GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1)


Company Name- Subject- PFMEA ID No- PFMEA/2001-2002/01
Plant Location- PFMEA Start Date- 01.01.21 Process Responsibility- Line Incharge
Customer Name- ASHOK LEYLAND PFMEA Revision Date- 25.01.21 Confidentiality level- 04
Model Year/ Platform- 2013 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM
Part Name :- Rocker Arm ( Int & Exh )

CONTINOUS
IMPROVEMENT STRUCTURE ANALYSIS (STEP2) FUNCTION ANALYSIS (STEP 3) FAILURE ANALYSIS (STEP 4)

Severity (S) of FE
2. Function of the 1. Failure Effects
History / change 3.Function of the 2. Failure Mode 3. Failure Cause
process work element & (FE) to the next
3.Process Work 1. Function of the process step &
Authorization ( As 1. Process Item 2. Process Step (FM) of the (FC) of the Work
Element process Item product heigher level
applicable ) process charecteristics Process Step Element
charecteristics element

Suppleir should be
Supplier Not
Sub Supplier approved as per DS-PUR- 7
Approved
001

Not meeting the


Chemical composition As per material standard. 7
specification

To provide
Dimensional Material can be Not meeting the
10 / Incoming acceptable i.e. As per standard 7
Parameters produce rejection or specification
Inspection of Raw Conformity to the
not meeting the Wrong material
Material specs i.e.
Rocker Arm Sub To transfer motion specifications e.g :- passed on the
Dimensinal,
assembly from input to output Dimensionaly,Hardn shop floor for
Metallurgical,
ess & Microstructure further processing. Not meeting the
Metallurgy Physical and visual As per standard 7
appereance material specification
for further operation

As per standard to prevent


Not meeting the
Standard packaging any dust, damage or 6
specification
colateral damage.

Free from dust, dirt, rust,


Not meeting the
Visual apperance pitting, black spots, dents 8
specification
and any other
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

RISK ANALYSIS (STEP 5) OPTIMIZATION (STEP 6)

pointer to evidence
Target Completion
Control (DC) of FC
Occurrence (O) of

Current Detection

Preventive Action

Action taken with

Severity (S) of FE
Completion Date
Detection Action
Detection (D) of

Occurrence (O)
Charecteristics

Person's Name

charecteristics
Detection (D)
Responsible
Filter Code

Filter Code
PFMEA AP

PFMEA AP

(optional)
( optional

Remarks
Special

Special
FC/FM

Status
or FM
Current Prevention

date
FC

Control (PC) of FC

Non-approved supplier Material can not be


can't supply as there is procured as purchase
4 4 M - - - - - - - - - - - - - - - -
no vendor code order will not be generated
provided to them without Vendor code

Incoming Inspection, IIIrd


Chemical composition party verification,
verified for every heat. 5 procurement from 6 M - - - - - - - - - - - - - - - -
approved mills.

Inspection with Variable &


Receipt inspection 5 attribute gauges 5 M - - - - - - - - - - - - - - - -
(As per inspection format)

Inspection with variable


Metallurgical Inspection
of every lot 5 instruments (As per 5 M - - - - - - - - - - - - - - - -
inspection format)

Packaging standard
verify the packaging
defined and mentioned 7 standard material 6 M - - - - - - - - - - - - - - - -
on Purchase Order

Receipt inspection 7 Checked visually 6 M - - - - - - - - - - - - - - - -


GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1)


Company Name- Subject- PFMEA ID No- PFMEA/2001-2002/01
Plant Location- PFMEA Start Date- 01.01.21 Process Responsibility- Line Incharge
Customer Name- ASHOK LEYLAND PFMEA Revision Date- 25.01.21 Confidentiality level- 04
Model Year/ Platform- 2013 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM
Part Name :- Rocker Arm ( Int & Exh )

CONTINOUS
IMPROVEMENT STRUCTURE ANALYSIS (STEP2) FUNCTION ANALYSIS (STEP 3) FAILURE ANALYSIS (STEP 4)

Severity (S) of FE
2. Function of the 1. Failure Effects
History / change 3.Function of the process 2. Failure Mode
1. Function of the process step & (FE) to the next 3. Failure Cause (FC)
Authorization ( As 1. Process Item 2. Process Step 3.Process Work Element work element & process (FM) of the Process of the Work Element
process Item product heigher level
applicable ) charecteristics Step
charecteristics element

(Cope & Drag) Dimensional Not meeting the


As per standard 7
Parameters specification

To provide
acceptable i.e. Material can be
Conformity to the As per standard to prevent produce rejection or Wrong material
20 / Pattern & Not meeting the
Rocker Arm Sub Standard packaging To transfer motion specs i.e. any dust, damage or colateral not meeting the 6 passed on the shop
Tooling specification
assembly from input to output Dimensinal, damage. specifications e.g :- floor for further
Inspection
Physical and visual Dimensionaly,Hardn processing.
appereance material ess & Microstructure
for further operation

Free from dust, dirt, rust,


Not meeting the
Visual apperance pitting, black spots, dents and 8
specification
any other
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

RISK ANALYSIS (STEP 5) OPTIMIZATION (STEP 6)

pointer to evidence
Target Completion
Control (DC) of FC
Occurrence (O) of

Current Detection

Preventive Action

Action taken with

Severity (S) of FE
Completion Date
Detection Action
Detection (D) of

Occurrence (O)
Charecteristics

Person's Name

charecteristics
Detection (D)
Responsible
Filter Code

Filter Code
PFMEA AP

PFMEA AP

(optional)
( optional

Remarks
Special

Special
FC/FM

Status
or FM
Current Prevention

date
FC
Control (PC) of FC

Inspection with Variable &


Receipt inspection 5 attribute gauges 5 M - - - - - - - - - - - - - - - -
(As per inspection format)

Packaging standard defined


verify the packaging standard
and mentioned on Purchase 7 6 M - - - - - - - - - - - - - - - -
material
Order

Receipt inspection 7 Checked visually 6 M - - - - - - - - - - - - - - - -


GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1)


Company Name- Subject- PFMEA ID No- PFMEA/2001-2002/01
Plant Location- PFMEA Start Date- 01.01.21 Process Responsibility- Line Incharge
Customer Name- ASHOK LEYLAND PFMEA Revision Date- 25.01.21 Confidentiality level- 04
Model Year/ Platform- 2013 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM
Part Name :- Rocker Arm ( Int & Exh )

CONTINOUS
IMPROVEMENT STRUCTURE ANALYSIS (STEP2) FUNCTION ANALYSIS (STEP 3) FAILURE ANALYSIS (STEP 4)

Severity (S) of FE
2. Function of the 1. Failure Effects
History / change 3.Function of the process
1. Function of the process step & (FE) to the next 2. Failure Mode (FM) of 3. Failure Cause (FC) of
Authorization ( As 1. Process Item 2. Process Step 3.Process Work Element work element & process
process Item product heigher level the Process Step the Work Element
applicable ) charecteristics
charecteristics element

Depression at core due to Cavity cleaning not done on


Extra metal at
7 depletion of carbon at regular basis resulting
casting surface
corebox carbon depletion
Knowledge of M/C Operation
Skilled operator
& process parameters

Dent at casting Tool mark on corebox Cleaning done through steel


8
surface pattern rod,brush etc

Extra metal & Sand


To produce core as per Temperature variation M/C heating controller
Core Shooter M/C inclusion at 7
specification showing in M/C failure
component

Shooting of sand in Low air shooting pressure in


To proviide a constant Sand inclusion at Air pressure not maintained
Rocker Arm Sub Air Pressure To transfer motion cavity through 7 M/C resulting low strength
30 / Core Making presure to M/C for shooting casting surface constantly
assembly from input to output pressure to obtain cores
cores

Blow holes at casting Low heating temperature


To obtain hardness within
Heating Temperature not
M/C Parameters spec & good surface finish of 7
fixed at M/C
cores Extra metal & Sand
inclusion at High heating temperature
component

Lower thickness of
To obtain profile & thickness
Core Box(Cope & Drag) casting at hollow 8 Higher thickness of core pattern cavity worn out
of cores within spec
surface

Applying at pattern surface


Sand inclusion at Sand erosion from core Not properly applying spray
Silicon Spray for Proper ejection of cores 7
casting surface surface during ejection on periodicaly basis
from M/C
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

RISK ANALYSIS (STEP 5) OPTIMIZATION (STEP 6)

pointer to evidence
Target Completion
Control (DC) of FC
Occurrence (O) of

Current Detection

Preventive Action

Action taken with

Severity (S) of FE
Completion Date
Detection Action
Detection (D) of

Charecteristics

Occurrence (O)
Person's Name

charecteristics
Detection (D)
Responsible
Filter Code

Filter Code
PFMEA AP

PFMEA AP

(optional)
( optional

Remarks
Special
Special

Status
FC/FM
or FM
Current Prevention

date
FC

Control (PC) of FC

Displayed Work Monitoring in every 4 hrs &


instruction machine for 5 record in core making record 6 M - - - - - - - - - - - - - - - -
reference WI-PRD-034 DOC NO- FR-PRD-036

Displayed work Verification of pattern


instruction in machine for condition after returning &
cleaning of corebox 5 4 M - - - - - - - - - - - - - - - -
record maintain through
pattern through copper pattern history card in ERP
rod only

Preventive maintenance
Preventive maintenance Plan
done as per yearly plan
Vs actual( FR-MNT-010) &
& autonomous 5 6 M - - - - - - - - - - - - - - - -
Autonomus maintenace
maintenance on daily
checksheet (FR-MNT-004)
basis

Monitoring in every 4 hrs &


FRL installed in line to record in Set-up Approval
provide constant 3 Report 6 M - - - - - - - - - - - - - - - -
pressure to M/C ( Doc
No :- FR-PRD-036)

Monitoring in every 4 hrs & - - - - - - - - - - - - - - - -


Heating Temp fixed
record in Set-up Approval
according to process
4 Report 6 M
validation & control
( Doc
through PLC
No :- FR-PRD-036) - - - - - - - - - - - - - - - -

Shelf Life of pattern is


Monitoring through Pattern
fixed to 250000 shots &
History Card in ERP
Pattern verification is 4 6 M - - - - - - - - - - - - - - - -
(Doc No: FR-TLG-003)
done on every 50000
shots

Monitoring in every 4 hrs &


Applying of silicon spray
record in Set-up Approval
in pattern after every 4
5 Report 6 M - - - - - - - - - - - - - - - -
shots to eject core
( Doc
smoothly
No :- FR-PRD-036)
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1)


Company Name- Subject- PFMEA ID No- PFMEA/2001-2002/01
Plant Location- PFMEA Start Date- 01.01.21 Process Responsibility- Line Incharge
Customer Name- ASHOK LEYLAND PFMEA Revision Date- 25.01.21 Confidentiality level- 04
Model Year/ Platform- 2013 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM
Part Name :- Rocker Arm ( Int & Exh )

CONTINOUS
IMPROVEMENT STRUCTURE ANALYSIS (STEP2) FUNCTION ANALYSIS (STEP 3) FAILURE ANALYSIS (STEP 4)

Severity (S) of FE
2. Function of the 1. Failure Effects
History / change 3.Function of the process
1. Function of the process step & (FE) to the next 2. Failure Mode (FM) of the 3. Failure Cause (FC) of the
Authorization ( As 1. Process Item 2. Process Step 3.Process Work Element work element & process
process Item product higher level Process Step Work Element
applicable ) charecteristics
charecteristics element

Cavity cleaning not done Cavity cleaning not done on


Depression at
8 on regular basis resulting regular basis resulting carbon
casting surface
carbon depletion depletion
Knowledge of M/C Operation
Skilled operator
& process parameters
Dent at casting Tool mark on pattern Cleaning done through steel
8
surface surface rod,brush etc

To produce Cope & Drag


Extra metal & Sand Temperature variation
Mold Making M/C mold as per specified 7 M/C heating controller failure
inclusion at casting showing in M/C
parameters

Extra metal & Sand High pattern plate


7
inclusion at casting temperature
To achieve a desired temp for
pattern in which resin coated
Pattern Plate Temp Temp thermocouple failure
sand will start bonding &
make a solid mold
Blow holes at Low pattern plate
7
casting temperature

Crack defect at
7 Low investment time
casting
Shooting of sand To achieve a desired Improper setting of investment
Investment time To transfer motion
Rocker Arm Sub in cavity through thickness of mold wrt time time in PLC
40 / Mold Making from input to
assembly gravity to obtain Blow holes at
output 7 High investment time
cope & drag molds casting

To cure the mold perfectly &


Blow holes at Improper setting of curing time
Curing time release the excess resin from 7 Low curing time
casting in PLC
mold

Low air shooting pressure


To proviide a constant Sand inclusion at Air pressure not maintained
Air Pressure 7 in M/C resulting low
presure to M/C for shooting casting surface constantly
strength cores

Blow holes at
Low heating temperature
To obtain hardness within casting
Heating Temperature not fixed
M/C Parameters spec & good surface finish of 7
Extra metal & Sand at M/C
cores
inclusion at High heating temperature
component

Lower thickness of
To obtain profile & thickness
Cope & Drag Pattern casting at hollow 8 Higher thickness of mold pattern cavity worn out
of mold within spec
surface

Applying at pattern surface


Sand inclusion at Sand erosion from core Not properly applying spray on
Silicon Spray for Proper ejection of cores 7
casting surface surface during ejection periodicaly basis
from M/C
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

RISK ANALYSIS (STEP 5) OPTIMIZATION (STEP 6)

Control (DC) of FC or
Occurrence (O) of FC

Filter Code (optional)


Filter Code ( optional

pointer to evidence
Target Completion
Current Detection

Preventive Action

Action taken with

Severity (S) of FE
Completion Date
Detection Action
Detection (D) of

Occurrence (O)
Charecteristics

Person's Name

charecteristics
Detection (D)
Responsible
PFMEA AP

PFMEA AP

Remarks
Special

Special
FC/FM

Status
Current Prevention Control

date
FM
(PC) of FC

Displayed Work instruction Monitoring in every 4 hrs &


machine for reference WI- 5 record in Mold making record 6 M - - - - - - - - - - - - - - - -
PRD-005 DOC NO- FR-PRD-0036

Displayed work instruction in Verification of pattern condition


machine for cleaning of after returning & record
5 4 M - - - - - - - - - - - - - - - -
pattern through copper rod maintain through pattern history
only card in ERP

Preventive maintenance Preventive maintenance Plan


done as per yearly plan & Vs actual( FR-MNT-010) &
5 6 M - - - - - - - - - - - - - - - -
autonomous maintenance Autonomus maintenace
on daily basis checksheet (FR-MNT-004)

1.PLC controlled 4 4 M P - - - - - - - - - - - - - - -
programming & Visual
inspection of every mold Monitoring of pattern plate temp
according to color chart once in 4hrs through IR
displayed in line pyrometer
2.Setup approval before
continous production 4 4 M P - - - - - - - - - - - - - - -

4 4 M - - - - - - - - - - - - - - - -
Process validation done & Monitoring of investment time in
fixed the spec & monitor every 4 hrs through PLC &
through PLC record in setup approval sheet
4 4 M - - - - - - - - - - - - - - - -

Process validation done & Monitoring of curing time in


fixed the spec & monitor 4 every 4 hrs through PLC & 4 M - - - - - - - - - - - - - - - -
through PLC record in setup approval sheet

Monitoring in every 4 hrs &


FRL installed in line to record in Set-up Approval
provide constant pressure to 4 Report 6 M - - - - - - - - - - - - - - - -
M/C ( Doc No :-
FR-PRD-036)

4 Monitoring in every 4 hrs & - - - - - - - - - - - - - - -


Heating Temp fixed
record in Set-up Approval
according to process
validation & control through
Report 6 M P
( Doc No :-
PLC 4 - - - - - - - - - - - - - -
FR-PRD-036)

Shelf Life of pattern is fixed Monitoring through Pattern


to 250000 shots 7 pattern History Card in ERP
4 6 M - - - - - - - - - - - - - - - -
verification is done on every (Doc No: FR-TLG-003)
50000 shots

Monitoring in every 4 hrs &


Displayed work instruction in record in Set-up Approval
machine for application of 4 Report 6 M - - - - - - - - - - - - - - - -
silicon spray in pattern ( Doc No :-
FR-PRD-036)
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1)


Company Name- Subject- PFMEA ID No- PFMEA/2001-2002/01
Plant Location- PFMEA Start Date- 01.01.21 Process Responsibility- Line Incharge
Customer Name- ASHOK LEYLAND PFMEA Revision Date- 25.01.21 Confidentiality level- 04
Model Year/ Platform- 2013 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM
Part Name :- Rocker Arm ( Int & Exh )

CONTINOUS
IMPROVEMENT STRUCTURE ANALYSIS (STEP2) FUNCTION ANALYSIS (STEP 3) FAILURE ANALYSIS (STEP 4)

Severity (S) of FE
2. Function of the 1. Failure Effects
History / change 3.Function of the process
1. Function of the process step & (FE) to the next 2. Failure Mode (FM) of 3. Failure Cause (FC) of
Authorization ( As 1. Process Item 2. Process Step 3.Process Work Element work element & process
process Item product heigher level the Process Step the Work Element
applicable ) charecteristics
charecteristics element

High Hardness at
8 High Si % at bath
casting

Knowledge of M/C Operation Wrong charging of raw


Skilled operator
& process parameters material in furnace

low hardness at
8 High C% at bath
casting

To melt the metal in required Slag inclusion,blow Hydrogen, nitrogen pickup Lining nature of furnace not
Induction Furnace 7
specification holes in casting in furnace during melting fixed

High & low hardness 8

To achieve the
Rocker Arm Sub To transfer motion To give the chemical result Chemical composition Internal calibration for
60 / Melting Spectrometer chemistry of part as
assembly from input to output within specific range showing out of specification spectrometer not done
per specification

Microstructural defect 8

To achieve the chemical


composition as per
High/low Hardness C% & Si% parameters not
M/C Parameters specification in order to 8 High Si & C% at bath
at casting fixed
achieve hardness & tensile
strength of component

To provide C & Si% in order High/low Hardness Failure of machine showing


CE meter 6 High Si & C% at CE meter
to match with spectrometer at casting wrong result
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

To achieve the desired


High/low Hardness Tapping temp not measured
Process Parameters microstructure & hardness of 8 High tapping temp
at casting by operator while tapping
component
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

RISK ANALYSIS (STEP 5) OPTIMIZATION (STEP 6)

Control (DC) of FC or
Occurrence (O) of FC

Filter Code (optional)


Filter Code ( optional

pointer to evidence
Target Completion
Current Detection

Preventive Action

Action taken with

Severity (S) of FE
Completion Date
Detection Action
Detection (D) of

Charecteristics

Occurrence (O)
Person's Name

charecteristics
Detection (D)
Responsible
PFMEA AP

PFMEA AP

Remarks
Special

Special
Status
FC/FM
Current Prevention Control

date
FM
(PC) of FC

5 6 M - - - - - - - - - - - - - - - -
Effectiveness of operator
On job training providing to
checked on every 3 months
operator regarding machine
& Skill matrix for melting
operations & effectiveness is
operation
measured in every 3 months
FR-HR-002
5 6 M - - - - - - - - - - - - - - - -

Acidic nature of lining is


fixed in furnace for increasing Monitoring of every lining
lining life & forming oxidation through furnace lining life
4 6 M - - - - - - - - - - - - - - - -
layer to form oxides which record
can remove it in the form of DOC No- FR-PRD-016
slag

3 6 M - - - - - - - - - - - - - - - -
Daily calibration of Monitoring on daily basis
spectrometer done as per through internal CRM before
internal CRM & weekly start of production & record
calibration through CRM on softcopy
3 6 M - - - - - - - - - - - - - - - -

Displayed SOP at M/C for


Monitoring on every heat
reference & without final bath
4 basis through online display 6 M - - - - - - - - - - - - - - - -
chemistry & lab approval
of spectrometer
pouring will not done

Alternate verification of Monitoring of every heat


chemistry through through spectrometer &
spectrometer for assurance 4 record on softcopy & 6 M - - - - - - - - - - - - - - - -
& Preventive maintenance Preventive maintenance Plan
done as per yearly plan Vs actual( FR-MNT-010)
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

Displayed SOP at M/C for Monitoring on every heat


reference & alternate basis through immersion
verification of pouring temp 5 pyrometer & record in melting 6 M P - - - - - - - - - - - - - - -
done at pouring stage to record
avoid rejection DOC NO- FR-PRD-005
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1)


Company Name- Subject- PFMEA ID No- PFMEA/2001-2002/01
Plant Location- PFMEA Start Date- 01.01.21 Process Responsibility- Line Incharge
Customer Name- ASHOK LEYLAND PFMEA Revision Date- 25.01.21 Confidentiality level- 04
Model Year/ Platform- 2013 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM
Part Name :- Rocker Arm ( Int & Exh )

CONTINOUS
IMPROVEMENT STRUCTURE ANALYSIS (STEP2) FUNCTION ANALYSIS (STEP 3) FAILURE ANALYSIS (STEP 4)

Severity (S) of FE
2. Function of the 1. Failure Effects
History / change 3.Function of the process
1. Function of the process step & (FE) to the next 2. Failure Mode (FM) of 3. Failure Cause (FC) of
Authorization ( As 1. Process Item 2. Process Step 3.Process Work Element work element & process
process Item product heigher level the Process Step the Work Element
applicable ) charecteristics
charecteristics element

Low & high amount of Inoculation amount of qty


8
inoculation while tapiing nt fixed

Knowledge of M/C Operation Low & High


Skilled operator
& process parameters Hardness at casting

Low & high metal tapped in Reference for tapping at


8
laddle laddle not fixed

To achieve the
desired Homogeneity / mixing of
Rocker Arm Sub To transfer motion To tap the metal in laddle in Low & High
70 / tapping Induction Furnace microstructure & 7 inoculation not done Ram sliding not working
assembly from input to output specific angle Hardness at casting
hardness of properly
component

To maintain the molten metal


Tap to pouring stage time
Laddle temp within tolerated time Cold at castings 8 Temp drop of molten metal
not fixed
range

To achieve the desired


High/low Hardness Tapping temp not measured
Process Parameters microstructure & hardness of 8 High tapping temp
at casting by operator while tapping
component
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

RISK ANALYSIS (STEP 5) OPTIMIZATION (STEP 6)

Control (DC) of FC or
Occurrence (O) of FC

Filter Code (optional)


Filter Code ( optional

pointer to evidence
Target Completion
Current Detection

Preventive Action

Action taken with

Severity (S) of FE
Completion Date
Detection Action
Detection (D) of

Charecteristics

Occurrence (O)
Person's Name

charecteristics
Detection (D)
Responsible
PFMEA AP

PFMEA AP

Remarks
Special

Special
Status
FC/FM
Current Prevention Control

date
FM
(PC) of FC

Effectiveness of operator
On job training providing to
checked on every 3 months
operator regarding machine
5 & Skill matrix for melting 6 M - - - - - - - - - - - - - - - -
operations & effectiveness is
operation
measured in every 3 months
FR-HR-002

Monitoring on once per shift


Marking on laddle done for
basis & record in laddle lining
reference while tapping of 5 6 M - - - - - - - - - - - - - - - -
register DOC NO - FR-PRD-
metal
018

Preventive maintenance Plan


Preventive maintenance
Vs actual
done as per yearly plan &
5 ( FR-MNT-010) & 6 M - - - - - - - - - - - - - - - -
autonomous maintenance on
Autonomus maintenace
daily basis
checksheet (FR-MNT-004)

Monitoring of every heat


Displayed SOP as per
through pouring time display
process validation & fixed
5 meter & record in pouring 6 M - - - - - - - - - - - - - - - -
pouring time range to avoid
sheet
cold defect
DOC NO- FR-PRD-006

Displayed SOP at M/C for Monitoring on every heat


reference & alternate basis through immersion
verification of pouring temp 5 pyrometer & record in melting 6 M - - - - - - - - - - - - - - - -
done at pouring stage to record
avoid rejection DOC NO- FR-PRD-005
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1)


Company Name- Subject- PFMEA ID No- PFMEA/2001-2002/01
Plant Location- PFMEA Start Date- 01.01.21 Process Responsibility- Line Incharge
Customer Name- ASHOK LEYLAND PFMEA Revision Date- 25.01.21 Confidentiality level- 04
Model Year/ Platform- 2013 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM
Part Name :- Rocker Arm ( Int & Exh )

CONTINOUS
IMPROVEMENT STRUCTURE ANALYSIS (STEP2) FUNCTION ANALYSIS (STEP 3) FAILURE ANALYSIS (STEP 4)

Severity (S) of FE
2. Function of the 1. Failure Effects
History / change 3.Function of the process
1. Function of the process step & (FE) to the next 2. Failure Mode (FM) of 3. Failure Cause (FC) of
Authorization ( As 1. Process Item 2. Process Step 3.Process Work Element work element & process
process Item product heigher level the Process Step the Work Element
applicable ) charecteristics
charecteristics element

Cold at castings 8 Slow pouring

Knowledge of Pouring Less knowledge about


Skilled operator
method & time pouring to operator

Flash at castings 8 Fast pouring

To achieve the
desired
Rocker Arm Sub To transfer motion To run the rail system in a
80 / Pouring microstructure &
assembly Mono Rail from input to output specific time in order to Cold at castings 7 Slow pouring Pneumatic cylinder failure
hardness of
component achieve constant speed

To maintain the molten metal


Tap to pouring stage time
Laddle temp within tolerated time Cold at castings 8 Temp drop of molten metal
not fixed
range

To achieve the desired


Effect of inoculation start
Process Parameters microstructure & hardness of Microstructural defect 8 More pouring time
fading at the end of pouring
component
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

RISK ANALYSIS (STEP 5) OPTIMIZATION (STEP 6)

Control (DC) of FC or
Occurrence (O) of FC

Filter Code (optional)


Filter Code ( optional

pointer to evidence
Target Completion
Current Detection

Preventive Action

Action taken with

Severity (S) of FE
Completion Date
Detection Action
Detection (D) of

Charecteristics

Occurrence (O)
Person's Name

charecteristics
Detection (D)
Responsible
PFMEA AP

PFMEA AP

Remarks
Special

Special
Status
FC/FM
Current Prevention Control

date
FM
(PC) of FC

Displayed SOP for pouring 5 6 M - - - - - - - - - - - - - - - -


Effectiveness of operator
time / mold for specific part &
checked on every 3 months
On job training providing to
& Skill matrix for melting
operator regarding machine
operation
operations & effectiveness is
FR-HR-002
measured in every 3 months
5 6 M - - - - - - - - - - - - - - - -

Preventive maintenance Plan


Preventive maintenance
Vs actual
done as per yearly plan &
5 ( FR-MNT-010) & 6 M - - - - - - - - - - - - - - - -
autonomous maintenance on
Autonomus maintenace
daily basis
checksheet (FR-MNT-004)

Monitoring of every heat


Displayed SOP as per
through pouring time display
process validation & fixed
pouring time range to avoid
3 meter & record in pouring 6 M P - - - - - - - - - - - - - - -
sheet
cold defect
DOC NO- FR-PRD-006

Pouring time fixed for every Monitoring on every heat


part through process basis through pouring timer &
validation & fixed in pouring
4
record in pouring record
6 M P - - - - - - - - - - - - - - -
timer DOC NO- FR-PRD-006
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1)


Company Name- Subject- PFMEA ID No- PFMEA/2001-2002/01
Plant Location- PFMEA Start Date- 01.01.21 Process Responsibility- Line Incharge
Customer Name- ASHOK LEYLAND PFMEA Revision Date- 25.01.21 Confidentiality level- 04
Model Year/ Platform- 2013 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM
Part Name :- Rocker Arm ( Int & Exh )

CONTINOUS
IMPROVEMENT STRUCTURE ANALYSIS (STEP2) FUNCTION ANALYSIS (STEP 3) FAILURE ANALYSIS (STEP 4)

Severity (S) of FE
2. Function of the 1. Failure Effects
History / change 3.Function of the process
1. Function of the process step & (FE) to the next 2. Failure Mode (FM) of 3. Failure Cause (FC) of
Authorization ( As 1. Process Item 2. Process Step 3.Process Work Element work element & process
process Item product heigher level the Process Step the Work Element
applicable ) charecteristics
charecteristics element

High/Low hardness 8 Fast/Late knockout

Knowledge of knockout Less knowledge about


Skilled operator
method & time knockout to operator

Microstructural defect 8 Fast/Late knockout

To achieve the
desired
Rocker Arm Sub To transfer motion
90 / Knockout microstructure & To achieve a desired time for Timer not showing correct
assembly Knockout Timer from input to output High/Low hardness 8 Timer failure
hardness of knockout of component time
component

Variation in knoukout time


More Hardness 8 Less Knockout time
as it is not fixed
To achieve the desired
Process Parameters microstructure & hardness of
component
Increase in knockout time
Low Hardness 8 More knockout time shows decrease in
hardness of component
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

RISK ANALYSIS (STEP 5) OPTIMIZATION (STEP 6)

Control (DC) of FC or
Occurrence (O) of FC

Filter Code (optional)


Filter Code ( optional

pointer to evidence
Target Completion
Current Detection

Preventive Action

Action taken with

Severity (S) of FE
Completion Date
Detection Action
Detection (D) of

Charecteristics

Occurrence (O)
Person's Name

charecteristics
Detection (D)
Responsible
PFMEA AP

PFMEA AP

Remarks
Special

Special
Status
FC/FM
Current Prevention Control

date
FM
(PC) of FC

Displayed SOP for knockout 5 6 M P - - - - - - - - - - - - - - -


Effectiveness of operator
time for specific part & On
checked on every 3 months
job training providing to
& Skill matrix for melting
operator regarding machine
operation
operations & effectiveness is
FR-HR-002
measured in every 3 months
5 6 M - - - - - - - - - - - - - - - -

Monitoring on every heat


basis & record on pouring
Alternate verification of
basis
timing through stop watch on
5 DOC NO- FR-PRD-006 6 M - - - - - - - - - - - - - - - -
per heat basis & Calibration
Calibration Plan Vs actual
done as per yearly plan
( FR-CAL-002)

5 6 M P - - - - - - - - - - - - - - -
Knockout time fixed for every Monitoring on every heat
part through process basis through knockout timer
validation & fixed in knockout & record in pouring record
timer DOC NO- FR-PRD-006
4 6 M P - - - - - - - - - - - - - - -
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1)


Company Name- Subject- PFMEA ID No- PFMEA/2001-2002/01
Plant Location- PFMEA Start Date- 01.01.21 Process Responsibility- Line Incharge
Customer Name- ASHOK LEYLAND PFMEA Revision Date- 25.01.21 Confidentiality level- 04
Model Year/ Platform- 2013 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM
Part Name :- Rocker Arm ( Int & Exh )

CONTINOUS
IMPROVEMENT STRUCTURE ANALYSIS (STEP2) FUNCTION ANALYSIS (STEP 3) FAILURE ANALYSIS (STEP 4)

Severity (S) of FE
2. Function of the 1. Failure Effects
History / change 3.Function of the process
1. Function of the process step & (FE) to the next 2. Failure Mode (FM) of 3. Failure Cause (FC) of
Authorization ( As 1. Process Item 2. Process Step 3.Process Work Element work element & process
process Item product heigher level the Process Step the Work Element
applicable ) charecteristics
charecteristics element

More or less ferrite/Pearlite & Not judge the defect visualy in


9
more carbide at component microstructure analysis

Knowledge of M/C operations


Fit & function failure
Skilled operator & checking Microstructure &
at customer end
hardness of component More or less hardness at Not correctly measure the
9
component reading of hardness

To check the
100 / Fitment issue in
Rocker Arm Sub microstructure &
Inspection( Metall engine assembly at
assembly hardness of
urgical) customer end
component

Chemistry showing wrong Improper flow rate of argon


9
result gas

High & low hardness 8

To give the chemical result Chemical composition Internal calibration for


Spectrometer
within specific range showing out of specification spectrometer not done

Microstructural defect 8
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

RISK ANALYSIS (STEP 5) OPTIMIZATION (STEP 6)

Control (DC) of FC or
Occurrence (O) of FC

Filter Code (optional)


Filter Code ( optional

pointer to evidence
Target Completion
Current Detection

Preventive Action

Action taken with

Severity (S) of FE
Completion Date
Detection Action
Detection (D) of

Charecteristics

Occurrence (O)
Person's Name

charecteristics
Detection (D)
Responsible
PFMEA AP

PFMEA AP

Remarks
Special

Special
Status
FC/FM
Current Prevention Control

date
FM
(PC) of FC

Trained metallurgist are only


responsible for miscrostructural
Effectiveness of operator
inspection & their effectiveness
checked on every 3 months &
is carried through MSA in every
4 Skill matrix for Lab 6 M - - - - - - - - - - - - - - - -
3 months
FR-HR-002
Also Grain morphology charts
are displayed in lab for
reference

On job training providing to Effectiveness of operator


operator regarding machine checked on every 3 months &
operations & effectiveness is 4 Skill matrix for Lab 6 M K - - - - - - - - - - - - - - -
measured in every 3 months FR-HR-002
through MSA

Monitoring on daily basis


Flow rate of argon gas fixed
through pressure gauge &
& displayed WI in M/C for 4 6 M - - - - - - - - - - - - - - - -
record in autonomous
reference
checksheet

4 6 M - - - - - - - - - - - - - - - -
Daily calibration of Monitoring on daily basis
spectrometer done as per through internal CRM before
internal CRM & weekly start of production & record
calibration through CRM on softcopy
4 6 M - - - - - - - - - - - - - - - -
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1)


Company Name- Subject- PFMEA ID No- PFMEA/2001-2002/01
Plant Location- PFMEA Start Date- 01.01.21 Process Responsibility- Line Incharge
Customer Name- ASHOK LEYLAND PFMEA Revision Date- 25.01.21 Confidentiality level- 04
Model Year/ Platform- 2013 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM
Part Name :- Rocker Arm ( Int & Exh )

CONTINOUS
IMPROVEMENT STRUCTURE ANALYSIS (STEP2) FUNCTION ANALYSIS (STEP 3) FAILURE ANALYSIS (STEP 4)

Severity (S) of FE
2. Function of the 1. Failure Effects
History / change 3.Function of the process
1. Function of the process step & (FE) to the next 2. Failure Mode (FM) of 3. Failure Cause (FC) of
Authorization ( As 1. Process Item 2. Process Step 3.Process Work Element work element & process
process Item product heigher level the Process Step the Work Element
applicable ) charecteristics
charecteristics element

Less knowledge & awareness


Knowledge of M/C operations Under dimension of
Skilled operator 7 Over grinding to operator regarding grinding
& process parameters component operations

To remove the
Rocker Arm Sub To transfer motion parting line, flashes
110 / Fettling
assembly from input to output & fins from
component suface finish not Ok rough surface of grinding Dressing not done by
7
in casting wheel operator

To grind the part as per


Bench Grinder
specification

Crack on chill face of


7 Vibration on grinding wheel Wheel alignment not done
casting
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

RISK ANALYSIS (STEP 5) OPTIMIZATION (STEP 6)

Control (DC) of FC or
Occurrence (O) of FC

Filter Code (optional)


Filter Code ( optional

pointer to evidence
Target Completion
Current Detection

Preventive Action

Action taken with

Severity (S) of FE
Completion Date
Detection Action
Detection (D) of

Charecteristics

Occurrence (O)
Person's Name

charecteristics
Detection (D)
Responsible
PFMEA AP

PFMEA AP

Remarks
Special

Special
Status
FC/FM
Current Prevention Control

date
FM
(PC) of FC

Displayed WI on shop floor for


Effectiveness of operator
grinding operator & On job
checked on every 3 months &
training providing to operator
5 Skill matrix for Lab 6 M - - - - - - - - - - - - - - - -
regarding machine operations &
FR-HR-002
effectiveness is measured in
every 3 months

Displayed WI for dressing Monitoring on daily basis &


procedure in M/C for 5 record in Machine 6 M - - - - - - - - - - - - - - - -
reference checksheet

Displayed WI for wheel Monitoring on daily basis &


aligning procedure in M/C for 5 record in Machine 6 M - - - - - - - - - - - - - - - -
reference checksheet
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1)


Company Name- Subject- PFMEA ID No- PFMEA/2001-2002/01
Plant Location- PFMEA Start Date- 01.01.21 Process Responsibility- Line Incharge
Customer Name- ASHOK LEYLAND PFMEA Revision Date- 25.01.21 Confidentiality level- 04
Model Year/ Platform- 2013 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM
Part Name :- Rocker Arm ( Int & Exh )

CONTINOUS
IMPROVEMENT STRUCTURE ANALYSIS (STEP2) FUNCTION ANALYSIS (STEP 3) FAILURE ANALYSIS (STEP 4)

Severity (S) of FE
2. Function of the 1. Failure Effects
History / change 3.Function of the process
1. Function of the process step & (FE) to the next 2. Failure Mode (FM) of 3. Failure Cause (FC) of
Authorization ( As 1. Process Item 2. Process Step 3.Process Work Element work element & process
process Item product heigher level the Process Step the Work Element
applicable ) charecteristics
charecteristics element

Counting of components
not done

Poor visual
appearance(extrametal &
Poor Surface finish on
Knowledge of M/C component at final
Skilled operator Operation & process inspection area
parameters Poor visual
To shot the
appearance(extra
To transfer motion component in
Rocker Arm Sub 120 / metal & Poor Uncleaned & surface
from input to order to achieve 6
assembly Shot Blasting Surface finish on finish not ok
output good surface
component at final
appearance
inspection area

Shots level not checked

To shot blast the


component in order to
Shot Blasting Machine Impellar work not properly
achieve good surface
appearance
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

RISK ANALYSIS (STEP 5) OPTIMIZATION (STEP 6)

Occurrence (O) of FC

Filter Code (optional)


Filter Code ( optional

pointer to evidence
Target Completion
Preventive Action

Action taken with

Severity (S) of FE
Detection Action

Completion Date
Detection (D) of

Occurrence (O)
Charecteristics

Person's Name

charecteristics
Detection (D)
Responsible
PFMEA AP

PFMEA AP

Remarks
Special

Special
FC/FM

Status
Current Prevention Control Current Detection Control (DC)

date
(PC) of FC of FC or FM

1.100% counting of
component &
Monitoring in every loading
2.Part wise loading qty
5 basis & record in shot blasting 6 M - - - - - - - - - - - - - - - -
defined in process sheet
record Doc no- FR-PRD-018
for reference Doc no- FR-
PRD-038

1.Timer is been installed in


M/C for time measurement
2.Shot blasting WI for
reference Doc no- FR-PRD-
Monitoring in every hour basis
038
4 & record in shot blasting record 6 M - - - - - - - - - - - - - - - -
3.On job training providing
Doc no- FR-PRD-018
to operator regarding
machine operations &
effectiveness is measured
in every 3 months

1.Amperage meter with


marking is installed in M/C
2.Shot blasting WI for
reference Doc no- FR-PRD-
Monitoring in every hour basis
038
5 & record in shot blasting record 6 M - - - - - - - - - - - - - - - -
3.On job training providing
Doc no- FR-PRD-003
to operator regarding
machine operations &
effectiveness is measured
in every 3 months

Preventive maintenance Preventive maintenance Plan


done as per yearly plan & Vs actual( FR-MNT-010) &
5 6 M - - - - - - - - - - - - - - - -
autonomous maintenance Autonomus maintenace
on daily basis checksheet (FR-MNT-004)
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1)


Company Name- Subject- PFMEA ID No- PFMEA/2001-2002/01
Plant Location- PFMEA Start Date- 01.01.21 Process Responsibility- Line Incharge
Customer Name- ASHOK LEYLAND PFMEA Revision Date- 25.01.21 Confidentiality level- 04
Model Year/ Platform- 2013 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM
Part Name :- Rocker Arm ( Int & Exh )

CONTINOUS
IMPROVEMENT STRUCTURE ANALYSIS (STEP2) FUNCTION ANALYSIS (STEP 3) FAILURE ANALYSIS (STEP 4)

Severity (S) of FE
2. Function of the 1. Failure Effects
History / change 3.Function of the process
1. Function of the process step & (FE) to the next 2. Failure Mode (FM) of 3. Failure Cause (FC) of
Authorization ( As 1. Process Item 2. Process Step 3.Process Work Element work element & process
process Item product heigher level the Process Step the Work Element
applicable ) charecteristics
charecteristics element

Defective
Component 1.Less Knowledge &
Knowledge of M/C
dispatched to Surface defects missed awareness to operator
Skilled operator Operation & process 9
customer & get during visual inspection 2. Lack of visual defect
parameters
break during display
engine running

130 / Fitment issue in To check the


Rocker Arm Sub
Visual engine assembly visual defects in
assembly
Inspection at customer end component Defective
Component
To provide good lighting
dispatched to Lux level not defined at
Lighting conditon condion for observing 9 Low lux level
customer & get inspection area
defects
break during
engine running

Fit & function


To identify the OK parts & Dimension out of
Gauges failure at customer 9 Gauge worn out
reject the defect pieces specification
end
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

RISK ANALYSIS (STEP 5) OPTIMIZATION (STEP 6)

Occurrence (O) of FC

Filter Code (optional)


Filter Code ( optional

pointer to evidence
Target Completion
Preventive Action

Action taken with

Severity (S) of FE
Detection Action

Completion Date
Detection (D) of

Charecteristics

Occurrence (O)
Person's Name

charecteristics
Detection (D)
Responsible
PFMEA AP

PFMEA AP

Remarks
Special

Special
FC/FM

Status
Current Prevention Control Current Detection Control (DC)

date
(PC) of FC of FC or FM

Limit sample acceptance


Limit sample board are
criteria
displayed in line for
Doc No : FR-ENG-011
reference &
& Effectiveness of operator
On job training providing to
4 checked on every 3 months 6 M - - - - - - - - - - - - - - - -
operator regarding machine
which reflects on Skill matrix of
operations & effectiveness
Final inspection
is measured in every 3
FR-HR-004
months

Lux level specified at visual


Monitoring on per shift basis &
inspection area(min 750 4 6 M - - - - - - - - - - - - - - - -
record in lux level register
lux)

Monitoring through Master list


Calibration of Gauges done
4 for calibration of gauges 6 M - - - - - - - - - - - - - - - -
according to schedule
Doc No : FR--CAL-002
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1)


Company Name- Subject- PFMEA ID No- PFMEA/2001-2002/01
Plant Location- PFMEA Start Date- 01.01.21 Process Responsibility- Line Incharge
Customer Name- ASHOK LEYLAND PFMEA Revision Date- 25.01.21 Confidentiality level- 04
Model Year/ Platform- 2013 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM
Part Name :- Rocker Arm ( Int & Exh )

CONTINOUS
IMPROVEMENT STRUCTURE ANALYSIS (STEP2) FUNCTION ANALYSIS (STEP 3) FAILURE ANALYSIS (STEP 4)

Severity (S) of FE
2. Function of the 1. Failure Effects
History / change 3.Function of the process
1. Function of the process step & (FE) to the next 2. Failure Mode (FM) 3. Failure Cause (FC) of
Authorization ( As 1. Process Item 2. Process Step 3.Process Work Element work element & process
process Item product heigher level of the Process Step the Work Element
applicable ) charecteristics
charecteristics element

Knowledge of M/C Fit & function


Dimension out of Less knowledge of GD&T
Skilled operator Operation & process failure at customer 9
specification to operator
parameters end

To check the
Fitment issue in
Rocker Arm Sub 140 / dimension of
engine assembly
assembly Final Inspection component as per
at customer end
customer Dwg

Fit & function


To check the component Dimension out of Uncalibrated measuring
Measuring Instruments failure at customer 9
specific dimension specification instrument used
end
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

RISK ANALYSIS (STEP 5) OPTIMIZATION (STEP 6)

Occurrence (O) of FC

Filter Code (optional)


Filter Code ( optional

pointer to evidence
Target Completion
Preventive Action

Action taken with

Severity (S) of FE
Detection Action

Completion Date
Detection (D) of

Occurrence (O)
Charecteristics

Person's Name

charecteristics
Detection (D)
Responsible
PFMEA AP

PFMEA AP

Remarks
Special

Special
FC/FM

Status
Current Prevention Control Current Detection Control (DC)

date
(PC) of FC of FC or FM

Monitoring of Trained personnel


Qualified & trained personel
through Standard room
are responsible for
capabilities matrix &
dimension inspection & 4 6 M - - - - - - - - - - - - - - - -
Effectiveness monitored in
effectiveness is measured
every 3 months
in every 3 months
Doc No: DS-STD-001

Monitoring through Master list


Calibration of equipment
4 for calibration of gauges 6 M - - - - - - - - - - - - - - - -
done as per schedule
Doc No : FR--CAL-002
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

Process failure Mode and Effects Analysis ( Process FMEA)

PLANNING & PREPARATION ( STEP 1)


Company Name- Subject- PFMEA ID No- PFMEA/2001-2002/01
Plant Location- PFMEA Start Date- 01.01.21 Process Responsibility- Line Incharge
Customer Name- ASHOK LEYLAND PFMEA Revision Date- 25.01.21 Confidentiality level- 04
Model Year/ Platform- 2013 Cross- Functional Team- ONT/MKG/RSM/SA/KM/US/AR/PK/SM/KS/BDM
Part Name :- Rocker Arm ( Int & Exh )

CONTINOUS
IMPROVEMENT STRUCTURE ANALYSIS (STEP2) FUNCTION ANALYSIS (STEP 3) FAILURE ANALYSIS (STEP 4)

Severity (S) of FE
2. Function of the 1. Failure Effects
History / change 3.Function of the process
1. Function of the process step & (FE) to the next 2. Failure Mode (FM) of 3. Failure Cause (FC) of
Authorization ( As 1. Process Item 2. Process Step 3.Process Work Element work element & process
process Item product heigher level the Process Step the Work Element
applicable ) charecteristics
charecteristics element

Rusted component
Rust prevention of To dip the component in Oiling not done on Less Knowledge &
150 / Oiling Skilled Operator dispatch to 8
final component RP as per work instruction component awareness to operator
customer

Packing of
component as per To pack the component as Customer Less Knowledge &
160 / Packing Skilled Operator 7 Improper Counting
standard/ per packing standard dissatisfaction awareness to operator
agreement
To transfer motion
Rocker Arm Sub
from input to
assembly
output

Storage of
170 / FG component as per To store the component Customer Components kept in
Storage 8 Rust in casting
Storage standard/ as per packing standard dissatisfaction floor
agreement

Dispatch of Proper documents not


To dispatch the component Customer Less Knowledge &
180 / Dispatch Skilled Operator component as per 7 attached along with
as per invoice dissatisfaction awareness to operator
invoice supply
GHAZIABAD PRECISION PRODUCTS PVT LTD FR-ENG-009

RISK ANALYSIS (STEP 5) OPTIMIZATION (STEP 6)

Occurrence (O) of FC

Filter Code (optional)


Filter Code ( optional

pointer to evidence
Target Completion
Preventive Action

Action taken with

Severity (S) of FE
Detection Action

Completion Date
Detection (D) of

Charecteristics

Occurrence (O)
Person's Name

charecteristics
Detection (D)
Responsible
PFMEA AP

PFMEA AP

Remarks
Special

Special
FC/FM

Status
Current Prevention Control Current Detection Control (DC)

date
(PC) of FC of FC or FM

Effectiveness monitored in
every 3 months which reflects
100% dipping application
through Skill matrix of Oiling
on component &
operation
On job training providing to 5 6 M - - - - - - - - - - - - - - - -
FR-HR-004
operator regarding machine
Work instruction for oiling
operations
operation
Doc No :- FR- ENG-023

Effectiveness monitored in
every 3 months which reflects
Dock audit as per schedule
through Skill matrix of Packing
&
operation
On job training providing to 5 6 M - - - - - - - - - - - - - - - -
FR-HR-004
operator regarding machine
Work instruction for Packing
operations
operation
Doc No :- FR- ENG-023

Components are stored in


Monitoring through Dock audit
pallet/bins to prevent from
conduct once in every week
moisture/ rust & displayed 5 6 M - - - - - - - - - - - - - - - -
DOC NO - FR-IQA-014
WI at area for reference
DOC NO- WI-PRD-046

Monitoring in every dispatch by


Invoice control 5 6 M - - - - - - - - - - - - - - - -
store incharge