PROCESS FAILURE MODE AND EFFECTS ANALYSIS Rev. No. (Date) 00 (01/01/2014)
PFMEA Number D10414420A-FMEA-MCD-01 Key Contact / Phone Name / Works / Dept Team Member Department
Rev. No. (Date) 00(03/10/2015) Mr. Vibhor V. Jain CEO
Mr. Vibhor V. Jain CEO
Date (Originated) 10/3/2015 Mr. Himanshu Duniwal PC
Part Number D10414410A Mr. R S Shekhawat Manager - EPD
Process Responsibility: Core Team
Part Name / Description Flywheel EURO 4550 DC Mr. Dhannjay Rai Manager - M/C Shop
Material Grade FG 260 Key Date : 3-Oct-15 Mr. Dharm Singh Manager - CMM
Set up Approval /
Incorrect Programing,Incorrect Set up of
Dimension Rejection Increases, CMM Report Sampling Test
More / Less 2 8 Fixture,loose Mounting/Clamping,Faulty Tool Travel 2 4 64
67.0 Assembly Problems & Every lot
, Tool Wear
Program Controlled
Set up Approval /
Incorrect Programing,Incorrect Set up of
Dimension Rejection Increases, CMM Report Sampling Test
More / Less 3 8 Fixture,loose Mounting/Clamping,Faulty Tool Travel 2 4 64
84.9 Assembly Problems & Every lot
, Tool Wear
Program Controlled
Set up Approval /
Incorrect Programing,Incorrect Set up of
Angle Rejection Increases, CMM Report Sampling Test
35 ° ± 30'
More / Less
Assembly Problems
4 8 ▼ Fixture,loose Mounting/Clamping,Faulty Tool 2
& Every lot
4 64
Travel , Tool Wear
Program Controlled
Set up Approval /
Incorrect Programing,Incorrect Set up of
Radius Rejection Increases, CMM Report Sampling Test
R135.2 / 135.5
More / Less
Assembly Problems
6 4 ▼ Fixture,loose Mounting/Clamping,Faulty Tool 2
& Every lot
4 32
Travel , Tool Wear
Program Controlled
Set up Approval /
Radius Incorrect Programing,Incorrect Set up of
Rejection Increases, CMM Report Sampling Test
R148.0 ± 0.2
More / Less
Assembly Problems
7 4 ▼ Fixture,loose Mounting/Clamping,Faulty Tool 2
& Every lot
4 32
Travel , Tool Wear
Program Controlled
Set up Approval /
Incorrect Programing,Incorrect Set up of
Dimension Rejection Increases, CMM Report Sampling Test
More / Less 8 8 Fixture,loose Mounting/Clamping,Faulty Tool Travel 2 4 64
121.2 Assembly Problems & Every lot
, Tool Wear
Program Controlled
Set up Approval /
Incorrect Programing,Incorrect Set up of
Dimension Rejection Increases, CMM Report Sampling Test
More / Less 9 8 Fixture,loose Mounting/Clamping,Faulty Tool Travel 2 4 64
131.9 Assembly Problems & Every lot
, Tool Wear
Program Controlled
1 of 13
Doc. No. PDC-EPD-F03
PROCESS FAILURE MODE AND EFFECTS ANALYSIS Rev. No. (Date) 00 (01/01/2014)
PFMEA Number D10414420A-FMEA-MCD-01 Key Contact / Phone Name / Works / Dept Team Member Department
Rev. No. (Date) 00(03/10/2015) Mr. Vibhor V. Jain CEO
Mr. Vibhor V. Jain CEO
Date (Originated) 10/3/2015 Mr. Himanshu Duniwal PC
Part Number D10414410A Mr. R S Shekhawat Manager - EPD
Process Responsibility: Core Team
Part Name / Description Flywheel EURO 4550 DC Mr. Dhannjay Rai Manager - M/C Shop
Material Grade FG 260 Key Date : 3-Oct-15 Mr. Dharm Singh Manager - CMM
Rejection Increases,
Loose 6 2 2 24
Assembly Problems Incorrect Programing,Incorrect Set up of
12 Holes Set up Approval,Operator Sampling Test
M8X1.25 ▼ Fixture,loose Mounting/Clamping,Faulty Tool
Monitoring,In-Process Inspection Every lot
Rework Increases, Travel , Tool Wear
Tight 5 2 2 20
Assembly Problems
2
Incorrect Programing,Incorrect Set up of
PCD Rejection Increases, Set up Approval,Operator Sampling Test
ɸ 312.0± 0.1
More/Less
Assembly Problems
18 8 ▼ Fixture,loose Mounting/Clamping,Faulty Tool
Monitoring,In-Process Inspection Every lot
2 32
Travel , Tool Wear
2
2 of 13
Doc. No. PDC-EPD-F03
PROCESS FAILURE MODE AND EFFECTS ANALYSIS Rev. No. (Date) 00 (01/01/2014)
PFMEA Number D10414420A-FMEA-MCD-01 Key Contact / Phone Name / Works / Dept Team Member Department
Rev. No. (Date) 00(03/10/2015) Mr. Vibhor V. Jain CEO
Mr. Vibhor V. Jain CEO
Date (Originated) 10/3/2015 Mr. Himanshu Duniwal PC
Part Number D10414410A Mr. R S Shekhawat Manager - EPD
Process Responsibility: Core Team
Part Name / Description Flywheel EURO 4550 DC Mr. Dhannjay Rai Manager - M/C Shop
Material Grade FG 260 Key Date : 3-Oct-15 Mr. Dharm Singh Manager - CMM
Rejection Increases,
More 6 2 7 84
Assembly Problems Incorrect Programing,Incorrect Set up of
6 Holes Set up Approval,Operator Sampling Test
Fixture,loose Mounting/Clamping,Faulty Tool Travel
ɸ 12.8 / 13.2 Monitoring,In-Process Inspection Every lot
Rework Increases, , Tool Wear
Less 5 2 7 70
Assembly Problems
Set up Approval /
Incorrect Programing,Incorrect Set up of
True Position Rejection Increases, CMM Report Sampling Test
More 8 Fixture,loose Mounting/Clamping,Faulty Tool Travel 2 2 32
0.4 Assembly Problems & Every lot
, Tool Wear
Program Controlled
Rejection Increases,
More 6 2 7 84
Assembly Problems Incorrect Programing,Incorrect Set up of
2 Holes Set up Approval,Operator Sampling Test
Fixture,loose Mounting/Clamping,Faulty Tool Travel
ɸ 6.0 Monitoring,In-Process Inspection Every lot
Rework Increases, , Tool Wear
Less 5 2 7 70
Assembly Problems
Rejection Increases,
More
Assembly Problems Incorrect Programing,Incorrect Set up of
Drill Depth Set up Approval,In-Process Sampling Test
20 6 Fixture,loose Mounting/Clamping,Faulty Tool Travel 2 5 60
25.0 mm Inspection Every lot
Rework Increases, , Tool Wear
Less
Assembly Problems
Rejection Increases,
More 5 2 7
Assembly Problems Incorrect Programing,Incorrect Set up of
Chamfer Set up Approval & Sampling Test
Fixture,loose Mounting/Clamping,Faulty Tool Travel 70
1.5X45° Program Controlled Every lot
Rework Increases, , Tool Wear
Less 4 2 7
Assembly Problems
Rejection Increases,
More 5 2 7
Assembly Problems Incorrect Programing,Incorrect Set up of
Chamfer Set up Approval & Sampling Test
23 Fixture,loose Mounting/Clamping,Faulty Tool Travel
3.0X45° Program Controlled Every lot
Rework Increases, , Tool Wear
Less 4 2 7
Assembly Problems
Rework Increases,
Less 6 Incorrect Programing,Incorrect Set up of 2 7 84
Chamfer Assembly Problems Set up Approval , Sampling Test
24 Fixture,loose Mounting/Clamping,Faulty Tool Travel
1.0 X 45° Rejection Increases, Program Controlled Every lot
More 5 , Tool Wear 2 7 70
Assembly Problems
3 of 13
Doc. No. PDC-EPD-F03
PROCESS FAILURE MODE AND EFFECTS ANALYSIS Rev. No. (Date) 00 (01/01/2014)
PFMEA Number D10414420A-FMEA-MCD-01 Key Contact / Phone Name / Works / Dept Team Member Department
Rev. No. (Date) 00(03/10/2015) Mr. Vibhor V. Jain CEO
Mr. Vibhor V. Jain CEO
Date (Originated) 10/3/2015 Mr. Himanshu Duniwal PC
Part Number D10414410A Mr. R S Shekhawat Manager - EPD
Process Responsibility: Core Team
Part Name / Description Flywheel EURO 4550 DC Mr. Dhannjay Rai Manager - M/C Shop
Material Grade FG 260 Key Date : 3-Oct-15 Mr. Dharm Singh Manager - CMM
Rejection Increases,
More 5 2 7 70
Assembly Problems Incorrect Programing,Incorrect Set up of
Radius Set up Approval & Sampling Test
26 Fixture,loose Mounting/Clamping,Faulty Tool Travel
R1.0 MAX. Program Controlled Every lot
Rework Increases, , Tool Wear
Less 4 2 7 56
Assembly Problems
Rework Increases,
Less 6 Incorrect Programing,Incorrect Set up of 2 7 84
Chamfer Assembly Problems Set up Approval , Sampling Test
28 Fixture,loose Mounting/Clamping,Faulty Tool Travel
1.0 X 45° Rejection Increases, Program Controlled Every lot
More 5 , Tool Wear 2 7 70
Assembly Problems
Rejection Increases,
More 5 2 7 70
Assembly Problems Incorrect Programing,Incorrect Set up of
Radius Set up Approval & Sampling Test
30 Fixture,loose Mounting/Clamping,Faulty Tool Travel
R1.0 MAX. Program Controlled Every lot
Rework Increases, , Tool Wear
Less 4 2 7 56
Assembly Problems
Rejection Increases,
Less 6 2 5 60
Assembly Problems Incorrect Programing,Incorrect Set up of
Depth Sampling Test
32 Fixture,loose Mounting/Clamping,Faulty Tool Travel Set up Approval
29.0 Every lot
Rework Increases, , Tool Wear
More 5 2 5 50
Assembly Problems
Rejection Increases,
Less 6 2 4 48
Assembly Problems Incorrect Programing,Incorrect Set up of
Depth Sampling Test
33 Fixture,loose Mounting/Clamping,Faulty Tool Travel Set up Approval
33.0 Every lot
Rework Increases, , Tool Wear
More 5 2 4 40
Assembly Problems
Rework Increases,
Less 6 Incorrect Programing,Incorrect Set up of 2 7 84
Chamfer Assembly Problems Set up Approval , Sampling Test
34 Fixture,loose Mounting/Clamping,Faulty Tool Travel
1.0 X 45° Rejection Increases, Program Controlled Every lot
More 5 , Tool Wear 2 7 70
Assembly Problems
Rejection Increases,
More 6 2 6 72
Assembly Problems Incorrect Programing,Incorrect Set up of
Inner Diameter Sampling Test
35 Fixture,loose Mounting/Clamping,Faulty Tool Travel Set up Approval
Ø 149.5 / 150.5 Every lot
, Tool Wear
4 of 13
Doc. No. PDC-EPD-F03
PROCESS FAILURE MODE AND EFFECTS ANALYSIS Rev. No. (Date) 00 (01/01/2014)
PFMEA Number D10414420A-FMEA-MCD-01 Key Contact / Phone Name / Works / Dept Team Member Department
Rev. No. (Date) 00(03/10/2015) Mr. Vibhor V. Jain CEO
Mr. Vibhor V. Jain CEO
Date (Originated) 10/3/2015 Mr. Himanshu Duniwal PC
Part Number D10414410A Mr. R S Shekhawat Manager - EPD
Process Responsibility: Core Team
Part Name / Description Flywheel EURO 4550 DC Mr. Dhannjay Rai Manager - M/C Shop
Material Grade FG 260 Key Date : 3-Oct-15 Mr. Dharm Singh Manager - CMM
5 of 13
Doc. No. PDC-EPD-F03
PROCESS FAILURE MODE AND EFFECTS ANALYSIS Rev. No. (Date) 00 (01/01/2014)
PFMEA Number D10414420A-FMEA-MCD-01 Key Contact / Phone Name / Works / Dept Team Member Department
Rev. No. (Date) 00(03/10/2015) Mr. Vibhor V. Jain CEO
Mr. Vibhor V. Jain CEO
Date (Originated) 10/3/2015 Mr. Himanshu Duniwal PC
Part Number D10414410A Mr. R S Shekhawat Manager - EPD
Process Responsibility: Core Team
Part Name / Description Flywheel EURO 4550 DC Mr. Dhannjay Rai Manager - M/C Shop
Material Grade FG 260 Key Date : 3-Oct-15 Mr. Dharm Singh Manager - CMM
Rejection Increases,
More 6 2 6 72
Assembly Problems Incorrect Programing,Incorrect Set up of
Inner Diameter Sampling Test
36 Fixture,loose Mounting/Clamping,Faulty Tool Travel Set up Approval
Ø 164.5 / 165.5 Every lot
Rework Increases, , Tool Wear
Less 5 2 6 60
Assembly Problems
Rejection Increases,
More 8 2 2 32
Assembly Problems Incorrect Programing,Incorrect Set up of Set up Approval,In Process
Inner Diameter Sampling Test
Ø 328.2 / 328.3
37 ▼ Fixture,loose Mounting/Clamping,Faulty Tool Inspection,Operator
Every lot
Rework Increases, Travel , Tool Wear Monitoring,SPC
Less 7 2 2 28
Assembly Problems
Rejection Increases,
More 6 2 6 72
Assembly Problems Incorrect Programing,Incorrect Set up of
Inner Diameter Sampling Test
38 Fixture,loose Mounting/Clamping,Faulty Tool Travel Set up Approval
Ø 344.5 / 349.5 Every lot
Rework Increases, , Tool Wear
Less 5 2 6 60
Assembly Problems
Rework Increases,
More 6 2 5 60
Assembly Problems Incorrect Programing,Incorrect Set up of
Outer Diameter Sampling Test
39 Fixture,loose Mounting/Clamping,Faulty Tool Travel Set up Approval
Ø 392.5 / 387.5 Every lot
Rejection Increases, , Tool Wear
Less 5 2 5 50
Assembly Problems
Rework Increases,
Less 6 Incorrect Programing,Incorrect Set up of 2 7 84
Chamfer Assembly Problems Set up Approval , Sampling Test
40 Fixture,loose Mounting/Clamping,Faulty Tool Travel
1.0 X 45° Rejection Increases, Program Controlled Every lot
More 5 , Tool Wear 2 7 70
Assembly Problems
Rejection Increases,
More 5 2 7 70
Assembly Problems Incorrect Programing,Incorrect Set up of
Radius Sampling Test
41 Fixture,loose Mounting/Clamping,Faulty Tool Travel Pattern Controlled
R5.0 Every lot
Rework Increases, , Tool Wear
Less 4 2 7 56
Assembly Problems
6 of 13
Doc. No. PDC-EPD-F03
PROCESS FAILURE MODE AND EFFECTS ANALYSIS Rev. No. (Date) 00 (01/01/2014)
PFMEA Number D10414420A-FMEA-MCD-01 Key Contact / Phone Name / Works / Dept Team Member Department
Rev. No. (Date) 00(03/10/2015) Mr. Vibhor V. Jain CEO
Mr. Vibhor V. Jain CEO
Date (Originated) 10/3/2015 Mr. Himanshu Duniwal PC
Part Number D10414410A Mr. R S Shekhawat Manager - EPD
Process Responsibility: Core Team
Part Name / Description Flywheel EURO 4550 DC Mr. Dhannjay Rai Manager - M/C Shop
Material Grade FG 260 Key Date : 3-Oct-15 Mr. Dharm Singh Manager - CMM
7 of 13
Doc. No. PDC-EPD-F03
PROCESS FAILURE MODE AND EFFECTS ANALYSIS Rev. No. (Date) 00 (01/01/2014)
PFMEA Number D10414420A-FMEA-MCD-01 Key Contact / Phone Name / Works / Dept Team Member Department
Rev. No. (Date) 00(03/10/2015) Mr. Vibhor V. Jain CEO
Mr. Vibhor V. Jain CEO
Date (Originated) 10/3/2015 Mr. Himanshu Duniwal PC
Part Number D10414410A Mr. R S Shekhawat Manager - EPD
Process Responsibility: Core Team
Part Name / Description Flywheel EURO 4550 DC Mr. Dhannjay Rai Manager - M/C Shop
Material Grade FG 260 Key Date : 3-Oct-15 Mr. Dharm Singh Manager - CMM
Rejection Increases,
Less 6 2 4 48
Assembly Problems Incorrect Programing,Incorrect Set up of
Depth Set up Approval, In Process Sampling Test
46 Fixture,loose Mounting/Clamping,Faulty Tool Travel
15.5 / 15.9 Inspection Every lot
Rework Increases, , Tool Wear
More 5 2 4 40
Assembly Problems
46A
Incorrect Programing,Incorrect Set up of
Flatness Rejection Increases, Set up Approval & Sampling Test
0.5
More
Assembly Problems
7 ▼ Fixture,loose Mounting/Clamping,Faulty Tool 2
Program Controlled Every lot
2 28
Travel , Tool Wear
Rejection Increases,
Less 6 2 6 72
Assembly Problems Incorrect Programing,Incorrect Set up of
Depth Sampling Test
47 Fixture,loose Mounting/Clamping,Faulty Tool Travel Set up Approval
24.5/24.9 Every lot
Rework Increases, , Tool Wear
More 5 2 6 60
Assembly Problems
Rejection Increases,
Less 6 2 6 72
Assembly Problems Incorrect Programing,Incorrect Set up of
Depth Set up Approval,In Process Sampling Test
9.0 / 9.15
48 ▼ Fixture,loose Mounting/Clamping,Faulty Tool
Inspection Every lot
Rework Increases, Travel , Tool Wear
More 5 2 6 60
Assembly Problems
Rejection Increases,
Less 6 2 6 72
Assembly Problems Incorrect Programing,Incorrect Set up of
Depth Sampling Test
49 Fixture,loose Mounting/Clamping,Faulty Tool Travel Set up Approval
37.0 Every lot
Rework Increases, , Tool Wear
More 5 2 6 60
Assembly Problems
Rejection Increases,
Less 6 2 4 48
Assembly Problems Incorrect Programing,Incorrect Set up of
Depth Sampling Test
50 Fixture,loose Mounting/Clamping,Faulty Tool Travel Set up Approval
49.5 / 50.0 Every lot
Rework Increases, , Tool Wear
More 5 2 4 40
Assembly Problems
Rejection Increases,
Less 6 2 4 48
Assembly Problems Incorrect Programing,Incorrect Set up of
Depth Sampling Test
51 Fixture,loose Mounting/Clamping,Faulty Tool Travel Set up Approval
56.0 Every lot
Rework Increases, , Tool Wear
More 5 2 4 40
Assembly Problems
Rejection Increases,
Less 6 2 4 48
Assembly Problems Incorrect Programing,Incorrect Set up of
Depth Sampling Test
52 Fixture,loose Mounting/Clamping,Faulty Tool Travel Set up Approval
98.0 Every lot
Rework Increases, , Tool Wear
More 5 2 4 40
Assembly Problems
8 of 13
Doc. No. PDC-EPD-F03
PROCESS FAILURE MODE AND EFFECTS ANALYSIS Rev. No. (Date) 00 (01/01/2014)
PFMEA Number D10414420A-FMEA-MCD-01 Key Contact / Phone Name / Works / Dept Team Member Department
Rev. No. (Date) 00(03/10/2015) Mr. Vibhor V. Jain CEO
Mr. Vibhor V. Jain CEO
Date (Originated) 10/3/2015 Mr. Himanshu Duniwal PC
Part Number D10414410A Mr. R S Shekhawat Manager - EPD
Process Responsibility: Core Team
Part Name / Description Flywheel EURO 4550 DC Mr. Dhannjay Rai Manager - M/C Shop
Material Grade FG 260 Key Date : 3-Oct-15 Mr. Dharm Singh Manager - CMM
Rework Increases,
Less 6 Incorrect Programing,Incorrect Set up of 2 7 84
Chamfer Assembly Problems Set up Approval , Sampling Test
54 Fixture,loose Mounting/Clamping,Faulty Tool Travel
1.0 X 45° Rejection Increases, Program Controlled Every lot
More 5 , Tool Wear 2 7 70
Assembly Problems
Rework Increases,
More 6 2 5 60
Assembly Problems Incorrect Programing,Incorrect Set up of
Outer Diameter Sampling Test
56 Fixture,loose Mounting/Clamping,Faulty Tool Travel Set up Approval
Ø 335.5 / 340.5 Every lot
Rejection Increases, , Tool Wear
Less 5 2 5 50
Assembly Problems
Rework Increases,
More 8 2 2 32
Assembly Problems Incorrect Programing,Incorrect Set up of Set up Approval,In Process
Outer Diameter Sampling Test
57 ▼ Fixture,loose Mounting/Clamping,Faulty Tool Inspection,Operator
Ø313.45 / 313.55 Every lot
Rejection Increases, Travel , Tool Wear Monitoring,SPC
Less 7 2 2 28
Assembly Problems
Rejection Increases,
More 8 Incorrect Programing,Incorrect Set up of 2 Set up Approval,In Process 2 32
Inner Diameter Assembly Problems Sampling Test
Ø 100.000 / 100.054
60 ▼ Fixture,loose Mounting/Clamping,Faulty Tool Inspection,Operator
Every lot
Rework Increases, Travel , Tool Wear Monitoring,SPC
Less 7 2 2 28
Assembly Problems
Rejection Increases,
More 8 Incorrect Programing,Incorrect Set up of 2 Set up Approval,In Process 2 32
Inner Diameter Assembly Problems Sampling Test
Ø 39.965 / 39.990
61 ▼ Fixture,loose Mounting/Clamping,Faulty Tool Inspection,Operator
Every lot
Rework Increases, Travel , Tool Wear Monitoring,SPC
Less 7 2 2 28
Assembly Problems
9 of 13
Doc. No. PDC-EPD-F03
PROCESS FAILURE MODE AND EFFECTS ANALYSIS Rev. No. (Date) 00 (01/01/2014)
PFMEA Number D10414420A-FMEA-MCD-01 Key Contact / Phone Name / Works / Dept Team Member Department
Rev. No. (Date) 00(03/10/2015) Mr. Vibhor V. Jain CEO
Mr. Vibhor V. Jain CEO
Date (Originated) 10/3/2015 Mr. Himanshu Duniwal PC
Part Number D10414410A Mr. R S Shekhawat Manager - EPD
Process Responsibility: Core Team
Part Name / Description Flywheel EURO 4550 DC Mr. Dhannjay Rai Manager - M/C Shop
Material Grade FG 260 Key Date : 3-Oct-15 Mr. Dharm Singh Manager - CMM
Rejection Increases,
Less 6 2 4 48
Assembly Problems Incorrect Programing,Incorrect Set up of
Tap Depth Set up Approval, Sampling Test
66 Fixture,loose Mounting/Clamping,Faulty Tool Travel
25.0 In-Process Inspection Every lot
Rework Increases, , Tool Wear
More 5 2 4 40
Assembly Problems
Rejection Increases,
Less 6 2 4 48
Assembly Problems Incorrect Programing,Incorrect Set up of
Drill Depth Set up Approval, Sampling Test
67 Fixture,loose Mounting/Clamping,Faulty Tool Travel
28.0 In-Process Inspection Every lot
Rework Increases, , Tool Wear
More 5 2 4 40
Assembly Problems
10 of 13
Hindustan Malleable Casting Works POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS (PROCESS FMEA)
EICHER TRACTORS (A Unit of Tafe Motors and
Part Name FLY WHEEL CASING Customer PFMEA No. HMCW/TMTL-01 Rev. No. 0
Tractors Limited)
Part No. 9701 063 1 Key Dates Date 22/05/08 Date 22/05/08
RES. &
S. COMPONENT POTENTIAL FAILURE RECOM. ACTION
RPN
RPN
S C FAILURE EFFECTS FAILURE CAUSES O FAILURE PREVENTION FAILURE DETECTION D TARGET S O D
No. OR PROCESS FUNCTION MODES ACTION TAKEN
DATE
Visual Inspection of
Heat Codes Missing 6 Casting Rework & Punching Operator Negligence 4 Sampling Inspection 4 96
Patterns
CE
High 7 Lost in Properties Operator's Negligence 4 100 % Monitoring Sampling Test 4 112
Pouring
Temperature
Low 7 Lost in Properties Operator's Negligence 4 100 % Monitoring Sampling Test 4 112
Low
7 Casting Rejection Improper Composition 4 Inprocess Inspection Sampling Test 4 112
Hardness
Hardness
Test
High
7 Casting Rejection Improper Composition 4 Inprocess Inspection Sampling Test 4 112
Hardness
High
7 Casting Rejection Improper Composition 4 Inprocess Inspection 4508325 4 ###
Strength
Tensile
Strength
4508404 7 4507524 4508365 4 Inprocess Inspection 4508325 4 ###
O = Failure occurrence probability D = Failure detection probability Risk Priority Number RPN = S x O x D
To be filled if RPN>150 11 of 13
Hindustan Malleable Casting Works POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS (PROCESS FMEA)
EICHER TRACTORS (A Unit of Tafe Motors and
Part Name FLY WHEEL CASING Customer PFMEA No. HMCW/TMTL-01 Rev. No. 0
Tractors Limited)
Part No. 9701 063 1 Key Dates Date 22/05/08 Date 22/05/08
RES. &
S. COMPONENT POTENTIAL FAILURE RECOM. ACTION
RPN
RPN
S C FAILURE EFFECTS FAILURE CAUSES O FAILURE PREVENTION FAILURE DETECTION D TARGET S O D
No. OR PROCESS FUNCTION MODES ACTION TAKEN
DATE
To be filled if RPN>150
I = Date of Implementation C = Classification S = Severity
12 of 13
Hindustan Malleable Casting Works POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS (PROCESS FMEA)
EICHER TRACTORS (A Unit of Tafe Motors and
Part Name FLY WHEEL CASING Customer PFMEA No. HMCW/TMTL-01 Rev. No. 0
Tractors Limited)
Part No. 9701 063 1 Key Dates Date 22/05/08 Date 22/05/08
RES. &
S. COMPONENT POTENTIAL FAILURE RECOM. ACTION
RPN
RPN
S C FAILURE EFFECTS FAILURE CAUSES O FAILURE PREVENTION FAILURE DETECTION D TARGET S O D
No. OR PROCESS FUNCTION MODES ACTION TAKEN
DATE
Excessive 7 Pitting over Surface More Blasting Time 4 Inprocess Inspection Visual Inspection 4 112
Poor 7 Loose Sand Less Blasting Time 4 Inprocess Inspection Visual Inspection 4 112
Poor 5 Increases Rework Improper Processing 5 Inprocess Inspection Visual Inspection 4 100
Dim. Oversize /
7 Increase Rework Improper Processing 3 Inprocess Inspection Sampling PDI 4 84
Inspection Undersize
Final
8
Inspection
Visual Casting
7 Casting Rejection Improper Processing 3 Inprocess Inspection Sampling PDI 4 84
Inspection Defects
O = Failure occurrence probability D = Failure detection probability Risk Priority Number RPN = S x O x D
To be filled if RPN>150
I = Date of Implementation C = Classification S = Severity
13 of 13