Professional Documents
Culture Documents
: PDC-EPD-F02
Control Plan Rev. No. : 00 (01/09/2019)
Issue No. : 02 (01/09/2019)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO
Production Drawing No. : 894172528'3'-MCD-03-04 Revision No. (Date): 03(11/05/2016) Mr. Himanshu Duniwal Manager QA & QMS
Control Plan Number : 894172528 CP-08 Organization / Plant Approval Date : Date (Originated) : 01/01/2014 Mr. R.S. Shekhawat Manager NPD mail@garimacastings.com
Part Number / Model No : 894172529 Other Approval / Date (if Reqd.) : Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop
Part Name / Description : GMI Flywheel Organization / Supplier Code : 8131 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Vineet Upadhyay Engineer QA & QMS
1. Set up Approval(QC-MCN-
1.Set up Approval(QC-MCN-
F01)
1st PC Set up QC Incharge F01)
Chuck 2.Operator Log Book (QC-
CNC TURNING CENTER WITH 3 JAW HYDRAULIC POWER
8.01 ▼ 22 ± 2.0 kg/cm2 Pressure Gauge 1 2/shift 2.100% Operator Monitoring Readjust the Pressure
Pressure 1 2/shift 3.In Process inspection
MCN-F10)
3.In Process Inspection Report
report(QC-MCN-F02)
(QC-MCN-F02)
1.Set up Approval
1.Set up Approval
(QC-MCN-F01) / CMM
CMM / Bore (QC-MCN-F01) / CMM
Report
▼ Ø 95.000 / Gauge with Dial 1st PC Setup QC Incharge Report
Check Tooling & ascertain 2.Operator log Book
8.03 Inner Diameter 2 100% Operator 2.100 % Operator Monitoring
TURNING Ist SETUP
1.Set up Approval
1.Set up Approval
(QC-MCN-F01)
(QC-MCN-F01)
1st PC Setup QC Incharge 2.Operator log Book
▼ Ø 271.30 / SG-32 with MSP- 2.100 % Operator Monitoring Check Tooling & ascertain
8.06 Outer Diameter 6 •
100% Operator (QC-MCN-F10)
271.40 mm 23 1 20th PC Inspector
3.In Process Inspection Report root Cause
3.In Process Inspection Report
(QC-MCN-F02)
(QC-MCN-F02)
4.SPC Analysis
4. SPC Chart
Ø 275.5 / 276.5 Set up Approval Check tooling & ascertain Set up Approval
8.07 Outer Diameter 7 Vernier Caliper 1st PC Set up QC Incharge
mm (QC-MCN-F01) root cause (QC-MCN-F01)
1 of 17
Doc. No. : PDC-EPD-F02
Control Plan Rev. No. : 00 (01/09/2019)
Issue No. : 02 (01/09/2019)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO
Production Drawing No. : 894172528'3'-MCD-03-04 Revision No. (Date): 03(11/05/2016) Mr. Himanshu Duniwal Manager QA & QMS
Control Plan Number : 894172528 CP-08 Organization / Plant Approval Date : Date (Originated) : 01/01/2014 Mr. R.S. Shekhawat Manager NPD mail@garimacastings.com
Part Number / Model No : 894172529 Other Approval / Date (if Reqd.) : Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop
Part Name / Description : GMI Flywheel Organization / Supplier Code : 8131 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Vineet Upadhyay Engineer QA & QMS
16.50 / 18.00 Set up Approval Check tooling & ascertain Set up Approval
8.08 Depth 9 Depth Vernier 1st PC Set up QC Incharge
CNC TURNING CENTER WITH 3 JAW HYDRAULIC POWER
C2 MAX.
Underfill
8.09 10 N/A
Permissible at
One Place
8
Tool Profile / Set up Approval Check tooling & ascertain Set up Approval
8.12 Radius 14 R0.8 mm Visual
1st PC Set up QC Incharge (QC-MCN-F01) root cause (QC-MCN-F01)
2 of 17
Doc. No. : PDC-EPD-F02
Control Plan Rev. No. : 00 (01/09/2019)
Issue No. : 02 (01/09/2019)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO
Production Drawing No. : 894172528'3'-MCD-03-04 Revision No. (Date): 03(11/05/2016) Mr. Himanshu Duniwal Manager QA & QMS
Control Plan Number : 894172528 CP-08 Organization / Plant Approval Date : Date (Originated) : 01/01/2014 Mr. R.S. Shekhawat Manager NPD mail@garimacastings.com
Part Number / Model No : 894172529 Other Approval / Date (if Reqd.) : Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop
Part Name / Description : GMI Flywheel Organization / Supplier Code : 8131 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Vineet Upadhyay Engineer QA & QMS
1.Set up Approval
1.Set up Approval
(QC-MCN-F01)
Surface Finish 1st PC Set up QC Incharge Check tooling & ascertain (QC-MCN-F01)
CNC TURNING CENTER WITH 3 JAW HYDRAULIC POWER
Surface Finish Set up Approval Check tooling & ascertain Set up Approval
8.17 Surface Finish 19 3.2 - 6.3 μRa 1st PC Set up QC Incharge
Comparator (QC-MCN-F01) root cause (QC-MCN-F01)
12.5 µRa - Surface Finish Set up Approval Check tooling & ascertain Set up Approval
8.18 Surface Finish 20 1st PC Set up QC Incharge
25 μRa Comparator (QC-MCN-F01) root cause (QC-MCN-F01)
TURNING Ist SETUP
Surface Finish Set up Approval Check tooling & ascertain Set up Approval
8.19 Surface Finish 21 3.2 - 6.3 μRa 1st PC Set up QC Incharge
Comparator (QC-MCN-F01) root cause (QC-MCN-F01)
CHUCK
8
Set up Approval Check tooling & ascertain Set up Approval
8.2 Chamfer 22 1.0 X 45 ͦ Visual 1st PC Set up QC Incharge (QC-MCN-F01) root cause (QC-MCN-F01)
Tool Profile / Set up Approval Check tooling & ascertain Set up Approval
8.21 Radius 23 R0.2 / 0.5 mm Visual
1st PC Set up QC Incharge (QC-MCN-F01) root cause (QC-MCN-F01)
Surface Finish Set up Approval Check tooling & ascertain Set up Approval
8.22 Surface Finish 24 3.2 - 6.3 μRa 1st PC Set up QC Incharge
Comparator (QC-MCN-F01) root cause (QC-MCN-F01)
Depth Vernier / Set up Approval Check tooling & ascertain Set up Approval
8.23 Depth 26 4.7 / 6.2 mm Height Gauge
1st PC Set up QC Incharge (QC-MCN-F01) root cause (QC-MCN-F01)
3 of 17
Doc. No. : PDC-EPD-F02
Control Plan Rev. No. : 00 (01/09/2019)
Issue No. : 02 (01/09/2019)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO
Production Drawing No. : 894172528'3'-MCD-03-04 Revision No. (Date): 03(11/05/2016) Mr. Himanshu Duniwal Manager QA & QMS
Control Plan Number : 894172528 CP-08 Organization / Plant Approval Date : Date (Originated) : 01/01/2014 Mr. R.S. Shekhawat Manager NPD mail@garimacastings.com
Part Number / Model No : 894172529 Other Approval / Date (if Reqd.) : Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop
Part Name / Description : GMI Flywheel Organization / Supplier Code : 8131 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Vineet Upadhyay Engineer QA & QMS
Surface Finish Set up Approval Check tooling & ascertain Set up Approval
8.24 Surface Finish 27 3.2 - 6.3 μRa 1st PC Set up QC Incharge
Comparator (QC-MCN-F01) root cause (QC-MCN-F01)
CNC TURNING CENTER WITH 3 JAW HYDRAULIC POWER CHUCK
1.Setup Approval
1.Setup Approval
TURNING Ist SETUP
(QC-MCN-F01)
1st PC Setup QC Incharge (QC-MCN-F01)
Check Tooling & ascertain 2.Operator Log Book
8.27 Depth 30 6.80 / 7.20 mm Height Gauge 1 20th PCOperator 2.100 % Operator Monitoring
root Cause (QC-MCN-F10)
1 50th PC Inspector 3.In Process Inspection
3.In Process Inspection
Report(QC-MCN-F02)
Report(QC-MCN-F02)
8 18.00 / 19.50 Set up Approval Check tooling & ascertain Set up Approval
8.3 Depth A1 Depth Vernier 1st PC Set up QC Incharge (QC-MCN-F01) root cause (QC-MCN-F01)
mm
4 of 17
Doc. No. : PDC-EPD-F02
Control Plan Rev. No. : 00 (01/09/2019)
Issue No. : 02 (01/09/2019)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO
Production Drawing No. : 894172528'3'-MCD-03-04 Revision No. (Date): 03(11/05/2016) Mr. Himanshu Duniwal Manager QA & QMS
Control Plan Number : 894172528 CP-08 Organization / Plant Approval Date : Date (Originated) : 01/01/2014 Mr. R.S. Shekhawat Manager NPD mail@garimacastings.com
Part Number / Model No : 894172529 Other Approval / Date (if Reqd.) : Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop
Part Name / Description : GMI Flywheel Organization / Supplier Code : 8131 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Vineet Upadhyay Engineer QA & QMS
Sr. No. Tool Name Tool / Insert Specifications Tool No. Ref. Ballooned No. Operation Program No.
Remarks: The ballooned dimensions 1, 2, 6 to be checked by the operator 100% and has to be recorded in the log book.Chuck Pressure has to be recorded in the log book.
Reviewed on 03/05/2016. Reviewed as per Product Audit Plan on 20/06/2018.
5 of 17
Doc. No. : PDC-EPD-F02
Control Plan Rev. No. : 00 (01/09/2019)
Issue No. : 02 (01/09/2019)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO
Production Drawing No. : 894172528'3'-MCD-03-04 Revision No. (Date): 03(11/05/2016) Mr. Himanshu Duniwal Manager QA & QMS
Control Plan Number : 894172528 CP-09 Organization / Plant Approval Date : Date (Originated) : 01/01/2014 Mr. R.S. Shekhawat Manager NPD mail@garimacastings.c
Part Number / Model No : 894172529 Other Approval / Date (if Reqd.) : Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop
Part Name / Description : GMI Flywheel Organization / Supplier Code : 8131 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Vineet Upadhyay Engineer QA & QMS
1. Set up Approval(QC-
1.Set up Approval(QC-MCN-
MCN-F01)
1st PC Set up QC Incharge F01)
Chuck 2.Operator Log Book (QC-
9.01 ▼ 22 ± 2.0 kg/cm2 Pressure Gauge 1 2/shift 2.100% Operator Monitoring Readjust the Pressure
CNC TURNING CENTER WITH 3 JAW HYDRAULIC POWER CHUCK
1.Setup Approval
1.Setup Approval
(QC-MCN-F01)
1st PC Setup QC Incharge (QC-MCN-F01)
Ø 296.7 / 297.3 Check Tooling & ascertain 2.Operator Log Book
9.02 Outer Diameter 8 Vernier Caliper 1 20th PC Operator 2.100 % Operator Monitoring
mm 1 50th PC Inspector 3.In Process Inspection
root Cause (QC-MCN-F10)
3.In Process Inspection
Report(QC-MCN-F02)
Report(QC-MCN-F02)
12.5 µRa - Surface Finish Set up Approval Check tooling & ascertain root Set up Approval
9.04 Surface Finish 25 1st PC Set up QC Incharge
25 μRa Comparator (QC-MCN-F01) cause (QC-MCN-F01)
TURNING IInd SETUP
1.Setup Approval
1.Setup Approval
(QC-MCN-F01)
1st PC Setup QC Incharge (QC-MCN-F01)
Check Tooling & ascertain 2.Operator Log Book
9.05 Depth 31 ▼ 61.9 / 62.1 mm Depth Vernier 1 20thPC Operator 2.100 % Operator Monitoring
root Cause (QC-MCN-F10)
1 35th PC Inspector 3.In Process Inspection
3.In Process Inspection
Report(QC-MCN-F02)
9 Report(QC-MCN-F02)
1.Setup Approval
1.Setup Approval
(QC-MCN-F01)
1st PC Setup QC Incharge (QC-MCN-F01)
Check Tooling & ascertain 2.Operator Log Book
9.06 Depth 32 ▼ 41.9 / 42.1 mm Depth Vernier 1 20thPC Operator 2.100 % Operator Monitoring
root Cause (QC-MCN-F10)
1 35th PC Inspector 3.In Process Inspection
3.In Process Inspection
Report(QC-MCN-F02)
Report(QC-MCN-F02)
Chamfer Set up Approval Check tooling & ascertain root Set up Approval
9.07 33 7.8 / 8.2 mm Height Gauge 1st PC Set up QC Incharge
Depth (QC-MCN-F01) cause (QC-MCN-F01)
33.70 / 34.30 Set up Approval Check tooling & ascertain root Set up Approval
9.08 Depth 34 Depth Vernier 1st PC Setup QC Incharge
mm (QC-MCN-F01) cause (QC-MCN-F01)
6 of 17
CNC TURNING CENTER WITH 3 JA
9
TURNING II
Doc. No. : PDC-EPD-F02
Control Plan Rev. No. : 00 (01/09/2019)
Issue No. : 02 (01/09/2019)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO
Production Drawing No. : 894172528'3'-MCD-03-04 Revision No. (Date): 03(11/05/2016) Mr. Himanshu Duniwal Manager QA & QMS
Control Plan Number : 894172528 CP-09 Organization / Plant Approval Date : Date (Originated) : 01/01/2014 Mr. R.S. Shekhawat Manager NPD mail@garimacastings.c
Part Number / Model No : 894172529 Other Approval / Date (if Reqd.) : Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop
Part Name / Description : GMI Flywheel Organization / Supplier Code : 8131 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Vineet Upadhyay Engineer QA & QMS
1.Setup Approval
1.Setup Approval
(QC-MCN-F01)
1st PC Setup QC Incharge (QC-MCN-F01)
Check Tooling & ascertain 2.Operator Log Book
9.10 Width 36 15.3 / 15.7 mm Micrometer 1 20thPC Operator 2.100 % Operator Monitoring
TURNING CENTER WITH 3 JAW HYDRAULIC POWER CHUCK
Surface Finish Set up Approval Check tooling & ascertain root Set up Approval
9.11 Surface Finish 37 3.2 - 6.3 μRa 1st PC Set up QC Incharge
Comparator (QC-MCN-F01) cause (QC-MCN-F01)
Surface Finish Set up Approval Check tooling & ascertain root Set up Approval
9.12 Surface Finish 38 3.2 - 6.3 μRa 1st PC Set up QC Incharge
Comparator (QC-MCN-F01) cause (QC-MCN-F01)
TURNING IInd SETUP
0.07 TIR
9 9.14 Parallelism 40 ▼
MAX. with
CMM / Height
Gauge with Dial LC
1st PC Setup /
1 / Shift
1.Set up Approval
(QC-MCN-F01) /
1.Set up Approval
Check Tooling & ascertain (QC-MCN-F01) /
Ref. 'C' on Ø 100% Inspector CMM Report
root cause CMM Report
0.001 2. On Part
225 mm
12.5 µRa - Surface Finish Set up Approval Check tooling & ascertain root Set up Approval
9.15 Surface Finish 41 1st PC Set up QC Incharge
25 μRa Comparator (QC-MCN-F01) cause (QC-MCN-F01)
12.5 µRa - Surface Finish Set up Approval Check tooling & ascertain root Set up Approval
9.16 Surface Finish 43 1st PC Set up QC Incharge
25 μRa Comparator (QC-MCN-F01) cause (QC-MCN-F01)
7 of 17
CNC TURNING CENTER WITH 3 JAW HYD
TURNING IInd SET
Doc. No. : PDC-EPD-F02
Control Plan Rev. No. : 00 (01/09/2019)
9 Issue No. : 02 (01/09/2019)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO
Production Drawing No. : 894172528'3'-MCD-03-04 Revision No. (Date): 03(11/05/2016) Mr. Himanshu Duniwal Manager QA & QMS
Control Plan Number : 894172528 CP-09 Organization / Plant Approval Date : Date (Originated) : 01/01/2014 Mr. R.S. Shekhawat Manager NPD mail@garimacastings.c
Part Number / Model No : 894172529 Other Approval / Date (if Reqd.) : Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop
Part Name / Description : GMI Flywheel Organization / Supplier Code : 8131 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Vineet Upadhyay Engineer QA & QMS
Ø 117.7 / 118.3 Set up Approval Check tooling & ascertain root Set up Approval
9.18 Inner Diameter 46 Inside Caliper 1st PC Set up QC Incharge
mm (QC-MCN-F01) cause (QC-MCN-F01)
Ø 135.5 / 136.5 Set up Approval Check tooling & ascertain root Set up Approval
9.19 Inner Diameter 47 Inside Caliper 1st PC Set up QC Incharge
mm (QC-MCN-F01) cause (QC-MCN-F01)
ING CENTER WITH 3 JAW HYDRAULIC POWER CHUCK
Ø 149.0 / 151.0 Set up Approval Check tooling & ascertain root Set up Approval
9.20 Inner Diameter 48 Vernier Caliper 1st PC Set up QC Incharge
mm (QC-MCN-F01) cause (QC-MCN-F01)
Ø 229.5 / 230.5
9.21 Groove Inner Dia 49 Visual 1st PC Program Controlled
mm
1.Setup Approval
1.Setup Approval
TURNING IInd SETUP
(QC-MCN-F01)
Ø 234.5 / 235.5 1st PC Setup QC Incharge Check Tooling & ascertain (QC-MCN-F01)
9.22 Inner Diameter 50 Vernier Caliper 2.100 % Operator Monitoring
mm 1 35th PC Inspector
3.In Process Inspection
root Cause 3.In Process Inspection
Report(QC-MCN-F02)
Report(QC-MCN-F02)
8 of 17
CNC TURNING CENTER WITH 3 JAW HYDRAULIC
Doc. No. : PDC-EPD-F02
Control Plan Rev. No. : 00 (01/09/2019)
12.5 µRa - Surface Finish Set up Approval Check tooling & ascertain root Set up Approval
9.26 Surface Finish 55 1st PC Set up QC Incharge
25 μRa Comparator (QC-MCN-F01) cause (QC-MCN-F01)
12.5 µRa - Surface Finish Set up Approval Check tooling & ascertain root Set up Approval
9.27 Surface Finish 56 1st PC Set up QC Incharge
25 μRa Comparator (QC-MCN-F01) cause (QC-MCN-F01)
WITH 3 JAW HYDRAULIC
CNC TURNING CENTER
TURNING IInd SETUP
POWER CHUCK
Sr. No. Tool Name Tool / Insert Specifications Tool No. Ref. Ballooned No. Operation Program No.
Remarks: The ballooned dimensions 8, 31, 32, 36 & 50 to be checked by the operator and has to be recorded in the log book.Chuck Pressure has to be recorded in the log book.
Reviewed on 03/05/2016. Reviewed as per Product Audit Plan on 20/06/2018.
9 of 17
Doc. No. : PDC-EPD-F02
Control Plan Rev. No. : 00 (01/09/2019)
Issue No. : 02 (01/09/2019)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO
Production Drawing No. : 894172528'3'-MCD-02-04 Revision No. (Date): 03(11/05/2016) Mr. Himanshu Duniwal Manager QA & QMS
Control Plan Number : 894172528 CP-10 Organization / Plant Approval Date : Date (Originated) : 01/01/2014 Mr. R.S. Shekhawat Manager NPD mail@garimacastings.com
Part Number / Model No : 894172529 Other Approval / Date (if Reqd.) : Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop
Part Name / Description : GMI Flywheel Organization / Supplier Code : 8131 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Vineet Upadhyay Engineer QA & QMS
1.Set up Approval
DRILLING , TAPPING
Report (QC-MCN-F02)
1.Set up Approval
10 108.64 / 108.74
1st PC Set up QC Incharge
(QC-MCN-F01) / CMM
Report Check tooling & ascertain
1.Set up Approval (QC-
MCN-F01) / CMM Report
10.04 Center Distance 68 ▼ CMM / RG 19 100% Operator
mm 20th PC Inspector
2.100% Opertor Monitoring root cause 2.In Process Inspection
1 3.In Process Inspection Report (QC-MCN-F02)
Report (QC-MCN-F02)
1.Set up Approval
1st PC (QC-MCN-F01) / CMM 1.Set up Approval (QC-
Set up QC Incharge
108.64 / 108.74 Report Check tooling & ascertain MCN-F01) / CMM Report
10.05 Center Distance 69 ▼ CMM / RG 19 100% Operator
mm 20th PC Inspector
2.100% Opertor Monitoring root cause 2.In Process Inspection
1 3.In Process Inspection Report (QC-MCN-F02)
Report (QC-MCN-F02)
1.Set up Approval
1st PC (QC-MCN-F01) / CMM 1.Set up Approval (QC-MCN-
Set up QC Incharge
Report Check tooling & ascertain root F01) / CMM Report
10.06 Center Distance 70 (134.7) mm CMM / RG 19 100% Operator
2.100% Opertor Monitoring cause 2.In Process Inspection Report
1 20th PC Inspector
3.In Process Inspection Report (QC-MCN-F02)
(QC-MCN-F02)
1.Set up Approval
1st PC (QC-MCN-F01) / CMM 1.Set up Approval (QC-
Set up QC Incharge
Report Check tooling & ascertain MCN-F01) / CMM Report
10.07 Center Distance 71 ▼ 62.7 / 62.8 mm CMM / RG 19 100% Operator
2.100% Opertor Monitoring root cause 2.In Process Inspection
1 20th PC Inspector
3.In Process Inspection Report (QC-MCN-F02)
Report (QC-MCN-F02)
10 of 17
Doc. No. : PDC-EPD-F02
Control Plan Rev. No. : 00 (01/09/2019)
Issue No. : 02 (01/09/2019)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO
Production Drawing No. : 894172528'3'-MCD-02-04 Revision No. (Date): 03(11/05/2016) Mr. Himanshu Duniwal Manager QA & QMS
Control Plan Number : 894172528 CP-10 Organization / Plant Approval Date : Date (Originated) : 01/01/2014 Mr. R.S. Shekhawat Manager NPD mail@garimacastings.com
Part Number / Model No : 894172529 Other Approval / Date (if Reqd.) : Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop
Part Name / Description : GMI Flywheel Organization / Supplier Code : 8131 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Vineet Upadhyay Engineer QA & QMS
1.Set up Approval
1st PC (QC-MCN-F01) / CMM 1.Set up Approval (QC-
Set up QC Incharge
125.45 / 125.55 Report Check tooling & ascertain MCN-F01) / CMM Report
10.08 Center Distance 72 ▼ CMM / RG 19 100% Operator
mm 20th PC Inspector
2.100% Opertor Monitoring root cause 2.In Process Inspection
1 3.In Process Inspection Report (QC-MCN-F02)
Report (QC-MCN-F02)
1.Set up Approval
1st PC (QC-MCN-F01) / CMM 1.Set up Approval (QC-MCN-
Set up QC Incharge
CMM / Receiving Report Check tooling & ascertain root F01) / CMM Report
10.09 PCD 73 Ø 74.00 mm 100% Operator
Gauge-13 50th PC Inspector
2.100% Opertor Monitoring cause 2.In Process Inspection Report
1 3.In Process Inspection Report (QC-MCN-F02)
(QC-MCN-F02)
DRILLING , TAPPING
1.Set up Approval
1st PC (QC-MCN-F01) / CMM 1.Set up Approval (QC-
Set up QC Incharge
CMM / Receiving Report Check tooling & ascertain MCN-F01) / CMM Report
10.11 PCD 75 ▼ Ø 251.00 mm 100%
10 Gauge-19
1
Operator
50th PC Inspector
2.100% Opertor Monitoring
3.In Process Inspection
root cause 2.In Process Inspection
Report (QC-MCN-F02)
Report (QC-MCN-F02)
11 of 17
Doc. No. : PDC-EPD-F02
Control Plan Rev. No. : 00 (01/09/2019)
Issue No. : 02 (01/09/2019)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO
Production Drawing No. : 894172528'3'-MCD-02-04 Revision No. (Date): 03(11/05/2016) Mr. Himanshu Duniwal Manager QA & QMS
Control Plan Number : 894172528 CP-10 Organization / Plant Approval Date : Date (Originated) : 01/01/2014 Mr. R.S. Shekhawat Manager NPD mail@garimacastings.com
Part Number / Model No : 894172529 Other Approval / Date (if Reqd.) : Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop
Part Name / Description : GMI Flywheel Organization / Supplier Code : 8131 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Vineet Upadhyay Engineer QA & QMS
1.Set up Approval
1st PC (QC-MCN-F01) / CMM 1.Set up Approval (QC-MCN-
Set up QC Incharge
Report Check tooling & ascertain root F01)
10.16 Drill Dia Ø 13.5 mm SPG-73 100% Operator
2.100% Opertor Monitoring cause 2.In Process Inspection Report
1 50th PC Inspector
3.In Process Inspection Report (QC-MCN-F02)
(QC-MCN-F02)
80
1.Set up Approval
1st PC (QC-MCN-F01) / CMM 1.Set up Approval (QC-MCN-
Set up QC Incharge
Report Check tooling & ascertain root F01)
10.18 Tap M8 X 1.25 TPG-09 100% Operator
2.100% Opertor Monitoring cause 2.In Process Inspection Report
1 50th PC Inspector
3.In Process Inspection Report (QC-MCN-F02)
(QC-MCN-F02)
DRILLING , TAPPING
1.Setup Approval
Std bolt with Vernier Check tooling & ascertain root Set up Approval
VMC Machine
1.Setup Approval
Vernier Caliper / Check tooling & ascertain root Set up Approval
Chamfer Dia. 8.5 X 90° 1st PC Setup QC Incharge (QC-MCN-F01)
CMM 2.Program Controlled
cause (QC-MCN-F01)
1.Set up Approval
1st PC (QC-MCN-F01) / CMM 1.Set up Approval (QC-
Set up QC Incharge
3 Holes Ø 5.974 / 5.988 SPG-72 / Receiving Report Check tooling & ascertain MCN-F01)
10.21 82 ▼ 100% Operator
Drill Dia mm Gauge- 19 20th PC Inspector
2.100% Opertor Monitoring root cause 2.In Process Inspection
1 3.In Process Inspection Report (QC-MCN-F02)
Report (QC-MCN-F02)
12 of 17
Doc. No. : PDC-EPD-F02
Control Plan Rev. No. : 00 (01/09/2019)
Issue No. : 02 (01/09/2019)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO
Production Drawing No. : 894172528'3'-MCD-02-04 Revision No. (Date): 03(11/05/2016) Mr. Himanshu Duniwal Manager QA & QMS
Control Plan Number : 894172528 CP-10 Organization / Plant Approval Date : Date (Originated) : 01/01/2014 Mr. R.S. Shekhawat Manager NPD mail@garimacastings.com
Part Number / Model No : 894172529 Other Approval / Date (if Reqd.) : Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop
Part Name / Description : GMI Flywheel Organization / Supplier Code : 8131 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Vineet Upadhyay Engineer QA & QMS
VMC Machine
1.Set up Approval
Check tooling & ascertain root Set up Approval
10.26 Radius 87 R18.00 mm Receiving Gauge-19 1st PC Set up QC Incharge (QC-MCN-F01)
cause (QC-MCN-F01)
2.Process Controlled
10
1.Setup Approval
43.00 / 47.00 Check tooling & ascertain root Set up Approval
10.27 Dimension 88 Vernier Caliper 1st PC Setup QC Incharge (QC-MCN-F01)
mm 2.Pattern Controlled
cause (QC-MCN-F01)
1.Setup Approval
18.50 / 21.50 Check tooling & ascertain root Set up Approval
10.28 Dimension 89 Vernier Caliper 1st PC Setup QC Incharge (QC-MCN-F01)
mm 2.Pattern Controlled
cause (QC-MCN-F01)
1.Setup Approval
Height Gauge with Check tooling & ascertain root Set up Approval
10.30 Depth 91 6.80 / 9.20 mm 1st PC Setup QC Incharge (QC-MCN-F01)
Scribber 2.Pattern Controlled
cause (QC-MCN-F01)
1.Set up Approval
VMC Machine
DRILLING ,
13 of 17
Doc. No. : PDC-EPD-F02
Control Plan Rev. No. : 00 (01/09/2019)
Issue No. : 02 (01/09/2019)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO
Production Drawing No. : 894172528'3'-MCD-02-04 Revision No. (Date): 03(11/05/2016) Mr. Himanshu Duniwal Manager QA & QMS
Control Plan Number : 894172528 CP-10 Organization / Plant Approval Date : Date (Originated) : 01/01/2014 Mr. R.S. Shekhawat Manager NPD mail@garimacastings.com
Part Number / Model No : 894172529 Other Approval / Date (if Reqd.) : Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop
Part Name / Description : GMI Flywheel Organization / Supplier Code : 8131 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Vineet Upadhyay Engineer QA & QMS
Sr. No. Tool Name Tool / Insert Specifications Tool No. Ref. Ballooned No. Operation Program No.
14 of 17
Doc. No. : PDC-EPD-F02
Control Plan Rev. No. : 00 (01/09/2019)
Issue No. : 02 (01/09/2019)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO
Production Drawing No. : 894172529 Revision No. (Date): 03(11/05/2016) Mr. Himanshu Duniwal Manager QA & QMS
Control Plan Number : 894172528 CP-11 Organization / Plant Approval Date : Date (Originated) : 01/01/2014 Mr. R.S. Shekhawat Manager NPD mail@garimacastings.com
Part Number / Model No : 894172529 Other Approval / Date (if Reqd.) : Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop
Part Name / Description : GMI Flywheel Organization / Supplier Code : 8131 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Vineet Upadhyay Engineer QA & QMS
1.Set up Approval
Chamfered Side 2.Work Instructions Set up Approval-Ring
To be on Top 1st PC Setup QC-Engg
11.01 of Ring Gear
Side
Visual
100% Operator
(PRD-MCN-WI11) Check & Segregate Fittment
Teeth 3.100% Operator (QC-MCN-F17)
Induction Heater & Hydraulic Press
Monitoring
Ring Gear Heating & Fittment
Sr. No. Tool Name Tool / Insert Specifications Tool No. Ref. Ballooned No. Operation Program No.
Tool Control
15 of 17
Doc. No. : PDC-EPD-F02
Control Plan Rev. No. : 00 (01/09/2019)
Issue No. : 02 (01/09/2019)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO
Production Drawing No. : 894172528'3'-MCD-01-04 Revision No. (Date): 03(11/05/2016) Mr. Himanshu Duniwal Manager QA & QMS
Control Plan Number : 894172528 CP-12 Organization / Plant Approval Date : Date (Originated) : 01/01/2014 Mr. R.S. Shekhawat Manager NPD mail@garimacastings.com
Part Number / Model No : 894172529 Other Approval / Date (if Reqd.) : Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop
Part Name / Description : GMI Flywheel Organization / Supplier Code :8131 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Vineet Upadhyay Engineer QA & QMS
Ø 250.0 ± 0.5 Stopper Controlled & WI Seek Clarification from Set Up Approval- DB
12.01 PCD 05 Vernier Caliper 1st PC Set Up- DB Supervisor
(PRD-MCN-WI06) Next higher authority (QC-MCN-F07)
mm
12
Center
20.00 mm WI Seek Clarification from Set Up Approval- DB
12.04 Distance / Wall Vernier Caliper 1st PC Set Up- DB Supervisor
(PRD-MCN-WI06) Next higher authority (QC-MCN-F07)
MIN.
Thickness
894172529"1"ASY-01-01
Sr. No. Tool Name Tool / Insert Specifications Tool No. Ref. Ballooned No. Operation Program No.
Tool
16 of 17
Doc. No. : PDC-EPD-F02
Control Plan Rev. No. : 00 (01/09/2019)
Issue No. : 02 (01/09/2019)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO
Production Drawing No. : 894172529 Revision No. (Date): 03(11/05/2016) Mr. Himanshu Duniwal Manager QA & QMS
Control Plan Number : 894172528 CP-13, 14 & 15 Organization / Plant Approval Date : Date (Originated) : 01/01/2014 Mr. R.S. Shekhawat Manager NPD mail@garimacastings.com
Part Number / Model No : 894172529 Other Approval / Date (if Reqd.) : Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop
Part Name / Description : GMI Flywheel Organization / Supplier Code : 8131 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Vineet Upadhyay Engineer QA & QMS
14.03 Part Identification No Mixing Visual 100% Each Batch 100 % Sorting -
PKG-PDS-WI01, PKG-
PDS-WI02, Drg No.
894172529
14
PKG-01-01
14.04 Box Type
As per Packaging
Visual 100% Each Batch & Monitoring by -
Specification Sheet Supervisor
As per Packaging
14.06 Labeling
Specification Sheet
Visual 100% Each Batch -
17 of 17