You are on page 1of 94

SIBILITY ACTI

POTENTIAL POTENTIAL RECOMM


Proc.No PROCESS POTENTIAL SE CLAS OC & ON
S NO. REQUIREMENT EFFECT OF CAUSE OF CURRENT PREVENTION CONTROL DET RPN ENDED SEV
. FUNCTION FAILURE MODE V S C TARGET TAKE
FAILURE FAILURE ACTION
COMP. N
DATE

Slight transport proble m Incoming


Quantity as per Quantity not as Incoming Inspection
1 inconvinience to 2 from 2 Inspection 7 28
Invoice per invoice Report
process supplier/customer Standard

A Portion of parts Incoming


Incoming Inspection
A-00 Incoming No Water mark Water Mark have to be 5 PH High / Low 6 Inspection 5
Report
reworked offline Standard

Incoming
Lot have to be Incoming Inspection
2 No Paint peel Off Paint peel off 6 PH High / Low 2 Inspection 5
reworked offline Report
Standard

Portion of parts to
Improper
be Incoming
processing/transpo Incoming Inspection
1 No Rust Rust Cleaning/Rework 3 7 Inspection 7 147
rt proble mfrom Report
instationand send Standard
supplier/customer
for processing

Portion of parts to
Improper
be Incoming
processing/transpo Incoming Inspection
2 No Dust Dust Cleaning/Rework 3 5 Inspection 7
rt proble mfrom Report
instationand send Standard
supplier/customer
for processing

Portion of parts to
Improper
be Incoming
processing/transpo Incoming Inspection
3 No Dirt Dirt Cleaning/Rework 3 2 Inspection 7
rt proble mfrom Report
instationand send Standard
supplier/customer
for processing

Partion of parts to Improper


Incoming
be Scrap and sent processing/transpo Incoming Inspection
4 No Dent & damage Dent & damage 7 2 Inspection 7
back to rt proble mfrom Report
Standard
Supplier/Customer supplier/customer

Portion of parts to
Improper
be Incoming
processing/transpo Incoming Inspection
5 No Excess Oil Excess Oil Cleaning/Rework 3 2 Inspection 7
rt proble mfrom Report
instationand send Standard
supplier/customer
for processing

Incoming
A-10
Inspection
Partion of parts to Improper
Incoming
Incoming be Scrap and sent processing/transpo Incoming Inspection
A-10 6 No Pitted Pitted 7 2 Inspection 7
Inspection back to rt proble mfrom Report
Standard
Supplier/Customer supplier/customer

Portion of parts to
Improper
be Incoming
processing/transpo Incoming Inspection
7 No Burr Burr Cleaning/Rework 3 2 Inspection 7
rt proble mfrom Report
instationand send Standard
supplier/customer
for processing

Portion of parts to
Improper
be Incoming
processing/transpo Incoming Inspection
8 No Buffing Marks Buffing Marks Cleaning/Rework 3 2 Inspection 7
rt proble mfrom Report
instationand send Standard
supplier/customer
for processing

Portion of parts to
Improper
be Incoming
processing/transpo Incoming Inspection
9 No Grease Grease Cleaning/Rework 3 2 Inspection 7
rt proble mfrom Report
instationand send Standard
supplier/customer
for processing

Portion of parts to
Improper
be Incoming
processing/transpo Incoming Inspection
10 No Fint or Cotton Fint or Cotton Cleaning/Rework 3 2 Inspection 7
rt proble mfrom Report
instationand send Standard
supplier/customer
for processing

Portion of parts to
Improper
be Incoming
processing/transpo Incoming Inspection
11 No Carbon Carbon Cleaning/Rework 3 8 Inspection 7 168
rt proble mfrom Report
instationand send Standard
supplier/customer
for processing

A Portion of part
Buffing not done Operation Inprocess Visual
1 No Rust Rust have to be 3 7 7
as per standard Standard Inspection
reworked Instation

A Portion of part
Buffing not done Operation Inprocess Visual
2 No Dust Dust have to be 3 7 7
as per standard Standard Inspection
reworked Instation

Buffing on
A-11
Parts

A Portion of part
Buffing not done Operation Inprocess Visual
3 No Spatter Spatter have to be 3 2 7
as per standard Standard Inspection
reworked Instation
A Portion of part
No Blackness on Blackness on Buffing not done Operation Inprocess Visual
4 have to be 3 2 7
surface surface as per standard Standard Inspection
reworked Instation

As per operation
Portion of part
Masking No Paint on Paint on masking Masking standard Inspection at
A-12 1 have to be 5 8
Fitment Masking Area area Loose/damage Unlading and unlaoding and final
reworked offline
final

Hanger
Preventive Inspection report for
Damage of maintenance and hanger and
4 8
Hangering Points inspection at unloading
unloading and inspection report
final

Hanger
Preventive Inspection report for
Excess paint on maintenance and hanger and
4 8
Contact Points inspection at unloading
unloading and inspection report
final
Portion of parts to
1 No Dull Finish Dull Finish 5
be Rework offline
Hanger
loose contact in- Preventive Inspection report for
between hanger maintenance and hanger and
4 8
contact point and inspection at unloading
part unloading and inspection report
final

Hanger
Preventive Inspection report for
Quantity not as per
maintenance and hanger and
the specified 4 8
inspection at unloading
hanger design
unloading and inspection report
final

Hanger
Preventive Inspection report for
Damage of maintenance and hanger and
5 8
Hangering Points inspection at unloading
unloading and inspection report
final

Hanger
Preventive Inspection report for
Excess paint on maintenance and hanger and
5 8
Contact Points inspection at unloading
unloading and inspection report
final
Entire lot to be
2 DFT high 6
reworked
Hanger
Preventive Inspection report for
maintenance and hanger and
Cleaning 5 8
inspection at unloading
unloading and inspection report
final
Hanger
Preventive Inspection report for
Quantity not as per
maintenance and hanger and
the specified 5 8
inspection at unloading
hanger design
unloading and inspection report
final
DFT as per specks
Hanger
Preventive Inspection report for
Damage of maintenance and hanger and
6 8
Hangering Points inspection at unloading
unloading and inspection report
final

Hanger
Preventive Inspection report for
Excess paint on maintenance and hanger and
6 8
Contact Points inspection at unloading
unloading and inspection report
final
Entire lot to be
3 DFT Low 6
reworked
Hanger
loose contact in- Preventive Inspection report for
between hanger maintenance and hanger and
6 8
contact point and inspection at unloading
part unloading and inspection report
final

Hanger
Preventive Inspection report for
Quantity not as per
maintenance and hanger and
the specified 6 8
inspection at unloading
hanger design
unloading and inspection report
final

Hanger
Preventive Inspection report for
Damage of maintenance and hanger and
6 8
Hangering Points inspection at unloading
unloading and inspection report
final

Hanger
Preventive Inspection report for
Excess paint on maintenance and hanger and
6 8
Contact Points inspection at unloading
unloading and inspection report
final
Portion of parts to
4 No Chemical Flow Chemical Flow 5
be Rework offline
Hanger
loose contact in- Preventive Inspection report for
between hanger maintenance and hanger and
6 8
contact point and inspection at unloading
part unloading and inspection report
final

Hanger
Preventive Inspection report for
Quantity not as per
maintenance and hanger and
the specified 6 8
inspection at unloading
hanger design
unloading and inspection report
final
A-20 Loading
A-20 Loading
Hanger
Preventive Inspection report for
Damage of maintenance and hanger and
6 8
Hangering Points inspection at unloading
unloading and inspection report
final

Hanger
Preventive Inspection report for
Excess paint on maintenance and hanger and
6 8
Contact Points inspection at unloading
unloading and inspection report
final
Portion of parts to
5 No Water mark Water Mark 5
be Rework offline
Hanger
loose contact in- Preventive Inspection report for
between hanger maintenance and hanger and
6 8
contact point and inspection at unloading
part unloading and inspection report
final

Hanger
Preventive Inspection report for
Quantity not as per
maintenance and hanger and
the specified 6 8
inspection at unloading
hanger design
unloading and inspection report
final

Hanger
Preventive Inspection report for
Damage of maintenance and hanger and
4 8
Hangering Points inspection at unloading
unloading and inspection report
final

Hanger
Preventive Inspection report for
Excess paint on maintenance and hanger and
4 8
Contact Points inspection at unloading
unloading and inspection report
final
Portion of parts to
6 No Scratch Scratch 7
be scraped
Hanger
loose contact in- Preventive Inspection report for
between hanger maintenance and hanger and
4 8
contact point and inspection at unloading
part unloading and inspection report
final

Hanger
Preventive Inspection report for
Quantity not as per
maintenance and hanger and
the specified 4 8
inspection at unloading
hanger design
unloading and inspection report
final

Hanger
Preventive Inspection report for
Damage of maintenance and hanger and
6 8
Hangering Points inspection at unloading
unloading and inspection report
final
Hanger
Preventive Inspection report for
Excess paint on maintenance and hanger and
6 8
Contact Points inspection at unloading
unloading and inspection report
final
Portion of parts to
7 No Touching Touching 5
be Rework offline
Hanger
loose contact in- Preventive Inspection report for
between hanger maintenance and hanger and
6 8
contact point and inspection at unloading
part unloading and inspection report
final

Hanger
Preventive Inspection report for
Quantity not as per
maintenance and hanger and
the specified 6 8
inspection at unloading
hanger design
unloading and inspection report
final

Hanger
Preventive Inspection report for
Damage of maintenance and hanger and
6 8
Hangering Points inspection at unloading
unloading and inspection report
final

Hanger
Preventive Inspection report for
Excess paint on maintenance and hanger and
6 8
Contact Points inspection at unloading
unloading and inspection report
final
Portion of parts to
8 No Air Pocket Air Pocket 5
be Rework offline
Hanger
loose contact in- Preventive Inspection report for
between hanger maintenance and hanger and
6 8
contact point and inspection at unloading
part unloading and inspection report
final

Hanger
Preventive Inspection report for
Quantity not as per
maintenance and hanger and
the specified 6 8
inspection at unloading
hanger design
unloading and inspection report
final
Inprocess
As per Operation
Temp. - Low/High 7 Inspection & Poka 5
standard
Yoke alarm

As per Operation Inprocess


PH High / Low 7 5
standard Inspection

Portion of parts to
1 No Dust Dust 5
be Rework offline

Circulation
As per Operation Inprocess
Pressure- 7 5
standard Inspection
High/Low

Inprocess
As per Operation
Dip time-High/Low 7 Inspection & PLC 1
standard
Control

Hot Water
A-30
Rinse

Inprocess
As per Operation
Temp. - Low/High 7 Inspection & Poka 5
standard
Yoke alarm

As per Operation Inprocess


PH High / Low 7 5
standard Inspection

Portion of parts to
2 No Blister Blister 5
be Rework offline

Circulation
As per Operation Inprocess
Pressure- 7 5
standard Inspection
High/Low

Inprocess
As per Operation
Dip time-High/Low 7 Inspection & PLC 1
standard
Control

Total Alkanity not As per Operation Inprocess


9 5
as defined Standard Inspection
Inprocess
As per Operation
Temp Hig/Low 9 Inspection and 5
Standard
Poka yoke Alarm

A Portion of part Circulation Inlet


As per Operation Inprocess
1 No Pin Hole Pin Hole have to be 5 Pressure not as 9 5
Standard Inspection
reworked offline defined

Inprocess
Dip time not as As per Operation
9 Inspection & PLC 1
defined Standard
Contorlled

As per Operation
Oil Content High 9 External Lab Test 9
Standard

Knock of
A-40 Degreasing
(KOD)

Total Alkanity not As per Operation Inprocess


1 5
as defined Standard Inspection

Inprocess
As per Operation
Temp Hig/Low 1 Inspection and 5
Standard
Poka yoke Alarm

Circulation Inlet
Lot have to be As per Operation Inprocess
1 No SST Failure SST Failure 6 Pressure not as 1 5
reworked offline Standard Inspection
defined

Inprocess
Dip time not as As per Operation
1 Inspection & PLC 1
defined Standard
Contorlled

As per Operation
Oil Content High 1 External Lab Test 9
Standard
Total Alkanity not As per Operation Inprocess
9 5
as defined Standard Inspection

Inprocess
As per Operation
Temp Hig/Low 9 Inspection and 5
Standard
Poka yoke Alarm

A Portion of part Circulation Inlet


As per Operation Inprocess
1 No Pin Hole Pin Hole have to be 5 Pressure not as 9 5
Standard Inspection
reworked offline defined

Inprocess
Dip time not as As per Operation
9 Inspection & PLC 1
defined Standard
Contorlled

As per Operation
Oil Content High 9 External Lab Test 9
Standard

A-50 Degreasing

Total Alkanity not As per Operation Inprocess


1 5
as defined Standard Inspection

Inprocess
As per Operation
Temp Hig/Low 1 Inspection and 5
Standard
Poka yoke Alarm

Circulation Inlet
Lot have to be As per Operation Inprocess
1 No SST Failure SST Failure 6 Pressure not as 1 5
reworked offline Standard Inspection
defined

Inprocess
Dip time not as As per Operation
1 Inspection & PLC 1
defined Standard
Contorlled
As per Operation
Oil Content High 1 External Lab Test 9
Standard

As per Operation Inprocess


PH High / Low 9 5
Standard Inspection

Total Alkali not as As per Operation Inprocess


9 5
per speck Standard Inspection

A Portion of part
As per Operation Inprocess
1 No Pin Hole Pin Hole have to be 5 Conductivity High 9 5
Standard Inspection
reworked offline

Poor Spray As per Operation Inprocess


9 5
Pressure Standard Inspection

Inprocess
Inspection & PLC
Spray time not as As per Operation
9 Conrolled 1
defined Standard
(Interlinked with dip
time)

As per Operation Inprocess


PH High / Low 1 5
Standard Inspection

Total Alkali not as As per Operation Inprocess


1 5
per speck Standard Inspection

Water- Rinse Lot have to be As per Operation Inprocess


A-60 2 SST as per Req SST Fail 6 Conductivity High 1 5
-1 reworked offline Standard Inspection
Poor Spray As per Operation Inprocess
1 5
Pressure Standard Inspection

Inprocess
Inspection & PLC
Spray time not as As per Operation
1 Conrolled 1
defined Standard
(Interlinked with dip
time)

As per Operation Inprocess


PH High / Low 7 5
Standard Inspection

Total Alkali not as As per Operation Inprocess


7 5
per speck Standard Inspection

A Portion of part
As per Operation Inprocess
3 No Paint Flow Paint Flow have to be 5 Conductivity High 7 5
Standard Inspection
reworked offline

Poor Spray As per Operation Inprocess


7 5
Pressure Standard Inspection

Inprocess
Inspection & PLC
Spray time not as As per Operation
7 Conrolled 1
defined Standard
(Interlinked with dip
time)

As per Operation Inprocess


PH High / Low 9 5
Standard Inspection

Total Alkali not as As per Operation Inprocess


9 5
per speck Standard Inspection
As per Operation Inprocess
Conductivity High 9 5
Standard Inspection

A Portion of part
1 No Pin Hole Pin Hole have to be 5
reworked offline
Circulation
As per Operation Inprocess
Pressure not as 9 5
Standard Inspection
defined

Water Flow rate As per Operation Inprocess


9 5
low Standard Inspection

Inprocess
Dip Time not as As per Operation
9 Inspection & PCL 1
deifined Standard
Controlled

As per Operation Inprocess


PH High / Low 1 5
Standard Inspection

Total Alkali not as As per Operation Inprocess


1 5
per speck Standard Inspection

As per Operation Inprocess


Conductivity High 1 5
Standard Inspection

Water- Rinse Lot have to be


A-70 1 No SST Failure SST failure 6
-2 reworked offline

Circulation
As per Operation Inprocess
Pressure not as 1 5
Standard Inspection
defined

Water Flow rate As per Operation Inprocess


1 5
low Standard Inspection
Inprocess
Dip Time not as As per Operation
1 Inspection & PCL 1
deifined Standard
Controlled

As per Operation Inprocess


PH High / Low 7 5
Standard Inspection

Total Alkali not as As per Operation Inprocess


7 5
per speck Standard Inspection

As per Operation Inprocess


Conductivity High 7 5
Standard Inspection

A Portion of part
1 No Paint Flow Paint Flow have to be
reworked offline
Circulation
As per Operation Inprocess
Pressure not as 7 5
Standard Inspection
defined

Water Flow rate As per Operation Inprocess


7 5
low Standard Inspection

Inprocess
Dip Time not as As per Operation
7 Inspection & PCL 1
deifined Standard
Controlled

Total Alkalli not as As per Operation Inprocess


1 5
defined Standard Inspection

As per Operation Inprocess


Ph Nor as defined 1 5
Standard Inspection

Lot have to be
1 No SST Failure SST Failure
reworked offline
1 No SST Failure SST Failure
reworked offline

Curculation
As per Operation Inprocess
Pressre not as 1 5
Standard Inspection
defined

Inprocess
Dip Time not as As per Operation
1 Inspection & PLC 1
defined Standard
Controlled
Surface
A-80 Conditioner
(Activation)

Total Alkalli not as As per Operation Inprocess


2 5
defined Standard Inspection

As per Operation Inprocess


Ph Nor as defined 2 5
Standard Inspection

Lot have to be
1 No Paint Peeloff Paint Peel Off 6
reworked offline

Curculation
As per Operation Inprocess
Pressre not as 2 5
Standard Inspection
defined

Inprocess
Dip Time not as As per Operation
2 Inspection & PLC 1
defined Standard
Controlled

Total Acidity not as As per Operation Inprocess


6 5
defined Standard Inspection

Oxidation Value As per Operation Inprocess


6 5
not as deifned Standard Inspection

Free Acifity Not as As per Operation Inprocess


6 5
defined Standard Inspection
Inprocess
As per Operation
Temp High/Low 6 Inspection & Poka 5
Standard
Yoke Alarm

Circulcation
As per Operation Inprocess
Pressre not as 6 5
Standard Inspection
defined

Inprocess
DFT as per Lot have to be As per Operation
1 DFT Low 6 Dip Time High/Low 6 Inspection & PLC 1
Specks reworked offline Standard
Contorlled

Coating Weight As per Operation Inprocess


6 5
High/Low Standard Inspection

As per Operation
SEM High 6 3rd party test 9
Standard

Auto Dosing of Inprocess


As per Operation
Bonderite M AD 6 Inspection & PLC 1
Standard
131 not as defined Control

Auto Dosing of Inprocess


As per Operation
Bonderite2030 E 6 Inspection & PLC 1
Standard
not as deinfed Control

Sludge Content As per Operation


6 3rd party 9
high Standard

Total Acidity not as As per Operation Inprocess


2 5
defined Standard Inspection
Oxidation Value As per Operation Inprocess
2 5
not as deifned Standard Inspection

Free Acifity Not as As per Operation Inprocess


2 5
defined Standard Inspection

Inprocess
As per Operation
Temp High/Low 2 Inspection & Poka 5
Standard
Yoke Alarm

Circulcation
As per Operation Inprocess
Pressre not as 2 5
Standard Inspection
defined

Inprocess
Lot have to be As per Operation
1 No Paint Peel off Paint Peel Off 6 Dip Time High/Low 2 Inspection & PLC 1
reworked offline Standard
Contorlled

Coating Weight As per Operation Inprocess


2 5
High/Low Standard Inspection

As per Operation
SEM High 2 3rd party test 9
Standard

Auto Dosing of Inprocess


As per Operation
Bonderite M AD 2 Inspection & PLC 1
Standard
131 not as defined Control

Auto Dosing of Inprocess


As per Operation
Bonderite2030 E 2 Inspection & PLC 1
Standard
not as deinfed Control
Sludge Content As per Operation
2 3rd party 9
high Standard

A-90 Phosphating

Total Acidity not as As per Operation Inprocess


6 5
defined Standard Inspection

Oxidation Value As per Operation Inprocess


6 5
not as deifned Standard Inspection

Free Acifity Not as As per Operation Inprocess


6 5
defined Standard Inspection

Inprocess
As per Operation
Temp High/Low 6 Inspection & Poka 5
Standard
Yoke Alarm

Circulcation
As per Operation Inprocess
Pressre not as 6 5
Standard Inspection
defined

A Portion of part Inprocess


As per Operation
1 No Chemical Flow Chemical Flow have to be 5 Dip Time High/Low 6 Inspection & PLC 1
Standard
reworked offline Contorlled

Coating Weight As per Operation Inprocess


6 5
High/Low Standard Inspection

As per Operation
SEM High 6 3rd party test 9
Standard
Auto Dosing of Inprocess
As per Operation
Bonderite M AD 6 Inspection & PLC 1
Standard
131 not as defined Control

Auto Dosing of Inprocess


As per Operation
Bonderite2030 E 6 Inspection & PLC 1
Standard
not as deinfed Control

Sludge Content As per Operation


6 3rd party 9
high Standard

Total Acidity not as As per Operation Inprocess


1 5
defined Standard Inspection

Oxidation Value As per Operation Inprocess


1 5
not as deifned Standard Inspection

Free Acifity Not as As per Operation Inprocess


1 5
defined Standard Inspection

Inprocess
As per Operation
Temp High/Low 1 Inspection & Poka 5
Standard
Yoke Alarm

Circulcation
As per Operation Inprocess
Pressre not as 1 5
Standard Inspection
defined

Inprocess
Lot have to be As per Operation
1 No SSt failure SST failure 6 Dip Time High/Low 1 Inspection & PLC 1
reworked offline Standard
Contorlled
Coating Weight As per Operation Inprocess
1 5
High/Low Standard Inspection

As per Operation
SEM High 1 3rd party test 9
Standard

Auto Dosing of Inprocess


As per Operation
Bonderite M AD 1 Inspection & PLC 1
Standard
131 not as defined Control

Auto Dosing of Inprocess


As per Operation
Bonderite2030 E 1 Inspection & PLC 1
Standard
not as deinfed Control

Sludge Content As per Operation


1 3rd party 9
high Standard

As per Operation Inprocess


Total Acidity High 1 5
Standard Inspection

Lot have to be Poor Spray As per Operation Inprocess


1 No SST failure SST Failure 6 1 5
reworked offline Pressure Standard Inspection

Inprocess
Spray time not as As per Operation Inspection & PLC
1 1
defined Standard Contorl ( Interlinked
with dip time)

As per Operation Inprocess


Total Acidity High 5 5
Standard Inspection
DI Water Portion of Parts to Poor Spray As per Operation Inprocess
A-100 2 No Blister Bilster 5 5 5
Rinse - I be reworked offline Pressure Standard Inspection

Inprocess
Spray time not as As per Operation Inspection & PLC
5 1
defined Standard Contorl ( Interlinked
with dip time)

As per Operation Inprocess


Total Acidity High 6 5
Standard Inspection

A Portion of part
Poor Spray As per Operation Inprocess
2 No Chemical Flow Chemical Flow have to be 5 6 5
Pressure Standard Inspection
reworked offline

Inprocess
Spray time not as As per Operation Inspection & PLC
6 1
defined Standard Contorl ( Interlinked
with dip time)

As per Operation Inprocess


Conductivity High 6 5
Standard Inspection

As per Operation Inprocess


PH High / Low 6 5
Standard Inspection

A Portion of part
1 No Chemical Flow Chemical Flow have to be 5
reworked offline
Circulation
As per Operation Inprocess
Pressure- 6 5
Standard Inspection
High/Low

Inprocess
As per Operation
Dip time-High/Low 6 Inspection & PLC 1
Standard
Contorlled

DI Water
A-110
Rinse - II
A-110
Rinse - II

As per Operation Inprocess


Conductivity High 5 5
Standard Inspection

As per Operation Inprocess


PH High / Low 5 5
Standard Inspection

Portion of Parts
2 No Blister Blister have to be 5
reworked offline
Circulation
As per Operation Inprocess
Pressure- 5 5
Standard Inspection
High/Low

Inprocess
As per Operation
Dip time-High/Low 5 Inspection & PLC 1
Standard
Contorlled

As per Operation Inprocess


Conductivity High 1 5
Standard Inspection

As per Operation Inprocess


PH High / Low 1 5
Standard Inspection

Circulation
As per Operation Inprocess
Pressure- 1 5
Standard Inspection
High/Low

Lot have to be
1 No SST failure SST failure 5
reworked offline

Inprocess
As per Operation
Dip time-High/Low 1 Inspection & PLC 1
Standard
Contorlled

Continuous water As per Operation Inprocess


1 5
Flow low Standard Inspection
Exit spray
As per Operation Inprocess
pressure not as 1 5
Standard Inspection
defined

As per Operation Inprocess


Conductivity High 2 5
Standard Inspection

As per Operation Inprocess


PH High / Low 2 5
Standard Inspection

Circulation
As per Operation Inprocess
Pressure- 2 5
Standard Inspection
High/Low

DI Water Lot have to be


A-120 1 No Paint peel Off Paint Peeloff 6
Rinse-III reworked offline

Inprocess
As per Operation
Dip time-High/Low 2 Inspection & PLC 1
Standard
Contorlled

Continuous water As per Operation Inprocess


2 5
Flow low Standard Inspection

Exit spray
As per Operation Inprocess
pressure not as 2 5
Standard Inspection
defined

As per Operation Inprocess


Conductivity High 5 5
Standard Inspection

As per Operation Inprocess


PH High / Low 5 5
Standard Inspection
Circulation
As per Operation Inprocess
Pressure- 5 5
Standard Inspection
High/Low
A Portion of part
1 No Blister Blister have to be 5
reworked offline
Inprocess
As per Operation
Dip time-High/Low 5 Inspection & PLC 1
Standard
Contorlled

Continuous water As per Operation Inprocess


5 5
Flow low Standard Inspection

Exit spray
As per Operation Inprocess
pressure not as 5 5
Standard Inspection
defined

Inprocess
As per Operation
Dip Time Hig/Low 5 Inspection & PLC 1
Standard
Contorlled

Inprocess
Voltage not as As per Operation
5 Inspection & PLC 1
defined Standard
Controlled

Inprocess
Anolyte
As per Operation Inspection & Poka
Conductivity nor 5 1
Standard Yoke auto add DI
as defined
water

Anolyte Flow not As per Operation Inprocess


5 5
as defined Standard Inspection

Permeate As per Operation Inprocess


5 5
Generation low Standard Inspection
Paint Circulation As per Operation Inprocess
5 7
with stagnation Standard Inspection

DFT as per Lot have to be Paint conducitivity As per Operation Inprocess


1 DFT High 6 5 5
Specks reworked offline not as defined Standard Inspection

Pressure As per Operation Inprocess


5 5
difference high Standard Inspection

As per Operation Inprocess


Backteria found 5 7
Standard Inspection

Ionic
As per Operation
Contamination 5 3rd Party 9
Standard
high

P/B Ratio not as As per Operation


5 3rd Party 9
defined Standard

As per Operation
Solvent high 5 3rd Party 9
Standard

Exit spray
As per Operation Inprocess
pressure not as 5 5
Standard Inspection
defined

Inprocess
As per Operation
Dip Time Hig/Low 6 Inspection & PLC 1
Standard
Contorlled
Inprocess
Voltage not as As per Operation
6 Inspection & PLC 1
defined Standard
Controlled

Inprocess
Anolyte
As per Operation Inspection & Poka
Conductivity nor 6 1
Standard Yoke auto add DI
as defined
water

Anolyte Flow not As per Operation Inprocess


6 5
as defined Standard Inspection

Permeate As per Operation Inprocess


6 5
Generation low Standard Inspection

Paint Circulation As per Operation Inprocess


6 7
with stagnation Standard Inspection

DFT as per Lot have to be Paint conducitivity As per Operation Inprocess


1 DFT Low 6 6 5
Specks reworked offline not as defined Standard Inspection

Pressure As per Operation Inprocess


6 5
difference high Standard Inspection

As per Operation Inprocess


Backteria found 5 7
Standard Inspection

Ionic
As per Operation
Contamination 6 3rd Party 9
Standard
high
P/B Ratio not as As per Operation
6 3rd Party 9
defined Standard

As per Operation
Solvent high 6 3rd Party 9
Standard

Exit spray
As per Operation Inprocess
pressure not as 6 5
Standard Inspection
defined

Inprocess
As per Operation
Dip Time Hig/Low 4 Inspection & PLC 1
Standard
Contorlled

Inprocess
Voltage not as As per Operation
4 Inspection & PLC 1
defined Standard
Controlled

Inprocess
Anolyte
As per Operation Inspection & Poka
Conductivity nor 4 1
Standard Yoke auto add DI
as defined
water

Anolyte Flow not As per Operation Inprocess


4 5
as defined Standard Inspection

Permeate As per Operation Inprocess


4 5
Generation low Standard Inspection

Paint Circulation As per Operation Inprocess


4 7
with stagnation Standard Inspection
A Portion of part
Paint conducitivity As per Operation Inprocess
1 No Dull Finish Dull Finish have to be 5 4 5
not as defined Standard Inspection
reworked offline

Pressure As per Operation Inprocess


4 5
difference high Standard Inspection

As per Operation Inprocess


Backteria found 5 7
Standard Inspection

Ionic
As per Operation
Contamination 4 3rd Party 9
Standard
high

P/B Ratio not as As per Operation


4 3rd Party 9
defined Standard

As per Operation
Solvent high 4 3rd Party 9
Standard

Exit spray
As per Operation Inprocess
pressure not as 4 5
Standard Inspection
defined

Inprocess
As per Operation
Dip Time Hig/Low 9 Inspection & PLC 1
Standard
Contorlled

Inprocess
Voltage not as As per Operation
9 Inspection & PLC 1
defined Standard
Controlled
Inprocess
Anolyte
As per Operation Inspection & Poka
Conductivity nor 9 1
Standard Yoke auto add DI
as defined
water

Anolyte Flow not As per Operation Inprocess


9 5
as defined Standard Inspection

Permeate As per Operation Inprocess


9 5
Generation low Standard Inspection

Paint Circulation As per Operation Inprocess


9 7
with stagnation Standard Inspection

Cathod
A Portion of part
Electro Paint conducitivity As per Operation Inprocess
A-130 1 No Pin Hole Pin Hole have to be 5 9 5
Deposition not as defined Standard Inspection
reworked offline
(CED)

Pressure As per Operation Inprocess


9 5
difference high Standard Inspection

As per Operation Inprocess


Backteria found 5 7
Standard Inspection

Ionic
As per Operation
Contamination 9 3rd Party 9
Standard
high

P/B Ratio not as As per Operation


9 3rd Party 9
defined Standard
As per Operation
Solvent high 9 3rd Party 9
Standard

Exit spray
As per Operation Inprocess
pressure not as 9 5
Standard Inspection
defined

Inprocess
As per Operation
Dip Time Hig/Low 7 Inspection & PLC 1
Standard
Contorlled

Inprocess
Voltage not as As per Operation
7 Inspection & PLC 1
defined Standard
Controlled

Inprocess
Anolyte
As per Operation Inspection & Poka
Conductivity nor 7 1
Standard Yoke auto add DI
as defined
water

Anolyte Flow not As per Operation Inprocess


7 5
as defined Standard Inspection

Permeate As per Operation Inprocess


7 5
Generation low Standard Inspection

Paint Circulation As per Operation Inprocess


7 7
with stagnation Standard Inspection

A Portion of part
Paint conducitivity As per Operation Inprocess
1 No Paint Flow Paint Flow have to be 5 7 5
not as defined Standard Inspection
reworked offline
Pressure As per Operation Inprocess
7 5
difference high Standard Inspection

As per Operation Inprocess


Backteria found 5 7
Standard Inspection

Ionic
As per Operation
Contamination 7 3rd Party 9
Standard
high

P/B Ratio not as As per Operation


7 3rd Party 9
defined Standard

As per Operation
Solvent high 7 3rd Party 9
Standard

Exit spray
As per Operation Inprocess
pressure not as 7 5
Standard Inspection
defined

Inprocess
As per Operation
Dip Time Hig/Low 1 Inspection & PLC 1
Standard
Contorlled

Inprocess
Voltage not as As per Operation
1 Inspection & PLC 1
defined Standard
Controlled

Inprocess
Anolyte
As per Operation Inspection & Poka
Conductivity nor 1 1
Standard Yoke auto add DI
as defined
water
Anolyte Flow not As per Operation Inprocess
1 5
as defined Standard Inspection

Permeate As per Operation Inprocess


1 5
Generation low Standard Inspection

Paint Circulation As per Operation Inprocess


1 7
with stagnation Standard Inspection

Lot have to be Paint conducitivity As per Operation Inprocess


1 No SST Failure SST failure 6 1 5
reworked offline not as defined Standard Inspection

Pressure As per Operation Inprocess


1 5
difference high Standard Inspection

As per Operation Inprocess


Backteria found 5 7
Standard Inspection

Ionic
As per Operation
Contamination 1 3rd Party 9
Standard
high

P/B Ratio not as As per Operation


1 3rd Party 9
defined Standard

As per Operation
Solvent high 1 3rd Party 9
Standard
Exit spray
As per Operation Inprocess
pressure not as 1 5
Standard Inspection
defined

Inprocess
As per Operation
Dip Time Hig/Low 2 Inspection & PLC 1
Standard
Contorlled

Inprocess
Voltage not as As per Operation
2 Inspection & PLC 1
defined Standard
Controlled

Inprocess
Anolyte
As per Operation Inspection & Poka
Conductivity nor 2 1
Standard Yoke auto add DI
as defined
water

Anolyte Flow not As per Operation Inprocess


2 5
as defined Standard Inspection

Permeate As per Operation Inprocess


2 5
Generation low Standard Inspection

Paint Circulation As per Operation Inprocess


2 7
with stagnation Standard Inspection

Lot have to be Paint conducitivity As per Operation Inprocess


1 No Paint Peel Off Paint Peel Off 6 2 5
reworked offline not as defined Standard Inspection

Pressure As per Operation Inprocess


2 5
difference high Standard Inspection
As per Operation Inprocess
Backteria found 5 7
Standard Inspection

Ionic
As per Operation
Contamination 2 3rd Party 9
Standard
high

P/B Ratio not as As per Operation


2 3rd Party 9
defined Standard

As per Operation
Solvent high 2 3rd Party 9
Standard

Exit spray
As per Operation Inprocess
pressure not as 2 5
Standard Inspection
defined

As per Operation Inprocess


PH not as required 7 5
Standard Inspection

As per Operation Inprocess


Non Volatility High 7 5
Standard Inspection

Conductivity not as As per Operation Inprocess


7 5
defined Standard Inspection

A Portion of Parts
1 No Paint Flow Paint Flow to be reworked 5
offline
Circulation
As per Operation Inprocess
Pressure not as 7 5
Standard Inspection
defined
Inprocess
Dip Time not as As per Operation
7 Inspection & PLC 1
defined Standard
Ccntorlled

Exit Pressure not As per Operation Inprocess


7 5
as defined Standard Inspection

A-140 Ultra Filter- I

As per Operation Inprocess


PH not as required 5 5
Standard Inspection

As per Operation Inprocess


Non Volatility High 5 5
Standard Inspection

Conductivity not as As per Operation Inprocess


5 5
defined Standard Inspection

A Portion of part
2 No Blister Blister have to be 5
reworked offline
Circulation
As per Operation Inprocess
Pressure not as 5 5
Standard Inspection
defined

Inprocess
Dip Time not as As per Operation
5 Inspection & PLC 1
defined Standard
Ccntorlled

Exit Pressure not As per Operation Inprocess


5 5
as defined Standard Inspection

As per Operation Inprocess


PH not as required 7 5
Standard Inspection
As per Operation Inprocess
Non Volatility High 7 5
Standard Inspection

Conductivity not as As per Operation Inprocess


7 5
defined Standard Inspection

A Portion of parts
1 No Paint Flow Paint Flow have to be 5
reworked offline
Circulation
As per Operation Inprocess
Pressure not as 7 5
Standard Inspection
defined

Inprocess
Dip Time not as As per Operation
7 Inspection & PLC 1
defined Standard
Ccntorlled

Exit Pressure not As per Operation Inprocess


7 5
as defined Standard Inspection

A-150 Ultra Filter- 2

As per Operation Inprocess


PH not as required 5 5
Standard Inspection

As per Operation Inprocess


Non Volatility High 5 5
Standard Inspection

Conductivity not as As per Operation Inprocess


5 5
defined Standard Inspection

2 No Blister Blister 5

Circulation
As per Operation Inprocess
Pressure not as 5 5
Standard Inspection
defined
Inprocess
Dip Time not as As per Operation
5 Inspection & PLC 1
defined Standard
Ccntorlled

Exit Pressure not As per Operation Inprocess


5 5
as defined Standard Inspection

As per Operation Inprocess


PH not as required 7 5
Standard Inspection

As per Operation Inprocess


Non Volatility High 7 5
Standard Inspection

Conductivity not as As per Operation Inprocess


7 5
defined Standard Inspection

A Portion of parts
1 No Paint Flow Paint Flow have to be 5
reworked offline
Circulation
As per Operation Inprocess
Pressure not as 7 5
Standard Inspection
defined

Inprocess
Dip Time not as As per Operation
7 Inspection & PLC 1
defined Standard
Ccntorlled

Exit Pressure not As per Operation Inprocess


7 5
as defined Standard Inspection

A-160 Ultra Filter-3

As per Operation Inprocess


PH not as required 5 5
Standard Inspection
As per Operation Inprocess
Non Volatility High 5 5
Standard Inspection

Conductivity not as As per Operation Inprocess


5 5
defined Standard Inspection

A Portion of part
2 No Blister Blister have to be 5
reworked offline
Circulation
As per Operation Inprocess
Pressure not as 5 5
Standard Inspection
defined

Inprocess
Dip Time not as As per Operation
5 Inspection & PLC 1
defined Standard
Ccntorlled

Exit Pressure not As per Operation Inprocess


5 5
as defined Standard Inspection

As per Operation Inprocess


Conductivity High 1 5
Standard Inspection

As per Operation Inprocess


PH High / Low 1 5
Standard Inspection

Circulation
Lot have to be As per Operation Inprocess
1 No SST failure SST failure 6 Pressure- 1 5
reworked offline Standard Inspection
High/Low

Inprocess
As per Operation
Dip time-High/Low 1 Inspection & PLC 1
Standard
Controlled
Exit spray
As per Operation Inprocess
pressure not as 1 5
Standard Inspection
defined

As per Operation Inprocess


Conductivity High 7 5
Standard Inspection

As per Operation Inprocess


PH High / Low 7 5
Standard Inspection

A Portion of parts Circulation


DI Water As per Operation Inprocess
Lot 2 No Paint Flow Paint Flow have to be 5 Pressure- 7 5
Rinse-IV Standard Inspection
reworked offline High/Low

Inprocess
As per Operation
Dip time-High/Low 7 Inspection & PLC 1
Standard
Controlled

Exit spray
As per Operation Inprocess
pressure not as 7 5
Standard Inspection
defined

As per Operation Inprocess


Conductivity High 5 5
Standard Inspection

As per Operation Inprocess


PH High / Low 5 5
Standard Inspection

A Portion of part Circulation


As per Operation Inprocess
3 No Blister Blister have to be 5 Pressure- 5 5
Standard Inspection
reworked offline High/Low
Inprocess
As per Operation
Dip time-High/Low 5 Inspection & PLC 1
Standard
Controlled

Exit spray
As per Operation Inprocess
pressure not as 5 5
Standard Inspection
defined

A Portion of parts
Air not blown on As per Operation Inspection at
1 No Water Mark Water Mark have to be 5 6 8 240
part properly Standard unloading and final
reworked offline

Air Blow
A-180
station

A Portion of parts
Air not blown on As per Operation Inspection at
2 No Paint Flow Paint Flow have to be 5 7 8
part properly Standard unloading and final
reworked offline

Inprocess
Ovan Temp As per Operation
4 Inspection & Poka 5
High/Low Standard
Yoke Alarm

Inprocess
Baking Time As per Operation
4 Inspection & PCL 1
High/Low Standard
contorller

Inprocess
A Portion of part Heat Exchager
As per Operation Inspection & PLC
1 No Dull finish Dull Finish have to be 5 Temperature not 4 2
Standard Contorlled and stop
reworked offline as defined
line

EMT not as As per Operation Inhouse 3 monthly


4 9
defined Standard plan

Inprocess
Flight bar out time As per Operation
4 Inspection & PLC 1
not as defined Standard
Contorlled
Inprocess
Ovan Temp As per Operation
2 Inspection & Poka 5
High/Low Standard
Yoke Alarm

Inprocess
Naking Time As per Operation
2 Inspection & PCL 1
High/Low Standard
contorller

Inprocess
Heat Exchager
Lot have to be As per Operation Inspection & PLC
1 No Paint peel off Paint Peel Off 6 Temperature not 2 2
reworked offline Standard Contorlled and stop
as defined
line

EMT not as As per Operation Inhouse 3 monthly


2 9
defined Standard plan

Inprocess
Flight bar out time As per Operation
2 Inspection & PLC 1
not as defined Standard
Contorlled

Inprocess
Ovan Temp As per Operation
1 Inspection & Poka 5
High/Low Standard
Yoke Alarm

Inprocess
Naking Time As per Operation
1 Inspection & PCL 1
High/Low Standard
contorller

Inprocess
Heat Exchager
Lot have to be As per Operation Inspection & PLC
1 No SST Failure SST failure 6 Temperature not 1 2
reworked offline Standard Contorlled and stop
as defined
line

EMT not as As per Operation Inhouse 3 monthly


1 9
defined Standard plan
Inprocess
Flight bar out time As per Operation
1 Inspection & PLC 1
not as defined Standard
Contorlled

A-190 Baking

Inprocess
Ovan Temp As per Operation
6 Inspection & Poka 5
High/Low Standard
Yoke Alarm

Inprocess
Naking Time As per Operation
6 Inspection & PCL 1
High/Low Standard
contorller

Inprocess
Heat Exchager
DFT as per Lot have to be As per Operation Inspection & PLC
1 DFT Low 6 Temperature not 6 2
Specks reworked offline Standard Contorlled and stop
as defined
line

EMT not as As per Operation Inhouse 3 monthly


6 9
defined Standard plan

Inprocess
Flight bar out time As per Operation
6 Inspection & PLC 1
not as defined Standard
Contorlled

Inprocess
Ovan Temp As per Operation
5 Inspection & Poka 5
High/Low Standard
Yoke Alarm

Inprocess
Naking Time As per Operation
5 Inspection & PCL 1
High/Low Standard
contorller

Inprocess
A Portion of part Heat Exchager
As per Operation Inspection & PLC
1 No Blister Blister have to be 5 Temperature not 5 2
Standard Contorlled and stop
reworked offline as defined
line
EMT not as As per Operation Inhouse 3 monthly
5 9
defined Standard plan

Inprocess
Flight bar out time As per Operation
5 Inspection & PLC 1
not as defined Standard
Contorlled

Inprocess
Ovan Temp As per Operation
7 Inspection & Poka 5
High/Low Standard
Yoke Alarm

Inprocess
Naking Time As per Operation
7 Inspection & PCL 1
High/Low Standard
contorller

Inprocess
A Portion of part Heat Exchager
As per Operation Inspection & PLC
1 No Dust Dust have to be 5 Temperature not 7 2
Standard Contorlled and stop
reworked offline as defined
line

EMT not as As per Operation Inhouse 3 monthly


7 9
defined Standard plan

Inprocess
Flight bar out time As per Operation
7 Inspection & PLC 1
not as defined Standard
Contorlled

A Portion of part
Final Inspection
No Blister Blister have to be 5 Oliy Part Loaded 5 Visual 8 200
Standard
reworked offline

A Portion of part
Air Blowing not Final Inspection
No Pin Holes Pin Holes have to be 5 9 Visual 8 360
Proper Standard
reworked offline
A Portion of part
Final Inspection
No Dust Dust have to be 5 Oliy Part Loaded 7 Visual 8 280
Standard
reworked offline

A Portion of part Air Blowing not


Final Inspection
No Touchmark Touchmark have to be 5 Proper / part 6 Visual 8 240
Standard
reworked offline hanginf not proper

A Portion of part
Air Blowing not Final Inspection
No Dull Finish Dull Finish have to be 5 4 Visual 8 160
Proper Standard
reworked offline

A Portion of part
Not Proper Final Inspection
No Chemical Flow Chemical Flow have to be 5 6 Visual 8 240
Handling Standard
reworked offline

A Portion of part
Final Inspection
No paint flow paint flow have to be 5 Rusty Part Loaded 7 Visual 8 280
Standard
reworked offline

A Portion of part
Final Inspection
A- 200 Unloading No Water Mark Water Mark have to be 5 6 Visual 8 240
Standard
reworked offline

A Portion of part
Final Inspection
No Unpainted Unpainted have to be 5 6 Visual 8 240
Standard
reworked offline

A Portion of parts
Final Inspection
No Scratch Scratch have to be 7 4 Visual 8 224
Standard
scrapped

A Portion of parts
No Dent & Final Inspection
Dent & Damage have to be 7 6 Visual 8 336
Damage Standard
scrapped
A Portion of part
Final Inspection
No Air Pocket Air Pocket have to be 5 6 Visual 8 240
Standard
reworked offline

Lot have to be Final Inspection


No Paint Peel off Paint Peel off 6 2 Visual 8 96
reworked offline Standard

Lot have to be Final Inspection Final Inspection


DFT High 6 5 6 180
reworked offline Standard Report

DFT As per
Specks

Lot have to be Final Inspection Final Inspection


DFT Low 6 6 6 216
reworked offline Standard Report

A Portion of part
Final Inspection
1 No Blister Blister have to be 5 Oliy Part Loaded 5 Visual 8 200
Standard
reworked offline

A Portion of part
Air Blowing not Final Inspection
2 No Pin Holes Pin Holes have to be 5 9 Visual 8 360
Proper Standard
reworked offline

A Portion of part
Final Inspection
3 No Dust Dust have to be 5 Oliy Part Loaded 7 Visual 8 280
Standard
reworked offline

A Portion of part Air Blowing not


Final Inspection
4 No Touchmark Touchmark have to be 5 Proper / part 6 Visual 8 240
Standard
reworked offline hanginf not proper

A Portion of part
Air Blowing not Final Inspection
5 No Dull Finish Dull Finish have to be 5 4 Visual 8 160
Proper Standard
reworked offline
A Portion of part
Not Proper Final Inspection
6 No Chemical Flow Chemical Flow have to be 5 6 Visual 8 240
Handling Standard
reworked offline

A Portion of part
Final Inspection
7 No paint flow paint flow have to be 5 Rusty Part Loaded 7 Visual 8 280
Standard
reworked offline

A Portion of part Improper


Final Inspection
8 No Water Mark Water Mark have to be 5 Processing at CED 6 Visual 8 240
Standard
reworked offline Process

A Portion of part Improper


Final Inspection
9 No Unpainted Unpainted have to be 5 Processing at CED 6 Visual 8 240
Standard
reworked offline Process

A Portion of parts Improper


Final Final Inspection
A-220 10 No Scratch Scratch have to be 7 Processing at CED 4 Visual 8 224
Inspection Standard
scrapped Process

A Portion of parts Improper


No Dent & Final Inspection
11 Dent & Damage have to be 7 Processing at CED 6 Visual 8 336
Damage Standard
scrapped Process

A Portion of part Improper


Final Inspection
12 No Air Pocket Air Pocket have to be 5 Processing at CED 6 Visual 8 240
Standard
reworked offline Process

Improper
Lot have to be Final Inspection
13 No Paint Peel off Paint Peel off 6 Processing at CED 2 Visual 8 96
reworked offline Standard
Process

Improper
Lot have to be Final Inspection Final Inspection
14 DFT High 6 Processing at CED 5 6 180
reworked offline Standard Report
Process

DFT As per
Specks
Specks

Improper
Lot have to be Final Inspection Final Inspection
15 DFT Low 6 Processing at CED 6 6 216
reworked offline Standard Report
Process

Improper
Lot have to be Final Inspection Final Inspection
16 No Adhesion fail Adhesion fail 6 Processing at CED 7
reworked offline Standard Report
Process

No Pencil Improper
Pencil Hardness Lot have to be Final Inspection Final Inspection
17 Hardness Test 6 Processing at CED 7
Test Fail reworked offline Standard Report
Fail Process

Improper
No Rubbing Test Lot have to be Final Inspection Final Inspection
18 Rubbing Test Fail 6 Processing at CED 7
Fail reworked offline Standard Report
Process

Improper
Lot have to be Final Inspection
19 No SST Fail SST life less 6 Processing at CED 1 3rd Part Test 9
reworked offline Standard
Process

A Portion of parts
Packing not as per Packing
A-230 Packing 1 No Scratch Scratches have to be 7 4 Visual 7
standard Standard
scrapped

Partion of part
1 No Mixing Mixing 7 Less Awareness 2 As per Standard Visual 7 98
reject

A-240 Dispatch

QTY as per
QTY not to be By work
2 invoice Less/ Min Inconvinience 2 Less Awareness 2 Visual 7 28
Less/ More Instruction
More

Sr. No. Symbol Description Rev No Rev Details Rev Dt PREPARED BY Approved By

1 * Poka Yoke 1 Cust prob(sludge on bolt ) in A(200) process added 5.2.19 Shubham Pankaj Patil
27.03.201
2 Critical characteristics 2 FILTER CLEANING POINT ADDED IN BAKING OPERATION Shubham Pankaj Patil
9
18.04.201
3 DURING INCOMING CARBON DEFECT NOT CHECK Shubham Pankaj Patil
9
10.05.201
4 DURING INCOMING WATER PH CHECK Shubham Pankaj Patil
9
15.05.201
5 COHERNECE DONE AS PER PLAN Shubham Pankaj Patil
9
6 CONTACT POINT OF HANGER IN OP A-20 24.5.2018 Shubham Pankaj Patil

7 HANGER FIXING POINT ADDED IN OP A-20 1.6.2019 Shubham Pankaj Patil

8 Hanger maintenance point added in OP-A20 for dust problem. 22.6.2019 Shubham Pankaj Patil

9 Hanger Selection point added in OP-A20 for pin holes problem. 1.7.2019 Shubham Pankaj Patil

10 Air blowing paint flow defect point added in OP-180 29.7.2019 Shubham Pankaj Patil

11 DIESAL CLEANING FOR PAINT PEEL OFF PROBLEM ADDED IN OP. A-20 5.8.2019 Shubham BIPIN TIWARI

12 FMEA REVIEW & Less Contact point Point added in OP-A20 25.9.2019 Shubham Pankaj Patil
OCC DET RPN
d By

atil

atil
atil

atil

atil

atil

atil

atil

atil

atil

WARI

atil

You might also like