS-01 CS-02
2 3 5
1 AR - 403 4 AR - 404
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:41 PM
ARCHITECT SECOND FLOOR MEZZANINE THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 211
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A SW-3 SW-4 A
CCTV
12 13 14 15 16 17 18 19 20 21 22 22 21 20 19 18 17 16 15 14 13 12
CCTV
D-02
CCTV DN SERVICE ELEV. LOBBY DN CCTV
BUILDING OFFICIAL: DATE:
FIRE EXIT 1 8.01 SQ.M. AR-501
FIRE EXIT 2
3200
3200
ST-01B 15.33 SQ.M. +16.50M. / +67.00M. ST-02B
SW-1 SW-2 +16.50M. / +67.00M. 16.07 SQ.M. AREA TABULATION (GFA)
AR-518
FF-07 FF-07 +16.50M. / +67.00M. AR-520
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
11 10 9 8 7 6 5 4 3 2 1 1 2 3 4 5 6 7 8 9 10 11 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
DDC
FIREBOX
FEMALE TOILET D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+16.45 M. 2.63 SQ.M. D-06 D-03 CCTV CCTV 650X650
FF-12 +16.50 M. EXEC. TOILET 1 EAD RISER 17F (LEASING FLOOR) 877.91 SQ.M.
AR-501 AR-501 5.33 SQ.M.
FF-07 +16.45 M. / +66.95M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
31.74 SQ.M. SERVICE HALLWAY 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
TOILET HALLWAY AR-501 FF-11 26.01 SQ.M.
D-07 11.02 SQ.M. +16.50 M.
+16.50M. / +67.00M.
EXEC. TOILET 2
FF-07
13F (LEASING FLOOR) 976.05 SQ.M.
AR-501 ELV ROOM D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 6.39 SQ.M. +16.45 M. 12F (LEASING FLOOR) 1001.19 SQ.M.
+16.50 M. AR-501
FF-12
FF-07 CHWS/R RISER
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
MALE TOILET AR-501 PWD TOILET
AR - 402 16.07 SQ.M. 4.88 SQ.M. 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
+16.45 M. D-03 +16.45 M. PAD RISER EAD RISER
FF-12 AR-501 350X350 FF-12 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER
C C1 D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
5F (BDO FLOOR) 1185.72 SQ.M.
20 4F MEZZANINE (PROVISION) 234.71 SQ.M.
1 19
2
4F (BDO FLOOR) 1185.72 SQ.M.
5824 1750 3050 3100 4925 1500 0 2350 5625 18
3 17 3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325
6325
4 16
25545
30037
AR-524
CONCRETE TOPPING
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
C2 C3 C4 C5 C6 B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
4000
B4 (PARKING) 1595.01 SQ.M.
BDO OFFICE FLOOR B5 (PARKING) 1595.01 SQ.M.
868.48 SQ.M.
+16.50M./ +67.0M. B6 (PARKING) 1330.63 SQ.M.
PROVISION FOR 50MM
CONCRETE TOPPING TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
C2 PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
9870
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
10362
SCHEDULE OF FLOOR FINISHES
G C7
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
C10
G 6" CHB WALL
8100 10600 11000 10875
THIRD FLOOR
LINE TOLERANCE
40575
CS-01 CS-02
1 AR - 403 2 3 AR - 404 5
4
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:44 PM
ARCHITECT THIRD FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 212
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A A
12 13 14 15 16 17 18 19 20 21 22
CCTV
DN BUILDING OFFICIAL: DATE:
FIRE EXIT 1 SERVICE ELEV. LOBBY FIRE EXIT 2
3200
3200
ST-01B 14.67 SQ.M. 8.01 SQ.M. 16.07 SQ.M. ST-02B
+20.25 M. / +70.25M. +20.25 M./+70.25M. +20.25 M. / +70.25M. AREA TABULATION (GFA)
AR-518 AR-520
FF-07 FF-07 FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP
11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
20F (HALL) 792.44 SQ.M.
B PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
650X650
EAD RISER 18F (LEASING FLOOR) 847.43 SQ.M.
17F (LEASING FLOOR) 877.91 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
FF-11
13F (LEASING FLOOR) 976.05 SQ.M.
HANGED AHU
1500X500 TEAD RISER 12F (LEASING FLOOR) 1001.19 SQ.M.
CHWS/R RISER
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
LS-02 ELEVATOR LOBBY LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
37.96 SQ.M.
AR - 402 FF-09 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
PAD RISER EAD RISER
350X350 8F (BDO FLOOR) 1089.09 SQ.M.
EAD RISER
C C 7F (BDO FLOOR) 1111.71 SQ.M.
6F (BDO FLOOR) 1134.34 SQ.M.
5F (BDO FLOOR) 1185.72 SQ.M.
20 4F MEZZANINE (PROVISION) 234.71 SQ.M.
1 19
2
4F (BDO FLOOR) 1185.72 SQ.M.
18
3 17 3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325
6325
4 16
25288
29780
AR-524
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
4000
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
9613
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
10105
SCHEDULE OF FLOOR FINISHES
G
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
G
6" CHB WALL
40575
CS-01 CS-02
1 2 3 5
AR - 403 4 AR - 404
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:46 PM
ARCHITECT THIRD FLOOR MEZZANINE THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 213
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A CCTV A
12 13 14 15 16 17 18 19 20 21 22
CCTV
D-02
CCTV DN DN CCTV
BUILDING OFFICIAL: DATE:
FIRE EXIT 1 AR-501 FIRE EXIT 2
3200
3200
15.39 SQ.M. SERVICE ELEV. LOBBY 16.07 SQ.M.
+24.00M. / +74.50M. 7.98 SQ.M. +24.00M. / +74.50M.
AREA TABULATION (GFA)
FF-07 +24.00M. / +74.50M. FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP FF-07 UP
11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
DDC
FIREBOX
FEMALE TOILET D-03
15.19 SQ.M. 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+23.95M. / +74.45M. JANITOR'S CLOSET D-06 D-03 CCTV CCTV 650X650
FF-12 EXEC. TOILET 1 EAD RISER 17F (LEASING FLOOR) 877.91 SQ.M.
2.63 SQ.M. AR-501 AR-501 5.33 SQ.M.
+24.00 M. +23.95 M. / +74.45M.
FF-07 16F (LEASING FLOOR) 900.54 SQ.M.
ELEVATOR LOBBY FF-12
31.74 SQ.M. SERVICE HALLWAY 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
TOILET HALLWAY FF-11 28.93 SQ.M.
AR-501
D-07 11.02 SQ.M. +24.00 M. / +74.50M.
+24.00M. / +74.50M. EXEC. TOILET 2
FF-07
13F (LEASING FLOOR) 976.05 SQ.M.
AR-501 D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 ELV ROOM +23.95 M. / +74.45M. 12F (LEASING FLOOR) 1001.19 SQ.M.
AR-501
6.39 SQ.M. FF-12
+24.00 M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501 PWD
MALE TOILET
AR - 402 16.15 SQ.M.
4.88 SQ.M. 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03 +23.95 M. / +74.45M. PAD RISER EAD RISER
+23.95 M. / +74.45M.
350X350 FF-12
FF-12 AR-501
CCTV EAD RISER
8F (BDO FLOOR) 1089.09 SQ.M.
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
5F (BDO FLOOR) 1185.72 SQ.M.
1750 3050 3100 4925 1500 2450 4800
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
24616
6325
6325
PROVISION FOR 50MM 3F (BDO FLOOR) 1229.58 SQ.M.
CONCRETE TOPPING
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 ST-07 AR - 401 GF MEZZANINE 517.71 SQ.M.
29108
AR-518
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
4000
B4 (PARKING) 1595.01 SQ.M.
BDO OFFICE FLOOR
B5 (PARKING) 1595.01 SQ.M.
832.29 SQ.M.
+24.00M./ +74.50M.
B6 (PARKING) 1330.63 SQ.M.
PROVISION FOR 50MM
CONCRETE TOPPING TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
8941
9433
G
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
FOURTH FLOOR
LINE TOLERANCE FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT
HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:49 PM
ARCHITECT FOURTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 214
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
CS-01 CS-02
AR - 403 AR - 404
RECOMMENDING APPROVAL AS TO:
1 2 3 5
4
40575 HEAD ARCHITECTURAL SECTION DATE:
A A
AOM AIM AIM
12 13 14 15 16 17 18 19 20 21 22
F J
DN
WF TS CCTV
FIRE EXIT 1 SERVICE ELEV. LOBBY FIRE EXIT 2 BUILDING OFFICIAL: DATE:
3200
3200
ST-01B 14.67 SQ.M. 8.01 SQ.M. 16.07 SQ.M. ST-02B
AREA TABULATION (GFA)
AR-518 +27.75 M. / +78.25M. +27.75M. / +78.25M. +27.75 M. / +78.25M. AR-520
FF-07 FF-07 FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP
WF TS
GA
11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
P
J AIM AIM AOM
FIREBOX
18F (LEASING FLOOR) 847.43 SQ.M.
650X650
EAD RISER 17F (LEASING FLOOR) 877.91 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
FF-11
13F (LEASING FLOOR) 976.05 SQ.M.
HANGED AHU
1500X500 TEAD RISER 12F (LEASING FLOOR) 1001.19 SQ.M.
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
LS-02 ELEVATOR LOBBY LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
37.68 SQ.M.
AR - 402 FF-09 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
PAD RISER EAD RISER
350X350 8F (BDO FLOOR) 1089.09 SQ.M.
EAD RISER
C C 7F (BDO FLOOR) 1111.71 SQ.M.
6F (BDO FLOOR) 1134.34 SQ.M.
5F (BDO FLOOR) 1185.72 SQ.M.
20 4F MEZZANINE (PROVISION) 234.71 SQ.M.
1 19
2
4F (BDO FLOOR) 1185.72 SQ.M.
18
3 17 3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325
6325
4 16
FOURTH FLOOR MEZZANINE 5 15 3F (BDO FLOOR) 1229.58 SQ.M.
166.56 SQ.M. 6 14
+27.75M/ + 78.25M. 2F MEZZANINE (PROVISION) 234.71 SQ.M.
7 13
PROVISION FOR 50MM 8 2F (BANK BRANCH) 1149.72 SQ.M.
LS-01 12 LS-01
CONCRETE TOPPING 9 11
AR - 401 10 AR - 401 GF MEZZANINE 517.71 SQ.M.
ST-04
GF 948.11 SQ.M.
AR-524
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
4000
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:52 PM
ARCHITECT FOURTH MEZZANINE FLOOR THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
PLAN CHECKED: DRAWN:
MMOSER ASSOCIATES
(S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 215
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A SW-3 SW-4 A
CCTV
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
DN FIRE EXIT 1 SERVICE ELEV. LOBBY DN
CCTV
15.33 SQ.M. 7.97 SQ.M. AR-501
CCTV
BUILDING OFFICIAL: DATE:
FIRE EXIT 2
3200
3200
ST-01A +31.50M. +31.50M./ +82.00M. ST-02A
16.07 SQ.M. AREA TABULATION (GFA)
SW-1 SW-2 AR-518 FF-07 FF-07 +31.50M./ +82.00M. AR-520
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FIRE CABINET
FEMALE TOILET DDC 650X650
FIREBOX
D-03
EAD RISER 18F (LEASING FLOOR) 847.43 SQ.M.
15.19 SQ.M. AR-501 JANITORS CLOSET
+31.45M. / +81.95M. D-06 D-03
2.63 SQ.M. EXEC. TOILET 1 CCTV CCTV
17F (LEASING FLOOR) 877.91 SQ.M.
FF-12 +31.50M. AR-501 AR-501 5.33 SQ.M.
FF-07 +31.50M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
33.32 SQ.M.
+31.50M. / +82.00M. 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
TOILET HALLWAY AR-501 +31.50M. / +82.00M. 28.93 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 +31.50M. / +82.00 13F (LEASING FLOOR) 976.05 SQ.M.
+31.50M./ +82.00M. FF-07
AR-501 D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 +31.50M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV ROOM AR-501
FF-12
6.39 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+31.50M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
MALE TOILET
AR - 402 16.07 SQ.M. PWD TOILET 850X850 850X850 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03
4.88 SQ.M. PAD RISER EAD RISER
+31.45 M. / +81.95M.
FF-12 AR-501 350X350 +31.50M. 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER FF-12
C C1 D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
23677
6325
3F (BDO FLOOR) 1229.58 SQ.M.
5824 1750 11075 1500 2450 4800
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
28169
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
C2 C3 C4 C5 C6 B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
4000
B4 (PARKING) 1595.01 SQ.M.
BDO OFFICE FLOOR B5 (PARKING) 1595.01 SQ.M.
+31.50./ +82.00M.
B6 (PARKING) 1330.63 SQ.M.
PROVISION FOR 150MM
RAISED FLOORING TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
8003
C2 PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
G C7
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
8495
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
FIFTH FLOOR C8
LINE TOLERANCE SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
C9
FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT
C10
HATCHING LEGENDS
G REINFORCED CONCRETE WALL
FIFTH FLOOR
LINE TOLERANCE
CS-01 CS-02
AR - 403 4 AR - 404
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:56 PM
ARCHITECT FIFTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 216
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A SW-3 SW-4 A
CCTV
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV DN FIRE EXIT 1 SERVICE ELEV. LOBBY DN CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. AR-501
7.97 SQ.M. FIRE EXIT 2
3200
3200
ST-01A +36.00M. / +86.50M. ST-02A
+36.00M. / +86.50M. 16.07 SQ.M. AREA TABULATION (GFA)
SW-1 SW-2 AR-518 FF-07 FF-07 +36.00M. / +86.50M. AR-520
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02 20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC 650X650
FIREBOX
D-03 EAD RISER
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
+35.95M. / +86.45M. AR-501
2.63 SQ.M. D-06 D-03
FF-12 EXEC. TOILET 02 CCTV CCTV
17F (LEASING FLOOR) 877.91 SQ.M.
+36.00 M. AR-501 AR-501 5.33 SQ.M.
FF-07 +35.95M. / +86.45M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.37 SQ.M.
+36.00M. / +86.50M. 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
HALLWAY +36.00M. / +86.50M. 28.93 SQ.M.
AR-501 +36.00M. / +86.50M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 01 13F (LEASING FLOOR) 976.05 SQ.M.
+36.00M. / +86.50M. FF-07
AR-501 D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 +35.95M. / +86.45M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV ROOM AR-501
FF-12
6.39 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+36.00 M.
LS-02 FF-07 D-04 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
MALE TOILET AR-501
AR - 402 16.07 SQ.M. PWD 850X850 850X850 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03 4.88 SQ.M. PAD RISER EAD RISER
+35.95M. / +86.45M.
350X350 +35.95M. / +86.45M.
FF-12 AR-501
EAD RISER
8F (BDO FLOOR) 1089.09 SQ.M.
CCTV FF-12
C C1 D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
HALLWAY
39.37 SQ.M. 5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
23116
6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
2F (BANK BRANCH) 1149.72 SQ.M.
27608
LS-01 LS-01
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
C2 C3 C4 C5 C6 B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
4000
B4 (PARKING) 1595.01 SQ.M.
BDO OFFICE FLOOR B5 (PARKING) 1595.01 SQ.M.
773.95 SQ.M.
+38.00M./ +86.50M. B6 (PARKING) 1330.63 SQ.M.
PROVISION FOR 150MM
RAISED FLOORING TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
7441
C2 PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
G
B6 25 SLOTS
7933
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
SIXTH FLOOR
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
LINE TOLERANCE
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
G HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:29:58 PM
ARCHITECT SIXTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 217
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV DN FIRE EXIT 1 SERVICE ELEV. LOBBY DN
DN CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. 7.97 SQ.M. AR-501
FIRE EXIT 2
+40.50M. / +91.00M. ST-02A
3200
3200
ST-01A +40.50M. / +91.00M. 16.07 SQ.M.
FF-07 +40.50M. / +91.00M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP
2725
UP
UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC 650X650
FIREBOX
D-03
15.19 SQ.M. EAD RISER 18F (LEASING FLOOR) 847.43 SQ.M.
+40.45 M./ +90.95M. AR-501 JANITORS CLOSET
2.63 SQ.M. D-06 D-03
FF-12 EXEC. TOILET 01 CCTV CCTV
17F (LEASING FLOOR) 877.91 SQ.M.
+40.50M. AR-501 AR-501 5.18 SQ.M.
FF-07 +40.45 M./ +90.95M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.48 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
TOILET HALLWAY AR-501 +40.50M. / +91.00M. 28.93 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 02 +40.50M. / +91.00M. 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
+40.50M. / +91.00M. D-03 3.71 SQ.M. FF-07
1500X500 TEAD RISER FF-11 +40.45 M./ +90.95M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV ROOM AR-501
6.39 SQ.M. FF-12
+40.50M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
AR - 402 MALE TOILET 850X850 850X850 AR - 402
PWD TOILET 9F (BDO FLOOR) 1072.98 SQ.M.
16.07 SQ.M. D-03 PAD RISER EAD RISER
+40.45 M./ +90.95M. 4.88 SQ.M.
FF-12 AR-501 350X350 +40.45 M./ +90.95M. 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
HALLWAY
39.37 SQ.M. 5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
22557
6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
27049
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
4000
B4 (PARKING) 1595.01 SQ.M.
BDO OFFICE FLOOR B5 (PARKING) 1595.01 SQ.M.
754.35 SQ.M.
+44.50M./ +91.00 M. B6 (PARKING) 1330.63 SQ.M.
PROVISION FOR 150MM
6883
G B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
7375
SEVENTH FLOOR
LINE TOLERANCE TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
SEVENTH FLOOR
LINE TOLERANCE REINFORCED CONCRETE WALL
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:02 PM
ARCHITECT SEVENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 218
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV DN FIRE EXIT 01 SERVICE ELEV. LOBBY DN CCTV
BUILDING OFFICIAL: DATE:
15.39 SQ.M. AR-501
FIRE EXIT 02
7.97 SQ.M. ST-02A
3200
3200
ST-01A +45.00 M./ +95.50M. +45.00 M./ +95.50M. 16.07 SQ.M.
FF-07 +45.00 M./ +95.50M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC 650X650
FIREBOX
D-03
15.19 SQ.M. EAD RISER 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
JANITORS CLOSET
+44.95 M./ +95.45M. 2.63 SQ.M. D-06 D-03 EXEC. TOILET 01 CCTV CCTV
17F (LEASING FLOOR) 877.91 SQ.M.
FF-12 +45.00 M./ +95.50M.
AR-501 AR-501 5.18 SQ.M.
FF-07 +44.95 M./ +95.45M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.05 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
TOILET HALLWAY AR-501 +45.00 M./ +95.50M. 28.93 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 02 +45.00 M./ +95.50M. 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
+45.00 M./ +95.50M. 3.71 SQ.M. FF-07
D-03
1500X500 TEAD RISER FF-11 +44.95 M./ +95.45M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV ROOM AR-501
FF-12
6.39 SQ.M.
+45.00 M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
MALE TOILET
AR - 402 16.07 SQ.M.
PWD TOILET 850X850 850X850 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03 4.88 SQ.M. PAD RISER EAD RISER
+44.95 M./ +95.45M.
350X350 +44.95 M./ +95.45M.
FF-12 AR-501
EAD RISER
8F (BDO FLOOR) 1089.09 SQ.M.
CCTV FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
HALLWAY
39.37 SQ.M. 5F (BDO FLOOR) 1185.72 SQ.M.
21997
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
5824 1750 11075 1500 7250 3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325
6325
3F (BDO FLOOR) 1229.58 SQ.M.
26489
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
4000
B4 (PARKING) 1595.01 SQ.M.
BDO OFFICE FLOOR B5 (PARKING) 1595.01 SQ.M.
732.69 SQ.M.
+45.00M./ +95.50M. B6 (PARKING) 1330.63 SQ.M.
6323
G B3 40 SLOTS
B4 40 SLOTS
EIGHTH FLOOR
B5 40 SLOTS
6815
LINE TOLERANCE B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
G FF-10
1200MMX600MMX10MM KERABEN SERIE SAVIA ROBLE RECTIFIED
PORCELAIN TILE
EIGHTH FLOOR
LINE TOLERANCE HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:06 PM
ARCHITECT EIGHTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 219
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV DN FIRE EXIT 01 SERVICE ELEV. LOBBY DN
DN CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. AR-501FIRE EXIT 02
7.97 SQ.M. ST-02A
3200
3200
ST-01A +49.50 M. / +100.00M. +49.50 M. / +100.00M. 16.07 SQ.M.
FF-07 +49.50 M. / +100.00M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
DDC 650X650
FIREBOX
FEMALE TOILET D-03
EAD RISER
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+49.45 M. / +99.95M. 2.63 SQ.M. D-06 D-03 CCTV CCTV
FF-12 +49.50 M. EXEC. TOILET 1 17F (LEASING FLOOR) 877.91 SQ.M.
AR-501 AR-501 5.33 SQ.M.
FF-07 +49.45 M. / +99.95M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.05 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
TOILET HALLWAY AR-501 +49.50 M. 28.93 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 +49.50 M. / +100.00M. 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
+49.50 M. / +100.00M. D-03 3.71 SQ.M. FF-07
1500X500 TEAD RISER FF-11 +49.45 M. / +99.95M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV ROOM AR-501
FF-12
6.04 SQ.M.
+49.50 M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
MALE TOILET
AR - 402 16.07 SQ.M.
PWD TOILET 850X850 850X850 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03 4.88 SQ.M. PAD RISER EAD RISER
+49.45 M. / +99.95M. +49.45 M. / +99.95M.
FF-12 AR-501 350X350 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
HALLWAY
21437
6325
3F (BDO FLOOR) 1229.58 SQ.M.
25929
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
4000
B4 (PARKING) 1595.01 SQ.M.
BDO RETAIL OFFICE B5 (PARKING) 1595.01 SQ.M.
712.14 SQ.M.
5762
6254
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:11 PM
ARCHITECT NINTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 220
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A CCTV A
CCTV
D-02
CCTV DN FIRE EXIT 01 SERVICE ELEV. LOBBY DN
DN CCTV
BUILDING OFFICIAL: DATE:
15.39 SQ.M. 7.97 SQ.M.
AR-501FIRE EXIT
ST-02A
3200
3200
ST-01A +54.00 M. / +104.50M. +54.00 M. / +104.50M. 16.07 SQ.M. AREA TABULATION (GFA)
AR-514 FF-07 FF-07 +54.00 M. / +104.50M. AR-515
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
UP
20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
DDC 650X650
FIREBOX
FEMALE TOILET D-03
EAD RISER
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+53.95 M. / +104.45M. 2.63 SQ.M. D-06 D-03 EXEC. TOILET 1 CCTV CCTV
FF-12 +54.00 M. 17F (LEASING FLOOR) 877.91 SQ.M.
AR-501 AR-501 5.33 SQ.M.
FF-07 +53.95 M. / +104.45M.
ELEVATOR LOBBY
16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.05 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
TOILET HALLWAY AR-501
+54.00 M. 28.93 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 +54.00 M. / +104.50M. 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
+54.00 M. / +104.50M. 3.71 SQ.M. FF-07
D-03
1500X500 TEAD RISER FF-11 +53.95 M. / +104.45M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV ROOM AR-501
FF-12
5.80 SQ.M.
+54.00 M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
AR - 402 MALE TOILET PWD 850X850 850X850 AR - 402
16.07 SQ.M. D-03 PAD RISER EAD RISER 9F (BDO FLOOR) 1072.98 SQ.M.
+53.95 M. / +104.45M. 4.88 SQ.M.
FF-12 AR-501 350X350 +53.95 M. / +104.45M. 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
20877
HALLWAY
39.37 SQ.M. 5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
5824 1750 6150 4925 1500 2450 4800 4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325
6325
25369
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
4000
B4 (PARKING) 1595.01 SQ.M.
BDO OFFICE FLOOR B5 (PARKING) 1595.01 SQ.M.
5202
691.29 SQ.M.
+54.00/ +104.50M. B6 (PARKING) 1330.63 SQ.M.
PROVISION FOR 150MM
RAISED FLOORING TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
G B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
TENTH FLOOR
LINE TOLERANCE
B4 40 SLOTS
5694
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:17 PM
ARCHITECT TENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 221
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A CCTV A
CCTV
D-02
FIRE EXIT
DN DN
CCTV
15.33 SQ.M. SERVICE ELEV. LOBBY AR-501
CCTV
BUILDING OFFICIAL: DATE:
FIRE EXIT
3200
3200
ST-01C + 58.50 M./ +109.00M. 7.97 SQ.M. ST-02C
+ 58.50 M./ +109.00M. 16.07 SQ.M. AREA TABULATION (GFA)
FIREBOX
DDC DDC 18F (LEASING FLOOR) 847.43 SQ.M.
JANITORS CLOSET
2.63 SQ.M. D-05 PWD CCTV CCTV 650X650
+ 58.50 M./ +109.00M. EAD RISER 17F (LEASING FLOOR) 877.91 SQ.M.
AR-501 5.33 SQ.M.
DAY TANK FF-07 D-06 +58.45 M./ +108.95M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
AR-501 FF-12
DAY TANK 32.45 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
38.58 SQ.M.
SERVICE HALLWAY + 58.50 M./ +109.00M.
D-06
9.45 SQ.M. 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501 FF-07
+ 58.50 M./ +109.00M.
1500X500 TEAD RISER
ELV RM FF-07 12F (LEASING FLOOR) 1001.19 SQ.M.
DAY TANK
FF-07 6.39 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+ 58.50 M.
LS-02 FF-07 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR - 402 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
PAD RISER EAD RISER
D-08
350X350 8F (BDO FLOOR) 1089.09 SQ.M.
GPS GPS GPS GPS GPS EAD RISER AR-501
C C 7F (BDO FLOOR) 1111.71 SQ.M.
20317
24809
6325
6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
D-09 D-09 D-09
LS-01 AR-501 AR-501 AR-501 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
TX-2 B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
PAHU AND CHILLER ROOM
4000
201.16 SQ.M. INCOMING B4 (PARKING) 1595.01 SQ.M.
4643
5135
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
G FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:22 PM
ARCHITECT ELEVENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 222
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV DN FIRE EXIT 1 SERVICE ELEV. LOBBY DN DN CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. 8.00 SQ.M. AR-501
FIRE EXIT 2 ST-02A
3200
3200
ST-01A + 64.50 M./ +115.00M. + 64.50 M./ +115.00M. 16.07 SQ.M.
FF-07 AR-515
AREA TABULATION (GFA)
AR-514 FF-07 + 64.50 M./ +115.00M.
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC
FIREBOX
D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+63.45 M./ +114.95M. 2.63 SQ.M. D-06 D-03 CCTV CCTV 650X650
FF-12 + 64.50 M. AR-501 EXEC. TOILET 1 17F (LEASING FLOOR) 877.91 SQ.M.
AR-501 EAD RISER
5.24 SQ.M.
FF-07 +63.45 M./ +114.95M.
ELEVATOR LOBBY
16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
31.84 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
TOILET HALLWAY AR-501 + 64.50 M. 29.11 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 + 64.50 M./ +115.00M. 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
+ 64.50 M./ +115.00M. 3.71 SQ.M. FF-07
D-03
1500X500 TEAD RISER FF-11 +63.45 M./ +114.95M. 12F (LEASING FLOOR) 1001.19 SQ.M.
TELCO / IT AR-501
FF-12
6.04 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+ 64.50 M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
MALE TOILET AR-501
AR - 402 16.21 SQ.M.
PWD TOILET 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03 4.88 SQ.M. PAD RISER EAD RISER
+63.45 M./ +114.95M.
350X350 +63.45 M./ +114.95M.
FF-12 AR-501
EAD RISER
8F (BDO FLOOR) 1089.09 SQ.M.
CCTV FF-12
C D-08 C
19553
24045
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325
6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
LEASABLE SPACE B2 (PARKING) 1595.01 SQ.M.
631.83 SQ.M.
+64.50M./ +115.00M. B3 (PARKING) 1595.01 SQ.M.
PROVISION FOR 50MM
3878
4000
CONCRETE TOPPING B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
G
PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
TWELFTH FLOOR B1 41 SLOTS
LINE TOLERANCE
B2 40 SLOTS
B3 40 SLOTS
4370
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
G SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:27 PM
ARCHITECT TWELFTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 223
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV DN FIRE EXIT 1 SERVICE ELEV. LOBBY DN CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. 8.00 SQ.M. AR-501FIREEXIT 2
ST-02A
3200
3200
ST-01A + 69.00 M./ +119.50M. +69.00./ +119.50M. 16.07 SQ.M.
FF-07 + 69.00 M./ +119.50M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC
FIREBOX
D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
+68.95/ +119.45 AR-501
2.63 SQ.M. D-06 D-03
EXEC. TOILET 1 CCTV CCTV 650X650
FF-12 + 69.00 M. EAD RISER 17F (LEASING FLOOR) 877.91 SQ.M.
AR-501 AR-501 5.09 SQ.M.
FF-07 +68.95 M. 16F (LEASING FLOOR) 900.54 SQ.M.
ELEVATOR LOBBY FF-12
32.69 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
TOILET HALLWAY AR-501
+69.00M./ +119.50M. 29.11 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 + 69.00 M./ +119.50M. 13F (LEASING FLOOR) 976.05 SQ.M.
+69.00M./ +119.50M. FF-07
AR-501 D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 +68.95 M. 12F (LEASING FLOOR) 1001.19 SQ.M.
TELCO / IT AR-501
FF-12
6.04 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+ 69.00 M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
AR - 402 MALE TOILET PWD 800X800 800X800 AR - 402
16.21 SQ.M. D-03 4.88 SQ.M. PAD RISER EAD RISER 9F (BDO FLOOR) 1072.98 SQ.M.
+ 68.95 M./ +119.45M. +68.95 M.
FF-12 AR-501 350X350 8F (BDO FLOOR) 1089.09 SQ.M.
EAD RISER FF-12
18983
CCTV
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
5824 1750 11075 1500 2450 4800
5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
23475
4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325
6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
LEASABLE SPACE
617.91 SQ.M. B2 (PARKING) 1595.01 SQ.M.
+69.00M./ +119.50M.
B3 (PARKING) 1595.01 SQ.M.
3308
4000
CONCRETE TOPPING B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
G
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
THIRTEENTH FLOOR GF (SURACE PARKING) 12 SLOTS
LINE TOLERANCE
B1 41 SLOTS
B2 40 SLOTS
3800
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
G TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
THIRTEENTH FLOOR FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
LINE TOLERANCE
FF-08 600MMX1200MM WABI SABI TAUPE LAPATTO RECT
HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:32 PM
ARCHITECT THIRTEENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 224
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV DN FIRE EXIT 1 SERVICE ELEV. LOBBY DN CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. AR-501
8.01 SQ.M. FIRE EXIT 2 ST-02A
3200
3200
ST-01A + 73.50 M./ +124.00M. 16.07 SQ.M.
FF-07
+ 73.50 M./ +124.00M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07 + 73.50 M./ +124.00M.
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
DDC
FIREBOX
FEMALE TOILET D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+ 73.45 M./ +123.95M. 2.63 SQ.M. D-06 D-03 CCTV CCTV 650X650
FF-12 EXEC. TOILET 01 17F (LEASING FLOOR) 877.91 SQ.M.
+ 73.50 M. AR-501 AR-501 EAD RISER
5.09 SQ.M.
FF-07 + 73.45 M./ +123.95M.
ELEVATOR LOBBY 16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.01 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
TOILET HALLWAY AR-501 73.50 M./ +124.00M.
+ 29.11 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 02 + 73.50 M./ +124.00M. 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
+ 73.50 M./ +124.00M. 3.71 SQ.M. FF-07
D-03
1500X500 TEAD RISER FF-11 + 73.45 M./ +123.95M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV ROOM AR-501
FF-12
6.29 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+ 73.50 M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
AR - 402 PWD 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
MALE TOILET D-03
4.88 SQ.M. PAD RISER EAD RISER
18423
16.21 SQ.M.
FF-12 AR-501 350X350 + 73.45 M./ +123.95M. 8F (BDO FLOOR) 1089.09 SQ.M.
+ 73.45 M./ +123.95M. CCTV EAD RISER FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
5824 1750 11075 1500 2450 4800 5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
22915
4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325
6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
LEASABLE SPACE
B2 (PARKING) 1595.01 SQ.M.
606.05 SQ.M.
2748
+73.50M./ +124.00M.
B3 (PARKING) 1595.01 SQ.M.
PROVISION FOR 50MM
4000
CONCRETE TOPPING B4 (PARKING) 1595.01 SQ.M.
3240
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
G TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
FOURTEENTH FLOOR SCHEDULE OF FLOOR FINISHES
LINE TOLERANCE
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:38 PM
ARCHITECT FOURTEENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 225
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
DN FIRE EXIT 1 SERVICE ELEV. LOBBY DN
CCTV
8.01 SQ.M. AR-501FIRE EXIT 2
CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. ST-02A
3200
3200
ST-01A +78.00M./ +128.50M. +78.00M./ +128.50M. 16.07 SQ.M.
FF-07 +78.00M./ +128.50M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP 2725 UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC
FIREBOX
D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+77.95 M./ +128.45M. 2.63 SQ.M. D-06 D-03 650X650
FF-12 EXEC. TOILET 1 CCTV CCTV
17F (LEASING FLOOR) 877.91 SQ.M.
+78.00 M. EAD RISER
AR-501 AR-501 5.09 SQ.M.
FF-07 +77.95 M./ +128.45M.
ELEVATOR LOBBY
16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.11 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
TOILET HALLWAY AR-501 +78.00M./ +128.50M. 29.11 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 +78.00M./ +128.50M. 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501
+78.00M./ +128.50M. D-03 3.71 SQ.M. FF-07
1500X500 TEAD RISER FF-11 +77.95 M./ +128.45M. 12F (LEASING FLOOR) 1001.19 SQ.M.
TELCO / IT AR-501
FF-12
5.80 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+78.00 M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
MALE TOILET
AR - 402 16.21 SQ.M. PWD TOILET 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03 PAD RISER EAD RISER
17958
22450
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325
6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
LEASABLE SPACE
B2 (PARKING) 1595.01 SQ.M.
2283
565.51 SQ.M.
+78.00M./ +128.50M.
B3 (PARKING) 1595.01 SQ.M.
PROVISION FOR 50MM
CONCRETE TOPPING B4 (PARKING) 1595.01 SQ.M.
G
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
6776
FIFTEENTH FLOOR TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
LINE TOLERANCE
PARKING PROVISIONS
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
G B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
FIFTEENTH FLOOR TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
LINE TOLERANCE
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:45 PM
ARCHITECT FIFTEENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 226
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
DN FIRE EXIT 1 SERVICE ELEV. LOBBY DN
CCTV
15.33 SQ.M. AR-501FIRE EXIT 2
CCTV
BUILDING OFFICIAL: DATE:
8.00 SQ.M. ST-02A
3200
3200
ST-01A +82.50 M./ +133.00M. +82.50 M./ +133.00M. 16.07 SQ.M.
FF-07 +82.50 M./ +133.00M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP 2725 UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
DDC
FIREBOX
FEMALE TOILET D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+ 82.45 M./ +132.95M. 2.63 SQ.M. D-06 D-03 650X650
FF-12 EXEC. TOILET 1 CCTV CCTV
17F (LEASING FLOOR) 877.91 SQ.M.
+82.50 M. AR-501 AR-501 5.09 SQ.M. EAD RISER
FF-07 + 82.45 M./ +132.95M.
ELEVATOR LOBBY
16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.11 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
TOILET HALLWAY +82.50 M. 29.11 SQ.M.
AR-501
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 +82.50 M./ +133.00M. 13F (LEASING FLOOR) 976.05 SQ.M.
+82.50 M./ +133.00M. FF-07
AR-501 D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 + 82.45 M./ +132.95M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV ROOM AR-501
FF-12
6.29 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+82.50 M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
MALE TOILET
AR - 402 800X800 800X800 AR - 402
17403
16.21 SQ.M. D-03 PWD TOILET PAD RISER EAD RISER 9F (BDO FLOOR) 1072.98 SQ.M.
+ 82.45 M./ +132.95M. 4.88 SQ.M.
FF-12 AR-501 350X350 + 82.45 M./ +132.95M. 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
HALLWAY
39.37 SQ.M. 5F (BDO FLOOR) 1185.72 SQ.M.
21895
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
5824 1750 11075 1500 2450 4800
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325
6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D D
B1 MEZZANINE 288.80 SQ.M.
1728
LEASABLE SPACE
553.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
+82.50M./ +133.00M.
G B3 (PARKING) 1595.01 SQ.M.
PROVISION FOR 50MM
CONCRETE TOPPING B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
SIXTEENTH FLOOR B6 (PARKING) 1330.63 SQ.M.
6220
LINE TOLERANCE
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
G
B5 40 SLOTS
B6 25 SLOTS
SIXTEENTH FLOOR TOTAL NO. OF PARKING PROVIDED 238 SLOTS
LINE TOLERANCE
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:30:54 PM
ARCHITECT SIXTEENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 227
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV DN FIRE EXIT 01 SERVICE ELEV. LOBBY DN CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. 8.01 SQ.M. AR-501
FIRE EXIT 02 ST-02A
3200
3200
ST-01A +87.00 M./ +137.50M. +87.00 M./ +137.50M. 16.07 SQ.M.
FF-07 AR-515
AREA TABULATION (GFA)
AR-514 FF-07 +87.00 M./ +137.50M.
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC
FIREBOX
D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+86.95 M./ +137.45M. 2.63 SQ.M. D-06 D-03 CCTV CCTV 650X650
FF-12 EXEC. WC 1 17F (LEASING FLOOR) 877.91 SQ.M.
+87.00 M. AR-501 AR-501 EAD RISER
5.24 SQ.M.
FF-07 +86.95 M./ +137.45M. 16F (LEASING FLOOR) 900.54 SQ.M.
ELEVATOR LOBBY FF-12
32.11 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
TOILET HALLWAY AR-501 +86.95 M./ +137.45M. 29.11 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. WC 2 +87.00 M./ +137.50M. 13F (LEASING FLOOR) 976.05 SQ.M.
+87.00 M./ +137.50M. FF-07
AR-501 D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 +86.95 M./ +137.45M. 12F (LEASING FLOOR) 1001.19 SQ.M.
ELV AR-501
FF-12
6.29 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+87.00 M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
16843
AR-501
MALE TOILET
AR - 402 16.21 SQ.M.
PWD 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03 4.88 SQ.M. PAD RISER EAD RISER
+86.95 M./ +137.45M.
350X350 +86.95 M./ +137.45M.
FF-12 AR-501
EAD RISER
8F (BDO FLOOR) 1089.09 SQ.M.
CCTV FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
21335
5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
5824 1750 11075 1500 2450 4800
6325
3F (BDO FLOOR) 1229.58 SQ.M.
7493
5660
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
G
B4 40 SLOTS
B5 40 SLOTS
SEVENTEENTH FLOOR
LINE TOLERANCE
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:31:03 PM
ARCHITECT SEVENTEENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 228
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
DN FIRE EXIT 01 SERVICE ELEV. LOBBY DN
CCTV
15.33 SQ.M. FIRE EXIT
AR-501 02
CCTV
BUILDING OFFICIAL: DATE:
8.00 SQ.M. ST-02A
3200
3200
ST-01A +91.50 M./ +142.00M. +91.50 M./ +142.00M. 16.07 SQ.M.
FF-07 +91.50 M./ +142.00M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP 2725 UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
DDC
FIREBOX
FEMALE TOILET D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+91.45M./ +141.95M. 2.63 SQ.M. D-06 D-03 CCTV CCTV 650X650
FF-12 EXEC. TOILET 1 17F (LEASING FLOOR) 877.91 SQ.M.
+91.50 M. AR-501 AR-501 EAD RISER
5.09 SQ.M.
FF-07 +91.45M./ +141.95M.
ELEVATOR LOBBY
16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.27 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
TOILET HALLWAY +91.50M. 29.11 SQ.M.
AR-501
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 +91.50 M./ +142.00M. 13F (LEASING FLOOR) 976.05 SQ.M.
+91.50 M./ +142.00M. FF-07
AR-501 D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 +91.45M./ +141.95M. 12F (LEASING FLOOR) 1001.19 SQ.M.
TELCO / IT AR-501
FF-12
6.39 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+91.50 M.
16262
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
AR - 402 MALE TOILET PWD TOILET 800X800 800X800 AR - 402
16.21 SQ.M. D-03 PAD RISER EAD RISER 9F (BDO FLOOR) 1072.98 SQ.M.
4.88 SQ.M.
+91.45M./ +141.95M. 350X350 +91.45M./ +141.95M.
FF-12 AR-501
EAD RISER
8F (BDO FLOOR) 1089.09 SQ.M.
CCTV FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
20754
HALLWAY
39.37 SQ.M. 5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
5824 1750 11075 1500 2450 4800
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325
3F (BDO FLOOR) 1229.58 SQ.M.
6912
5079
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
G B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
EIGHTEENTH FLOOR
LINE TOLERANCE B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:31:09 PM
ARCHITECT EIGHTEENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 229
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A CCTV A
14 15 16 17 18 19 20 21 22 23 24 25 26
CCTV
D-02
CCTV FIRE EXIT 01 SERVICE ELEV. LOBBY DN CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M. 8.00 SQ.M. AR-501FIRE EXIT 02
ST-02A
3200
3200
ST-01A +96.00 M./ +146.50M. +96.00 M./ +146.50M. 16.07 SQ.M.
FF-07 +96.00 M./ +146.50M. AR-515
AREA TABULATION (GFA)
AR-514 FF-07
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP
13 12 11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
FEMALE TOILET DDC
FIREBOX
D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+96.00 M./ +146.50M. 2.63 SQ.M. D-06 D-03 CCTV CCTV 650X650
FF-12 + 96.00 M. EXEC. TOILET 1
EAD RISER 17F (LEASING FLOOR) 877.91 SQ.M.
AR-501 AR-501
FF-07 5.26 SQ.M.
ELEVATOR LOBBY +95.95M./ +146.45M. 16F (LEASING FLOOR) 900.54 SQ.M.
FF-12
32.11 SQ.M.
+96.00 M./ +146.50M. 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
TOILET HALLWAY AR-501 +96.00 M. 29.11 SQ.M.
D-07 11.02 SQ.M. FF-11 EXEC. TOILET 2 +96.00 M./ +146.50M. 13F (LEASING FLOOR) 976.05 SQ.M.
+96.00 M./ +146.50M. FF-07
AR-501 D-03 3.71 SQ.M.
1500X500 TEAD RISER FF-11 +95.95M./ +146.45M. 12F (LEASING FLOOR) 1001.19 SQ.M.
TELCO / IT AR-501
FF-12
5.80 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
15723
+ 96.00 M.
FF-07 D-04
LS-02 LS-02 10F (BDO FLOOR) 1041.98 SQ.M.
AR-501
MALE TOILET
AR - 402 16.21 SQ.M. PWD TOILET 800X800 800X800 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
D-03
4.88 SQ.M. PAD RISER EAD RISER
+96.00 M./ +146.50M.
FF-12 AR-501 350X350 +95.95M./ +146.45M. 8F (BDO FLOOR) 1089.09 SQ.M.
CCTV EAD RISER FF-12
C D-08 C 7F (BDO FLOOR) 1111.71 SQ.M.
AR-501
20215
HALLWAY 6F (BDO FLOOR) 1134.34 SQ.M.
39.37 SQ.M.
+96.00M./ +146.50M. 5F (BDO FLOOR) 1185.72 SQ.M.
FF-13
4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
5824 1750 11075 1500 2450 4800
3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325
6373
4540
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
GF (SURACE PARKING) 12 SLOTS
G B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
NINETEENTH FLOOR
LINE TOLERANCE B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:31:15 PM
ARCHITECT NINETEENTH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 230
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A CCTV A
ST-07
12 13 14 15 16 17 18 19 20 21 22
CCTV
AR-518 D-02
DN FIRE EXIT 01 SERVICE ELEV. LOBBY DN
CCTV
8.00 SQ.M. AR-501FIRE EXIT 02
CCTV
BUILDING OFFICIAL: DATE:
15.33 SQ.M.
3200
3200
ST-01B +100.50 M./ +151.00M. +100.50 M./ +151.00M. 16.07 SQ.M. ST-02B
FF-07 +100.50 M./ +151.00M. AREA TABULATION (GFA)
AR-518 FF-07 AR-520
FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP UP
11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02
20F (HALL) 792.44 SQ.M.
B AR-501 PLUMBING SHAFT
600X300MM
PLUMBING SHAFT
3000X325MM
B
19F (LEASING FLOOR) 832.66 SQ.M.
DDC
FIREBOX
FEMALE TOILET D-03
15.19 SQ.M. JANITORS CLOSET 18F (LEASING FLOOR) 847.43 SQ.M.
AR-501
+100.45 M./ +150.95M. 2.63 SQ.M. D-06 D-03 CCTV CCTV 650X650
FF-12 EXEC. TOILET 1 17F (LEASING FLOOR) 877.91 SQ.M.
+100.50 M. AR-501 AR-501 EAD RISER
5.26 SQ.M.
DN FF-07 +100.45 M./ +150.95M. 16F (LEASING FLOOR) 900.54 SQ.M.
ELEVATOR LOBBY FF-12
32.11 SQ.M. 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
TOILET HALLWAY AR-501 +100.50 M. 29.11 SQ.M.
D-07 10.97 SQ.M. FF-11 +100.50 M./ +151.00M.
+100.50 M./ +151.00M. EXEC. TOILET 2 13F (LEASING FLOOR) 976.05 SQ.M.
AR-501 D-03 3.71 SQ.M. FF-07
1500X500 TEAD RISER FF-11 +100.45 M./ +150.95M. 12F (LEASING FLOOR) 1001.19 SQ.M.
TELCO / IT AR-501
FF-12
15163
19655
AR-501
6F (BDO FLOOR) 1134.34 SQ.M.
HALLWAY 5F (BDO FLOOR) 1185.72 SQ.M.
39.37 SQ.M.
FF-13 4F MEZZANINE (PROVISION) 234.71 SQ.M.
4F (BDO FLOOR) 1185.72 SQ.M.
3F MEZZANINE (PROVISION) 234.71 SQ.M.
5813
6325
TWENTIETH FLOOR MEZZANINE PROJECTION 3F (BDO FLOOR) 1229.58 SQ.M.
5824 1750 11075 1500 2450 4800
2F MEZZANINE (PROVISION) 234.71 SQ.M.
2F (BANK BRANCH) 1149.72 SQ.M.
GF MEZZANINE 517.71 SQ.M.
LEASABLE SPACE GF 948.11 SQ.M.
458.04 SQ.M.
G +100.50M./ +151.00M. TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
PROVISION FOR 50MM
B1 (PARKING) 1595.01 SQ.M.
CONCRETE TOPPING D
B1 MEZZANINE 288.80 SQ.M.
TWENTIETH FLOOR
LINE TOLERANCE B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
3980
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
G GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
TWENTIETH FLOOR
LINE TOLERANCE B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:31:22 PM
ARCHITECT TWENTIETH FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 231
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A CCTV A
12 13 14 15 16 17 18 19 20 21 22
ST-07 CCTV
AR-518
DN DN BUILDING OFFICIAL: DATE:
SERVICE ELEV. LOBBY ST-02A
3200
3200
ST-01A
8.01 SQ.M. AR-515
AREA TABULATION (GFA)
AR-514 +104.25M./+154.75M.
FF-07 FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP FF-07 UP
11 10 9 8 7 6 5 4 3 2 1 20F MEZZANINE (PROVISION) 426.86 SQ.M.
20F (HALL) 792.44 SQ.M.
B PLUMBING SHAFT PLUMBING SHAFT B
RLS-A 600X300MM 3000X325MM RLS-A 19F (LEASING FLOOR) 832.66 SQ.M.
FIREBOX
AR - 417 AR - 417 18F (LEASING FLOOR) 847.43 SQ.M.
700X600 650X650 17F (LEASING FLOOR) 877.91 SQ.M.
EAD RISER EAD RISER
DN TWEENTIETH FLOOR MEZZANINE STORAGE
118.52 SQ.M. 7.49 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
+104.25M./ 154.75M. FF-07 15F (LEASING FLOOR) 925.77 SQ.M.
6150
6150
SERVICE HALLWAY 13F (LEASING FLOOR) 976.05 SQ.M.
9.45 SQ.M.
1500X500 TEAD RISER +104.25M. 12F (LEASING FLOOR) 1001.19 SQ.M.
FF-11
15113
FF-11
11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
ELEVATOR LOBBY
LS-02 RLS-B 37.65 SQ.M. LS-02 RLS-B 10F (BDO FLOOR) 1041.98 SQ.M.
TOILET +104.25M./+154.75M.
AR - 402 AR - 417 6.05 SQ.M. FF-09 800X800 800X800 AR - 402 AR - 417 9F (BDO FLOOR) 1072.98 SQ.M.
+104.20/ +154.70M. PAD RISER EAD RISER
350X350 8F (BDO FLOOR) 1089.09 SQ.M.
FF-12 EAD RISER
C C 7F (BDO FLOOR) 1111.71 SQ.M.
19605
6F (BDO FLOOR) 1134.34 SQ.M.
HALLWAY
107.57 SQ.M. 5F (BDO FLOOR) 1185.72 SQ.M.
+104.25/ 154.75M.
PROVISION FOR 50MM 4F MEZZANINE (PROVISION) 234.71 SQ.M.
CONCRETE TOPPING
RLS-C RLS-C 4F (BDO FLOOR) 1185.72 SQ.M.
AR - 418 AR - 418 3F MEZZANINE (PROVISION) 234.71 SQ.M.
5763
6325
R-13 3F (BDO FLOOR) 1229.58 SQ.M.
AR-533
OPEN 2F MEZZANINE (PROVISION) 234.71 SQ.M.
TO
LS-01 BELOW LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
G
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
3930
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
G GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:31:29 PM
ARCHITECT TWEENTIETH MEZZANINE FLOOR THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
PLAN CHECKED: DRAWN:
MMOSER ASSOCIATES
(S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 232
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
RCS-A
RCS-B RCS - D RCS-C
AR - 416 4 RECOMMENDING APPROVAL AS TO:
1 2 3 AR - 416 AR - 416 AR - 416 5
40575 HEAD ARCHITECTURAL SECTION DATE:
A A
DDC
CCTV
D-02
DN DN
FIRE EXIT 01 BUILDING OFFICIAL: DATE:
SERVICE ELEVATOR LOBBY AR-501
3200
3200
ST-01B 14.67 SQ.M. ST-02D
+108.00M./ +158.50
MELD BATTERY
PANEL X5
7.90 SQ.M. AREA TABULATION (GFA)
AR-514
FF-07 +108.00M./ +158.50 AR-516
CONTROL PANEL
PE3
FF-07 FF-07 ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP
CONTROL PANEL
CONTROL PANEL 20F MEZZANINE (PROVISION) 426.86 SQ.M.
D-02 PE5
PE2
AR-501 20F (HALL) 792.44 SQ.M.
B ATTACHMENT B
RLS-A ATTACHMENT PANEL
PNL PE5 CCTV
RLS-A 19F (LEASING FLOOR) 832.66 SQ.M.
1500
CCTV
PE2-PE3
GRP.
AR - 417 CTRL
AR - 417 18F (LEASING FLOOR) 847.43 SQ.M.
17F (LEASING FLOOR) 877.91 SQ.M.
PE 02, 03 ,05 MACHINE ROOM HEIGHT
47.21 SQ.M. 16F (LEASING FLOOR) 900.54 SQ.M.
+108.00M./ +158.50M.
15F (LEASING FLOOR) 925.77 SQ.M.
676
14F (LEASING FLOOR) 950.91 SQ.M.
6150
6150
NON-POTABLE ELEVATED 13F (LEASING FLOOR) 976.05 SQ.M.
DDC
WATER TANK
14437
CAP = 102 CU.M. 12F (LEASING FLOOR) 1001.19 SQ.M.
FIRE PUMP ROOM
21.56 SQ.M. 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
+108.00M./ +158.50M.
RLS-B FF-07 RLS-B 10F (BDO FLOOR) 1041.98 SQ.M.
AR - 417 AR - 417 9F (BDO FLOOR) 1072.98 SQ.M.
8F (BDO FLOOR) 1089.09 SQ.M.
18929
C PUMP ROOM FOR POTABLE AND NON POTABLE C 7F (BDO FLOOR) 1111.71 SQ.M.
7.25 SQ.M.
+108.00M./ +158.50 6F (BDO FLOOR) 1134.34 SQ.M.
ST-03 FF-07
UP AR-522 5F (BDO FLOOR) 1185.72 SQ.M.
DDC
4F MEZZANINE (PROVISION) 234.71 SQ.M.
RLS-C RLS-C 4F (BDO FLOOR) 1185.72 SQ.M.
5087
ELEVATED MAKE-UP
AR - 418 WATER TANK AR - 418 3F MEZZANINE (PROVISION) 234.71 SQ.M.
6325
POTABLE ELEVATED
3F (BDO FLOOR) 1229.58 SQ.M.
WATER TANK
2F MEZZANINE (PROVISION) 234.71 SQ.M.
2F (BANK BRANCH) 1149.72 SQ.M.
3251
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
G PARKING PROVISIONS
GF (SURACE PARKING) 12 SLOTS
ROOF DECK FLOOR
B1 41 SLOTS
LINE TOLERANCE
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:31:37 PM
ARCHITECT ROOFDECK FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 233
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A A
3200
3200
AREA TABULATION (GFA)
ROOF DECK 02 LEVEL ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
+111.00M./+161.50M. UP
20F MEZZANINE (PROVISION) 426.86 SQ.M.
20F (HALL) 792.44 SQ.M.
B B
RLS-A RLS-A 19F (LEASING FLOOR) 832.66 SQ.M.
AR - 417 FIRE TANK AR - 417 18F (LEASING FLOOR) 847.43 SQ.M.
ACCU UNITS
9350
17F (LEASING FLOOR) 877.91 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.
14F (LEASING FLOOR) 950.91 SQ.M.
6150
6150
13F (LEASING FLOOR) 976.05 SQ.M.
CONTROL PANEL
PE-01
CONTROL PANEL ATTACHMENT PANEL
PE-04 PE-01, PE-04
12F (LEASING FLOOR) 1001.19 SQ.M.
PE 01 & 04 MACHINE ROOM FFL 11F (MEP / UTILITY FLOOR) 1018.43 SQ.M.
LS-02 RLS-B 29.14 SQ.M. RLS-B LS-02
+110.40M./ +160.90M. 10F (BDO FLOOR) 1041.98 SQ.M.
AR - 402 AR - 417 AR - 417 AR - 402 9F (BDO FLOOR) 1072.98 SQ.M.
8F (BDO FLOOR) 1089.09 SQ.M.
C C 7F (BDO FLOOR) 1111.71 SQ.M.
19675
6F (BDO FLOOR) 1134.34 SQ.M.
ROOF DECK TOP OF PUMP ROOM
+108.00M./+158.50M. DN 5F (BDO FLOOR) 1185.72 SQ.M.
+111.15M./+161.65M.
4F MEZZANINE (PROVISION) 234.71 SQ.M.
RLS-C RLS-C 4F (BDO FLOOR) 1185.72 SQ.M.
AR - 418 ST-03 AR - 418 3F MEZZANINE (PROVISION) 234.71 SQ.M.
UP
6325
AR-522
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
4000
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
E
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:31:46 PM
ARCHITECT ROOF DECK LEVEL 02 THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 234
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
CS-01 2
RCS-A RCS-B RCS - D RCS-C CS-02
1 AR - 403 3 5
AR - 416 AR - 416 4 AR - 416 AR - 416 AR - 404 RECOMMENDING APPROVAL AS TO:
40575
HEAD ARCHITECTURAL SECTION DATE:
8100 10600 11000 10875 APPROVED:
+111.00M. / +161.50M.
A A
ST-02C
TOP OF MACHINE ROOM SLAB SE-01 MACHINE ROOM
DN AR-516 BUILDING OFFICIAL: DATE:
+111.15M./+161.65M. 19.16 SQ.M.
3200
3200
CCTV
AREA TABULATION (GFA)
+114.20M./+164.70M.
ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
UP
20F MEZZANINE (PROVISION) 426.86 SQ.M.
ST-02I
20F (HALL) 792.44 SQ.M.
B AR-522 B
RLS-A RLS-A 19F (LEASING FLOOR) 832.66 SQ.M.
AR - 417 AR - 417 18F (LEASING FLOOR) 847.43 SQ.M.
17F (LEASING FLOOR) 877.91 SQ.M.
16F (LEASING FLOOR) 900.54 SQ.M.
15F (LEASING FLOOR) 925.77 SQ.M.
14F (LEASING FLOOR) 950.91 SQ.M.
6150
6150
13F (LEASING FLOOR) 976.05 SQ.M.
14437
18929
C C 7F (BDO FLOOR) 1111.71 SQ.M.
6F (BDO FLOOR) 1134.34 SQ.M.
DN TOP OF PUMP ROOM 5F (BDO FLOOR) 1185.72 SQ.M.
+111.15M./+161.65M.
4F MEZZANINE (PROVISION) 234.71 SQ.M.
RLS-C RLS-C 4F (BDO FLOOR) 1185.72 SQ.M.
5087
6325
AR-522 UP
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 G AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
+111.00M. / +161.50M. TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D
HELIPAD PROJECTION B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
3254
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
G
PARKING PROVISIONS
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
4 TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:31:55 PM
ARCHITECT ROOF DECK MEZZANINE FLOOR THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
PLAN CHECKED: DRAWN:
MMOSER ASSOCIATES
(S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 235
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE:
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
A A
3000 10280 3000
BUILDING OFFICIAL: DATE:
SAFETY ZONE FATO/TLOF SAFETY ZONE
3200
3200
AREA TABULATION (GFA)
ROOF DECK (MEP / UTILITY FLOOR) 767.30 SQ.M.
1 2 3 4 5 20F MEZZANINE (PROVISION) 426.86 SQ.M.
ST-02I
20F (HALL) 792.44 SQ.M.
B 1110 9 8 6
AR-522 B
RLS-A RLS-A 19F (LEASING FLOOR) 832.66 SQ.M.
7
AR - 417 12 AR - 417 18F (LEASING FLOOR) 847.43 SQ.M.
1413
9350
1615 17F (LEASING FLOOR) 877.91 SQ.M.
191817 16F (LEASING FLOOR) 900.54 SQ.M.
20
2221 15F (LEASING FLOOR) 925.77 SQ.M.
DN
14F (LEASING FLOOR) 950.91 SQ.M.
6150
6150
13F (LEASING FLOOR) 976.05 SQ.M.
12F (LEASING FLOOR) 1001.19 SQ.M.
15675
LS-02 RLS-B LS-02 RLS-B 10F (BDO FLOOR) 1041.98 SQ.M.
AR - 402 AR - 417 AR - 402 AR - 417 9F (BDO FLOOR) 1072.98 SQ.M.
6325
3F (BDO FLOOR) 1229.58 SQ.M.
2F MEZZANINE (PROVISION) 234.71 SQ.M.
LS-01 LS-01 2F (BANK BRANCH) 1149.72 SQ.M.
AR - 401 AR - 401 GF MEZZANINE 517.71 SQ.M.
GF 948.11 SQ.M.
+110.65M. / +161.10M. TOTAL GFA ABOVE GROUND 21920.99 SQ.M.
B1 (PARKING) 1595.01 SQ.M.
D
B1 MEZZANINE 288.80 SQ.M.
B2 (PARKING) 1595.01 SQ.M.
B3 (PARKING) 1595.01 SQ.M.
B4 (PARKING) 1595.01 SQ.M.
B5 (PARKING) 1595.01 SQ.M.
B6 (PARKING) 1330.63 SQ.M.
+118.00M. / +168.50M. TOTAL FLOOR AREA BELOW GROUND 9858.86 SQ.M.
PARKING PROVISIONS
GF (SURACE PARKING) 12 SLOTS
B1 41 SLOTS
B2 40 SLOTS
B3 40 SLOTS
B4 40 SLOTS
B5 40 SLOTS
B6 25 SLOTS
TOTAL NO. OF PARKING PROVIDED 238 SLOTS
TOTAL NO. OF ACCESSIBLE PARKING 5 SLOTS
SCHEDULE OF FLOOR FINISHES
FF-07 FLOWCOAT HS LIGHT GREY HIGH PERFORMANCE EPOXY COATING
HATCHING LEGENDS
CS-01 RCS-A RCS-B RCS - D RCS-C CS-02 REFERENCE DIMENSIONS FOR ELECTRONICS, MECHANICAL & FIRE
1 AR - 403 2 AR - 416 3 AR - 416 4 AR - 416 AR - 416 AR - 404 5 PROTECTION ITEMS WILL BE REFLECTED ON THEIR RESPECTIVE
PLANS
SUBMISSION DATE:
SEAL OWNER/REPRESENTATIVE: PROJECT: SHEET CONTENT DATE NO. REVISIONS DATE BY PROJECT NO.
FOR BID 10/29/2021
BUCK RICHNOLD I. SIA
DOCUMENTS 7:32:04 PM
ARCHITECT HELIPAD FLOOR PLAN THESE DRAWINGS ARE SHEET NO.
THE PROPERTY OF
MMOSER ASSOCIATES
CHECKED: DRAWN: (S) PTE LTD AND ARE
INSTRUMENTS OF
REG NO. : 018506 PTR NO. : 2279961 MA. PATRICIA F. VILLAREAL A PROPOSED BDO CEBU FUENTE TOWER CSH JCLV PROFESSIONAL DESIGN
SERVICES NOT TO
AR - 236
BDO UNIBANK, INC. REPRODUCED EXCEPT
BY WRITTEN
DATE : SEP. 19, 2003 DATE : JAN. 08, 2021 AGREEMENT WITH
SCALE REVISION CONSULTANT.
AS SHOWN IN 20X30
SCALE AT 50% ON A3
14F BDO CORPORATE CENTER ORTIGAS, 12ADB AVENUE, ORTIGAS CENTER,
TIN NO. : 209-530-523 AT : CEBU CITY LOCATION: MANDALUYONG CITY ADDRESS: FUENTE OSMENA ROTUNDA, CEBU CITY, PHILIPPINES, 6000 FILE: