Action Results
Potential P Responsibilit
New RPN
New Occ
New Sev
New Det
Item / Potential Potential S Cause(s)/ r Current D R Recommend y & Target Actions
Failure Effect(s) e Process e P ed
Function Mode(s) of Failure v Mechanism( o Controls t N Action(s) Completion Taken
s) of Failure b Date
0 0
pressure tear up / high 10 high 6 validade age 1 60 anual check A. Birk ; Date anual check 10 2 1 20
hose from break pressure pressure in and of hoses; of hoses
reservoir to steam / oil the suitability of avoid included in
actuator jet reservoir pressure bending check list
hose
0 0
Write down each failure mode 0 Response Plans and Tracking 0
and potential consequence(s) of 0 0
that failure.
0 0
0 Priority Number - The combined weighting of
Risk 0
Severity - On a scale of 1-5, Severity, Likelihood, and Detectability.
rate the Severity of each RPN
0 = Sev X Occ X Det 0
failure (5= most severe).
0 0
0 0
Likelihood - Write down the Detectability - Examine
0 the current 0
potential cause(s), and on a design, then, on a scale of 1-5, rate the
scale of 1-5, rate the Likelihood Detectability of 0each failure 0
of each failure (5 = most likely). (5 = least detectable).
0 0
0 0
0 0
0 0
severity
insignificant minor injuries notable injuries major injuries death
1 2 3 4 5
very unlikely 1 1 2 3 4 5
unlikely 2 2 4 6 8 10
likelihood
notable chance 3 3 6 9 12 15
probable 4 4 8 12 16 20
almost certain 5 5 10 15 20 25
Example 15 20 25
almost certain 1 15 20 25
detectibility
high 2 30 40 50
medium 3 45 60 75
low 4 60 80 100
remote 5 75 100 125
Action Results
New RPN
New Occ
New Det
New Sev
Potential Failure Potential Effect(s) S Potential Cause(s)/ r Current Process D R Recommended Responsibility &
Item / Function Mode(s) of Failure e Mechanism(s) of o Controls e P Action(s) Target Completion Actions Taken
v Failure b t N Date