This document summarizes the grouting work for a soil nailing project to repair bridge foundations. It includes details of 20 grouting points such as location, date, depth, theoretical and actual grout volumes, percentage overbreak, number of grout bags, and amount of water. The grout volumes generally exceeded the theoretical volumes, with overbreaks ranging from 7.6% to 789.5%. The total number of cement bags used was 198.
This document summarizes the grouting work for a soil nailing project to repair bridge foundations. It includes details of 20 grouting points such as location, date, depth, theoretical and actual grout volumes, percentage overbreak, number of grout bags, and amount of water. The grout volumes generally exceeded the theoretical volumes, with overbreaks ranging from 7.6% to 789.5%. The total number of cement bags used was 198.
This document summarizes the grouting work for a soil nailing project to repair bridge foundations. It includes details of 20 grouting points such as location, date, depth, theoretical and actual grout volumes, percentage overbreak, number of grout bags, and amount of water. The grout volumes generally exceeded the theoretical volumes, with overbreaks ranging from 7.6% to 789.5%. The total number of cement bags used was 198.