Ford EMC lab is having an issue with the part 8A8T-19G461-AA that Harada
produced.
Ford EMC lab complained that they had to use high transmitted power to pass
the reception test. EMC did replace the base antenna on the vehicle and the
problem went away.
Not determined
Quality Productivity
Standard: x Downtime Duration: x 1- Identified 2- Implemented
Deviation: x Scrap Quantity: x
Eng Chg: x Scrap Cost: x 4- Closed 3- Feedback
Defect: 1 Safety Impact: x
Containment: Breakpoint Who Date Status
Picked up the part at Ford. Part Number: 8A8T-19G461-AA. Manufacturing Date:
04/14/2007. SN: 00071 N/A Julia Fan 10/21/2009 Done
Harada RF Lab did preliminary testing, and found AM transistor shorted. Please see the Ervin
third tab. N/A Larashi 10/23/2009 Done
Mike
Sent damaged transistor to vendor for detail analysis N/A Merrick 10/30/2009 Done
Received Sanyo "Returned Product Analysis Report". The report will be attached to the Mike
email. N/A Merrick 11/30/2009 Done
Man Machine
PROBLEM
AM transistor was
shorted due to
EMC test overload overload
Physical handling damaged Defect transistor from supplier
Method Material
Test each ( ) (?) ( crossed out)
direct
cause
and Direct Cause of the Problem Possible Direct Cause Not a cause of the problem
decide
PAGE 1 OF 2
Report Number:
Problem Solving Report
Root Cause Analysis: In the first WHY write down the Direct Causes from the front.
(If more than one possible or direct cause is found, use additional sheets)
WHY? EMC lab complained that they had to use high transmitted power to pass the reception test
WHY? AM Gain lower than spec.
WHY? AM transistor shorted
WHY? Internal damage to the tramsistor
WHY? An overvoltage applied to the transistor
Root Cause: An overvoltage applied to the transistor
Transfer to Champion: (if necessary)
Harada US Harada China
Mike Merrick RF Assistant Manager
Lessons Learned: Could the communication of this problem and its fixes
possibly prevent other departments from incurring the same problem? If yes, 1 1- Identified2 2- Implemented
which area?
Verification & Resolution Questions: Y N
4
N/A Problem Escalation:
4- Closed
3 3- Feedback
What level is the problem
Has this reoccurred? X currently being supported?
Have the Process Sheets been updated? X Author
Has the DFMEA/PFMEA been updated? X Line Supervisor
Has the Control Plan/Process Flow been updated? X Manager
VP
CEO
Have other forms been updated? X
PAGE 2 OF 2
Two Warranty Parts 8A8T-19G461-AA Testing Results
AM FM
Shorted Q3
7/15/2008 814 -23 -18 -22 46 (AM Amp) 6.4 5.5 5.8 Good
AA Testing Results
SDARS
Current
Draw(mA) Detail Analysis
SDARS Gain (Spec. 34+/-2.5dB) (Spec. 55- Result
160mA)
2.320GHz 2.32625GHz 2.3325GHz
Shorted Q1
0.7 -1.3 -2.4 130.0 (SDARS LNA)
Shorted Q1
2.2 1.9 1.3 138.0 (SDARS LNA)