The document outlines the requirements and timeline for obtaining various permits from the DENR including a permit to operate, hazardous waste generator ID, and discharge permit. Most requirements are marked as "OK" or needing templates or plans to be submitted by June 13th. The last item on getting a DENR ID number as a hazardous waste generator and submitting the latest effluent water quality results are also listed as needed.
The document outlines the requirements and timeline for obtaining various permits from the DENR including a permit to operate, hazardous waste generator ID, and discharge permit. Most requirements are marked as "OK" or needing templates or plans to be submitted by June 13th. The last item on getting a DENR ID number as a hazardous waste generator and submitting the latest effluent water quality results are also listed as needed.
The document outlines the requirements and timeline for obtaining various permits from the DENR including a permit to operate, hazardous waste generator ID, and discharge permit. Most requirements are marked as "OK" or needing templates or plans to be submitted by June 13th. The last item on getting a DENR ID number as a hazardous waste generator and submitting the latest effluent water quality results are also listed as needed.
Engineer's Report WILL BE PROVIDED BY WMP (OK) JUN 12
Picture / Brochure instead of Drawing Requirement DATA SHEET FOR GENERATOR SET (OK) JUN 13 For Private Sector, copy of DTI Registration Certificate, SEC Registration Certificate and Cooperative Registration Certificate. For SEC REGISTRATION (OK) JUN 12 Government Offices/GOCCs, Certification that it is a Government owned Property Environmental Management Plan Alredy emailed by Engr. Rhea JUN 13
HAZARDOUS WASTE GENERATOR ID REMARKS
Official Letter of Request DONE
Duly notarized affidavit attesting to the truth, accuracy, and genuineness of all information, documents and records contained DONE and attached in the application Description of existing waste management plan SEEKING TEMPALTE FOR DRAFTING JUN 13 Pollution Control Officer (PCO) Accreditation Certificate DONE Contingency and Emergency Plan SEEKING TEMPALTE FOR DRAFTING JUN 13 ONGOING CONSTRUCTION (FOR SUBMISSION Photographs of the hazardous waste storage area OF PLANS WITH PERSPECTIVE AND ACTUAL JUN 13 ACCOMPLISHMENT PHOTOS
DISCHARGE PERMIT REMARKS
Water billing statement for the whole year* NOT APPLICABLE
Waste Water Line Layout (Duly signed and sealed by a registered NOT APPLICABLE sanitary or chemical engineer)* Vicinity Map of the Plant (Duly signed and sealed by a registered FOR SUBMISSION OF SIR ERNIE JUN 13 sanitary or chemical engineer)*
Plan and Elevation Layout of Waste Water Treatment Facility with
specifications (Duly signed and sealed by a registered sanitary or FOR SUBMISSION OF SIR ERNIE JUN 13 chemical engineer)*
FOR INSTALLATION (FOR SUBMISSION OF
Photo of Installed effluent flow measuring device FLOWMETER DATA SHEET, AND INSTALLATION JUN 14 PLAN) Official Receipt for Application Fee UPON PAYMENT TBA Notarized Application* FOR SIGNATURE OF PPWRLC PRESIDENT JUN 13 Engineer's Report* ALREADY SUBMITTED BY WMP ECC or CNC* DONE DENR ID number as hazardous waste generator FOR SUBMISSION OF APPLICATION NUMBER Other Documents latest results of water quality of effluent Official Receipt for Wastewater Discharge Fee UPON PAYMENT