You are on page 1of 3

Proof of Compliance to Permit Conditions

Name of Proponent: Manila Water Philippine Ventures, Inc.


Address: Alviera, Porac, Pampanga
Title: Alviera Estate Sewage Treatment Plant

Permit Conditions Complied? Remarks/Proof


Yes No
1. The permit holder
shall discharge through
a Drainage Canal
leading to Porac River
for a period of one
(1) year with effluent
wastewater flow not
exceeding 400
cu.m/day and in
conformity with the
DENR
Administrative Order
No. 2016-08 (Water
Quality Guidelines and
General Effluent Complied -See attached lab
Standards): result
Ammonia, NH3-N 0.5
mg/L
Surfactants (MBAS) 15
mg/L
BOD 50 mg/L
Oil and Grease 5 mg/L
Nitrate, NO3-N 14 mg/L
Fecal Coliform 400
MPN/100mL
Phosphate 1 mg/L

2. The permit holder


shall submit quarterly
Self-Monitoring Report
to this Bureau in
accordance with
DENR Administrative
Complied
Order No. 27 (Series of
2003). The deadline of
the submission shall be
fifteen
(15) days after the end
of each quarter.
3. The permit holder Complied
shall allow the entry of
authorized personnel of
this Office to conduct
inspection and
other related activity
for compliance
monitoring of the
subject establishment
or facility.
4. The permit holder Complied -Electromagnetic
shall install any flowmeter is installed
applicable flow meter to monitor daily
for effluent flow flowrate
measurement.
5. The permit holder
shall implement regular
dosing of disinfectant
for SARS-Cov-2 Virus -Disinfection through
prior to
Complied chlorination is used
discharge of its
effluent, likewise
amount of chemicals
used shall be reported
in the submitted
quarterly
Self Monitoring Report.
6. The permit holder
shall ensure that as per
submitted plans and
specification of the
Wastewater
Treatment Facility with
Complied
capacity of 400
cu.m/day shall be
properly installed and
operational with the
following components:
One (1) Unit Roto
Strainer, One (1) Unit
Equalization Tank, One
(1) Unit
Selector Tank, Two (2)
Units Aspiral Reactor,
One (1) Unit Sludge
Tank, One (1) Unit
Clarifier, and One
(1) Unit Effluent Tank.
7. An application for Complied
renewal of this permit
shall be filed not less
than thirty (30) days
before the expiry
date as indicated in this
permit.
8. This permit shall be
properly posted in a
conspicuous location at Complied
the premises, and shall
be adequately
framed or otherwise
protected against
damage

You might also like