S. No. Contingency Plan

a) Multi-skilled work force is used. Supervisors


capable of handling all problems.

b) More than one shifts can be operated


1 Labour Shortage
c) Present capacity utilization is 80% which can
be increased, if need arises.

2 Key Machine & Equipment Failure

a) More than one machine of each type


b) More than one shifts can be operated
2.1 Production Machines
c) Preventive maintenance is
regularly done for all machines.

2.2 CMM a) More than one machine

a) More than one systems are installed with


2.3 Computer networking and back-up of data is taken.

a) Backup of all the measuring instruments are available


2.4 Instruments
and in calibrated condition.
2.4 Compressor a) 3 Compressors are available.
a) DG Set of 380 KVA is installed which can run whole
3 Utility Interruptions
plant except the furnaces.
Not likely but if reported; sufficient quantity can be
4 Field Returns
immediately processed